PROJECT MONITORING REPORT TEMPLATE FOR CBMS NAME OF CBM: ANAS YAHYA EMAIL: [email protected] STATE AND L.G.A VISITED: CHIKUN LGA, KADUNA STATE DATE OF VISIT: 15 th March 2018 PROJECT TITLE RENOVATION OF TWO (2) CLASSROOMS WITH FURNITURE AT GARIN KUJAMA, KUJAMA WARD, CHIKUN LGA, KADUNA STATE BUDGET AMOUNT Not Available CONTRACT AMOUNT #6,192,083.00 LOCATION GARIN KUJAMA, KUJAMA WARD, CHIKUN LGA, KADUNA STATE NAME OF CONTRACTOR AKUSTAN ENGINEERING LTD IS THERE A SIGNPOST? No Sign post DURATION OF PROJECT (check on the signpost, if available) Not Specified

PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: [email protected] state and l.g.a visited: chikun lga,

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: anaxyahya@gmail.com state and l.g.a visited: chikun lga,

PROJECT MONITORING REPORT TEMPLATE FOR CBMS

NAME OF CBM: ANAS YAHYAEMAIL: [email protected] AND L.G.A VISITED: CHIKUN LGA, KADUNA STATEDATE OF VISIT: 15th March 2018

PROJECT TITLERENOVATION OF TWO (2) CLASSROOMS WITH FURNITURE AT

GARIN KUJAMA, KUJAMA WARD, CHIKUN LGA, KADUNASTATE

BUDGET AMOUNTNot Available

CONTRACT AMOUNT#6,192,083.00

LOCATION GARIN KUJAMA, KUJAMA WARD, CHIKUN LGA, KADUNASTATE

NAME OF CONTRACTOR AKUSTAN ENGINEERING LTD

IS THERE A SIGNPOST? No Sign post

DURATION OF PROJECT(check on the signpost, if available)

Not Specified

Page 2: PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: anaxyahya@gmail.com state and l.g.a visited: chikun lga,

IMPLEMENTING AGENCY(check on the signpost, if available)

Universal Basic Education Commission (UBEC)

PROJECT IMPLEMENTATION STATUS Not StartedAt All

Ongoing Abandoned Completed(When)

Yes

EXTENT OF IMPLEMENTATION/WORKDONE SO FAR (DESCRIBE)

None. Work is yet to commence as at the time of the visit.

SHOULD THEY HAVE GONE FORCONSTRUCTION AS AGAINST

RENOVATION?

Yes, they should have gone for construction, as againstrenovation because the classroom structure are alreadyweak and damaged. A new construction would have beenmost appropriate for the project.

Page 3: PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: anaxyahya@gmail.com state and l.g.a visited: chikun lga,

Pic 1: The dilapidated Classroom.

IS THE PROJECT IN A STRATEGICAREA?

Yes

HOW QUICK CAN ONE LOCATE IT? It was quite easy to locate because it is the only primaryschool in the ward. Also only road leads in and out ofkujama town. The school is directly opposite a recentlyconstructed primary health care centre.

WHAT IS THE IMPACT OF THE PROJECTIN THE COMMUNITY?

PRINCIP AL The school head teacher stated that the renovation andfurnishing of the classrooms is much needed by the schoolas the school lacks classrooms and furnitures for pupils.

He went on to state that if the project is carried out, it wouldgo a long way in making teaching and learning very easyand comfortable.

STUDENTTwo young pupils were asked if they needed new classes orfence, and their response was “We need a playground witha lot of play area like seesaw, swing, football pitch etc like itis seen in most private schools around”. Therefore it couldbe deduced that the renovation of the block is not apriority of the end users even though it is needed.

COMMUNITY DWELLERS

Not Applicable

ANY INSTITUTIONAL BOTTLENECK No

Page 4: PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: anaxyahya@gmail.com state and l.g.a visited: chikun lga,

AFFECTING IMPLEMENTATION OFPROJECT

GENERAL REMARKS/OTHEROBSERVATIONS

The contractor is yet to mobilise and start work on site as atthe time of the visit. The head teacher also noted that the school requires aperimeter fence and gate house to safeguard the studentsas well as the school structures from vandalisation.

He also noted that the block to be renovated wasvandalised by criminals who carted away valuable itemslike doors, windows and even the roofing sheets.

He went on to add that criminals are using the dilapidatedstructures as hideouts and a place for smoking.

CLEARLY LABELLEDPHOTOGRAPHS/DOCUMENTS/ AUDIO/

VIDEOS ATTACHED

Pic – Existing blocks within the school

Page 5: PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: anaxyahya@gmail.com state and l.g.a visited: chikun lga,

Pic 3 Classroom blocks in the school

Pic 4 – Back view of existing blocks

Page 6: PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: anaxyahya@gmail.com state and l.g.a visited: chikun lga,

Pic 5 A Newly constructed classroom within the school

Pic 6 Seriously damaged building of the classrooms

Page 7: PROJECT MONITORING REPORT TEMPLATE FOR CBMS · project monitoring report template for cbms name of cbm: anas yahya email: anaxyahya@gmail.com state and l.g.a visited: chikun lga,

Pic 7 – Existing blocks of classrooms