What is the current TRAC Tier on the 2016-2019
Major New Construction Program List?Tier III
Please identify the project mode (roadway, transit
or frieght):Roadway
Project Description:
Proposed TRAC funding is for the completion of Right-of-Way acquisition for a 5.2 mile section of
two lane highway with additional climbing lanes and with a full interchange at SR 775 as part of a
future four lane limited access highway. This current phase is known as Phase 2 of the Chesapeake
By-pass project. This project has been listed as part of the Southeast Ohio Plan.
ODOT District District 9 County Lawrence
ODOT PID 75923 Project Mode Roadway
Project Information
Application ID 2016-D09-01 Date Submitted 6/28/2016
Project Name LAW-Chesapeake Bypass Phase 2 / LAW-7-2.17
Processed: 6/29/2016 2016 TRAC Funding Application 1 of 13
Roadway Segments No
Local Investments No
What Type of Application Are you Submitting?
Existing TRAC Project - Tier I, II or III project
seeking additional funds to advance to the
next stage of project development.
Existing TRAC Projects
Existing TRAC projects are not required to submit the complete application. The information submitted in your most recent application will be used in the evaluation and scoring of the application. However, since the level of project detail continually increases you can choose to update the following sections:
Project Development Schedule & Milestones Yes
City Chillicothe
State OH Zip Code: 45601
Phone (740) 774-9067
Email [email protected]
Address650 Eastern Avenue
Project Sponsor Information
Project Name LAW-Chesapeake Bypass Phase 2 / LAW-7-2.17
Sponsoring Agency ODOT - District 9
Project Contact Christopher Pridemore
Processed: 6/29/2016 2016 TRAC Funding Application 2 of 13
Utility Relocation Not Started 12/1/2017
Detailed Design In Progress 12/1/2017
Right-of-way Acquisition In Progress 12/1/2017
Preliminary Engineering Studies Complete 6/15/2001
Environmental / NEPA Approval Complete 6/15/2001
Status Date
Planning Studies Complete 1/1/2001
Interchange Modification Study (IMS) /
Interchange Justification Studies (IJS)Not Started 1/0/1900
Project Schedule
New projects are required to supply project milestone information. Please select the status of each
milestone below as either Not Yet Started, In Progress or Completed. Additionally please enter the
corresponding date for the milestone and status.
Processed: 6/29/2016 2016 TRAC Funding Application 3 of 13
0 0 0 0
0 0 0
New Roadways / New Alignment 0
Begin Latitude Begin longitude End Latitude End longitude
0 0 0
0 0 0
Secondary Roadway
Segments
0 0 0
0 0 0
0 0 0
ODOT NLFID Begin Point End Point
Primary Roadway
Segment0 0 0
Transportation Information
In an effort to understand the complex issues associated with the project TRAC collects a variety of transportation related data and information in the evaluation process including: congestion data, safety data, truck traffic, and model derived transportation values; such as, cost/benefit analysis and air quality. The roadway segments associated with the application is the basis of this analysis. Transit and Freight related projects should identify the roadway segments that will receive the benefit from projects
New project applications must identify the primary roadway segment that will be improved by the project and ancillary roadways that will be improved as part of the project.
Processed: 6/29/2016 2016 TRAC Funding Application 4 of 13
Truck Miles Traveled (TMT) Reduction 0
Existing Freight Capacity 0
Existing Freight Volume / Existing Freight Capacity
Ratio0
Freight Capacity Increase 0
Freight Multi-Modal Project Information
Freight Type 0
Route/Number 0
Existing Freight Volume 0
Existing Peak Hour Ridership / Capacity Ratio 0
Added Peak Hour Capacity 0
Vehicle Miles Traveled (VMT) Reduction 0
Route/Number 0
Peak Hour Ridership 0
Existing Capacity 0
Transit Multi-Modal Project Information
Transit Type 0
Processed: 6/29/2016 2016 TRAC Funding Application 5 of 13
Please provide a brief explanation as to how this project will connect an STS resource with a
local freight or transit facility or resource
Improves access to "The Point" Intermodal Industrial Park. This facility has highway access, rail
access with an operational siding of the Norfolk-Southern Heartland Corridor, and an existing deep
water port and barge facility on the Ohio River.
Will the project facilitate a connection between two
or more corridors or modal hubs identified on the
STS?
No
Please provide a brief explanation as to how this project will facilitate a connection between
two or more STS resources.
0
Will the project connect an STS resource with a local
freight or transit facility or resource?Yes
Strategic Transportation System (STS) Connections
The Strategic Transportation System (STS), identified as part of Access Ohio 2040 - ODOT’s long
range transportation plan - stratifies Ohio’s significant transportation corridors and inter-modal
hubs across Ohio. Additional information about the STS and Access Ohio 2040 can be view at
the Access Ohio 2040 Website
Is the project part of an STS corridor? Yes
Processed: 6/29/2016 2016 TRAC Funding Application 6 of 13
What is the estimated percentage of road route
miles served by transit routes (excluding ADA/Para
Transit) within the project area?
68%
Warehouse 104,073
Commerical 2,590,805
Insitutional 1,853,242
Water and Sewer Service 100%
What is the estimated square footage for the following building types within the calculated project
area?
Light Industrial -
Heavy Industrial -
Estimated Project Area Acerage 9,677
What is the estimated percentage of acres being served by the local services within the
estimated project area calculated above?
Local Streets and Roadways 50%
Electrical Service 100%
Local Investment Factors
Built Out Local AttributesLocal Investment factors analysis and evaluation of the dollar value of existing, local built-out attributes such as streets, water, and land use. For this analysis TRAC has standardized the project area as a one-mile "rectangular" buffer around the primary roadway segment. Additionally TRAC also considers percentage of acres served by local services within the rectangular buffer with the the following
formula: (Length of the primary roadway segment in miles + 2 miles) x 2 miles x 640 acres)
What is the length of the primary roadway segment
being improved by the project?5.560
Processed: 6/29/2016 2016 TRAC Funding Application 7 of 13
Poverty Rate Data Source
Sub-County Unempolyment Rate
Unempolyment Rate Data Source
0
0
0
As part of the application scoring process, ODOT collects county level information as the standard measurement for poverty and unemployment factors; however, if a project sponor provides defensible data at a sub-county or census tract level, TRAC can consider that level of geographic analysis for scoring and evaluation.
Do you want to enter distress values for a sub-
county area to be used in the evaluation of this
application?
No - I want to use the information collected
by ODOT.
County 0
Sub-County Poverty Rate 0
What is the dollar value of committed or recent
public investment in new, non-project
infrastructure within the project area? (Millions)
$ 30,000,000
What is the present value of private investment in
existing facilities within the project area? (Millions) $ 255,543,000
Local Investment Factors
Economic Distress - Poverty & Unemployment Rates
What is the estimated percentage of existing
building square footage that is currently vacant?5%
New Local Investments
TRAC will consider the monetized value of public investments or commitments for new, non-project infrastructure and private investments within 5-year time horzion prior to and after the date of this TRAC Application.
Processed: 6/29/2016 2016 TRAC Funding Application 8 of 13
-$ -$ -$ 100.00$
Will additional TRAC funds be needed for future
phases of development or construction?Yes
PE DD RW CO
PE DD RW CO
-$ 4.77$ 6.50$ -$
CO Funding Request -$ 0
Total New TRAC Funding Reqeust 11.55$
Has TRAC previously committed funding for the
development or construction of this project?Yes
DD Funding Request -$ 0
RW Funding Request 11.55$ 2017
Which phase(s) you are requesting new TRAC
funding for as part of this application?RW - Right-of-way
Amount (Millions) Requested Fiscal Year
PE Funding Request -$ 0
Project Funding Plan
TRAC Funding ReqeustPlease indicate the amount of funding being requested by phase and fiscal year. Funding requests should consider the funding that will be needed with the next two fiscal years.
Processed: 6/29/2016 2016 TRAC Funding Application 9 of 13
Local Funding Totals
PE DD RW CO
-$ -$ -$ 0.10$
PE DD RW CO
-$ -$ -$ -$
-$ -$ -$ -$
Local funding Source (5) 0
Local funding Source (4) 0
PE DD RW CO
PE DD RW CO
-$ -$ -$ -$
-$ -$ -$ 0.05$
Local funding Source (3)Lawrence County Transportaton Improvement
District
Local funding Source (2) Lawrence County Port Authority
PE DD RW CO
PE DD RW CO
-$ -$ -$ 0.05$
Will local funding sources be used in the
development or construction of this project?Yes
What is the total number of local funding sources for
the development and construction of this project?3
Local funding Source (1) Lawrence County Engineer
Local Funding CommitmentsProject Development and construction can be funded with multiple local funding sources. The questions below will help identify the funding sources for this project.
Processed: 6/29/2016 2016 TRAC Funding Application 10 of 13
% Local % ODOT % OTIC % TRAC
1.0% 0.0% 0.0% 99.0%
Total Local Total ODOT Total OTIC Total TRAC
0.10$ -$ -$ 122.82$
Funding Totals -$ 4.77$ 18.05$ 100.10$
Total Project Cost 122.92$
New TRAC Funding -$ -$ 11.55$ -$
Future TRAC Funding -$ -$ -$ 100.00$
OTIC Bond Funding -$ -$ -$ -$
Previous TRAC Funding -$ 4.77$ 6.50$ -$
Local Funding -$ -$ -$ 0.10$
ODOT / Earmark Funding -$ -$ -$ -$
Funding Summary
PE DD RW CO
PE DD RW CO
-$ -$ -$ -$
-$ -$ -$ -$
OTIC Turnpike Bond Revenue Funding
Have Ohio Turnpike and Infrastructure Commission
(OTIC) Revenue Bonds been committed for the No
ODOT Program or Emark Funding Commitments
Will funding from another ODOT program or
legislative earmarks be used in the development or No
PE DD RW CO
Processed: 6/29/2016 2016 TRAC Funding Application 11 of 13
Date of Inflated Estimate 1/0/1900
Year of Inflation Estimate $ -
Railroad $ -
Contingency $ -
Total Estimate $ -
Traffic Control $ -
Structures $ -
Retaining Walls $ -
Tier I Construction Estimate
Projects requesting Tier I status are required to submit a budgetary construction estimate. Additionally estimates must be inflated to the anticipated year of construction using ODOT's 2014-20818 Business Plan Inflation Estimator Excel worksheet.
Roadway $ -
Drainage $ -
Processed: 6/29/2016 2016 TRAC Funding Application 12 of 13
District Acknowledgement
Has the appropriate ODOT District Planning Office
been contacted about the development and
construction of this project?
Yes
Has the ODOT District Office provided a letter or
support or acknowledgment for this project?No
Is this project within the boundaries of a
Metropolitan Planning Organization (MPO)?Yes
Please identify the respective MPO. KYOVA
Has the MPO provided a letter or support or
acknowledgment for this project?Yes
MPO & District Acknowledgement
MPO Acknowledgement
Processed: 6/29/2016 2016 TRAC Funding Application 13 of 13
¾¾7
¾¾7
¾¾34 2
¾¾873
¾¾577
£ ¤06
§̈ ¦46
¾¾2
Phase II
Phase I - Comp
lete
Proctorville
Chesapeake
§̈ ¦46Phase IAPhase I
B
HuntingtonM
ap #
1C
hesa
peak
e By
pass
Pha
se II
Loc
atio
n
Lege
nd
Inte
rsta
te
Loca
l Roa
ds
US
Hig
hway
Sta
te R
oute
s
Ü0
10.
5M
iles
M
ap #
2 E
cono
mic
Impa
ct
Phas
e 2
Proj
ect
Phas
e 1
Proj
ect O
uter
belt
Oth
er
1 M
ile
Eco
nom
ic
Influ
ence
A
rea
Indu
stri
al A
reas
C
omm
erci
al /
Offi
ce A
reas
1
Mile
Zon
e
K
ey E
mpl
oym
ent C
ente
rs
The
Poi
nt In
term
odal
Po
rt/L
ogis
tics C
ente
r (S
uper
fund
Red
veop
men
t)
(New
FE
D E
X R
egio
nal
Gro
und
Cen
ter)
Dow
ntow
n
Hun
tingt
on/
Pullm
an S
quar
e
Mar
shal
l U
nive
rsity
Ohi
o U
nive
rsity
So
uthe
rn
Eas
t Cam
pus
Tri
-Sta
te A
irpo
rt
FE
D E
X Re
gion
al A
ir
Ope
ratio
ns
St. M
ary’
s M
edic
al
Map
#2
E
cono
mic
Impa
ct
Map