Project Completion Report
May 2011
Project for the Rehabilitation of
Flood Affected Communities
Submitted to: United Nations Development Program Pakistan
Submitted by: Farmers Development Organization Central Office: Khitran House, Danish Town, Bahadurpur Chowk, Bosan Road, Multan Ph: 061-4745945 Fax: 061-4745845 E-Mail: [email protected], Web: www.fdopk.org Field Office Kot Addu: Behind Ghalamandi Near Remania Masjid, Railway By Pass Road Kot Addu Ph:0662-241090
Page 2 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Acknowledgement
I take immense pleasure in thanking the whole field team of United Nations Development Program
Pakistan especially Ms. Akiko Hanaya Field Coordinator UNDP Pakistan for supporting and
facilitating us to carry out the project work.
I wish to express my deep sense of gratitude to Project Management Committee for their
guidance/contribution and useful suggestions, which helped us in implementing the project, within the set
time.
Words are inadequate in offering my thanks to the Project Staff, CO members and all the
community members for their encouragement and cooperation in carrying out the project work
and for the successful completion of this project.
Ghulam Mustafa
Executive Director
Farmers Development Organization
Page 3 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Acronyms
CO Community Organization
CPI Community Physical Infrastructure
EDT Enterprise Development Training
FDO Farmers Development Organization
UNDP United Nation Development Program
UC Union Council
FNK Family Nutrition Kit
Page 4 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Introduction
“Everyone has the right to a standard of living adequate for the health and well-being of himself and of his family, including food, clothing, housing and medical care and necessary social services, and the right to security in the event of unemployment, sickness, disability, widowhood, old age or other lack of livelihood in circumstances beyond his control” says article 25 of Universal Declaration of Human Rights. But the flood affected people of Pakistan are still deprived of these basic rights despite intense work of Government and Civil society organizations. School and hospital buildings are either collapsed or need renovations. Physical infrastructure: roads, bridges, water courses and irrigation channels are destroyed. Problems in registration and compensation for flood victims are manifold. Agriculture is the back bone of the people of the South Punjab, which is badly affected due to this flood. Small farmers especially women are amongst the most affected people and they are most neglected too. Thus the livelihood activities of these areas are badly affected. To overcome this difficult situation, FDO in collaboration with UNDP has implemented a Project for the Rehabilitation of Flood Affected Communities in Union Council Daira Deen Panah of Tehsil Kot Addu, District Muzaffargarh. The project iterated the history of FDO’s dedication towards its dream of better, stronger and prosperous communities once again. The project for The Rehabilitation of Flood Affected Communities was implemented by Farmers
Development Organization with the financial assistance of UNDP Pakistan in following six villages of
Union Council Daira Din Panah, Tehsil Kot Addu district Muzaffar Garh:
1. Basti Babni
2. Basti Samandri
3. Basti Shouri
4. Basti Muzamill Wala
5. Dhadhi Wala
6. Basti Boha
Objectives: The objectives of the projects were as following:
1. To restore the Basic Community Physical Infrastructure (Irrigation, sanitation and clean drinking
water ) to resettle the flood affected communities in six villages of UC Daira Din Panah
2. To assist 500 Flood effected families to be less dependent on external aid in their current situation
and to support the restoration of livelihood systems through provision of seeds and fertilizers,
Business Incubation and installation of Family Nutrition Kits(Kitchen Gardening)
Methodology:
FDO adopted the methodology of social mobilization to achieve the above mentioned objectives. 7
democratic and inclusive community organizations were formed in above mentioned six villages with an
effective representation from the most vulnerable segments of society e.g. poor of the poorest, widows,
tenants, elderly people and persons with disabilities (Annex-I). A project Management Committee with
representatives from FDO and COs were also formed to provide assistance to FDO and these Community
Organizations in project implementation (Annex-II).
Activities and Achievements of the Project:
Page 5 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
The objectives of the project were achieved through
a set of activities; we are enlisting major activities
which were further divided into small activities:
1. Distribution of seeds and fertilizers to small
farmers for wheat sowing season
2. Implementation of Physical Infrastructure
Schemes
3. Installation of Family Nutrition Kits
4. Enterprise Development Training and
Business Incubation
Distribution of Seeds and Fertilizers: a baseline survey of the target areas was conducted
by FDO team to identify and prioritize the needs of
local communities. After baseline survey, Community
Organizations (COs) were formed. These Community
Organizations consisting on the marginalized and
disadvantaged members and these COs were formed for
managing their own development through transparent,
equitable, inclusive, accountable and community demand
driven processes.
COs immediately after their inception, ranked the challenges
faced by their
community and it
was revealed that
the provision of
seeds and
fertilizers for the
small farmers and tenants was the most important challenge to
be met immediately. They prepared inclusive lists of the small
farmers and tenants for the provision of seeds and fertilizers.
FDO tallied these lists with the data of Government
departments; Project Management Committee further
scrutinized the list.
Seeds and Fertilizers Distribution
Community Physical Infrastructure: Each CO identified the needs of Community Physical Infrastructure (water, sanitation brick pavement and clean drinking water) in their area. FDO’s engineers along with Social
0
100
200
300
400
1st Round 2nd Round Total
297
85
382
During the first round, seeds
and fertilizers were distributed
to 297 small farmers and
tenants, while in the second
round seeds were distributed
among 85 small farmers and
tenants hence totaling
382farmers. (Annex-III)
Page 6 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Mobilization team visited the site to prepare the feasibility reports for the schemes proposed by the community. Proposals were developed only for the feasible schemes with detailed cost estimations. These proposals were approved by the Project Management Committee. Once approved by PMC, phase of implementation of the schemes was started. From among the local communities, various working committees were formed for the implementation of each scheme; procurement committee, Finance Committee and Audit Committee. The purpose of these committees is to enhance the sense of ownership among the communities for this kind of interventions. All the material was procured from the local markets to inject money in to local economy. Local community was encouraged to work as skilled and unskilled laborers for these schemes.
FDO kept multiple checks through community participation to ensure quality in implementing such schemes; Procurement committees ensured the high quality material e.g, bricks and cement. For provision of clean drinking water, FDO installed hand pumps (100 feet deep). (Annex-IV)
0
5
10
15
20
25
30
5
3
56
21
3
1
4
30
Breakup of CPI Schemes
Page 7 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Installation of Family Nutrition Kits:
Community Organizations were asked to identify the lists of women holding small patch of land for
installation of 17’*12’ FNK. FDO signed an
agreement with Micro Drip for installation and
training to manage this high efficiency irrigation
system for 105 households.
Since this irrigation system is new to the women of local communities, Micro Drip experts and FDOs
social Organizer spent a good amount of time in making it understandable to the local women regarding
its management (Annex-V).
Enterprise Development Training (EDT) and Business Incubation:
0
5000
10000
15000
20000
25000
Households Total Beneficiaries Male Female
2862
20034
9817 10217
Beneficiaries of CPI Schemes
Page 8 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
One of the most promising components of this project was the restoration of livelihood for fifty
households. FDO designed its intervention utilizing the inherent capacity in enterprise development. After
identification of fifty five beneficiaries, their capacity to manage a business was nourished through three
days intensive business development training. The training was delivered according to the needs and
understanding of the local community. All of these participants have started their journey to prosperity
once again after this training and their business incubation.
55 community members were trained through Three Days Business Development Training These
participants were nominated by their local Community Organizations through participatory wealth
ranking. The training ended up incubating the businesses for the 53 participants, hence reaching for it
objective of sustained livelihood support to flood victims (Annex-VI).
Objective of the workshop:
1. To sustain and improve the economic conditions of the flood affected households by business
incubation
2. To build the capacity of the trainees about basic concept of business(market survey, marketing,
book keeping etc)
Sessions Plan: This three days training was divided into 11 sessions. This training workshop was conducted in two groups concurrently to maximize the effectiveness through individual attention, but both of the trainings followed a similar pattern. Both groups were facilitated by Mr. Mohammad Waqas and Babr Sufian who were trained in capacity building for Enterprise Development. The sessions were supervised by Mr. Rafi Ullah Baloch who was a master trainer on enterprise development. The training continued for three days and a range of business related topics were brought into discussion. This EDT was a task which offered numerous challenges to FDO team but poverty, misery, self pity, sense of helplessness among the participants proved to be the most challenging, but as the training was proceeding towards its hype, it systematically conquered all the psychological complications of the participants. All the business were conceived, keeping the local social and market context in view, they emerged as an independent, confident and responsible citizen with a determination to be a support for other. During the third and fourth day businesses were all set to be launched with grandeur of a solid determination.
Business Incubation:
At the end of the participants developed their business
development plans. A purchase committee was finalized in a
management meeting for business incubation which includes
representative from project management committee,
representative from each group of business identified, from FDO
program, finance and admin sections to make the procurement
process transparent and economical. The procedures for the
procurement committee were defined and after completion of business development plan, procurement
committee started to procure business kits for the participants. They visited markets in Kot Addu and
Multan for procurement, identified the required material for each business from business plan and
Page 9 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
prepared the kits for each individual business. These kits were supplied to the premises of respective
business and with proper visibility and marketing tools (banners and visiting cards) implementation, these
businesses were started.
Cosmetics & Bangles , 1 Cycle Repairing, 1
Donkey Cart, 8
Electrition, 1
Flour Machine, 1
Fruit Cart, 2
Hair Dresser, 1
Karyana Shop, 13
Livestock, 3Plumber, 1
Poultry, 1
Shoe Maker, 7
Tailoring, 13
Break-up of 53 Business Incubations
Page 10 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Lessons Learnt:
Working in post disaster conditions always confronts the organization with ever new challenges and
resolving these challenges brings loads of wisdom to the organization, this project was no exception.
Let’s explain the challenges and lessons learnt from those challenges for each activity:
Distribution of Seeds and Fertilizers:
After formation of community groups, next milestone was the distribution of seeds and fertilizers
to the small farmers and tenants.
Procurement of quality seeds and fertilizers was the first management challenge because the seed
available with the government departments was not up to the mark.FDO negotiated with the
management of Engro Foods and procured high quality seed for its project.
FDO collected the lists of land holding from Government departments but the records and not up
to date. Moreover in post disaster conditions, most of the things are manipulated to attract the aid.
In order to ensure the provision of seeds and fertilizers only to the most vulnerable families, FDO
requested its Cos to provide the list of small farmers and tenants in their area. These lists were
compared with the lists from Government departments to remove the discrepancies. To further
ensure the authenticity of the list of beneficiaries, it was again scrutinized by Project management
Committee. Getting the lists of beneficiaries verified from three groups of stakeholders left no
room for any kind of injustice.
Implementation of CPI schemes:
FDO believes in community participation to achieve the best results. COs were entrusted with the
responsibility of identifying and prioritizing the needs of basic physical infrastructure in their
areas.
At times late disbursement of funds cause hindrance in implementation of these kinds of schemes
but FDO managed to overcome these challenges with its own resources.
In this activity, duplication has always been a threat of which FDO team was warned in the very
beginning. But the psyche of the disaster hit communities poses a greater challenge for field
workers. A couple of such problems faced us; a community requested for a hand pump to be
installed for clean drinking water in their area. After going through all the procedures of
feasibility and implementation it was revealed that another organization has also installed hand
pump in vicinity.
FDO increased its communication with district government and other organizations working in
that area regarding its interventions.FDO uninstalled that hand pump and installed it to another
location where it was needed more.
Similarly on a request from community group FDO started digging for water course but the
opposite party got stay from the court so we had to cease our activity on that project. These kinds
of issues causes wastage of time and human resources, so critical in short term projects.
Such conditions are often hard to predict when you choose to rely on the local communities.
Installation of Family Nutrition Kits (FNK)
Community Organizations were asked to identify the lists of women holding small patch of land
for installation of 17’*12’ FNK. FDO signed an agreement with Micro Drip for installation and
training to manage this high efficiency irrigation system.
Since this irrigation system is new to the women of local communities, Micro Drip experts and
FDOs social Organizer spent a good amount of time in making the women understand its
management.
Enterprise Development Training and Business Incubation
Through participatory wealth ranking community organizations identified the most vulnerable
families for livelihood assistance who were further evaluated by FDO through poverty score card
for vulnerability. 52 households, thus identified were invited for a three days Enterprise
Development Training. The training was focused at developing an understanding of community
Page 11 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
regarding basic principles of running a good business like
marketing, book keeping and linkages building. All the
participants developed their business plan for the next year in
which they identified the resources to restart their businesses. A
procurement committee consisting of representatives from
Community and FDO started procurement for the assets for
these trainees and assets were transferred to their business
locations. Their businesses were properly launched through
marketing tools and now they all are running their businesses
better than ever.
The first challenge for FDO was to train a group of people who have never been through training
and most of them were illiterate but FDOs Enterprise Development Trainers started from scratch
and through practical work and market survey, taught them the principle of business
management.
Secondly, FDO has never been for cash grants. To ensure the procurement of business Kits
through transparent and participatory approach and their delivery to the beneficiaries, FDO
established a procurement committee consisting of representatives from Community and FDO.
This committee surveyed the local markets for the procurement of assets and delivered these
assets to the business place of beneficiaries.
Best Practices:
Since rehabilitation in post disaster circumstances is in process of developing and following a standard
way of doing things that multiple organizations can use. FDO’s following best practices are often based
upon common sense, are commonly used where no specific formal methodology is in place or the existing
methodology does not sufficiently address the issue.
1. A strong communication with district government and other organizations regarding target area
and interventions is of utmost importance to avoid the duplication.
2. Social Mobilization is of essence in post disaster conditions to get the people out of the
psychological trauma and building their spirit for collective actions for development.
3. For all the interventions, the most vulnerable groups of the community e.g. women, children,
widows, elderly people and persons with disabilities must be given priority
4. For the interventions like distribution of seeds and fertilizers:
Time factor must be kept in mind whether it’s the right season for sowing the crop?
Data for the beneficiaries must be collected from multiple sources and it must be
carefully scrutinized.
Criteria for the selection of beneficiaries must be very clear and objective.
5. For Basic Physical Infrastructure Schemes:
Community should be engaged in identifying and prioritizing the need of basic
infrastructure.
Schemes benefiting the entire community should be implemented
Local Community should be engaged in implementation
for procurement of materials and as laborers. It develops
a sense of ownership.
Material must be purchased from local markets to inject
money and increase the employment opportunities for
local communities.
6. For the Installation of FNK
If a technology is new to the people of local
communities, they need demonstration on how to
manage it.
Vendor must be sensitized regarding the importance of
Page 12 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
successful implementation of this kind of interventions
7. For Business Incubation
People must be capacitated on how to create opportunities for livelihood according to
their local context.
Their capacity must be built through training in local language, with local example and
exposure to local markets.
Their know-how regarding basic business concepts e.g., marketing, nook keeping and
linkages building must be enhance.
Instead of cash grants, people must be provided with the resources (business kits) to start
their businesses.
Since the procurement of a diverse range of assets like
livestock, donkeys carts, poultry and others is not
possible through generally accepted accounting
procedure(collecting quotations, signing agreements and
payments through checks), a group of responsible people
must be entrusted to accomplish this task with
transparency.
Recommendations:
For such short term projects, time is the most critical
resource. All the official procedures that may cause delay
in implementation process must be catalyzed.
Coordination and collaboration with general stakeholders
in general and with partner organizations must be very
effective.
Such emergency projects are best accomplished in an
environment of mutual confidence and support. Partner
Organizations must facilitate each other to overcome the challenges they face.
Annexure:
Annex-I List of Community Organizations
Page 13 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Sr. No
Name President Secretary
1 Muzammil Wala Community Organization
Liaqat Hayat Khan Mohammad Ameen 0334-6564864
2 Shori Community Organization Qari Mohammad Saleem
Mohammad Kouar
0332-6426533
3 Samandari Community Organization Malik Din Mohammad
Fazal Hussain
0345-6742890 0307-3061223
4 Babni Community Organization Mohammad Rehan Nadeem Iqbal
0332-3679423 0301-7881945
5 Boha Community Organization Malik Mushtaq Boha Mohammad Akhter
0300-7483336 0307-3065570
6 Wasaib Community Organization Mohammad Afzal Mohammad Ashraf
0331-6863793 0331-3302569
7 Sada Bahar Community Organization Mohammad Akmal Mohammad Bux
0313-6776569
Annex-II Project Management Committee
Sr. No Name Organization Contact Number
Page 14 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
1 Mohammad Yaseen Muzammil Wala Community Organization
0345-6438000
2 Mohammad Arshad Shori Community Organization 0331-9780321
3 Abdul Rauf Samandari Community Organization 0345-7184242
4 Mohammad Islam Babni Community Organization 0342-8551174
5 Abdul Aziz Boha Boha Community Organization 0308-6370660
6 Abdul Hameed Wasaib Community Organization 0306-2342910
7 Malik Abdul Majeed Madadgar 0333-6003696
8 Rafi Ullah Baloch FDO 0336-7230441
Annex-III List of Seeds and Fertilizer Distribution (Round-1)
Page 15 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
Sr# Name CNIC Phone Land for seed
in Canal
1 Mohammad Naseer Shah 32303-4603058-1 03345449756 3
2 Fida Hussain Shah 32303-0729597-1 03443693728 14
3 Mohammad Rafiq Shah 32303-3709424-1 03474153365 9
4 Ata Ullah Shah 32303-5574654-3 03453817072 5
5 Gul Mohammad Shah 32303-1976100-7 03453405044 6
6 Ashraf Ali 32303-3917625-3 03004911285 24
7 Mohammad Yaseen 32303-0805162-1 24
8 Fazal Hussain 32303-9954578-9 03073061223 6
9 Nazeer Ahmed 32303-0723392-9 8
10 Basheer Ahmed 32303-1254194-1 6
11 Muneer Hussain 32303-0805875-5 16
12 Ghulam Abbas 32303-0919610-9 12
13 Azeem Bux 32303-8461033-5 3
14 Ghulam Shabbir 32303-6284271-9 8
15 Mohammad Bilal 32303-6061728-1 12
16 Peer Bux 32303-2190769-7 8
17 Mohammad Ramzan 32303-8243821-5 03472150425 8
18 Ghulam Serwar 32303-0783958-5 03022362150 16
19 Abdul Hafiz 32303-8593028-3 03464290195 8
20 Mohammad Akhter 32303-4384546-9 03436533157 16
21 Abdul Rasheed 32303-0334241-7 03466449146 16
22 Syed Zafer Hussain Shah 32303-7151147-1 16
23 Khursheed Ahmed 32303-7329503-5 8
24 Mohammad Kashif Usman 32303-7035383-1 03004729008 2
25 Khalid Javaid 32303-9833713-5 03457298627 16
26 Mohammad Ramzan 32303-0312138-9 03467888567 16
27 Khadim Hussain 32303-1809548-3 16
28 Mohammad Younas 32303-8918841-7 03007372038 8
29 Mohammad Ibrahim 32303-7207575-1 16
30 Mhemood ul Hasan 32303-0777598-7 03067395515 22
31 Akhter Abbas 32303-0770570-7 03017486837 2
32 Abdul Aziz 32303-2395317-1 03438627410 16 Canal
33 Mohammad Amir 32303-03846536-7 03467083721 6 Canal
34 Mohammad Saleem Akhter
32303-6357848-3 03036584705 16 Canal
35 Faqeer Mohammad 32303-0772553-1 6 Canal
36 Mohammad Jahanzaib Ghazi
32303-2744905-5 03136960362 16 Canal
Page 16 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
37 Mohammad Faheem Akhter
32303-9795520-1 03056711980 16 Canal
38 Mohammad Arbab Jahangeer
32303-2202166-7 03136960362 16 Canal
39 Ashiq Hussain 32303-4230505-7 03366085039 2 Canal
40 Riaz Hussain 32303-6218672-3 03326424548 16 Canal
41 Nazer Hussain 32303-1062752-1 03136776569 16 Canal
42 Mohammad Tariq 32303-5783085-9 03326435340 4 Canal
43 Noor Mohammad 32303-7790226-3 03437084547 4 Canal
44 Manzoor Hussain 32303-0682733-9 03443674311 16 Canal
45 Ghulam Hussain 32303-0618648-7 9 Canal
46 Mohammad Iqbal 32303-6914245-5 4 Canal
47 Nazeer Ahmed 32303-0723392-9 8 Canal
48 Mohammad Haneef 32303-7957967-7 2 Canal
49 Akhter Abbas Shah 32303-0770570-7 6 Canal
50 Basheer Ahmed 32303-1254194-1 16 Canal
51 Shahid Hussain 32303-1606423-3 8 Canal
52 Abdul Hafeez 32303-8593028-3 8 Canal
53 Allah Bux 32303-0771709-7 16 Canal
54 Muneer Hussain 32303-0805875-5 03334862397 8 Canal
55 Mohammad Latif 32303-6721015-9 03014582853 8 Canal
56 Ashraf Ali 32303-3917625-3 03004911285 16 Canal
57 Ghulam Serwar 32303-0783958-5 03013272450 16 Canal
58 Ghulam Abbas 32303-0919610-9 0332-4915722 16 Canal
59 Shimal Hussain 32303-8651513-1 8 Canal
60 Nazeer Ahmed 32303-98005318-1 03013272450 16 Canal
61 Ghulam Hussain 32303-0618648-7 03013394608 9 Canal
62 Mohammad Farooq 32303-1737787-3 03436533157 8 Canal
63 Mohammad Ramzan 32303-8243821-5 03156803437 16 Canal
64 Abdul Rasheed 32303-0334241-7 03466449146 16 Canal
65 Syed Sajad Hussain 32303-7164503-5 03466449146 1 canal
66 Mohammad Hussain 32303-0722295-9 03013272450 8 Canal
67 Zulfiqar Ali 32303-1080457-7 03453667843 16 Canal
68 Mohammad Nawaz 32303-4125899-5 0346-6441064 2 canal
69 Saeed Ahmed 32303-9856104-5 03017879272 8 Canal
70 Khalid Mhemood 32303-6719517-1 03477301962 6 Canal
71 Nazer Hussain 32303-4559266-5 03454879473 8 Canal
72 Mohammad Yousan 32303-8386125-5 2 Canal
73 Ghulam Qadir 32303-0556672-7 03067991090 2 Canal
74 Mohammad Qasim 32303-1425004-9 03067991090 2 canal
75 Mohammad Ramzan 32303-0708370-1 03067991090 2 Canal
76 Mohammad Ramzan 32303-1448009-5 03026972274 16 Canal
77 Abdul Latif 32303-0793316-5 03026954662 16 canal
Page 17 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
78 Miraj deen 32303-0805871-5 03366086175 16 Canal
79 Meelad Hussian 32303-0722122-9 2 Canal
80 Riaz Ahmed 32303-2472263-3 0331-9783498 16 Canal
81 Fida Hussain 32303-0729597-1 8 Canal
82 Syed Ashiq Hussain 32303-1834212-5 16 Canal
83 Rahim Bux 32303-5438144-7 16 Canal
84 Mohammad Akmal 32303-2639758-1 03136776569 16 Canal
85 Mohammad Pervaiz 42501-5519817-5 03477301962 6 Canal
86 Mohammad Kamran 32303-4879704-1 6 Canal
87 Mohammad Rafiq 32303-9164715-9 8 Canal
88 Peer Bux 32303-2190769-7 16 Canal
89 Mohammad Ramzan 32303-3679505-3 16 Canal
90 Azeem Buskh 32303-3273777-7 16 Canal
91 Ghulam Rasool 32303-0723400-9 3 Canal
92 Abdul Rheman 32303-8888472-7 2.5 Canal
93 Deen Mohammad 32303-4653946-9 16 Canal
94 Fazal Hussain 32303-9954578-9 2 Canal
95 Samundari Wali 32303-7597565-1 03438627410 16 Canal
96 Mohammad Iqbal 32303-2091412-9 03326432404 16 Canal
97 Mohammad Saeed 42201-6737404-3 8 Canal
Silhay wala
1 Mohammad Affzal 32303-0272082-3 24
2 Mohammad Nawaz 32303-5308137-3 03004418093 24
3 Ghulam Shabbir 32303-7358568-1 16
4 Manzoor Hussain 32303-4435808-9 03002442857 24
5 Mohammad Ashraf 32303-4728336-1 03122384443 16
6 Mohammad Peyara 32303-3143540-7 24
7 Mohammad Shafee 32303-2948635-3 24
8 Mohammad Yousaf 32303-1556519-3 16
9 Ameer Bux 32303-0781914-3 16
10 Allah Bux 32303-6952113-5 24
11 Faqeer Mohammad 32303-7461886-9 16
12 Allah Wasaya 32303-7808596-9 16
13 Ghulam Abbas 32303-2272719-1 16
14 Sajjad Hussain 32303-7213482-7 03457291266 16
Babnee wala
1 Nadeem Iqbal 32303-3130739-7 03017881945 5
2 Islam Mohammad 32303-5648863-3 03428551174 9
3 Waseela Bibi (Widow) 32303-0706819-2 7
4 Ghulam Nabi 32303-6144592-9 03057893254 12
Page 18 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
5 Saeed Ahmed 32303-3686521-9 03465523170 24
6 Mohammad Irfan 32303-6392825-5 9
7 Mohammad Yousaf 32303-0772083-5 16
8 Mhemood 32303-0794195-3 24
9 Nabu Deen 32303-4478545-9 5
10 Mohammad saeed 32303-2129401-5 6
11 Mohammad Akram 32303-6114591-3 12
12 Mohammad Perwaiz 32303-6035872-7 16
13 Noor Mohammad 32303-6933405-9 24
14 Mohammad Yousaf 32303-0772083-5 16 Canal
15 Rab Nawaz 32303-0722405-9 16 Canal
16 Nawaz Ali 32303-7938034-9 16 Canal
17 Mohammad Anwar 32303-8186508-1 03026972562 16 Canal
18 Noor Hussain 32303-7515662-7 03087545995 16 Canal
19 Mohammad Adrees 32303-0789829-7 03017881945 8 Canal
20 Sami Ullah 32303-6107468-5 03137782009 6 Canal
21 Mohammad Intizar 32303-3786513-5 03017881945 6 Canal
22 Umer Hyat 32303-4180554-9 03456411815 6 Canal
23 Zulfiqar 32303-0729592-1 03012345447 6 Canal
24 Mohammad Jameel 32303-0174844-5 03012719908 6 Canal
25 Ghulam Fareed 32303-6737882-1 12 Canal
26 Mohammad Rasheed 32303-4555489-3 3 Canal
27 Jamshaid Ali 32303-9771340-9 03346929605 12 Canal
28 Sabir Hussain 32303-6141621-7 03346929605 3 Canal
29 Mohammad Yameen 32303-0243250-7 2 Canal
30 Ghulam Mohammad 32303-1474941-3 5 Canal
31 Mohammad Hussain 32303-8547245-7 03465541645 1 Canal
32 Hashim Shehzad 32303-2372360-1 03466448909 2 Canal
33 Azeem Ashraf 32304-5771497-1 0333-6030807 16 Canal
34 Nadeem Ahsraf 32304-5772542-1 03007487953 16 Canal
Shoree Wala
1 Mohammad Hanif 32303-1738846-7 03466441051 24
2 Mohammad Safdar 32303-7370560-5 24
3 Haji Mohammad 32303-3707834-1 16
4 Riaz Ahmed 32303-2472263-3 03319783498 24
5 Abdul Ghafoor 32303-7058528-1 03426624010 24
6 Bashir Ahmed 32303-1440006-3 24
7 Abid Hussain 32303-6509571-5 8
8 Ameer Mavia 32303-4480121-5 16
9 Mohammad Irfan 32303-0384174-3 16
10 Basheer Ahmed 32303-4722751-3 12
Page 19 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
11 Mohammad Aslam 32303-7829144-7 03442936747 8 Canal
12 Mohammad Iqbal 32303-5953716-3 11 Canal
13 Kosar Pervaiz 32303-1497407-1 03024090174 1 Canal
14 Faiz Bux 32303-4728564-7 03465541645 10 Canal
15 Ghulam Rasool 32303-8920435-3 03086952330 1 .5 Canal
16 Raheem Bux 32303-6991502-3 03326426533 3 Canal
17 Ilahi Bux 32303-8132945-9 03067343213 4 Canal
18 Ghulam Rasool 32303-8529077-9 03326426533 6 Canal
19 Ahmed Saeed 32303-1985338-5 03067343213 2 Canal
20 Mohammad Ramzan 32303-4967945-5 16 Canal
21 Hafiz Mohammad Saleem 32303-9731656-9 03075246058 3 Canal
22 Mohammad Hussain 32303-0779236-5 03037549826 16 Canal
23 Mohammad Mazher 32303-3550949-1 0343-7158683 1 .5 Canal
24 Zafer Iqbal 32303-5060829-9 03465541645 2 Canal
25 Abdul Rheman 32303-8333584-3 03326426533 7 Canal
26 Mohammad Arshad 32303-1290993-1 03319780321 2 Canal
27 Habib ullah 32303-6826108-1 03319780321 5 Canal
28 Mohammad Bilal 32303-8077240-1 03014744085 5 Canal
29 Shahid Iqbal 32303-8598852-1 03016961300 8 Canal
30 Javiad Iqbal 32303-2418082-9 03014588148 8 Canal
31 Khadim Hussain 32303-4990167-3 03072240986 16 Canal
32 Ghulam Qasim 32303-7923099-7 03442936747 2 Canal
33 Iltaf Hussain 32303-3438009-3 03437217225 20 Canal
34 Ghulam Fareed 32303-6290924-9 0303-7549826 12 canal
35 Karam Hussain 32303-5592638-9 03466448909 2 Canal
36 Abdul Rheman 32303-2154941-1 03442936747 2 Canal
37 Ghulam Abbas 32303-4857006-3 03022712655 1 Canal
38 Mohammad Ramzan 32303-7708032-5 03466448905 1 Canal
Chah Muzamil Wala
1 Mohammad Saeed 32303-5931065-7 03426622523 24
2 Mohammad Rafiq 32303-7321576-3 24
3 Mohammad Naeem Qadir 32303-0794489-1 16
4 Sultan Ahmed 32303-0703699-9 03454864944 16
5 Nadeem Qadir 32303-9742908-3 03046654676 23
6 Mohammad Zohaib 32303-4023335-5 03466440508 16
7 Ghulam Mustafa 32303-6162371-7 03086976462 8
8 Saeed Ahmed 32303-5045482-3 03467082126 16
9 Kareem Bux 32303-5778226-9 03347024036 16
10 Mohammad Yaseen 32303-5904459-1 03456438000 16 Canal
11 Ghulam Mohammad 32303-4628906-1 03456438000 2 Canal
Page 20 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
12 Kaloo 32303-3307618-7 03016954594 32 Canal
13 Ghulam Fareed 32303-0818150-5 0334-6922972 5 Canal
14 Kareem Bux 32303-8501023-3 03346922972 5 Canal
15 Ghulam Hussain 32303-6036571-9 03346922972 4 Canal
16 Ashiq Hussain 32303-2258760-3 03007737236 7 Canal
17 Mohammad Ramzan 32303-5597602-9 03366091740 16 Canal
18 Allah Bux 32303-7392014-3 03472150282 4 Canal
19 Mohammad Ramzan 32303-6866163-1 03476684129 4 Canal
20 Shafee Mohammad 32303-1004343-3 03056804219 5 canal
21 Ghulam Abbas 32303-6268230-9 3 .5Canal
22 Riaz Hussain 32303-8028836-7 03005607018 3 canal
23 Ashiq Mohammad 32303-7526704-3 030070966331 3 Canal
24 Khuda Bux 32303-9297332-7 03436543690 7 canal
25 Ghanzanfer Abbas 32303-8963304 11 Canal
26 Mohammad Ramzan 32303-0791076-7 03433673397 10 Canal
27 Basheer Ahmed 32303-8195910-1 03347876321 4 Canal
28 Ghulam Fareed 32303-6491877-3 03442223216 4 Canal
29 Manzoor Hussain 32303-0791090-7 03055701760 8 Canal
30 Mohammad Kamran 32303-6257822-5 03423724398 3 Canal
31 Nazeer Ahmed 32303-0791079-9 03017857367 4 Canal
32 Abdul Aziz 32303-0791079-7 03426630350 8 Canal
33 Mohammad Yousaf 32303-3952290-5 03457157386 4 Canal
34 Sajida Baigum 32303-2432556-8 8 Canal
35 Mohammad Haneef 32303-0516712-9 8 Canal
Sonaray wala
1 Saeed Ahmed 32303-6184734-1 03457357887 24
2 Mohammad Ramzan 30303-9900337-3 03316807701 16
3 Ghulam Mustafa 32303-5678332-2 03422144629 4
4 Imam Bux 32303-1532571-7 03422144629 16
5 Ghulam Mohammad 32303-0808650-5 03457290658 4
6 Ghulam Hassan 32303-6965751-7 03447029236 8
7 Ghulam Murtaza 32303-7466906-7 03457357898 4
8 Mohammad Abbas 32303-4169716-5 03457357887 4
9 Shamim Mai 32303-1252816-6 03426624079 8
10 Anwer Mai 32303-4559435-4 03457357887 8
11 Pathano Mai 32303-1103050-4 03447971851 8
12 Zafer Iqbal 32303-1555426-1 03447971851 16
13 Mohammad Afzal 32303-2155645-9 03447971851 8
14 Aftab Alam 32303-1786681-5 03139495962 8
Buha
Page 21 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
1 Fazal Mhemood 32303-0781205-1 03467175663 24
2 Khalid Naeem 32303-1695831-3 03016954504 24
3 Baber Malik 32303-7790276-3 03328041392 24
4 Abida Baigum (Widow) 32303-2432556-8 24
5 Ameer Baigum (Widow) 32303-3730932-4 24
6 Saeed Akhter 32303-0782305-1 24
7 Mohammad Tariq Javaid 32303-0780646-3 24
8 Faisal Mhemood 32303-3266475-7 16
9 Mohammad Zubair 32303-0780636-3 24
10 Mohammad Ramzan 32303-0729583-5 16
11 Zahid Iqbal 32303-0729583-9 16
12 Mohammad Asif Bilal 32303-0729585-1 03009004142 24
13 Mohammad Sajid Hussain 32303-8995078-7 16
14 Mohammad Yousaf 32303-0770077-3 16
15 Jawad Mhemood 32303-9401397-5 16
16 Mohammad Numan Shahid
32303-8540728-5 24
17 Aysha Baigum (widow) 32303-3387843-8 16
18 Mohammad Arshad 32303-5416271-9 16
19 Khursheed Baigum 32303-5391658-4 8
20 Ghulam Yaseen 32303-0781538-3 03015727146 12
21 Khalil Akhter 32303-3921080-1 5 Canal
22 Faheem Akhter 32303-7351577-5 16 Canal
23 Mohammad Yaseen 32303-5671387-7 5 Canal
24 Mohammad Rafiq 32303-7841995-1 03077842130 8 Canal
25 Mohammad Rasheed Akhter
32303-0781132-5 8 Canal
26 Abdul Rheman 31789216333 03086370660 16 Canal
27 Mohammad Haseeb 32303-4181206-5 03086976865 16 Canal
28 Mohammad Akhter 32303-0730872-1 03448222172 8 Canal
29 Mohammad Haneef 36203-0335122-7 03014865631 4 Canal
30 Naseer Ahmed 32303-4731792-5 8 Canal
31 Mohammad Jaffer 32303-5037116-5 03027830328 12 Canal
32 Riaz Ahmed 32303-5011953-3 03013272453 16 Canal
33 Mohammad Mheboob 32303-2885973-7 03453461145 16 Canal
34 Dilshad Baigum 32303-7273958-8 8 Canal
35 Ghulam Mustafa 32303-0141801-7 12 Canal
36 Basheer Ahmed 32303-4162532-9 16 Canal
37 Nazeer Ahmed 32303-9069772-7 6 Canal
38 Shakeel Akhter 32303-9090432-3 8 Canal
Dhadhi
Page 22 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
wala
1 Ghulam Rasool 32303-2693335-7 4 Bigay
2 Riaz Hussain 32303-6060778-1 03457290656 12 Canal
3 Fazal Hussain 32303-0505826-9 03437592848 4 Canal
4 Wahid Bux 32303-4276634-3 03437117367 8 canal
5 Wahid Bux 32303-7658233-9 03453773652 16 Canal
6 Ahmed Bux 32303-8073710-5 03472150260 12 Canal
7 Mohammad Ramzan 32303-8704982-1 16 Canal
8 Amir Naeem 32303-6046587-3 030660956592 10 Canal
9 Basheer Ahmed 32303-3024470-9 030568635618 16 Canal
10 Muneer Husain 32303-0792985-5 034537736527 4 Canal
11 Mohammad Javaid 32303-5915330-1 8 Canal
12 Mohammad Afzal 32303-9152884-7 03447029387 2 Canal
13 Mohammad Ashraf 32303-2271385-5 03447029387 2 Canal
1 Rab Nawaz 32303-0963096-9 2
2 Sabir Hussain 32303-6778532-1 1.5
3 Nazer Hussain 32303-2209656-5 7
4 Ghulam Fareed 32303-3116200-7 6
5 Khuda yar 32303-0638991-3 20
6 Mohammad Hussain 32303-3852929-5 03433673826 2 Canal
7 Khadim Hussain 32303-0858596-9 03433673826 10 marlay
8 Abid Hussain 32303-0581317-3 03433673826 1 .5 Canal
9 Ghulam Serwar 32303-2304751-5 03433673826 4 Canal
10 Mohammad Sonhara 32303-0557781-7 03433673826 8 Canal
11 Allah Ditta 32303-0919821-9 0306-8852897 40
12 Kareem Bux 32303-3909153-7 0306-8852897 40
13 Atta Muhammad Khan 32303-1852246-1 16
14 Muhammad Imran 32303-2923578-1 24
Page 23 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
List Round-2
Sr# NAME FATHER'S NAME
CNIC HAMLET ADDRESS LAND
(Canals)
1 FAQEER MOHAMMAD
MAMDOO 32103-4217210-
9 SAMANDRI
DAIRA DEEN PANAH
16
2 ABDUL-AZIZ MOHAMMAD BUX
32303-0790355-7
SAMANDRI DAIRA DEEN PANAH
16
3 AKHTER ABBAS SHARAF DEEN 32303-0770570-
7 SAMANDRI
DAIRA DEEN PANAH
8
4 MOHAMMAD ARSHAD
ALLAH BUX 32303-9979235-
3 SAMANDRI
DAIRA DEEN PANAH
8
5 GHULAM QASIM
PEER BUX 32303-603009-9 SAMANDRI DAIRA DEEN PANAH
16
6 MOHAMMAD ASHRAF
ALLAH BUX 42201-2275170-
9 SAMANDRI
DAIRA DEEN PANAH
16
7 MOHAMMAD IMRAN
DEEN MOHAMMAD
32303-6664316-1
SAMANDRI DAIRA DEEN PANAH
16
8 PEER BUX ILAHI BUX 32303-0749579-
7 SAMANDRI
DAIRA DEEN PANAH
16
9 MOHAMMAD RAMZAN
SHER MOHAMMAD
32303-4296569-1
SAMANDRI DAIRA DEEN PANAH
16
10 MAZHAR HUSSAIN
FAZAL HUSSAIN 32303-4474523-
7 SAMANDRI
DAIRA DEEN PANAH
16
11 NAZAR HUSSAIN
MUREED HUSSAIN
32303-0780929-9
SAMANDRI DAIRA DEEN PANAH
8
12 ABDUL RASHEED
MOHAMMAD BUX
32303-9397881-7
SAMANDRI DAIRA DEEN PANAH
8
13 GHULAM YASEEN
MOHAMMAD BUX
32303-5345044-3
SAMANDRI DAIRA DEEN PANAH
16
14 MOHAMMAD SALEEM AKHTER
KAREEM BUX 32303-5404684-
1 SAMANDRI
DAIRA DEEN PANAH
16
15 SHOAIB ASHRAF
GHULAM HUSSAIN
32303-6793606-7
SAMANDRI DAIRA DEEN PANAH
16
Page 24 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
16 MOHAMMAD AKHTER
PEER BUX 32303-4233721-
5 SAMANDRI
DAIRA DEEN PANAH
16
17 MOHAMMAD ASHRAF
AMEER BUX 32303-7629532-
9 SAMANDRI
DAIRA DEEN PANAH
16
18 IJAZ AHMAD MOHAMMAD IBRAHEEM
32303-8791309-7
SHORI DAIRA DEEN PANAH
8
19 SHAMAL HUSSAIN
IMAM BUX 32303-8651513-
1 SHORI
DAIRA DEEN PANAH
8
20 MOHAMMAD RAMZAN
MOHAMMAD YOUSUF
32303-2085380-9
SHORI DAIRA DEEN PANAH
8
21 ISHAAQ AHMAD
ALLAH BUX 32303-9768158-1
SHORI DAIRA DEEN PANAH
8
22 KHUDA BUX MOHAMMAD BUX
32303-9846840-1
SHORI DAIRA DEEN PANAH
16
23 MOHAMMAD IBRAHEEM
ALLAH BUX 32303-7207575-
1 SHORI
DAIRA DEEN PANAH
16
24 MAZHAR IQBAL
MALIK MULAZIM HUSAIN
32303-0770536-5
SHORI DAIRA DEEN PANAH
16
25 HAJI NAZAR HUSSAIN
ALLAH DITTAH 32303-9557781-
3 SHORI
DAIRA DEEN PANAH
16
26 QARI ABDUL HAMEED
HAJI ALLAH BUX
32303-2937402-3
SHORI DAIRA DEEN PANAH
16
27 KAREEM BUX QADIR BUX 36302-7132142-
1 SHORI
DAIRA DEEN PANAH
16
28 ILAHI BUX KHUDA BUX 32303-3977919-
5 SHORI
DAIRA DEEN PANAH
16
29 FAZAL HUSSAIN
MOHAMMAD RAMZAN
32303-8548766-7
SHORI DAIRA DEEN PANAH
8
30 MOHAMMAD AKHTER
HAJI MOHAMMAD
32303-3707834-1
SHORI DAIRA DEEN PANAH
16
31 AZEEM BUX MOHAMMAD SONHARA
32303-8461033-5
SHORI DAIRA DEEN PANAH
8
Page 25 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
32 FAIZ BUX MOHAMMAD SONHARA
32303-3601649-1
SHORI DAIRA DEEN PANAH
8
33 GHULAM RASOOL
ALLAH DITTAH 32303-1239203-1
SHORI DAIRA DEEN PANAH
8
34 MOHAMMAD HUSSAIN
ALLAH DITTAH 32303-8547245-
7 SHORI
DAIRA DEEN PANAH
8
35 NAZEER AHMAD
SHER MOHAMMAD
32303-3311500-9
SHORI DAIRA DEEN PANAH
8
36 AZEEZ-U-LLAH HAFIZ GHULAM HAIDER
32303-3902737-5
SHORI DAIRA DEEN PANAH
8
37 ASHIQ HUSSAIN
ILAHI BUX 32303-4230505-
7 SHORI
DAIRA DEEN PANAH
8
38 GHULAM SHABBIR
AHMAD BUX 32303-4342668-
1 SUNAREY
DAIRA DEEN PANAH
8
39 HAQ NAWAZ GHULAM SARWAR
32303-6318400-9
SUNAREY DAIRA DEEN PANAH
8
40 TASLEEM KAUSAR(WID)
M. AHMADNAWAZ
32303-0270598-8
SUNAREY DAIRA DEEN PANAH
16
41 MAKHDUM ARSHAD NAWAZ
M.AHMAD NAWAZ
32303-9289664-5
SUNAREY DAIRA DEEN PANAH
16
42 ASAD ABBAS IFTIKHAR RASOOL
32303-3148129-3
SUNAREY DAIRA DEEN PANAH
16
43 KULSOOM BIBI MOHAMMAD KHAN
32303-5835386-0
SUNAREY DAIRA DEEN PANAH
8
44 ABDUL-WAHEED
OMAR DEEN 32303-0729591-
7 BABNEE
DAIRA DEEN PANAH
8
45 HAJIRA BIBI NAWAB ALI 32303-0706818-
4 BABNEE
DAIRA DEEN PANAH
8
46 MOHAMMAD YASEEN
ALLAH DITTAH 32303-3759054-
9 BABNEE
DAIRA DEEN PANAH
8
47 ABDUL WAHAB MUSHTAQ AHMAD
32303-8251573-7
BABNEE DAIRA DEEN PANAH
8
Page 26 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
48 ZAKIA BIBI ABDUL WAHEED
32303-7165609-6
BABNEE DAIRA DEEN PANAH
8
49 HAKIM ALI MOHAMMAD RAMZAN
32303-1896753-5
BABNEE DAIRA DEEN PANAH
8
50 SALAH-U-DEEN ABDUL WAHEED
32303-7599276-3
BABNEE DAIRA DEEN PANAH
8
51 SAMODAN BIBI MOHAMMAD RIAZ
32303-7645946-8
BABNEE DAIRA DEEN PANAH
8
52 MOHAMMAD REHAN
MOHAMMAD RIAZ
32303-9636091-3
BABNEE DAIRA DEEN PANAH
8
53 MOHAMMAD ISMAEEL
SAEED AHMAD 32303-6788229-
1 BABNEE
DAIRA DEEN PANAH
8
54 MOHAMMAD ISHAAQ
MANGTA 32303-0722138-
1 BABNEE
DAIRA DEEN PANAH
8
55 ZULFIQAR ALI MOHAMMAD AKBAR
32303-5930775-7
BABNEE DAIRA DEEN PANAH
8
56 MOHAMMAD ASHRAF
GHULAM QADIR
32303-6543911-1
BUHA DAIRA DEEN PANAH
8
57 MANSOOR AHMAD
MOHAMMAD AKHTER
32303-7748733-3
BUHA DAIRA DEEN PANAH
8
58 MOHAMMAD SADIQ
AHMAD BUX 32303-6718601-
1 BUHA
DAIRA DEEN PANAH
8
59 SAEED AHMAD ALLAH WASAYA
32303-0782385-1
BUHA DAIRA DEEN PANAH
16
60 GHULAM FAREED
WAHID BUX 32303-8050518-
1 BUHA
DAIRA DEEN PANAH
16
61 ILAHI BUX KHUDA BUX 32303-8205092-
5 BUHA
DAIRA DEEN PANAH
16
62 QAISAR PERWAIZ
SAEED AHMAD 32303-0782383-
3 BUHA
DAIRA DEEN PANAH
16
63 SHAMEEM AHMAD
MOHAMMAD NAWAZ
32303-3654572-1
BUHA DAIRA DEEN PANAH
16
Page 27 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
64 ABDUL-AZIZ ILAHI BUX 32303-0791898-
3 BUHA
DAIRA DEEN PANAH
16
65 AZIZ-U-REHMAN
GUL NAWAZ 32303-1780319-
9 BUHA
DAIRA DEEN PANAH
16
66 MOHAMMAD SHOIAB AKHTER
M.NAJEEB AKHTER
32303-0797736-5
BUHA DAIRA DEEN PANAH
16
67 RUKHSANA YASMEEN
M.MUNEER HAIDER
32303-5997676-0
BUHA DAIRA DEEN PANAH
16
68 GHULAM FAREED
AHMAD BUX 32303-720948-7 MUZAMIL DAIRA DEEN PANAH
8
69 NABI BUX AHMAD BUX 32303-7972181-
9 MUZAMIL
DAIRA DEEN PANAH
8
70 MOHAMMAD BUX
AHMAD BUX 32303-5430633-
9 MUZAMIL
DAIRA DEEN PANAH
8
71 AHMAD BUX MALIK SHAHROO
32303-5285536-5
MUZAMIL DAIRA DEEN PANAH
8
72 GHULAM MUSTAFA
GHULAM HAIDER
32303-6037314-1
MUZAMIL DAIRA DEEN PANAH
16
73 NAVEED IQBAL RAHEEM BUX 32303-0780857-
1 MUZAMIL
DAIRA DEEN PANAH
8
74 MOHAMMAD ASLAM
KHUDA BUX 32303-9512884-
3 MUZAMIL
DAIRA DEEN PANAH
8
75 MOHAMMAD AKRAM
KHUDA BUX 32303-9157996-
5 MUZAMIL
DAIRA DEEN PANAH
8
76 MOHAMMAD ASLAM
MOHAMMAD BUX
32303-9374936-9
MUZAMIL DAIRA DEEN PANAH
16
77 ABDUL-REHMAN
MOHAMMAD BUX
32303-0787776-3
MUZAMIL DAIRA DEEN PANAH
8
78 MOHAMMAD HUSSAIN
ALLAH DEWAYA
32303-4798147-5
MUZAMIL DAIRA DEEN PANAH
16
79 SULTAN MEHMOOD
KAREEM BUX 32303-1422799-
9 MUZAMIL
DAIRA DEEN PANAH
16
Page 28 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
80 IRSHAD BEGUM (WID)
MEHR ALLAH DAD
32303-0769369 MUZAMIL DAIRA DEEN PANAH
16
81 ABDUL KHALIQ HAFIZ GHULAM HAIDER
32303-5166181-7
MUZAMIL DAIRA DEEN PANAH
16
82 SHEKH FAIZ SHEKH GHULAM HAIDER
32303-2936452-3
MUZAMIL DAIRA DEEN PANAH
16
83
MOHAMMAD AMEEN
MOHAMMAD BUX
32303-2777868-7
MUZAMIL DAIRA DEEN PANAH
16
84
MUHAMMAD ASIF IQBAL
MUHAMMAD AASHIQ
32303-6449312-9
MUZAMIL DAIRA DEEN PANAH
8
85
ABDUL-RASHEED
NIZAM-U-DEEN 32303-0781451-9
MUZAMIL DAIRA DEEN
PANAH 8
Annex-IV List of CPI Schemes:
# Name of Scheme Estimated
Qty Actual Qty
Village
Name
Estimated
Cost (Rs.)
Page 29 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
1 New Soling
1500 1450
Muzamil
Wala 800,550
2 Repair of Soling
800 758
Muzamil
Wala 197,252
3 RCC Culverts
3 3
Muzamil
Wala 120,832
4 Open Drain
1800 2106
Muzamil
Wala 646,130
5 Community Latrine
3 3
Muzamil
Wala 154,109
6 Hand Pump
5 6
Muzamil
Wala 75,500
1,994,373
7 New Soling
1000 500 Shouri 512,800
8 Resoling
700 400 Shouri 159,508
9 Culverts
1 2 Shouri 51,704
10 Sewerage
3120 2800 Shouri 2,048,600
11 Community Latrine
3 3 Shouri 154,109
12 H.Pump(05 Nos.)
5 5 Shouri 75,515
13 Watercourse 2'x2'
2000 2000 Shouri 1,151,480
14 Watercourse 1'-9"x2'
2000 2090 Shouri 1,080,700
15 New Soling
3592 3200 Samandary 1,842,652
16 Resoling
1500 1800 Samandary 356,460
17 Culverts
3 4 Samandary 118,432
18 Open Drain
3287 2700 Samandary 1,174,382
19 Community Latrine
3 3 Samandary 154,109
20 H.Pump
27 27 Samandary 345,600
21
Watercourse 2'x 2'-
6" 2000 2005 + 1 Culvert Samandary 1,424,184
5,415,819
22 New Soling
1200 1075 Bebni
444,840
23 H.Pump
10 10 Bebni
105,000
Page 30 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
24
Community Latrine
with Septic Tank 8 8 Bebni
410,957
960,797
25 New Soling
1000 1160 Booha
371,440
26 Open Drain
1400 1636 Booha
504,215
27
Community Latrine
with Septic Tank 3 3 Booha
154,109
1,029,764
28
New Soling
(2200Rft) 2200 2280+ 3Culverts
Sunaray
Wala 730,525
29 H.Pump(11 Nos.)
11 11+Drain+4Culverts
Sunaray
Wala 166,100
896,625
30 Watercourse 2'x2' 1000 1000 Aukan Wala 462,802
Annex-V List of Family Nutrition Kits:
SR# NAME W/O ,D/O, S/O CNIC HAMLET
1 ZAINAB MAI (WID) MOHAMMAD RAMZAN 32303-
0702537-0 SAMANDRI
2 KHADEEJA BIBI (WID) MOHAMMAD ASHRAF 32303-
9547383-2 SAMANDRI
Page 31 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
3 SAIMA BIBI AASHIQ HUSSAIN 32303-
6013894-0 SAMANDRI
4 SHAMEEM BIBI MOHAMMAD YUNUS 32303-
4640977-2 SAMANDRI
5 RUBEENA BIBI ABDUL RASHEED 32303-
0759623-8 SAMANDRI
6 KULSOOM BIBI ALLAH BUX 32303-
1363118-0 SAMANDRI
7 SAKEENA MAI (WID) GHULAM HUSSAIN 32303-
3985298-2 SAMANDRI
8 FAUZIA BIBI GHULAM ABBAS 32303-
8670690-4 SAMANDRI
9 SAIRA BIBI GHULAM ABBAS 32303-
2775123-0 SAMANDRI
10 KARAM ILAHEE SHARAF HUSSAIN 32303-
0748494-0 SAMANDRI
11 MAI ZAREENA AZEEM BUX 32303-
7482333-4 SAMANDRI
12 HAMEEDA MAI MOHAMMAD MUSA 32303-
7421795-6 SAMANDRI
13 FATIMA MAI DEEN MOHAMMAD 32303-
1607963-4 SAMANDRI
14 SAKEENA BIBI SHAUKAT ABBAS 32303-
5357626-8 SAMANDRI
15 ABIDA HUSSAIN MUNEER ALI 32303-
9490461-4 SAMANDRI
36 SAFDARI (WID) MANSAB ALI 32303-
2588059-4 BABNI
37 ZAKIA BIBI (WID) WAHEED-U-DEEN 32303-
7165609-6 BABNI
38 HAJIRA (WID) NAWAB ALI 32303-
0708818-4 BABNI
39 WASEELA (WID) MUNAWAR HUSSAIN 32303-
0706819-2 BABNI
40 JAFFERI ABDUL WAHEED 32303-
0700818-0 BABNI
41 RAEESA YAMEEN 32303-
7592462-8 BABNI
42 SAMOODAN (WID) MOHAMMAD RIAZ 32303-
7645946-8 BABNI
43 RAZIA RAB NAWAZ 32303-
0701941-2 BABNI
44 WAKEELA GHULAM FAREED 32303-
6462243-8 BABNI
45 SAMEENA MOHAMMAD YUSUF 32303-
0743348-0 BABNI
46 SAJIDA BIBI MOHAMMAD SAEED 32303-
8437867-4 BABNI
Page 32 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
47 SALMA BEGAM ISLAAM MOHAMMAD 32303-
3992884-6 BABNI
48 GHULAM FATIMA MOHAMMAD IQBAL 32303-
8603969-6 SHORI
49 ZAREENA BIBI KAUSAR PERWAIZ 32303-
8106404-8 SHORI
50 TAAJ MAI MOHAMMAD HUSSAIN 32303-
0749360-2 SHORI
51 GULZAR BIBI (WID) NABI BUX 36302-
9942156-6 SHORI
52 RUKHSANA BIBI SHAUKAT PERWAIZ 32303-
5224563-6 SHORI
53 SHAMEEM MAI (WID) ABDUL MAJEED 32303-
1252810-6 SHORI
54 KULSOOM BIBI ABDUL HAMEED 32303-
0238752-0 SHORI
57 MANZOOR MAI MOHAMMAD RAMZAN 32303-
1582622-0 SHORI
58 DAULAT (WID) MOHAMMAD HUSSAIN 32303-
0328735-0 MUZAMIL
59 IQBAL BEGAM (WID) GHULAM SHABBIR 32303-
4277270-8 MUZAMIL
60 YASMEEN BIBI MOHAMMAD AMEEN 32303-
6253056-8 MUZAMIL
61 SADDAN MAI (WID) GHULAM QADIR 32303-
5360480-4 MUZAMIL
62 RUKHSANA BIBI NADEEM QADIR 32303-
4369922-8 MUZAMIL
63 WASSO MAI GHULAM HUSSAIN 32303-
1591794-4 MUZAMIL
64 MOHAMMAD RAMZAN QADIR BUX 32303-
0791076-7 MUZAMIL
65 ZAINAB (WID) ILAHEE BUX 32303-
0758547-4 MUZAMIL
66 SAJIDA BIBI MOHAMMAD SHAFEE 32303-
6607300-6 MUZAMIL
67 SAKEENA BIBI MOHAMMAD RAFEEQ 32303-
0549601-0 MUZAMIL
68 TAAJ MAI GHULAM FAREED 32303-
6147481-0 MUZAMIL
69 HAJIRAN BIBI MOHAMMAD SAFDAR 32303-
9757032-2 MUZAMIL
70 MANZOOR MAI MOHAMMAD BUX 32303-
1738672-6 MUZAMIL
71 PATHANI MAI MOHAMMAD SHAFEE 32303-
4209510-8 MUZAMIL
72 SHEHNAZ BIBI BASHEER AHMAD 32303-
4111439-6 MUZAMIL
Page 33 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
73 ALLAH WASAEE ALLAH WASAYA 32303-
1782609-4 MUZAMIL
74 MANSAB MAI MOHAMMAD YUSUF 32303-
4432500-0 MUZAMIL
75 Haleema Mai Kaloo 323032064010-
2 MUZAMIL
76 AMEER BEGAM (WID) RAHEEM BUX 32303-
3730932-4 BOHA
77 SAKEENA BEGAM ILAHI BUX 32303-
7164718-0 BOHA
78 NAHEED AKHTER MOHAMMAD ZUBAIR 32303-
0750281-6 BOHA
79 AYESHA MAI (WID) NOOR MOHAMMAD 32303-
3387843-8 BOHA
80 JAMSHAID BEGAM MOHAMMAD AKHTER 32303-
0704800-4 BOHA
81 RAZIA BEGAM MOHAMMAD ASHRAF 32303-
3898311-2 BOHA
82 SAJIDA BEGAM ASHIQ HUSSAIN 32303-
2432556-0 BOHA
83 NAZEER BEGAM SAEED AHMAD 32303-
0751565-0 BOHA
84 SAMEENA HANEEF ABDUL AZIZ 32303-
7656834-4 BOHA
85 ASHRAF BEGAM MOHAMMAD RAMZAN 32303-
0706806-8 BOHA
86 ZAHIDA MALIK MOHAMMAD YOUSUF 32303-
0741971-8 BOHA
87 SAEEDA BEGAM FAHEEM AKHTER 32303-
9280918-2 BOHA
88 AYESHA MAI RASHEED AHMAD 32303-
2977925-0 BOHA
89 JANNAT MAI WAHID BUX 32303-
2502589-8 WASAIB
90 NAZEER BIBI MOHAMMAD HUSSAIN 32303-
2791229-8 WASAIB
91 BHIRAWAN MAI KHUDA YAAR 32303-
0710644-4 WASAIB
92 BUSHRA BIBI KHADIM HUSSAIN 32303-
5753812-2 WASAIB
93 ALLAH WASAI (WID) PEER BUX 32303-
6908063-4 WASAIB
94 BHIRAWAN MAI ALLAH WASAYA 32303-
6395478-4 WASAIB
95 SAKEENA MAI (WID) MOHAMMAD NAWAZ 32303-
7242729-8 WASAIB
96 RUQYA BIBI MOHAMMAD BILAL 32303-
9850723-8 WASAIB
Page 34 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
97 NASREEN MAI GHULAM MUSTAFA 32303-
6505275-6 WASAIB
98 AAMINA BIBI GHULAM MURTAZA 32303-
0121615-4 WASAIB
99 KULSOOM BIBI AMEER MOHAMMAD 32303-
9192032-2 WASAIB
100 SAKEENA MAI (WID) MOHAMMAD AFZAL 32303-
7007654-6 WASAIB
101 AYESHA MAI GHULAM SARWAR 32303-
9191137-0 WASAIB
102 ZAINAB MAI MOHAMMAD SONHARA 32303-
3925545-2 WASAIB
103 HASEENA MAI GHULAM SHAFEE 32303-
2948737-2 WASAIB
104 NASEEM MAI ALLAH BUX 32303-
9974997-0 WASAIB
105 BAKHTO MAI IMAM BUX 32303-
3718528-8 WASAIB
Annex-VI List of Business Incubation:
Sr. #
Name CNIC Contact Number
Village Name Business Assets Provided
1 Ghulam Muhammad
32303-1474941-3
3326422426 Basti Babni Karyana Shop Counter +Rack+Material
2 Mehmood 32303-0794195-3
3017881945 Basti Babni Karyana Shop Counter +Rack+Material
Page 35 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
3 M.Arslan 32303-6616749-5
3326422426 Basti Babni Karyana Shop Counter +Rack+Material
4 Allah wasi 32303-612564-6
#VALUE! Silei wala Karyana Shop
Counter +Rack+Material
5 Aashiq Hussain 32303-1834212-5
3136877526 Basti Samandri Karyana Shop Counter +Rack+Material
6 Saeed Ahmad 32303-8278691-9
3477301901 Basti Samandri Karyana Shop Counter +Rack+Material
7 Karam Hussain 32303-5592638-9 3466448909
Basti Shori Karyana Shop Counter +Rack+Material
8 M.Hanif 36203-0331512-7
3014865631 Basti Boha Karyana Shop Counter +Rack+Material
9 M.Nawaz 32303-8852106-9
___________________
Basti Muzammal Wala
Karyana Shop
Counter +Rack+Material
10 Samina Bibi 32303-6538019-6
34721150282 Basti Muzammal Wala
Karyana Shop
Counter +Rack+Material
11 Iqbal Bibi 32303-4277270-8
3467881873 Basti Muzammal Wala
Karyana Shop
Counter +Rack+Material
12 Kaneez Mai 32303-6490011-6
3453211692 Basti Muzammal Wala
Karyana Shop
Counter +Rack+Material
13 Zafar Iqbal 32303-5060829-9
3366081917 Basti Shori Karyana Shop Counter +Rack+Material
14 Abdul Sattar 32303-5962340-3
3324429301 Basti Shori Shoe Maker Leather+tools
15 M.Arif 32303-1215263-1
3025165988 Basti Shori Shoe Maker Leather+tools
16 Mohammad Bilal
32303-9067060-7
3012297665 Basti Shori Shoe Maker Leather+tools
17 Aashiq Hussain 32303-335232-3
3023741240 Basti Shori Shoe Maker Leather+tools
18 Abdul Rehman 32303-8333584-3
3366081917 Basti Shori Shoe Maker Sewing machine +Leather +tools
19 M.Iqbal 32303-5953716-3
3366081917 Basti Shori Shoe Maker Leather+tools
20 M.Yousaf 32303-9615384-9
3326426533 Basti Shori Shoe Maker Leather+tools
21 Shamim Akhtar 32303-0303367-0
3422144629 Basti Dhadhi wala
Tailoring Tailoring rack+machine+Iron+Material
22 Amina Bibi 32303-0121615-4
__________________
Basti Dhadhi wala
Tailoring Tailoring rack+machine+Iron+Material
23 Samina Bibi 32303-3546897-7
3066764464 Basti Shori Tailoring Tailoring rack+machine+Iron+Material
Page 36 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
24 Amna Bibi 32303-4037059-6
3457357887 Basti Shori Tailoring Tailoring
rack+machine+Iron+Material
25 Gulshad Bibi 32303-0716527-0
___________________
Basti Samandri Tailoring Tailoring
rack+machine+Iron+Material
26 Reena Bibi 32303-0716527-0
3086955089 Basti Samandri Tailoring Tailoring
rack+machine+Iron+Material
27 Sakeena Bibi 32303-3985298-2
3334862397 Basti Samandri Tailoring Tailoring
rack+machine+Iron+Material
28 M.Waqas Shah 32303-4957718-1
3428089162 Basti Samandri Tailoring Tailoring
rack+machine+Iron+Material
29 Razia Bibi 32303-9831721-4
-3066764464 Basti Samandri Tailoring Tailoring rack+machine+Iron+Material
30 Asif raza 32303-3898311-7
3317018733 Basti Boha Tailoring Tailoring
rack+machine+Iron+Material
31 Razia Bibi 32303-9461773-3
3433829979 Basti Boha Tailoring Tailoring rack+machine+Iron+Material
32 Javed Iqbal 32303-8234932-7
3472150282 Basti Muzammal Wala
Tailoring Tailoring rack+machine+Iron+Material
33 Ijaz 32303-3403702-
3012129307 Basti Muzammal Wala
Tailoring Tailoring rack+machine+Iron+Material
34 Khuda Yar 32303-0638991-3
3433673826 Basti Dhadhi wala
Donkey Cart Donkey+Cart
35 Khadim Hussain
32303-0858596-9
3433673826 Basti Dhadhi wala
Donkey Cart Donkey+Cart
36 Rab Nawaz 32303-0963096-9
3433673826 Basti Dhadhi wala
Donkey Cart Donkey+Cart
37 Mohammad Idrees
32303-0789829-7
3017881945 Basti Babni Donkey Cart Cart
38 Sallah-U-Deen 32303-7599276-3
3456108106 Basti Babni Donkey Cart Donkey
39 Karim Bux 32303-0235666-7
3472150282 Basti Muzammal Wala
Donkey Cart
Donkey
40 M.Javed 32303-9447713-5
3472241970 Basti Muzammal Wala
Donkey Cart
Donkey+Cart
41 Haq Nawaz 32303-4918934-5
3472150282 Basti Muzammal Wala
Donkey Cart
Donkey
42 Abdul Majeed 32303-3590216-5
3433673826 Basti Dhadhi wala
Fruit Cart Fruit+cart
43 Sabir Hussain 32303-6141621-7
3367942317 Basti Babni Fruit Cart Fruit
Page 37 of 37
Project Completion Report “project for The Rehabilitation of Flood Affected Communities”
44 Allah Bux 32303-7392014-3
3472150282 Basti Muzammal Wala
Poultry Cycle +Poultry hens
45 Allah Wasaya 32303-7808596-9
3062342910 Basti Dhadhi wala
Livestock (Goats) 2 Goats
46 Hakim Ali 32303-1896753-5
3067599863 Basti Babni Livestock 2 Sheeps
47 Mohammad Irfan
3.23036E+11 3058495126 Basti Babni Livestock (Goats) 2 Goats
48 Akram Nadeem 3077877475 Basti Boha Cycle Repairing Cycle repairing materail
49 Latif 32303-7321576-3
3426410212 Basti Muzammal Wala
Hair Dresser
Chair+counter +materail
50 Syed Sajjad Hussain
32303-7164503-5
3476688252 Basti Samandri Electrition Electric tools +material
51 Nazar Hussain 32303-0780929-9
3023727149 Basti Samandri Plumber Plumber tools +materail
52 M.Arif 32303-4637488-5
3447985894 Basti Shori Cosmetics + Bangalo Cosmetic products+bangalos
53 Chanan Mai 31201-3852426-4
3082551348 Basti Samandri Flour Machine Repairment of floor mill + Peter