Project Management
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 2
Laws of Project Management
Projects progress quickly until they are 90% complete. Then they remain at 90% complete forever.
When things are going well, something will go wrong. When things just can’t get worse, they will. When things appear to be going better, you have overlooked something.
If project content is allowed to change freely, the rate of change will exceed the rate of progress.
Project teams detest progress reporting because it manifests their lack of progress.
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 3
How it should go (e.g., waterfall model)
Requirements Analysis
Implementation
Design
System Testing
Delivery and Installation
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 4
How it often goes
Requirements Analysis
D
E
L
A
YVaporware
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 5
Software Project Management Plan Software Project:
All technical and managerial activities required to deliver the deliverables to the client.
A software project has a specific duration, consumes resources and produces work products.
Management categories to complete a software project: Tasks, Activities, Functions
Software Project Management Plan: The controlling document for a software project. Specifies the technical and managerial approaches to
develop the software product.
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 6
Functions, Tasks, Activities
Functions (also known as Umbrella activities) Project Management Configuration Management Documentation Quality Assurance (includes Verification and Validation) Traceability Training …
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 7
Tasks
Smallest unit of management accountability Atomic unit of planning and tracking Finite duration, need resources, produce tangible result
(documents, model, code)
Specification of a task: Work package Name, description of work to be done Preconditions for starting, duration, required resources Work product to be produced, acceptance criteria for it Risk involved
Completion criteria Includes the acceptance criteria for the work products
(deliverables) produced by the task.
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 8
Examples of Tasks
Unit test class “Foo” Test subsystem “Bla” Write user manual Write meeting minutes and post them …
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 9
Activities
Major unit of work Culminates in major project
milestone: Internal checkpoint should
not be externally visible Scheduled event used to
measure progress
Milestone often produces baseline:
formally reviewed work product under change control (change
requires formal procedures)
Activities may be grouped into larger activities: Establishes hierarchical
structure for project (phase, step, ...)
Allows separation of concerns
Precedence relations often exist among activities (PERT Chart)
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 10
Examples of Activities
Major Activities: Develop Requirements
model Develop Analysis Model Develop Architecture (aka
System Design model) …
Activities during requirements: Define scenarios Identify stakeholders Define Use Case model Design preliminary User
Interface
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 11
Example of Hierchical Organization:Chief Programmer Team
Chief Programmer
Librarian Administration Tester
Junior Programmer
AssistantChief Programmer
Senior Programmer
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 12
Another Project Organization: Egoless Programming Team (Weinberg)
Analyst
Designer Librarian
Tester Programmer
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 13
Project-Based Project Organization
Project Leader
Coaches
Team Members
Basis of organization:Nonlinear information flow across dynamically formed units
Basis of organization:Nonlinear information flow across dynamically formed units
Subsystem Team Subsystem Team Subsystem Team
A B
A wants to talk to B: Communication FlowA wants to make sure B does a certain change: Decision Flow
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 14
Observations on Management Structures
Hierarchical structures Do not work well with iterative and incremental software
development process Manager is not necessarily always right
Project-based structures Cut down on bureaucracy reduces development time Decisions are expected to be made at each level Hard to manage
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 15
Hierarchical Structure
Projects with high degree of certainty, stability, uniformity and repetition. Requires little communication Role definitions are clear
When? The more people on the project, the more need for a formal
structure Customer might insist that the test team be independent from the
design team Project manager insists on a previously successful structure
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 16
Project-Based Structure
Project with degree of uncertainty Open communication needed among members Roles are defined on project basis
When? Requirements change during development New technology develops during project
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 17
Your Project-Based Structure
Get together in your group and discuss options for your team organization and structure Subteams for functions, activities, tasks? Team lead? Subteam leads or co-ordinators?
Question: Discuss the advantages and disadvantages of these:For a team of 6 members3 members are going to work on delivering the detailed design (they
check their work before submitting it to the team) and correct problems
3 team members are assigned to independently review the detailed design and identify defects
Or6 members are going to work on delivering the detailed design (the
whole team checks the work before it is posted for evaluation) .
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 18
Possible Mappings of ToDos to People
One-to-One Ideal but often not worth to be called a project
Many-to-Few Each project member assumes several roles ("hats") Danger of overcommittment Need for load balancing
Many-to-"Too-Many" Some people don't have significant roles Bystanders Losing touch with project
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 19
Managerial Processes
Management Objectives and Priorities Philosophy, goals and priorities
Assumptions, Dependencies, Constraints External factors
Risk Management Identifying, assessing, tracking, contingencies for risks
Monitoring and Controlling Mechanisms Reporting mechanisms and formats, information flows, reviews
Staffing Plan Needed skills (what?, how much?, when?)
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 20
Project Management Heuristics
Make sure to be able to revise or dump a project plan Complex system development is a nonlinear activity
If project goals are unclear and complex use team-based project management. In this case Avoid GANTT charts and PERT charts for projects with changing
requirements Don’t look too far into the future
Avoid micro management of details Don’t be surprise if current project management tools don’t
work: They were designed for projects with clear goals and fixed
organizational structures