3
Project: Architect Contact Information & Seal: STOA STUDIOS Architect R R S C FL 9 9 @ GA L RA 9 Sheet: Drawing: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Issue: Tenant Improvement © 2017 by Stoa Studios, all rights reserved. All drawings, illustrations, ideas, and other information contained on this sheet are the property of Stoa Studios and may not be reproduced either wholly or in part in any manner without the express written consent of Stoa Studios. Engineer Contact Information & Seal: Governer's Square Mall Suite #1070 Tallahassee, Florida Architect: S T O A Studios T E C T E A R C H I U T U D I S S T O A S O R REVIEW SET JUL EPG ENGINEERING Engineer S B A O FL 9 EPG @ FL L PE 99 FL L PE 99 REVIEW SET JUL PERMIT SET AUG Tenant Improvement AAEQ A A E AB A B ACT A C T A C A C AFF A F F ALUM A BLDG B BLK B B B CEM C COL C CONC C CONT C DF D F DIM D DET D DWG D EA E ELEC E EL E EQ E EVTR E EWC E W C EXH E EXP E FC F C FD F D FIN F FOC F C FOM F M GA G GC G C GYP G HB H B HCM H C M HDWR H HM H C M HORIZ H HTG H HT H ID I D INSUL I INT I JST J LAV L LAM L LH L H LWT L W LL L MECH M MFG M MH M H MISC M MO M O NC N NIC N C NTS N S OA O OC O C OD O D OPNG O PVC P C PL P L RA R A RCP R C P REINF R RH R H RO R O ROW R W SC S C SCHED S SHT S SIM S SPEC S SQ S STL S STRUCT S TEL T THK T THRES T T T TYP T VERT V WSCT W WC W C WWF W W F W W ABBREVIATIONS GENERAL NOTES A A A G C A GC I I GC GC A A A D A ; T A GENERAL CONTRACTOR SUBCONTRACTORS GC GC GC GC T S A GC U GC GC GC GC 9 A L GC C ; L C GC : GC C GC GC L A L D A OSHA GC O A GC GC GC L CONSTRUCTION A A A T T T W A A A C UON T G C GENERAL CONDITIONS SYMBOL LEGEND X X D R CROSS REFERENCE S N D R SECTION ELEVATION S N REVISION R A G R D R F R F E R W R KEYNOTE SYMBOLS ELEVATION TAG R W P ENLARGEMENT D E W T R Governer's Square Mall Suite #1070 Tallahassee, Florida PROJECT LOCATION MAP • SITE PROJECT DIRECTORY OWNER PS I FL I PO B S PR 9 LANDLORD G G P L P P C M 99 ARCHITECT S S R R S C FL 9 9 ENGINEER EPG E S B A O FL 9 STATEMENT OF CODE COMPLIANCE I A F B C FBC A A I A REGULATION SUMMARY JURISDICTION C T G M B P N M S T FL 9 APPLICABLE CODES BUILDING: FBC ELECTRICAL: NEC MECHANICAL: FBC M PLUMBING: FBC P ENERGY: FBC E ACCESSIBILITY: FBC A FIRE: FFPC E BUILDING DATA OCCUPANCY: G M: M CONSTRUCTION: T IIB N F GROSS AREA 99 SALES AREA STOCKROOM 9 RESTROOM OCCUPANT LOAD SALES AREA STOCK RESTROOM ALTERATION LEVEL: L ADJACENT OCCUP: G M: M FIRE SEPARATION: N DRINKING FOUNTAIN: 9 RESTROOMS: T 9 DRAWING INDEX GENERAL IDX PROJECT INDEX ARCHITECTURAL A CODE LIFE SAFETY A LISTED UL DETAILS A SPECS • ARCHITECTURAL • 1 A PLAN • FLOOR & CEILING A PLAN • FIXTURE & FINISH A ELEVATIONS • STOREFRONT A ELEVATIONS • INTERIOR PROJECT DESCRIPTION PROJECT LOCATION MAP • MALL X SCALE: V IDX PROJECT INDEX REVIEW SET RESTROOM/FOUNTAIN LOCATION JUL SPACE 9 FT TO EXISTING PUBLIC RESTROOMS DRINKING FOUNTAIN MALL LOCATION GENERAL T T F S F P I : ARCHITECTURAL I : S T MECHANICAL FIRE PLUMBING ELECTRICAL N REVIEW SET JUL PERMIT SET AUG REVISION SUMMARY REVISION JAN ISSUE DESCRIPTION OF REVISION S SHEET REFERENCE REF R IDX A A

PROJECT DIRECTORY R · 2018-01-09 · [email protected] FL Lic. #PE43599 FL Lic. #PE72998 REVIEW SET 25 JUL 2017 PERMIT SET 14 AUG 2017 Tenant Improvement AAEQArchitect Approved Eq

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT DIRECTORY R · 2018-01-09 · EPGroup@att.net FL Lic. #PE43599 FL Lic. #PE72998 REVIEW SET 25 JUL 2017 PERMIT SET 14 AUG 2017 Tenant Improvement AAEQArchitect Approved Eq

Project:

Architect Contact Information & Seal:

STOA STUDIOSArchitect

52 Riley Rd Ste 374Celebration, FL 34747(407) [email protected] Lic. #RA014339

Sheet:

Drawing:

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Issue:

Ten

ant Im

prov

emen

t

© 2

017

by St

oa St

udio

s, al

l righ

ts re

serv

ed. A

ll dra

win

gs, il

lustr

atio

ns, id

eas,

and

othe

r info

rmat

ion

cont

aine

d on

this

shee

t are

the

prop

erty

of S

toa

Stud

ios a

nd m

ay n

ot b

e re

prod

uced

eith

er w

holly

or in

par

t in

any

man

ner w

ithou

t the

exp

ress

writ

ten

cons

ent o

f Sto

a St

udio

s.

Engineer Contact Information & Seal:

Gov

erne

r's Sq

uare

Mal

l • S

uite

#10

70 •

Tal

laha

ssee

, Flo

rida

Architect:

S T O AStudios

TECT

E

AR

C

HIU

TUD

ISS

TO

AS

O

R

REVIEW SET 21 JUL 2017

EPG ENGINEERINGEngineer

1325 S. Bumby AveOrlando, FL 32806(407) [email protected] Lic. #PE43599FL Lic. #PE72998

REVIEW SET 25 JUL 2017PERMIT SET 14 AUG 2017

Tenant Improvement

AAEQ Architect Approved EqAB Anchor BoltACT Acoustical Ceiling TileA/C Air ConditioningAFF Above Finish FloorALUM AluminumBLDG BuildingBLK Block(ing)B/ Bottom ofCEM CementCOL ColumnCONC ConcreteCONT ContinuousDF Drinking FountainDIM DimensionDET DetailDWG DrawingEA EachELEC Electric(al)EL ElevationEQ EqualEVTR ElevatorEWC Electric Water CoolerEXH ExhaustEXP ExposedFC Fixture ContractorFD Floor DrainFIN FinishFOC Face of ConcreteFOM Face of MasonryGA GaugeGC General ContractorGYP GypsumHB Hose BibbHCM Hollow Core MetalHDWR HardwareHM Hollow Core MetalHORIZ HorizontalHTG HeatingHT HeightID Inside DiameterINSUL InsulationINT InteriorJST JoistLAV LavatoryLAM LaminatedLH Left HandLWT Light WeightLL LandlordMECH MechanicalMFG ManufacturerMH Man HoleMISC MiscellaneousMO Masonry OpeningNC Non-combustibleNIC Not in ContractNTS Not to ScaleOA OverallOC On CenterOD Outside Diameter

OPNG OpeningPVC Polyvinyl ChoridePL Property LineRA Return AirRCP Reinf. Conc. PipeREINF ReinforcedRH Right HandRO Rough OpeningROW Right-of-WaySC Solid CoreSCHED ScheduleSHT SheetSIM SimilarSPEC SpecificationsSQ SquareSTL SteelSTRUCT StructuralTEL TelephoneTHK ThicknessTHRES ThresholdT/ Top ofTYP TypicalVERT VerticalWSCT WainscotWC Water ClosetWWF Welded Wire FabricW/ With

ABBREVIATIONS

GENERAL NOTES

1. Architect does not have control over and will not be responsible for construction means, methods,techniques, sequences, procedures, or for safety precautions and programs in connection withthe work. Architect will not be responsible for failure by contractor or others to carry out the work inaccordance with the contract documents. Architect will not be responsible for or have controlover the acts or omissions of the General Contractor or others.

2. All codes having jurisdiction shall be observed strictly in the construction of the project, includingall applicable state, city, and county building, zoning, electrical, mechanical, plumbing, and firecodes. GC shall verify all code requirements prior to construction. In the event of a conflictbetween the contract documents and the applicable code requirements, code requirementsshall prevail.

3. In the event that errors and/or omissions are discovered in the contract documents, they shall bebrought to the attention of the architect for clarification and/or correction. GC will be heldresponsible for the results of any errors, discrepancies, or omissions which the GC failed to notifythe Architect of before construction and/or fabrication of the work.

4. Architect has designed in accordance with American Disabilities Act; upon occupancy Tenantcompliance with said Act shall include (but to be limited to) design, construction, and/oralterations to the premises.

GENERAL CONTRACTOR / SUBCONTRACTORS

1. GC shall coordinate its work with that of the utility companies and all trades. GC shall provideaccess as required.

2. GC shall locate all existing utility service lines and protect them throughout construction.3. GC shall layout work and be responsible for all lines, elevations, measurement of the building,

utilities, and other work executed under the contract.4. Time is of the essence and subcontractors shall keep sufficient personnel on the job at all times to

perform all work in the most expeditious manner consistent with good workmanship and businesspractice.

5. Subcontractor shall examine existing utility conditions, stub-ins, and/or access to utilities and verifywith information on these drawings. Any discrepancies shall be brought to the attention of GC.

6. Upon completion of the work, GC shall have all surfaces professionally cleaned and made readyto use. GC shall remove all construction rubbish, scaffolding, equipment, temporary protection,temporary field structures, and anything else that was required in connection with theconstruction but not a permanent part thereof.

7. GC shall be responsible for removal of debris for all trades, and for keeping the job site clean.8. GC shall leave the construction dumpster on site after substantial completion to allow retail

operations to dispose of merchandising trash during initial stocking of the store.9. All work shall be performed as to cause a minimum of interference with any other tenants and the

operation of the Landlord's entire premises. GC shall take all precautionary steps to protect thefacilities on the premises and the facilities of others affected by performance of the work.

10. Construction equipment and materials are to be located in confined areas; truck traffic to berouted in and from the site as directed by Landlord. Cost of work shall include overtimenecessitated by these requirements.

11. GC shall arrange, pay for, and maintain any needed temporary facilities at the premisesincluding: electrical service, trash removal, protection, enclosure barricade, use of elevators, airconditioning, and heating at the premises for the duration of the work.

12. GC shall keep a complete set of the drawings, including approved shop drawings, at the job sitefor the duration of the work. Copies or originals of all permits and approvals shall also be kept at atthe job site for the duration of the work.

13. GC shall possess a complete set of the most current construction documents, and provide copiesto all subcontractors.

14. GC shall review with the Landlord's representative the manner in which all connections to thestructure will be made. Any penetrations in the building envelope or structure shall be reviewedwith the Landlord and approved in writing.

15. During performance of work, subcontractors are responsible for provision and maintenance ofwarning signs, light signal devices, guard lights, barricades, guard rails, fences, and other devicesas appropriately located on and around the job site which will give proper and understandablewarning to all persons with regard to hazardous conditions, equipment, and operations beingperformed in conjunction with the subcontractor's work. All warning devices shall comply withO.S.H.A. and other applicable governmental regulations as required for the constructionprocedures and conditions encountered.

16. GC shall carry all necessary insurance as required by law and hold harmless the Owner and/orArchitect from any loss, liability, claim or demand for damages arising out of or relating to theperformance of the work as described by these drawings.

17. GC shall guarantee all work specified and/or described by these drawings free from any defectsor malfunctions for one year from the substantial completion date or from the time of occupancy,whichever comes first. GC is responsible for all work executed by subcontractors.

18. GC shall coordinate fire protection work with Landlord's preferred subcontractor.

CONSTRUCTION

1. All cutting, drilling, or removals required shall upon completion be repaired, patched, and finishedon all surfaces to new condition by subcontractors.

2. All floor cuts/penetrations shall be termite treated by a licensed exterminator.3. All reused material & equipment must be refurbished to 'like-new' condition.4. The Tenant shall not permit the installation or use of any hazardous substances in any component

of the premises during its tenancy.5. There shall be no substitution of materials where a manufacturer is specified. Where the term 'or

approved equal' is used, the Architect alone shall determine suitability.6. All work shall be erected and installed plumb, level, square, true, and in proper alignment.7. Applicable standards of the construction industry have the same force and effect on

performance of work as if incorporated directly into these construction document. Complianceshall be with the standards in effect as of the date of these construction documents U.O.N.

8. These General Conditions shall apply to all work and all drawings in this set, and shall extend toany changes, extras, or additions agreed to during the course of the work.

GENERAL CONDITIONS

SYMBOL LEGEND

#X-###

#X-###

#

Drawing Reference

CROSS REFERENCE

Sheet Number

Drawing Reference

SECTION/ELEVATION

Sheet Number

REVISION

Revision Area

General Reference

Door Reference

Finish Reference

Furn/Equip Reference

Window Reference

KEYNOTE SYMBOLS

ELEVATION TAG

#'-#" ReferenceWorking Point

ENLARGEMENT

Drawing

Enlargement

Wall Type Reference

Governer's Square Mall • Suite #1070 • Tallahassee, Florida

PROJECT LOCATION MAP • SITE

PROJECT DIRECTORY

OWNER

PS Imports FL, Inc.P.O. Box 8115Santurce, PR 00910(787) 420-8200

LANDLORD

General Growth Properties10300 Little Patuxent ParkwayColumbia, Maryland 21044(410) 992-6045

ARCHITECT

Stoa Studios52 Riley Rd Ste 374Celebration, FL 34747(407) 749-0789

ENGINEER

EPG Engineering1325 S. Bumby AveOrlando, FL 32806(407) 896-7411

STATEMENT OF CODE COMPLIANCE

It is the intent of Architect to comply fully with the 2014 Florida Building Code(FBC) to the best of Architect's interpretation and ability, and it is Architect'sunderstanding that the drawings and specifications for this design are incompliance with said regulations. In the event that portion(s) of thesedrawings and/or specifications are found to be non-compliant with anyportions of said regulations, notify Architect prior to commencement ofassociated work.

REGULATION SUMMARY

JURISDICTION

City of TallahasseeGrowth Management - Building Permitting435 N. Macomb StTallahassee, FL 32301(850) 891-7001

APPLICABLE CODES

BUILDING: 2014 FBCELECTRICAL: 2011 NECMECHANICAL: 2014 FBC MechanicalPLUMBING: 2014 FBC PlumbingENERGY: 2014 FBC EnergyACCESSIBILITY: 2014 FBC AccessibilityFIRE: 2014 FFPC (5th Edition)

BUILDING DATA

OCCUPANCY: Group M: MercantileCONSTRUCTION: Type IIB | Non-combustible | Fully sprinkleredGROSS AREA 929 sf SALES AREA 777 sf STOCKROOM 092 sf RESTROOM 060 sf

OCCUPANT LOAD 28 persons SALES AREA 26 persons (030sf/occupant) STOCK 01 persons (300sf/occupant) RESTROOM 01 persons (100sf/occupant)

ALTERATION LEVEL: Level 2ADJACENT OCCUP: Group M: MercantileFIRE SEPARATION: No separation required

DRINKING FOUNTAIN: 290lf to public drinking fountainsRESTROOMS: Tenant's restroom is for staff only

290lf to nearest public restrooms

DRAWING INDEX

GENERAL

IDX PROJECT INDEX

ARCHITECTURAL

A001 CODE & LIFE SAFETYA002 LISTED UL DETAILSA003 SPECS • ARCHITECTURAL • 1A101 PLAN • FLOOR & CEILINGA102 PLAN • FIXTURE & FINISHA701 ELEVATIONS • STOREFRONTA702 ELEVATIONS • INTERIOR

PROJECT DESCRIPTION

PROJECT LOCATION MAP • MALL

#

#

X-#

#

#

##

SCALE: Varies

IDX

PROJECT INDEX

REVI

EW SE

T

RESTROOM/FOUNTAIN LOCATION

21 JU

L 201

7

SPACE #1070

290FT TO EXISTING

PUBLIC RESTROOMS &

DRINKING FOUNTAIN

MALL LOCATION

GENERAL

These drawings propose interior renovations to an existing tenant suite within a covered shopping mall.The scope of work is primarily cosmetic, as identified in the Finish Schedule and Fixture Plan. In addition,the following more substantial improvements are proposed:

ARCHITECTURAL

In addition to general cosmetic and fixture updates, the following architectural improvements areproposed:

1. Select portions of the storefront are proposed to be re-clad.2. The storefront signage and graphics are proposed to be replaced.

MECHANICAL / FIRE / PLUMBING / ELECTRICAL

No mechanical, fire, or plumbing work is proposed.REVI

EW SE

T25

JUL 2

017

PERM

IT SE

T14

AUG

201

7

REVISION SUMMARY

REVI

SION

13

JAN

2017

1

ISSUE DESCRIPTION OF REVISION(S) SHEET REFERENCE

-

REF#

Removed all improvements related to the ceiling, ceiling IDX, A101, A702now proposed to be left entirely as-is

Page 2: PROJECT DIRECTORY R · 2018-01-09 · EPGroup@att.net FL Lic. #PE43599 FL Lic. #PE72998 REVIEW SET 25 JUL 2017 PERMIT SET 14 AUG 2017 Tenant Improvement AAEQArchitect Approved Eq

SCALE: 1/2" = 1'-0"

A702

INTERIOR ELEVATIONS

Project:

Architect Contact Information & Seal:

STOA STUDIOSArchitect

52 Riley Rd Ste 374Celebration, FL 34747(407) [email protected] Lic. #RA014339

Sheet:

Drawing:

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Issue:

Ten

ant Im

prov

emen

t

© 2

017

by St

oa St

udio

s, al

l righ

ts re

serv

ed. A

ll dra

win

gs, il

lustr

atio

ns, id

eas,

and

othe

r info

rmat

ion

cont

aine

d on

this

shee

t are

the

prop

erty

of S

toa

Stud

ios a

nd m

ay n

ot b

e re

prod

uced

eith

er w

holly

or in

par

t in

any

man

ner w

ithou

t the

exp

ress

writ

ten

cons

ent o

f Sto

a St

udio

s.

Engineer Contact Information & Seal:

Gov

erne

r's Sq

uare

Mal

l • S

uite

#10

70 •

Tal

laha

ssee

, Flo

rida

Architect:

S T O AStudios

TECT

E

AR

C

HIU

TUD

ISS

TO

AS

O

R

REVIEW SET 21 JUL 2017

EPG ENGINEERINGEngineer

1325 S. Bumby AveOrlando, FL 32806(407) [email protected] Lic. #PE43599FL Lic. #PE72998

REVIEW SET 25 JUL 2017PERMIT SET 14 AUG 2017

PAINTED PINE WALL BASE

WF08-96

0606 06

ELEVATION KEYNOTESADDITIONAL INFORMATION

01

03

STOREFRONT CLADDING • BULKHEADNew 1" thick (actual) MDF panel @ bulkhead with continuous wave style relief;provide 1 1/2" thick (actual) perimeter trim per elevation; paint entire assemblyand all existing storefront components with new finish per A102

02

NEW STOREFRONT SIGNAGE14"H x 3"D aluminum channel letters pin-mounted to bulkhead; gloss black finish

04

05

06

WALL BASE1x6 painted pine wall base; clear-grade w/out knots; see Finish Schedule

07

WALL GRAPHICSAll wall graphics are vinyl prints adhered directly to wall by graphic vendor;Owner/Tenant to provide actual graphic files to GC/Vendor for production

09

FITTING MIRROR12"W x 72"H x 1/4" glass mirror, fastened directly to existing pier

DISPLAY SHELVINGCantilevered open shelving, laminate finish per Finish Schedule; 30"L x 12"D x 2"H,see elevation for vertical spacing of individual shelves

STOREFRONT CLADDING • END WALLSNew 1" thick (actual) MDF panel @ each end wall, with continuous wave stylerelief, installed around existing graphic display boxes; paint with new finish perA102

NEW STOREFRONT GRAPHICSReplace existing graphics in storefront display boxes with new graphics; Ownerto provide digital files to GC for creation of the graphics

08

EXISTING WALL REVEALExisting 3/4" aluminum reveal along perimeter of storefront @ Landlord'sbulkhead and @ Landlord's neutral piers

WF08-84 WF08-72

1'-0"

1'-6"

1'-6"

1'-6"

1'-6"

1'-6"

8'-6"

8'-6"

7'-0" 6'-0"8'-0"

B/ EXISTING CEILING • EL. 11'-0"

11'-0

"

T/ EXISTING FLOOR SLAB • EL. 0'-0"

ft

ELEVATION • INTERIOR • REAR LEFT

8421

Scale: 1/4" = 1'-0"03A702

ft

ELEVATION • INTERIOR • REAR RIGHT

8421

Scale: 1/4" = 1'-0"01A702

8'-6"

8'-6"

ft

ELEVATION • INTERIOR • FRONT LEFT

8421

Scale: 1/4" = 1'-0"02A702

ft

ELEVATION • INTERIOR • FRONT RIGHT

8421

Scale: 1/4" = 1'-0"04A702

WF08-108 WF08-108 VICT-65

9'-0" 9'-0" 5'-5"

1'-0"

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

1'-0"

1'-6"

1'-6"

1'-6"

1'-6"

1'-6"

SHELF

SHELF

SHELF

SHELF

SHELF

SHELF

8'-6"

8'-6"

PAINTED PINE WALL BASE

8'-6"

3'-9"

EXISTING STOREFRONT BASE

EXISTING STOREFRONT GLASS

VICT-45

2'-0"

3'-4" 11'-6"

WF08-138

0606

06 06 06 06

EXIST.STRFRNTGLASS

2'-0"

2'-0"

2'-0"

2'-0"

B/ EXISTING CEILING • EL. 11'-0"

11'-0

"

T/ EXISTING FLOOR SLAB • EL. 0'-0"

B/ EXISTING CEILING • EL. 11'-0"

11'-0

"

T/ EXISTING FLOOR SLAB • EL. 0'-0"

B/ EXISTING CEILING • EL. 11'-0"

11'-0

"

T/ EXISTING FLOOR SLAB • EL. 0'-0"

2'-0"

2'-0"

2'-0"

10"11'-1"10"

1

Page 3: PROJECT DIRECTORY R · 2018-01-09 · EPGroup@att.net FL Lic. #PE43599 FL Lic. #PE72998 REVIEW SET 25 JUL 2017 PERMIT SET 14 AUG 2017 Tenant Improvement AAEQArchitect Approved Eq

K-2338-8VITREOUS CHINALAVATORYBANCROFT K-2338-8VITREOUS CHINALAVATORYBANCROFT

Project:

Architect Contact Information & Seal:

STOA STUDIOSArchitect

52 Riley Rd Ste 374Celebration, FL 34747(407) [email protected] Lic. #RA014339

Sheet:

Drawing:

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Issue:

Ten

ant Im

prov

emen

t

© 2

017

by St

oa St

udio

s, al

l righ

ts re

serv

ed. A

ll dra

win

gs, il

lustr

atio

ns, id

eas,

and

othe

r info

rmat

ion

cont

aine

d on

this

shee

t are

the

prop

erty

of S

toa

Stud

ios a

nd m

ay n

ot b

e re

prod

uced

eith

er w

holly

or in

par

t in

any

man

ner w

ithou

t the

exp

ress

writ

ten

cons

ent o

f Sto

a St

udio

s.

Engineer Contact Information & Seal:

Gov

erne

r's Sq

uare

Mal

l • S

uite

#10

70 •

Tal

laha

ssee

, Flo

rida

Architect:

S T O AStudios

TECT

E

AR

C

HIU

TUD

ISS

TO

AS

O

R

REVIEW SET 21 JUL 2017

EPG ENGINEERINGEngineer

1325 S. Bumby AveOrlando, FL 32806(407) [email protected] Lic. #PE43599FL Lic. #PE72998

REVIEW SET 25 JUL 2017PERMIT SET 14 AUG 2017

SCALE: 1/4" = 1'-0"

A101

PLAN • DEMOLITION

PRE-DEMOLITION

1. GC and demolition subcontractor shall be responsible for verification of allexisting field conditions so as to become familiarwith the demolition and/orremoval work which may be required to produce the end results intended inthe construction documents. Verification shall be conducted prior tocommencement of any demolition work. Report any discrepancy (fromconditions and dimensions indicated) on these drawings to the Architect priorto commencement of work.

2. GC shall verify working hours with mall management when heavy demolitionis required.

3. GC shall be responsible for obtaining all required permits and pay all fees aspart of the work required for this project.

4. Prior to commencement of demolition work, GC shall coordinate the removalof any and all plumbing, electrical, mechanical, and/or architectural items,including wall partitions, with the corresponding subcontractor.

5. All finishes, materials, systems, etc. which are to remain shall be restored to'like new' condition.

DEMOLITION DEBRIS

6. Remove all debris to dumpster area as designated by the Landlord.Demolition subcontractor shall provide the dumpster unless otherwiseindicated.

7. Removal of construction debris is the responsibility of the demolitionsubcontractor.

8. Demolition subcontractor shall provide removal & insurance of the debris box.9. Demolish and remove from the premises in a manner acceptable to all

jurisdictional agencies, the Landlord, and the GC.10. The site shall be cleared of all demolished components & debris at least once

per day or more often if required to maintain safe working conditions. GCshall verify approved methods & locations for removal with the mallmanagement.

GENERAL

11. The renovation work described in the construction documents anticipates thedemolition of existing construction in part or in its entirety and the removal,relocation, and re-powering of certain construction materials andequipment.

12. Care shall be taken to not remove or damage any work which may affectthe use or operation of any other premises or tenant. Any such damage orremoval shall be immediately repaired or replaced at the sole cost of thesubcontractor.

13. All existing areas scheduled to remain that are damaged during demolitionshall be patched, repaired, and finished as required to match adjacentconstruction. Any such damage or removal shall be immediately repaired orreplaced at the sole cost of the subcontractor.

14. Electrical fixtures, outlets, junction boxes, conduit, piping, panels, transformers,etc., are to be disconnected and/or removed as applicable to the new floorplan as noted in the electrical drawings.

15. All abandoned items (equipment, wiring, plumbing, blocking, etc.) shall becompletely removed from the space.

16. GC shall provide temporary bracing, shoring, and supports as required forexisting structural systems to prevent damage during construction.

17. Sprinkler subcontractor shall relocate and/or provide new sprinkler heads asrequired and so as not to interfere with lighting fixtures, HVAC, grilles, etc. Allwork shall conform to local and NFPA codes. Center sprinkler heads in ceilingtile where applicable. Notify mall management prior to shutting off anyvalves.

WALL FIXTURE REMOVALRemove all existing fixtures, slatwall, and any other wall displayaccessories, leaving only the gypsum board wall cladding; patch& repair gypsum board as necessary, and prepare surface toreceive new fixtures

02

03

04

01

NOT USED

FLOOR & CEILING PLAN KEYNOTESDEMOLITION PLAN GENERAL NOTES

FLOOR PREPARATIONExisting floor is unfinished concrete, with some evidence of a priorfinish floor surface being installed over it; remove all residue fromprior flooring and remove all related components including wallbase, adhesive residue, etc.; fully prepare floor substrates for newfinish flooring per Finish Schedule

05

06

07

NOT USED

NOT USED

08

FLOOR RECEPTACLE LOCATIONRelocate existing floor power and communications receptaclesto new cashier location per E sheets

EXIT SIGNAGE / EMERGENCY LIGHTING RELOCATIONRelocate existing exit signage and emergency lighting asindicated

ft

PLAN • DEMOLITION • FLOOR

8421

Scale: 1/4" = 1'-0"03A101

DEMISING WALL

ft

PLAN • EXISTING/PROPOSED

8421

Scale: 1/4" = 1'-0"04A101

L A N

D L

O R

D ' S

S E

R V

I C E

C O

R R

I D O

R

M A

L L

C O

R R

I D O

R

101

SALES FLOOR

102

STOCKROOM

103

RESTROOM

NOTE

No ceiling modifications are proposed, this plan is included for general reference only.

NOTE

Verify dimensions of existing conditions in field. If substantive discrepancies are discovered betweenactual existing conditions and what is shown in the drawings, notify Architect immediately.

DEMISING WALL

DEMISING WALL / ADJACENT TENANT

DEM

ISING

WAL

L

L A N

D L

O R

D ' S

S E

R V

I C E

C O

R R

I D O

R

M A

L L

C O

R R

I D O

R

101

SALES FLOOR

102

STOCKROOM

103

RESTROOM

DEMISING WALL / ADJACENT TENANTDE

MISI

NG W

ALL

M A L L C O R R I D O R

M A L L C O R R I D O R

DEMISING WALL

DEMISING WALL

M A L L C O R R I D O R

M A L L C O R R I D O R

ft

PLAN • PROPOSED • FLOOR

8421

Scale: 1/4" = 1'-0"01A101

DEMISING WALL

101

SALES FLOOR

102

STOCKROOM

103

RESTROOM

01

DEMISING WALL

DEMISING WALL / ADJACENT TENANT

DEM

ISING

WAL

L

M A L L C O R R I D O R

M A L L C O R R I D O R

0101 01 01

01

01

01 01

02

NOT USED

GENERAL

1. Dimensions to new construction are from to rough framing U.O.N.2. GC is responsible to maintain the structural, architectural, and fire rated

integrity of the project area and other affected areas throughout theduration of the project. All work, materials, and equipment provided byGC shall be guaranteed for a minimum period of one year from date offinal acceptance; GC shall provide owner with all equipment manuals,warranties, and operating instructions for GC provided equipment uponfinal acceptance

3. If conflicting information is discovered within the architectural drawingsand/or specifications, the better quality and/or greater quantity of workand/or materials shall be assumed correct and submitted to Architect forclarification

4. All interior finish and trim materials shall meet applicable coderequirements for flame spread ratings

MILLWORK

1. All millwork depicted herein shall comply with standards for custom gradeas specified in the current edition of the Architectural Woodworker InstituteStandards.

2. All architectural woodwork shall be guaranteed to be of good materialand workmanship and free from defects that render it unserviceable forthe use for which it is intended for a period of one (1) year after approvedfinal installation.

3. All architectural millwork shall be factory finished with field work limited totouch-up only

4. All architectural woodwork occurring on vertical surfaces shall meetstandards for Class A(1) requirements

5. All hardware shall be stainless steel or brushed nickel

PROPOSED PLAN GENERAL NOTES

13

09 NOT USED

08

10 NOT USED

11 WALL ACCENT GRAPHIC11'-1"W x 9'-6"H 'Beya Beya' graphic adhered directly to wall asindicated on plan; graphic extends from top of base board tounderside of floating soffit above; contact Owner for actualdigital file for all graphics

12 NOT USED

1'-0" 6'-0" 10" 7'-0" 10" 11'-1" 2'-6"2'-6" 10" 8'-0" 1'-0"

1'-0"

11'-6

"1'-

2"4'-

81 2"

10"

3'-9"

3'-0"

17'-0"

11"

1'-0"4"9'-0"8"9'-0"

2'-6"

10" 5'-5" 10"

WF08-108 WF08-108

WF08-84WF08-72 WF08-96

WF0

8-13

8

WALL GRAPHIC SHELF

SHEL

F

FRAM

E

FRAME

07

11

14

14

13

13

MIRROR

MIRRORSLATS

SLATS

CASHWRAP

14 WALL SHELVING30"W x12"D x 2"H wall shelving, cantilevered wall-mount style; seeFixture Schedule on A102 for more information; see A701 forelevations and vertical spacing information

EXISTING STOREFRONT GRAPHIC DISPLAY BOXESPreserve and protect existing graphic display boxes throughoutconstruction; replace existing graphics with new graphicsprovided by Owner

M A

L L

C O

R R

I D O

R

15 NOT USED

1