23
Project Name : Asdiqa’a Elmareed Hospital Prepared by : Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor : Eman Elajrami

Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Embed Size (px)

Citation preview

Page 1: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Project Name:Asdiqa’a Elmareed Hospital

Prepared by:Mahmoud El Madhoun 120070078Rajab El Nabih 120070074

The supervisor:Eman Elajrami

Page 2: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Agenda Introduction Analysis Design

Page 3: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

IntroductionTo keep pace with technological developments taking place in the

world and theConversion of systems to cope with superior levels in the

development and performance and speedsThe project is a computerized system will help in the computerization and archiving of data and to facilitate the

process of data entry.

Page 4: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

The Problemusing traditional system

The problem lies in the use of the traditional system and the system is primitive depends on the paper transactions, accounting, data storage

reasons or (project idea)The problem lies in the use of the traditional system and the system

is primitive depends on the paper transactions, accounting, data storage you choose this problem as a problem in the island transformation of the system Aliqlide order to facilitate the development of a more transactions and store the files and data is fast and comfortable, and benefit the institution

Page 5: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Objectives1 -Transform the traditional system to a computerized system

2 -Save time and effort3 -Reduce the consumption of paper and stores files and other

4 -Raise the efficiency of the institution5 -Keep pace with software development and technical

The solutionsTransform the traditional system to a computerized systemAlohas introduction of the system to facilitate the work of the Foundation and work with high efficiency and save time and effort that will benefit the institution in Alehiapalamlp and reduce the financial cost of future development

Page 6: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Suitable solution and whyThe appropriate solution is to get rid of the traditional system and to facilitate

the work of the organization and save time and effort in this system and reduction of paper and convert it into data which are easy to deal with the added or modified, or even storage and retrieval process, which contributes to the cost resulting from Tqllil Mjazn paper, as well as the burden of the archive in case the search for the old data

Project Requirements (SW,HW)HW The use of a computer for each department, and supply networks

SW For the software will use one of the programs either the program or Access oracle

Page 7: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Feasibility studyCost of the project will be the cost of software and hardware and configure

the internal network of the Foundation

And is estimated at about 30.000 $

Page 8: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Analysis System Requirements Data Flow Diagramming Use case diagram Activity diagram Stat diagram Class diagram Sequence diagram

Page 9: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

System Requirements

The patient enters the reception and pay the feesPatient data entry and storage

Send the patient to the desired postsOperations section

Query for patient data in the databaseDoing the operation and store in the database

give the medicine to the patientThe date is set for review

Surgery section

Query for patient data in the databaseDoing the surgery operation and store in the database

give the medicine to the patientThe date is set for review

Query for patient data in the database Doing analysis and store in the database

Page 10: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Data Flow DiagrammingContext diagram

Page 11: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Data Flow Diagramming

Level 1 diagram

Level 1 diagram

Page 12: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami
Page 13: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Use case diagram

Data Entry

<<include>>

Laboratory

OperationSurgery

<<Extend>><<Extend>><<Extend>>

Report

<<Extend>> <<Extend>><<Extend>>

Data Entry of Analysis

Data Entry

<<include>>

<<include>>

Data Entry

ReceptionFees

Page 14: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Laboratory

Data Entry

URINE STOOL STEROID CULTURE y

SEROLOGY

Data Entry Data Entry

Data Entry Data Entry

Reports

<<include>>

<<include>>

<<include>><<include>>

<<include>><<Extend>>

<<Extend>> <<Extend>>

<<Extend>>

<<Extend>>

<<Extend>>

<<Extend>>

<<Extend>>

<<Extend>>

<<Extend>>

Page 15: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Activity diagram

Page 16: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

State diagram

Page 17: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

State diagram

Page 18: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Sequence diagram

Page 19: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Sequence diagram

Page 20: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Design ER diagram Schema Diagram

Page 21: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

ER diagram

Page 22: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami
Page 23: Project Name: Asdiqa’a Elmareed Hospital Prepared by: Mahmoud El Madhoun 120070078 Rajab El Nabih 120070074 The supervisor: Eman Elajrami

Thank you