Page | 1 Mudlo Road, Mudlo – Culvert Repairs Summary Council has allocated funding in the 2015/16 financial year to repair two sets of cross road culverts along Mudlo Road, Mudlo, as shown in the plan of work overleaf. Works proposed The project will involve lining the existing steel piped road stormwater drainage infrastructure. The work will include: minor vegetation clearing and earthworks inserting a plastic pipe lining inside the existing piped infrastructure, including concrete grouting, headwalls and aprons, and reinstatement of the roadway Council endeavours to minimise disturbance of established vegetation on its projects where possible. Traffic management Your patience during construction is appreciated. Traffic management measures will be in place to ensure the safety of all road users. Timing Construction is expected to commence in early 2016, subject to weather. Further Information For more information about this project T 1300 307 800 E [email protected] Project Information Project No. 4218527. February 2016

Project Information - Mudlo Rd Culvert Repairs · The project will involve lining the existing steel piped road ... minor vegetation clearing and ... Project Information - Mudlo Rd

  • Upload
    hacong

  • View
    216

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Project Information - Mudlo Rd Culvert Repairs · The project will involve lining the existing steel piped road ... minor vegetation clearing and ... Project Information - Mudlo Rd

P a g e | 1

Mudlo Road, Mudlo – Culvert Repairs

Summary

Council has allocated funding in the 2015/16 financial year to repair two sets of cross road culverts along Mudlo Road, Mudlo, as shown in the plan of work overleaf.

Works proposed

The project will involve lining the existing steel piped road stormwater drainage infrastructure.

The work will include:

minor vegetation clearing and earthworks

inserting a plastic pipe lining inside the existing piped infrastructure, including concrete grouting, headwalls and aprons, and

reinstatement of the roadway

Council endeavours to minimise disturbance of established vegetation on its projects where possible.

Traffic management

Your patience during construction is appreciated. Traffic management measures will be in place to ensure the safety of all road users.

Timing

Construction is expected to commence in early 2016, subject to weather.

Further Information

For more information about this project

T 1300 307 800 E [email protected]

Project Information Project No. 4218527. February 2016

Page 2: Project Information - Mudlo Rd Culvert Repairs · The project will involve lining the existing steel piped road ... minor vegetation clearing and ... Project Information - Mudlo Rd

2015/2016 CAPITAL WORKS PROGRAM

MUDLO ROAD, MUDLO

JANUARY 2016

AutoCAD SHX Text
N
AutoCAD SHX Text
LOCALITY PLAN (N.T.S.)
AutoCAD SHX Text
Mudlo
AutoCAD SHX Text
R O A D
AutoCAD SHX Text
PROPOSED CULVERT REHABILITATION
AutoCAD SHX Text
M U D L O
AutoCAD SHX Text
CH18.2km PLAN
AutoCAD SHX Text
CH16.7km PLAN
AutoCAD SHX Text
M U D L O
AutoCAD SHX Text
R O A D
AutoCAD SHX Text
CH18.2km SITE
AutoCAD SHX Text
CH16.7km SITE
AutoCAD SHX Text
Rd
AutoCAD SHX Text
Mudlo Rd
AutoCAD SHX Text
Mudlo Rd
AutoCAD SHX Text
White Rock Rd
AutoCAD SHX Text
McKewan Rd
AutoCAD SHX Text
Road
AutoCAD SHX Text
Tansey
AutoCAD SHX Text
Kilkivan
AutoCAD SHX Text
KILKIVAN
AutoCAD SHX Text
Bular Rd
AutoCAD SHX Text
Wide Bay Hwy
AutoCAD SHX Text
PROPOSED CULVERT REHABILITATION