12/19/2014 1 Community Open House #2 Dec. 17, 2014 1 East Aberdeen Mobility Project Open House #2 - 12/17/14 East Aberdeen Mobility Project About the Project 2 This image cannot currently be displayed. This image cannot currently be displayed. This image cannot currently be displayed. Continuation of 2007 Study Federal Funding with Local Match Project Team Open House #2 - 12/17/14 East Aberdeen Mobility Project

Project East Aberdeen Mobility - GHCOG...East Aberdeen Mobility Project Open House #2 -12/17/14 16 Public Feedback –Online Survey Results East Aberdeen Mobility Project Open House

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

12/19/2014

1

Community Open House #2

Dec. 17, 2014

1

East Aberdeen Mobility

Project

Open House #2 -12/17/14

East Aberdeen Mobility Project

About the Project

2

This image cannot currently be displayed.

This image cannot currently be displayed.This image cannot currently be displayed.

• Continuation of 2007 Study

• Federal Funding with Local Match

• Project Team

Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

2

Project ObjectivesShort Term Solutions

• Emergency Response Plan

Full Build Solution

• Mobility on US 12

• Safety

• Emergency access

• “Real” Solutions

3Open House #2 - 12/17/14East Aberdeen Mobility Project

Study Limits

4Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

3

Project Timeline Overview

5Open House #2 - 12/17/14East Aberdeen Mobility Project

PHASE 1 PHASE 2

Develop Alternatives:

Design Challenges - Rock and a Hard Place

6

• Wishkah & Chehalis Rivers• Steep Slopes• Rail

Geography

• Underground Conflicts• Poor & Saturated SoilsGeology

•23’ vertical clearance over railroad•500’ - 600’ long Ramps•Large Vehicle Turning Radii•Pedestrian Routes

Geometry

• Financially Feasible Project• US12 is Economic Engine (delivers tourists, moves freight, access to retail)

Economics

• Minimize Impacts• Mitigate for Unavoidable impacts• Awareness of Project Delivery to Plan

for Change

People

Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

4

Narrow Down to Top 3 Design Alternatives

7

Top 3 Design Concepts

Evaluation Criteria

10 Design

Concepts

Property Owner &

Businesses Concerns • Construction Cost

• Right of Way Impacts

• Environmental

• Constructability

• Traffic Flow

Open House #2 - 12/17/14East Aberdeen Mobility Project

Top 3 Alternatives

Alt. A:

Heron St. Flyover

8

Alt. C: Chehalis St.

Overcrossing

Alt. B:Benn St. Texas-T

Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

5

Option A: Heron Street Flyover Future Condition Rendering

9Open House #2 - 12/17/14East Aberdeen Mobility Project

10

Option A: Heron Street Flyover

Circulation

Ramp Cross Section

Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

6

Option B: Benn Street Texas-T Future Condition Rendering

11Open House #2 - 12/17/14East Aberdeen Mobility Project

Option B: Benn St. Texas-T

Circulation

12

Ramp Cross Section

Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

7

Option C: Chehalis St. Overpass Future Condition Rendering

13Open House #2 - 12/17/14East Aberdeen Mobility Project

14

Option C: Chehalis St. OverpassCirculation

Ramp Cross Section

Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

8

Process to Select Preferred Alternative

15

Preferred Alternative

Evaluation Criteria

Ranking

City & Port Staff

Evaluation

Public Feedback

• Construction Cost

• Right of Way Impacts

• Environmental

• Constructability

• Traffic Flow

Open House #2 - 12/17/14East Aberdeen Mobility Project

16

Public Feedback – Online Survey Results

Open House #2 - 12/17/14East Aberdeen Mobility Project

60

46

30

28

11

23

Ease congestion on US12

Reduce blockages that impede accessto neighborhood and mall

Improve safety for pedestrians andbicycles

Identify solutions that can beimplemented quickly and cost-

effectively

Improve vehicle access via eastboundlanes to neighborhood north of US12

Minimize impacts to businesses

Project Objectives RatingPreferred Alternative

Ev

a

in

g

Ev

al

ua

ti

on

C

ri

te

ri

a

Ra

nk

in

g

Ci

ty

a

ti

on

Ci

ty

&

P

or

t

St

af

f

Ev

al

ua

ti

on

Pu

bl

ic

F

ee

db

ac

k

12/19/2014

9

Public Feedback – Online Survey Results

17Open House #2 - 12/17/14East Aberdeen Mobility Project

22

9

40

Alternate A - Heron St. Flyover

Alternate B - Benn St. Texas T

Alternate C - Chehalis St.Overcrossing

Design Alternative Ranking

Preferred Alternative

Ev

a

in

g

Ev

al

ua

ti

on

C

ri

te

ri

a

Ra

nk

in

g

Ci

ty

a

ti

on

Ci

ty

&

P

or

t

St

af

f

Ev

al

ua

ti

on

Pu

bl

ic

F

ee

db

ac

k

Preferred Design Concept:Alternate C - Chehalis St. Overpass

18Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

10

Next Steps:

• Phase 2– Engineering & Environmental Review Begins early 2015

19Open House #2 - 12/17/14East Aberdeen Mobility Project

Phase 2 Steps of Interest:

• Refine Preferred Concept Design

▫ Iterative Process

▫ Evaluate Ramp Touch-down Designs

▫ Minimize Impacts

20Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

11

Phase 2 Steps of Interest:

Project Aesthetics

21Open House #2 - 12/17/14East Aberdeen Mobility Project

Roundabout

Bridge Railings &

Fencing

Retaining Walls

Phase 2:

• Property Owner Coordination

▫ Iterative Process

• Continued Public Outreach Opportunities

▫ Open Houses

▫ Roundabout Education

22Open House #2 - 12/17/14East Aberdeen Mobility Project

12/19/2014

12

Design Element - Roundabout

23Open House #2 - 12/17/14East Aberdeen Mobility Project

Thank you!

Open House #2 - 12/17/14East Aberdeen Mobility Project 24

• Please visit Project Stations Tonight

• Sign-in List (contact information)

• Comments will be collected

• See Grays Harbor Council of Governments’ project website for more information:

▫ http://www.ghcog.org/aberdeenmobility.html