14
1 MOBY DICK Mobility and Differentiated Services in a Future IP Network (Keyaction IV.5.2 Terrestrial Wireless Systems and Networks) Hans Joachim Einsiedler T-Nova Deutsche Telekom Innovationsgesellschaft mbH, Berkom Goslarer Ufer 35, D-10589 Berlin, Germany [email protected] Telephone: +49-30-3497 3518 Fax: +49-30-3497 3519

Project Consortium

  • Upload
    pascha

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

Mobility and Differentiated Services in a Future IP Network (Keyaction IV.5.2 Terrestrial Wireless Systems and Networks) - PowerPoint PPT Presentation

Citation preview

Page 1: Project  Consortium

1

MOBY DICKMobility and Differentiated Services in a Future IP Network

(Keyaction IV.5.2 Terrestrial Wireless Systems and Networks)

Hans Joachim Einsiedler

T-Nova Deutsche Telekom Innovationsgesellschaft mbH, Berkom

Goslarer Ufer 35, D-10589 Berlin, [email protected]

Telephone: +49-30-3497 3518Fax: +49-30-3497 3519

Page 2: Project  Consortium

2

MOBY DICK

Project Consortium Telecom Companies:

– T-Nova, Berkom (Germany), Co-ordination– Portugal Telecom (Portugal)

Manufactures:– Centre de Recherche de Motorola (France)– NEC (United Kingdom/Germany)– Alcatel SEL (Germany)

Research institute/University– Eidgenössische Technische Hochschule Zürich (Switzerland)– GMD Fokus (Germany)– University Madrid (Spain)– University Stuttgart (Germany) (RUS + IND)– University Cracow (Poland)

Page 3: Project  Consortium

3

MOBY DICK

Objectives of Moby Dick

Development, implementation and test of end-to-end communication components based on the IP next generation (IPv6)

Support of

– seamless vertical and horizontal hand-over mechanisms for and between different networks (e.g. UMTS, WirelessLAN and Ethernet).

– QoS mechanisms based on the Internet Engineering Task Force (IETF) respectively Differentiated Services during times of QoS end-to-end connectivity without interrupts .

– AAA mechanisms based on the Internet Research Task Force (IRTF) for different kind of access networks.

– billing and charging mechanisms for IP QoS connections.

Local and international trials with ERASMUS exchange students (Students between Madrid/Spain and Stuttgart/Germany).

Page 4: Project  Consortium

4

MOBY DICK

Detailed Workpackage Information (WP1)

Workpackage 1: Project Framework (Requirements, Applications and System Integration)

– Definition and selection of end-user applications.

– Definition and selection of:

– QoS requirements in access networks and backbone - e.g. Differentiated Services (Layer3) or Multi Protocol Label Switching (Layer2).

– Mobility requirements for vertical and horizontal hand-over mechanisms.

– AAA and charging architecture for access networks and backbone.

– Integration of the workpackages WP2, WP3 and WP4.

Page 5: Project  Consortium

5

MOBY DICK

Detailed Workpackage Information (WP2, WP3 and WP4)

Implementation workpackages:

– Workpackage 2: Quality of Service Design, implementation and local testing.

– Workpackage 3: Mobility Design, implementation and local testing.

– Workpackage 4: Authentication, Authorisation, Accounting and Charging Design, implementation and local testing. Implementation will be based on an Open Source Platform.

Page 6: Project  Consortium

6

MOBY DICK

Detailed Workpackage Information (WP5 - WP6)

Workpackage 5: Integration, Validation, Evaluation and Trials

– Co-ordination of the tests

– WP5.1: first and local implementation tests.

– WP5.2: second test with all components in one location.

– Co-ordination of the final long distance trial with ERASMUS-exchange

students (WP5.3).

Workpackage 6: Project Management and External Relations

– Co-ordination of the project.

– Establishing and maintenance of connections and co-operation with other

IST project, EURESCOM project and standardisation bodies.

Page 7: Project  Consortium

7

MOBY DICK

Workpackage Structure and Project Time Period

WP1

WP2 WP3 WP4

WP5.1

WP6

WP5.2

WP5.3

time

0

4

12

16

20

24

26

30

36

28

Page 8: Project  Consortium

8

MOBY DICK

W-CDMA(Intra-RNC)

W-CDMA(Inter-RNC)

W-CDMA to802.11

802.11 (Inter-Domain)

802.11 toEthernet

W-CDMA

W-CDMA

W-CDMA

802.11

802.11

Ethernet

Domain B

Domain C

Domain D

Domain A

Backbone

Network Structure

Adaptation of network resources. Vertical and horizontal hand-over. QoS guarantee. AAA and Charging.

Page 9: Project  Consortium

9

MOBY DICK

Trial Scenario

Madrid/Spainor Stuttgart

UMTS

Ethernet

WirelessLAN

ERASMUS-exchange student

AAA, Policy and Charging Server

Home-server

Backbone

Interface between access network and backbone

Page 10: Project  Consortium

10

MOBY DICK

remote

network

European IP

backbone

National/

company/

university

research

IP network

fixed or radio

access

network

mobile terminal

Servers / Brokers

Detailed Trial Scenario

UMTS

WirelessLAN

Ethernet

hand-over

Page 11: Project  Consortium

11

MOBY DICK

Quality of Service

W-CDMA

W-CDMA

802.11

Ethernet

Domain C

Domain D

Domain A

Backbone

Backbone: Strategies - Differentiated Services, MPLS, re-routing.Access Part: Quality of Service - Multi Protocol Label Switching (MPLS), Differentiated Services, Integrated Services,

Inter-layer signalling, Header compression, Transmission Control Protocol (TCP).

QoS end - to - end - WP 3 Mobility

Page 12: Project  Consortium

12

MOBY DICK

Mobility

W-CDMA

W-CDMA

W-CDMA

802.11

802.11

Ethernet

Domain B

Domain C

Domain D

Domain A

Backbone

Backbone: -Access Part: Mobility Management, IPv6 Interface for Radio Network Controller (RNC), Inter-layer signalling, Resource management.

Page 13: Project  Consortium

13

MOBY DICKBackbone: -Access Part: AAA Local agent (AAAL), AAA Home agent (AAAH)

Charging concept, Authorisation for QoS parameters,Authentication for resource allocation,Charging of resources.

Authorisation-Authentication-Accounting-Charging

AAAH

W-CDMA

W-CDMA

802.11

Ethernet

Domain CDomain D

Domain A

Backbone

DB

AAALDatabase (DB)

AAALDB

Charging; AAA; WP2 - QoS

Res

ourc

e m

anag

emen

t

W

P3

- M

obili

ty

Page 14: Project  Consortium

14

MOBY DICK

Project’s contract preparation phase is not finished yet (middle of November).

Planned start early next year (January 2001 or February 2001).

Participation in standardisation bodies as soon as possible.Participation in IST clusters from the beginning.Close co-operation with other IST projects and

Research and Development projects - world-wide.

Future/First Steps - Conclusion