Project: Date: Terrabella Materials Profile Color Calculations Total Terrabella Shingle Panel (21ea per 100sq.ft.) Squares x 21 = Panels (Plus 10 - 15 % waste) Linear Feet Hip and Ridge / 1.45 = Pieces (Plus waste) Linear Feet Gable / 4 = Pieces (Plus waste) Linear Feet Eave & short course/ 7.9 = Pieces (Plus waste) Linear Feet Step and (Hips x 2) / 7.5 (Plus waste) Linear Feet Step and Head Wall / 4 = Pieces (Plus waste) Terrabella Shake Hip/Ridge/Rake End Cap As needed for closure of hip, ridge, and rake. Linear Feet Valley / 7.5 = Pieces (Plus waste) Linear Feet Valley/7.75 = pieces (Plus waste) As required for special details Includes can of granules and can of adhesive 1 ea per 20 square Squares/20 = Kits For Hips Lineal feet of Hip = lineal feet (Plus Waste) For Ridges Lineal feet of Ridge x 2 = lineal feet (Plus Waste) Approximately 1 per lineal feet of wood Lineal feet of wood x 1 = pieces (Plus Waste) Approximately 110 each per square (Squares of Shake + (Shingle Shake Hip and Ridge /50) x 110 = number of screws (Plus Waste) Approximately 1 tube per 5 squares Squares / 5=number of tubes 20 lf per roll Ridge lineal feet / 20 Caulk/sealant Terrabella Flat Sheet 14"x50" Terrabella Touch Up Kit Terrabella Interlock Valley 8' 2"x2" Wood Battens 1"x2" or 2"x2" Wood Battens Galvanized 16 Penny Nails Terrabella Valley Cap 8' Contractor: Order Sheet Terrabella Shake Rake/gable Trim 50" Terrabella Starter 8' Terrabella Z-Bar Flashing 50" (Step and Head wall) Panel screws Terrabella Shingle/Shake Hip and Ridge(1.45lf per each) Terrabella Channel 8' (Step flashing and both sides of Hips) Ridge vent www.terrabellaroof.com

Project: Contractor: Order Sheet Date · PDF fileTablesaw Terrabella Shingle Panel (21ea per 100sq.ft.) plus 10-15% waste Tools needed Tin Snips Circular Saw ape Measure

  • Upload
    lyque

  • View
    219

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Project: Contractor: Order Sheet Date · PDF fileTablesaw   Terrabella Shingle Panel (21ea per 100sq.ft.) plus 10-15% waste Tools needed Tin Snips Circular Saw ape Measure

Project:

Date:

Terrabella Materials Profile Color Calculations Total

Terrabella Shingle Panel (21ea per 100sq.ft.)

Squares x 21 = Panels (Plus 10 - 15 % waste)

Linear Feet Hip and Ridge / 1.45 = Pieces (Plus

waste)

Linear Feet Gable / 4 = Pieces (Plus waste)

Linear Feet Eave & short course/ 7.9 = Pieces

(Plus waste)

Linear Feet Step and (Hips x 2) / 7.5 (Plus

waste)

Linear Feet Step and Head Wall / 4 = Pieces

(Plus waste)

Terrabella Shake Hip/Ridge/Rake End Cap

As needed for closure of hip, ridge, and rake.

Linear Feet Valley / 7.5 = Pieces (Plus

waste)

Linear Feet Valley/7.75 = pieces (Plus waste)

As required for special details

Includes can of granules and can of adhesive 1 ea per 20 square

Squares/20 = Kits

For Hips

Lineal feet of Hip = lineal feet (Plus Waste)

For Ridges

Lineal feet of Ridge x 2 = lineal feet (Plus Waste)

Approximately 1 per lineal feet of wood

Lineal feet of wood x 1 = pieces (Plus Waste)

Approximately 110 each per square

(Squares of Shake + (Shingle Shake Hip and Ridge /50) x

110 = number of screws (Plus Waste)

Approximately 1 tube per 5 squares

Squares / 5=number of tubes

20 lf per roll

Ridge lineal feet / 20Caulk/sealant

Terrabella Flat Sheet 14"x50"

Terrabella Touch Up Kit

Terrabella Interlock Valley 8'

2"x2" Wood Battens

1"x2" or 2"x2" Wood Battens

Galvanized 16 Penny Nails

Terrabella Valley Cap 8'

Contractor:Order Sheet

Terrabella Shake Rake/gable Trim 50"

Terrabella Starter 8'

Terrabella Z-Bar Flashing 50" (Step and Head wall)

Panel screws

Terrabella Shingle/Shake Hip and Ridge(1.45lf per each)

Terrabella Channel 8' (Step flashing and both sides of Hips)

Ridge vent

www.terrabellaroof.com

Page 2: Project: Contractor: Order Sheet Date · PDF fileTablesaw   Terrabella Shingle Panel (21ea per 100sq.ft.) plus 10-15% waste Tools needed Tin Snips Circular Saw ape Measure

Tablesaw

www.terrabellaroof.com

Terrabella Shingle Panel (21ea per 100sq.ft.) plus 10- 15% waste

www.terrabellaroof.com

Tools neededTin Snips Circular Sawape Measure crew Gun and Bendersammer ablesaw

G. Terrabella Interlock Valley Cap 8'

Accessories

A. Terrabella Shingle/Shake Hip and Ridge(1.45lf per each)

B. Terrabella Shake Rake/gable Trim 50"

C. Terrabella Starter 8' (Short course)

D. Terrabella Channel 8' (Step flashing and both sides of Hips

E. Terrabella Z-Bar Flashing 50" (Step and Head wall)

F. Terrabella Interlock Valley 8'

H. Terrabella Flat Sheet 14"x50"

Terrabella Shake Hip/Ridge/Rake End Cap (To close the ends of hip and ridges)

I. Ridge vent 20 lf. Per roll (Optional)

C

Other Required Items

Follow local building codes Roofing underlayment (one layer required)

High Grade Roofing Sealant

Galvanized Pipe Flashings 2x2's and 1x2's as needed for hips and ridges

Check website for the latest installation instruc