20
Pre- Feasibility Report Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana). Vardan Environet, Gurgaon Page | 15 PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY LOI has been granted for over an area of 89.48 ha in favor of M/s. Tirupati Earth & Projects Works Pvt. Ltd. by The Director General, Department of Mines & Geology, Haryana vide memo no.- DMG/ HY/ Cont/ Nagla Rangran Block/ YNR B 14/ 2017/ 2654 dated 16.06.2017 for a period of 9 years (Copy enclosed as Annexure- I).The proposed production capacity of sand is 39,00,000 TPA. The lease area lies on riverbed of Yamuna River in District- Yamuna Nagar (Haryana). Total M.L. area is 89.48 ha. which is non- forest land. The contractor shall be under obligation to carry out mining in accordance with all other provisions as applicable under the Mine Act, 1952, Mines and Minerals (Development and Regulation) Act, 1957, Forest (Conservation) Act, 1980 and Environment (Protection Act), 1986 and the rules made there under, wild life (Protection) Act 1972, water (Prevention and control of pollution) Act 1974 and Air (Prevention and Control of Pollution) Act, 1981. 1.1 Salient Features of the Project Table- 1: Salient Features of the Project Project name Proposed Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14”. Mining Lease Area 89.48 ha. Location of mine Village- Nagla, Tehsil- Radaur, District- Yamuna Nagar (Haryana). Cordinates S.no Latitudes Longitudes BP-1 N 29° 58’ 56” E 77° 13’ 52” BP-2 N 29° 58’ 55” E 77° 13’ 54.5” BP-3 N 29° 59’ 06” E 77° 13’ 54.5” BP-4 N 29° 59’ 24” E 77° 13’ 59” BP-5 N 29° 59’ 19.494” E 77° 14’ 5.123” BP-6 N 29° 59’ 17” E 77° 14’ 6.8” BP-7 N 29° 59’ 08” E 77° 14’ 4.3” BP-8 N 29° 59’ 01” E 77° 14’ 4.3” BP-9 N 29° 59’ 09.5” E 77° 14’ 14.1” BP-10 N 29° 59’ 8.6” E 77° 14’ 15” BP-11 N 29° 59’ 12” E 77° 14’ 19” BP-12 N 29° 59’ 6.372” E 77° 14’ 18.067” BP-13 N 29° 58’ 35.526” E 77° 13’ 58.447” BP-14 N 29° 58’ 27” E 77° 13’ 59.4” BP-15 N 29° 58’ 30.909” E 77° 13’ 54.347” BP-16 N 29° 58’ 31.805” E 77° 13’ 49.786” BP-17 N 29° 58’ 30.257” E 77° 13’ 46.081” BP-18 N 29° 58’ 26.367” E 77° 13’ 41.892” BP-19 N 29° 58’ 19” E 77° 13’ 40” BP-20 N 29° 58’ 14.5” E 77° 13’ 42.5” BP-21 N 29° 58’ 10” E 77° 13’ 38.6” BP-22 N 29° 58’ 10.6” E 77° 13’ 32” BP-23 N 29° 58’ 18” E 77° 13’ 32” BP-24 N 29° 58’ 30” E 77° 13’ 34.5” BP-25 N 29° 58’ 40” E 77° 13’ 39.4” BP-26 N 29° 58’ 51” E 77° 13’ 46.8” Khasra no. Majri village 31min, 34, 35, 36, 32 min, 33, 37, 38, 70 min, 71 min, 42 min,43, 133, 134, 135, 136 min, 142 min, 143, 144, 145, 152, 156, 157, 158 min, 153, 154, 155 min,165 min, 166 min, 168, 169, 180, 184, 185 min, 177,181,182, 183, 206, 207, 208,

Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 15

PRE-FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY LOI has been granted for over an area of 89.48 ha in favor of M/s. Tirupati Earth & Projects Works Pvt. Ltd. by The Director General, Department of Mines & Geology, Haryana vide memo no.- DMG/ HY/ Cont/ Nagla Rangran Block/ YNR B 14/ 2017/ 2654 dated 16.06.2017 for a period of 9 years (Copy enclosed as Annexure-I).The proposed production capacity of sand is 39,00,000 TPA. The lease area lies on riverbed of Yamuna River in District- Yamuna Nagar (Haryana). Total M.L. area is 89.48 ha. which is non- forest land. The contractor shall be under obligation to carry out mining in accordance with all other provisions as applicable under the Mine Act, 1952, Mines and Minerals (Development and Regulation) Act, 1957, Forest (Conservation) Act, 1980 and Environment (Protection Act), 1986 and the rules made there under, wild life (Protection) Act 1972, water (Prevention and control of pollution) Act 1974 and Air (Prevention and Control of Pollution) Act, 1981.

1.1 Salient Features of the Project

Table- 1: Salient Features of the Project

Project name Proposed Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14”.

Mining Lease Area 89.48 ha.

Location of mine Village- Nagla, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Cordinates S.no Latitudes Longitudes

BP-1 N 29° 58’ 56” E 77° 13’ 52”

BP-2 N 29° 58’ 55” E 77° 13’ 54.5”

BP-3 N 29° 59’ 06” E 77° 13’ 54.5”

BP-4 N 29° 59’ 24” E 77° 13’ 59”

BP-5 N 29° 59’ 19.494” E 77° 14’ 5.123”

BP-6 N 29° 59’ 17” E 77° 14’ 6.8”

BP-7 N 29° 59’ 08” E 77° 14’ 4.3”

BP-8 N 29° 59’ 01” E 77° 14’ 4.3”

BP-9 N 29° 59’ 09.5” E 77° 14’ 14.1”

BP-10 N 29° 59’ 8.6” E 77° 14’ 15”

BP-11 N 29° 59’ 12” E 77° 14’ 19”

BP-12 N 29° 59’ 6.372” E 77° 14’ 18.067”

BP-13 N 29° 58’ 35.526” E 77° 13’ 58.447”

BP-14 N 29° 58’ 27” E 77° 13’ 59.4”

BP-15 N 29° 58’ 30.909” E 77° 13’ 54.347”

BP-16 N 29° 58’ 31.805” E 77° 13’ 49.786”

BP-17 N 29° 58’ 30.257” E 77° 13’ 46.081”

BP-18 N 29° 58’ 26.367” E 77° 13’ 41.892”

BP-19 N 29° 58’ 19” E 77° 13’ 40”

BP-20 N 29° 58’ 14.5” E 77° 13’ 42.5”

BP-21 N 29° 58’ 10” E 77° 13’ 38.6”

BP-22 N 29° 58’ 10.6” E 77° 13’ 32”

BP-23 N 29° 58’ 18” E 77° 13’ 32”

BP-24 N 29° 58’ 30” E 77° 13’ 34.5”

BP-25 N 29° 58’ 40” E 77° 13’ 39.4”

BP-26 N 29° 58’ 51” E 77° 13’ 46.8”

Khasra no. Majri village 31min, 34, 35, 36, 32 min, 33, 37, 38, 70 min, 71 min, 42 min,43, 133, 134, 135, 136 min, 142 min, 143, 144, 145, 152, 156, 157, 158 min, 153, 154, 155 min,165 min, 166 min, 168, 169, 180, 184, 185 min, 177,181,182, 183, 206, 207, 208,

Page 2: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 16

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2.1 Identification of Project and Project Proponent

LOI has been granted over an area of 89.48 ha in favor of M/s. Tirupati Earth & Project Works Pvt. Ltd. by The Director General, Department of Mines & Geology, Haryana vide memo no.- DMG/ HY/ Cont/ Nagla Rangran Block/ YNR B 14/ 2017/ 2654 dated 16.06.2017 for a period of 9 years. The details of the project proponent and project are given below:

Name of the Applicant Sh. Gurpreet Singh Sabharwal

Address of Applicant M/s Tirupati Earth & Projects works Pvt. Ltd. 3, Sadashiv Properties, Katras Road,

209, 210, 215, 219, 220, 221, 216, 218, 230, 231, 217, 229,232, 233, 234, 238, 44, 36, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69,146, 147,148, 149,150. Nagla Rangran Village 1//17 min, 18, 19, 21, 22/1, 23/1, 23/2, 24 min, 5//1, 2, 3,4min, 8min, 9, 10, 12, 13/1 min,19 min, 22/2min, 6/5, 6, 7, 8,13, 14/1, 14/2, 19, 20, 21,22, 23,24. 7//25. 8//4/1, 4/2, 5/1, 5/2, 6, 7, 13, 14/1, 14/2, 15, 16, 17, 18, 22, 23/1, 23/2, 23/3, 24, 25. 9//1, 2, 3, 4/1, 4/2, 5, 6,7, 8, 9/1, 9/2, 10, 11/1,11/2, 12, 13, 14, 15 min,16min, 17, 18, 19/1, 19/2, 20, 21, 22, 23, 24min.17//1, 2, 3, 4min, 7min, 9, 10, 11, 12, 13min, 18min, 19, 20/1, 20/2, 21, 22min.18//2, 3, 4, 5, 6,7, 8, 9, 12/1, 12/2, 13, 14, 15, 16, 17, 18, 22, 23, 24, 25/1, 25/2, 19//2, 3, 4, 5, 6, 7, 8, 9, 12, 13, 14, 15/1, 15/2, 16, 19. 20//1, 2min, 9min, 10, 11, 20, 35. Sandhala Village 9//12 min, 13, 19, 20 min, 21 min, 22, 18//5, 6, 7 min, 14 min, 15, 16, 17, 18 min, 23 min, 24/1, 24/2, 25 19//1, 10, 11, 21//2min, 3, 4, 5/1, 5/2, 6, 7, 8, 9 min, 12, 13, 14, 15, 16, 17, 18, 19, 20 min, 21 min, 22, 23, 24, 25,20//1 ,10 11. 34//1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 13, 14, 18 19, 20, 21, 22, 23. 33//6 min, 15, 16, 25.37//5 min,6,15,16,25 36//1, 2, 3, 8/1, 8/2, 13, 12/1, 12/2, 11, 20, 19/1, 19/2, 18, 21, 22, 45//5, 46//1, 2.

Toposheet number H43R1, H43R5, H43L4, H43L8

River/Nalla/Nadi/Khad Yamuna River.

Minerals of mine Sand (minor mineral).

Reserves Geological reserves= 53,68,800 MT Mineable reserves = 39,64,800 MT (Replenishable every year)

Proposed Production Capacity 39,00,000 TPA.

Project Cost Rs. 9.5 Crore/-

Method of mining Open cast Semi- Mechanized.

No of working days 300 Days

Water demand (aaproximate) Total Water Requirement: 70 KLD Domestic: 10 KLD Dust Supression: 40 KLD Plantation: 20 KLD

Man power 115 persons.

Nearest railway station Kalanaur (~14.21 km in NE direction

Nearest State/ National Highway

SH- 6 (~3 km in North direction).

Nearest airport Chandigarh (~ 85 km in NW direction).

Page 3: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 17

Bank More, Dhanbad, Jharkhand

Name of Mine Nagla Rangran Block/ YNR B 14.

Mineral Sand (Minor mineral).

Area (ha) 89.48 ha.

Status of Project New

2.2 Brief Description of Nature of the Project The proposed mining contract area is 89.48 ha of “Nagla Rangran Block/ YNR B 14”of District- Yamuna Nagar (Haryana). It has been proposed to excavate 39,00,000 Tons of sand per year from the river. The mineral sand will be replenished in monsoon season every year, as the mining will be undertaken on a rotation basis, in such a way that excavated areas of previous years mining will act as depository for the post- monsoon season.

2.3 Need for the Project and Its Importance to the Country or Region Building huge infrastructure as envisaged by Government of India/Haryana Government particularly in road and housing sector requires basic building and construction raw materials. The sand is one of primary building material required for the purpose. The mining activities as proposed are the backbone of all construction and infrastructure projects as the raw material for construction is made available only from such mining. The sand to be excavated is in high demand at the local market for real estate and infrastructure industry. This project will also provide employment to local people helping them earn livelihood. In addition to this, it will further prevent widening of the Yamuna river bed due to the deposition of sediments which if not mined out will result in raising of the river bed causing flooding, damage to the adjoining areas, destruction of life and property. 2.4 Demands-Supply Gap As is used as raw material in construction of building and infrastructure projects, the demand is increasing day by day. In past, demand was not too much but now a days due to rapid industrialization and urbanization, its demand is increasing with pace of time. At present, demand is more than the supply. 2.5 Imports vs. Indigenous Production There will be no import for the project. The indigenously produced machinery will be used and the excavated mineral will be for domestic market. 2.6 Export Possibility There are no export possibilities from the proposed mining activity. 2.7 Domestic/ Export Markets Domestic Market The sand excavated will be directly sold in the market. Export Market The proposed mining activity is for indigenous consumption only for real estate and infrastructure sector etc. There is no possibility of export of sand from this mine.

2.8 Employment Generation (Direct and Indirect) due to the project

Around 115 workers will be employed directly and 600 indirectly in the proposed project. Transportation is required. Hence jobs and business opportunities in logistical activities will come up.

3.0 PROJECT DESCRIPTION 3.1 Type of Project Including Interlinked and Interdependent Projects, If Any.

Project is semi- mechanized mining project. This project does not have interlink or interdependency on any other project.

Page 4: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 18

3.2 Location (map showing general location, specific location, and project boundary & project site layout) with coordinates. The lease area is situated near Village – Nagla Rangran, Tehsil- Radaur and District – Yamuna Nagar (Haryana). The lease area falls within the Survey of India top sheet no.- H43R1, H43R5, H43L4, H43L8. The location of the mine is shown in the figure below.

Figure 1: Location Map of the Project Site

3.3 Details of Alternate Sites

This is a sand mining project. No alternate sites were considered as this is site specific project for which LOI has been granted by State Govt.

3.4 Size or magnitude of operation Production of Sand of 39,00,000 TPA is proposed from this mine and mining will be done by opencast semi- mechanized method.

3.5 Project description with process details Method of Mining Mining activity will be carried out by open cast semi-mechanized method.

Light weight excavators will be used for digging and loading of mineral in tippers.

No OB/ waste material will be produced.

No drilling/ blasting is required as the material is loose in nature.

Proper benching of 3.0 m height will be maintained.

Roads will be properly made and sprayed by water for suppression of dust.

Roads in the lease area for the movement of loaded trippers/ trucks will not have slopes more than 1 in 20.

Page 5: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 19

Extraction activities will start in the blocks from the upstream side to downstream side. This will not obstruct the movement of water, if any, during monsoon period in the river course.

Approach roads from this block are as already described earlier will be merging with permanent tar roads on both sides of the river for transportation of the mineral to final destinations.

3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product/s, mode of Transport of Raw Material and Finished Product No raw material will be required in the proposed project. The operation involves the excavation of balusand in its existing form and transported to the endusers.

3.7 Resource Optimization/ Recycling and Reuse Minerals are generally depleting asset once mined; but minerals like sand will be replenished naturally. Thus a scientific approach will be taken up for excavation of mineral with systematic method. There will be no OB or waste generation as the sand is exposed in the river bed. But, at the later stage, if any soil or waste will be obtained during mining, then same will be stored with proper protection and will be used for reclamation (plantation).

3.8 Availability of Water, its Source, Energy/ Power Requirement and Source 3.8.1 Water Requirement

The total water requirement will be 70 KLD which will be sourced from the nearby villages through tankers. Water balance is given below:

Figure- 2: Water Balance Diagram 3.8.2 Power All the activities will be carried out in a semi-mechanized manner. The material will be excavated and loaded directly into dumpers, tractors-t rolley etc. by the diesel run excavator cum loaders. The operation will be done only from sun rise to sun set. So there is no requirement of power for the proposed mining activity.

3.8.3 Liquid Effulent No liquid effulent will be generated at the mine site due to the mineral excavation. Only domestic waste water will be generated from mine office etc. which will be disposed off in septic tank via soak pits.

3.9 EIA Process of the project : As the project activity falls under Category ‘A’, Project or Activity 1(a) as per EIA Notification dated 14.09.2006, EIA

study and Public consulation is required for the mining project as per ToR issued by MoEF&CC, New Delhi. 4.0 SITE ANALYSIS 4.1 Connectivity

4.1.1 Nearest Railway Station- • Kalanaur (~14.21 km in NE direction). 4.1.2 Nearest Airport- Chandigarh (~ 85 km in NW direction).). 4.1.3 Nearest Highway- SH- 6 (~3 km in North directioin). 4.2 Landform, Landuse and Land ownership

The mining lease is a part of river bed of Yamuna River in Tehsil- Radaur, District- Yamuna Nagar (Haryana). The

Dust Suppression- 40.00 KLD

\

(22.00 KLD)

Domestic-10.00 KLD

(8.00 KLD)

Plantation-20.00 KLD

(15.0 KLD)

Total Water Requirement (70.00 KLD)

Page 6: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 20

proposed activity is to take place in river bed where the excavated sand will be replenished during rainy season every year and hence there will be no change in land use.

4.3 Topography Yamuna Nagar district of Haryana located in north-eastern part of Haryana State. The district is bounded, in north by Himachal Pradesh, in the east by Uttar Pradesh, in west by Ambala district, in south by Karnal and Kurukshetra districts. Total geographical area of the district is 1756 sq.Km and comprises 4% of total area of State. The district is mainly drained by the rivers Yamuna, Markanda and its tributaries. Markanda is tributary of river Ghaggar and drains major part of the district. The high land between Markanda River and small rivulets of River Yamuna acts as basin boundary between west flowing rivers of Indus system and east flowing Rivers of Ganga basin. River Yamuna drains eastern part of the district and acts as boundary between Haryana and Uttar Pradesh State. Yamuna Nagar district is bestowed with rich water resources, both surface as Well as ground water resources. The ground water is major sources of irrigation in the district. Nearly 40% of area is irrigated by canal water. Distributaries in the district are 21.45 Km long. Two major canals passing through the district are Western Yamuna Canal and augmentation canal. Length of unlined WYC is 63.64Km whereas augmentation canal is 22.54 Km long. Net irrigated area is 1130Km2 whereas, gross irrigated area 1860 Km2. Percentage of gross area irrigated to total cropped area is 91.6%. Systematic hydro geological surveys in the district was carried out by Geological Survey of India during 1956-61.Re-Appraisal Hydro Geological Surveys in the district were carried out by Central Ground Water Board, during 1975 -77,1981- 82 and 1988-89. (Source: http://cgwb.gov.in/District_Profile/HariyanaYamuna Nagar.pdf )

4.4 Existing land use pattern and shortest distances from Forests, Water bodies, Eco sensitive areas, etc. There is no forest land involved in the M.L. area. The entire mining contract lies in River bed of Yamuna River. There is no RF/ PF present within 10 km radius of the study area.

4.5 Existing Infrastructure The site has no existing infrastructure, except for connecting road for transportation.

4.6 Environmental Settings 4.6.1 Physiography

The district is divided into four Physiographic units: • Shiwaliks, • Dissected Rolling Plains, • Interfluvial Plains, • Active and Recent Flood Plains, • Relict Plains. Shiwaliks hills: Siwalik hill ranges occupy the northern fringe of Yamuna Nagar district and attain the height up to 950m amsl above mean sea level). The hills are about 500m high with respect to the adjacent alluvial plains. These are characterized by the broad tableland topography that has been carved into quite sharp slopes by numerous ephemeral streams come down to the outer slopes of the Siwaliks and spread much of gravels boulders, pebbles in the beds of these streams. Kandi Belt: A dissected rolling plain in the northern parts of district is a transitional tract between Siwaliks hills and alluvial plains. It is about 25 Km wide and elevation varies between 250 and 375m amsl (above mean sea level). Interfluvial plains: This tract is part of higher ground between Ghaggar and Chautang and includes high mounds and valleys. In general, the slope is from northeast to southwest. Active and recent flood plains: This plain is narrow tract along river Yamuna in the district. Relict wedge plain- This is almost in alignment to the surface water divide between the westward flowing Ghaggar and eastward flowing Yamuna River.

Page 7: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 21

4.6.2 Drainage The important rivers/ streams of the district are Yamuna, Sarasvati, Chautang, Rakshi, Somb, Boli, etc. Yamuna river after rising from the snow-clad peaks of the middle himalayas at yamnotri, enters the district from its northeastern corner through a narrow corridor in the Siwaliks. It is a perennial river. Bolinadi joins the Sombnadi near dadupur and then the combined Somb and Bolinadis join the Yamuna River at Meharmajra. The rakshi stream takes its birth in the rolling foot hill plain while the Chautang and Sarasvati rivers originate in the lower hills. Generally, the slope of the district is from north-east to south- west, in which direction most of rivers/nadis/ rainfed torrents flow down.

4.6.3 Geography Yamuna Nagar District falls in geological domain in the Shivalik hills which are confined to the northern pa rt of Haryana. Yamuna Nagar District has subtropical continental monsoon climate that is characterized by seasonal rhythm, hot summers, cool winter, unreliable rainfalls and great variation in temperature. In winters frost sometime occurs during December and January. Yamuna Nagar District experiences extreme climate conditions. May and June are the hottest months while December and January are the coldest. Maximum temperature on average goes as high as 44 degree Celsius in the summer season. Temperature starts rising steadily from February onwards till the onset of monsoon. The average annual rainfall of the district comes out to be 970.33mm. The important rivers of the district are Yamuna River, Sarasvati, Chautang, Rakshi Rivers, etc. Yamuna River enters the district from its northeastern corner through a narrow corridor in the Shivalik. It is a perennial river. Generally, the slope of Yamuna Nagar District is from north-east to south-west, in which direction most of rivers flow down. The soils in the district are mainly loamy in nature. The underground water in the district is suitable for domestic and irrigation purposes. The district has favorable climate for the growth of rich vegetation due to reasonably good rainfall and elevation. Tropical dry deciduous forests and sub-tropical forests are found here. Yamuna Nagar District of Haryana receives second highest rainfall after Panchkula District. (Source: http://www.indianetzone.com/48/yamuna_nagar district.htm)

4.6.3.1 Climatic condition The climate of Yamuna Nagar district can be classified as subtropical monsoon, mild and dry winter, hot summer and sub-humid which is mainly dry with hot summer and cold winter except during monsoon season when moist air of oceanic origin penetrates into the district. There are four seasons in a year. The hot weather season starts from mid March to last week of the June followed by the southwest monsoon which lasts up to September. The transition period from September to November forms the post monsoon season. The winter season starts late in November and remains up to first week of March. (Source: http://cgwb.gov.in/District_Profile/HariyanaYamuna Nagar.pdf)

4.6.3.2 Rainfall and Tempreture The normal annual rainfall of the district is 1107 mm, which is unevenly distributed over the area in 43 days. The south west monsoon sets in from last week Of June and withdraws in end of September, contributed about 81% of annual Rainfall. July and August are the wettest months. Rest 19% rainfall is received during Non-monsoon period in the wake of western disturbances and thunderstorms. Rainfall Normal Annual Rainfall - 1107 mm Normal monsoon Rainfall- 898 mm Temperature Mean Maximum- 48.8°C (May andJune) Mean Minimum- 6.8°C (January) Normal Rainy days- 43 (Source: http://cgwb.gov.in/District_Profile/HariyanaYamuna Nagar.pdf)

4.6.3.3 Administrative set-up The district Yamuna Nagar comes under the Haryana state administratively. It has the following administrative

Page 8: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 22

subdivisions:

Sub-Division Tehsil Block Area of Block (Hectares)

Jagadhari

Jagadhari Jagadhari 38546

Mustafabad 20481

Radaur 23995

Bilaspur Bilaspur

Bilaspur 28435

Chhachhrauli 45570

Chhachrauli Sadhaura 15182

4.6.3.4 Economy

Yamuna Nagar is well known for its industries. It has emerged as an important industrial destination in the state. This has been despite its relatively isolated location from rest of the state. Due to expanding industries, the city kept on extending geographically. This is primarily due to an increasing number of immigrants. This led to an intermixing of diverse culture. It also has to do with the rural ambiance which is reported to have undergone a lot of change. With increasing population, the trading aspects became brighter and the city went on becoming the second highest revenue generator of Haryana, immediately after Faridabad that owes its position largely to its prime location. The city produces sugar machinery, paper machinery along with highly efficient equipments for petro-chemical plants, which are shipped to various refineries across the country. The city is also known for its Plywood productions, which is attributed to the easy accessibility of primary raw material – poplar tree. It has also one of India's largest railway carriage and wagon repair workshops. Recently, Reliance Industries has also installed a thermal power plant in the town. Haryana Urban Development Authority has done major development work in the land stretch linking the city with Jagadhri, the other part of twin city. Sources: http://msmedikarnal.gov.in/dps/yamunana.pdf

4.6.3.5 Geophyical Status Gross area irrigated in the district Yamuna Nagar is 1860 Km2, whereas net area irrigated is 1130 Km2, percentage of gross area irrigated to total cropped area is 91.6%. Nearly about 1040 Km2 of area is irrigated through 28561 shallow tube wells and pump sets, besides this there are 200 deep public tube wells. The discharge of shallow tube-wells varies between 200 lpm and 480 lpm, whereas the discharge of deep tube-wells varies between 2000 lpm and 3500 lpm. The depth of shallow tube wells ranges between 40-80m, whereas deep tube-wells range up to 270m depth. Of the shallow tube wells 8851 are diesel engine operated and remaining 19710 are run by electric motors. The drinking water supply is mainly ground water based in the district, besides piped water supply, the public health department as well as public has installed hand pump as most convenient water source to meet water shortage in villages and towns. The Yamuna is Perennial River and descending from Himalayas in Uttarakhand and a dam has been constructed at Tajewala to harness water, which is being used for irrigation in west Yamuna canal areas. But this water is used mostly in other districts. In Yamuna Nagar district, only 40 Km2

area is irrigated by this canal system.

4.6.3.6 Infrastructure It is an important industrial town having metal, utensil and plywood industries. Large industries like Shri Gopal Paper Mills and Saraswati Sugar Mills (biggest Sugar mill in Asia) are also located here. The city produces sugar machinery, paper machinery along with highly efficient equipments for petro-chemical plants, which are shipped to various refineries across the country. The city is also known for its Plywood productions, which is attributed to the easy accessibility of primary raw material – poplar tree. It has also one of India's largest railway carriage and wagon repair workshops. Recently, Reliance Industries has also installed a thermal power plant in the town. Haryana Urban Development Authority has done major development work in the landstretch linking the city with Jagadhri, the other part of twin city.

Social Infrastructure available

Road Connectivity SH- 6 (~3 km in North direction).

Page 9: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 23

Nearest Railway Station Kalanaur (~14.21 km in NE direction). Nearest Airport Chandigarh (~ 85 km in NW direction).

Nearest Police Station Jathlana Police Station ~4 km in North direction.

Nearest Hospital

Saini Hospital, Radaur ~9 km in NW direction.

Nearest school

Nagla Primary School ~0.8 Km in E direction. -10 km,SW

Nearest Post office

Nakur post office -9.1 Km in SE

4.6.3.7 Demography As per provisional data of 2011 census Yamuna Nagar urban agglomeration had a population of 383,318, out of which males were 205,346 and females were 177,972. The literacy rate was 85.72%.

5.0 PLANNING BRIEF 5.1 Planning Concept

Open cast semi-mechanized mining method will be adopted for sand mining. Mineral excavated will be used for meeting the huge demand of construction material like coarse and fine aggregate required in building construction and infrastructure works, road material for construction and maintenance of roads / highways.

5.2 Assessment of Infrastructure Demand (physical and social) Adequate infrastructure facilities are available in the vicinity of mine contract area and due to the mining activities; no extra infrastructure over and above the existing infrastructure is required except for the creation of approach road from riverbed to link roads from different blocks of mining.

5.3 Amenities/Facilities

Mines Office, Workshop etc. : Proper site services such as First Aid, Rest Shelter, and Drinking Water will be provided to the mine workers.

Rest Shelter : Rest shelter along with first-aid station complying with all the provisions of Mines Rules will be provided by the project proponent.

Water Supply : Water will be supplied for human consumption, dust suppression and for plantation.

Power Supply : The mine will work in day time only, so no lighting arrangement will be required.

Transport of Men and Material : Employee will report to the duty on own means. The material from the mine will be transported by trucks / tippers / tractor trollies.

Communication : Mobile phones will be used for communication.

Security Arrangements : Appropriate security arrangement will be made.

5.4 Population Projection The project will employ most of the workers from nearby villages except for supervisory staff. Thus there will no increase in population due to the project. However, few people from other areas may migrate in this area for employment and business opportunities.

5.5 Land Use The mining contract area 89.48 ha is part of Yamuna riverbed falling in Yamuna Nagar district, Haryana. There is no forest land in the contract area. The area so excavated will get filled up due to sediment inflow during flooding/heavy rain fall in the river bed. The ultimate land use of the mine contract area will not change after systemetic and scientific mining closure.

6.0 PROPOSED INFRASTRUCTURE 6.1 Industrial Area (Processing Area)

No industrial area is proposed.

Page 10: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 24

6.2 Residential Area (Non Processing Area) As the local people will be given employment, no residential area/ housing is proposed.

6.3 Green Belt The green belt shall be developed as per approved eco-friendly mine lease plan and as per CPCB guidelines. The project proponent shall also develop greenbelt in the premises of the schools, hospitals and also carry out the avenue plantation in the vacant areas along roads. The greenbelt shall be developed by planting saplings per year. Indigenous species with the consultation of the State Forest Department shall be planted and maintained.

6.4 Social infrastructure • Road facility (existing roads will be maintained regularly) • Employment opportunity • Medical camps • Social awareness camps • Donations to schools • Secondary employment opportunities • Formation of self help groups for the women in nearby villages

6.5 Connectivity

From the contract area, an unmetalled road joins a metalled road which further joins the nearest state highway.

6.6 Drinking Water Management Water required for drinking purpose will be obtained through tankers from the nearby available sources.

6.7 Sewerage System No sewerage system is proposed. However for sanitation purpose portable toilets will be made available.

6.8 Industrial Waste Management Not applicable

6.9 Solid Waste Management There will be no OB or waste generation as the sand is exposed in the river bed. But, at the later stage, if any soil or waste will be obtained during mining, then same will be stored with proper protection and will be used for reclamation (plantation).

6.10 Power Requirement and Supply/Source. All the activities will be carried out in amechanized manner with diesel operated machinery. The operation will be done only from sun rise to sun set hence there is no power requirement for the proposed activity.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN There is no human settlement within the mine contract area. No human settlement will be disturbed due to the mining activity. So, no Rehabilitation and resettlement is proposed. 8.0 PROJECT SCHEDULE AND COST ESTIMATES 8.1 Likely date of start of construction and likely date of completion. The project will commence once Environmental Clearance and other necessary certificates are obtained from the respective departments. 8.2 Estimated project cost along with analysis in terms of economic viability of the Project Total cost of the Project is approximately Rs. 9.5 Crore/-.

Page 11: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 25

8.3 Viability of the Project 1. Production capacity = 39,00,000 TPA 2. Production cost = Rs. 115.50 per MT 3. Sale value of mineral = Rs. 116.50 per MT 4. Profit = Sale Value – Production Cost = Rs. 115.50 – Rs.112.50 per MT = Rs. 3 per MT 5. Estimate profit for 1 years= Rs. 3 x 39,00,000 = Rs. 1, 17,00,000/- (Maximum)

As stated above, there is possibility that the project maybe viable.

9.0 ENVIRONMENTAL MANAGEMENT PLAN Environmental Management Plan details the environmental quality control measures which are proposed for this project to achieve the annual production capacity of 39,00,000 TPA of Sand (Minor Mineral). The environmental management plan includes all preventive as well as mitigation measures to minimize impact on environment for the mined out sand.

9.1 Land Use Pattern Envisaged mining operation will be carried out in the River bed. This will be dry bed mining. There will be no mining activities when there is flow of water in the working zones. During rainy season, the activities will be stopped, if there is flow in the river. Besides resource extraction, following activities will be kept in view:

a) Protection and restoration of ecological system b) Prevent damages to the river regime c) Protect river in configuration such as bank erosion, change of water course gradient, flow regime etc. d) Prevent contamination of ground water

Safeguard Measures While carrying out mining activity following measures will be taken:

Mining activities will be carried out only in dry bed. No in stream mining will be practiced.

Identification of river stretches for mining will be completed.

There will be no mining near the banks. This is to protect the bank erosion and river migration.

Mineral Sand from river will be restricted to a maximum depth of 3.0 m from the existing bed level. This is for safety and sustainability.

As the lease area is quite large and long in length, systematic extraction will be carried out to prevent seasonal scouring and enhanced erosion.

Extraction will be carried out in a manner that there is no obstruction to flow of water, if any, during rainy season.

Mining on the concave side of the river channel should be avoided to prevent bank erosion. Similarly meandering segment of river will be selected to prevent natural eroding banks and to promote mining on natural building (aggrading) meanders component

There will be no generation of OB/ waste material. No backfilling has been proposed in the excavated zone. River bed will be replenished by sediments during rainy season.

9.2 Air Pollution Control Air Pollution: Emission of gases and dust takes place due to movement of vehicles. Spraying of water and plantation along the road side prevents the spread of dust. Plantation also acts as barrier for restricting pollution. Impact on air environment has been assessed taking in to consideration the proposed production and increase emissions. The sources of air pollution are given below:

Operation of mining machinery/ loading operations.

Transportation of mineral.

Wind erosion from barren area and river bed. Air pollutants released during production can be checked by:

Dust suppression system/ water spraying would be adopted at mine working and loading points.

Excavation operations to be suspended during very strong wind conditions.

Page 12: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 26

Afforestation will be carried out for control of dust.

Plantation with wide canopy trees along approach road will help in dust suppression.

Persons to be provided with dust mask and other personal protective equipments particularly during summer months and dust storm periods.

Transportation

Regular water spraying on haulage roads during mineral transportation by water sprinklers,

Avoid over loading of tippers and consequent spillage on the roads,

Mineral carrying trucks will be effectively covered by tarpaulin to avoid escape of fine dust to atmosphere.

Air quality will be regularly monitored both in the core zone and the buffer zone. Controlling of NO2 level The source of NOx is due to vehicular emission. This can be controlled by proper maintenance and servicing of vehicles. Only P.U.C. certificated vehicles will be permitted.9.3 Water Pollution Control

9.3.1 Surface and Ground Water Management There is no surface water body within the mining lease area. Thus, there is no localized /concentrated contamination of water from the mining in area.

The proposed working are far above the general ground water table. No toxic minerals substances and tailing pond located in the area. Thus quality of ground water will not pollute.

The mining does not have any impact on topography and natural drainage of surrounding area. 9.3.2 Waste Water Management No waste water will be generated from the mining activity of mineral as the project only involves extraction of sand.

9.3.3 Domestic Sewage Water Management

Domestic waste water will be disposed in soak pits via septic tank.

9.4 Noise Pollution Control There is no drilling and blasting for mineral extraction. Noise pollution due to transportation will not cause any problem to the inhabitants of this area because there is no human settlement in close proximity to the link roads in lease area. Effective steps will be taken to keep the noise level well below the DGMS prescribed limit of 85 dBA. Noise control is achieved by the following:

Proper care and maintenance of the equipments will be carried out.

Personal protective equipments will be provided to the workers.

9.5 Solid waste Management There will be no OB or waste generation as the sand is exposed in the river bed. But, at the later stage, if any soil or waste will be obtained during mining, then same will be stored with proper protection and will be used for reclamation (plantation).

9.6 Socio Economic Improvement It is proposed that the lessee will spend for social development of the local residents. Under social development of the area, the lessee will donate part of his profit to provide drinking water facility, books to the poor student of the local school and medicines in the local hospital for treatment of the poor people and other social work.

In the recruitment process of the organization, local people will be given preference.

Most of the deserving candidates have already been absorbed.

The management will recruit the skilled and semiskilled workers from the nearby villages thus increasing the social status of the villagers.

The management will contribute for the overall economy and social development of the area.

9.7 Details of Health Checkup and Insurance of all the Employed Persons All workers will be subjected to medical examination as per Mines Rule, 1955 both at times of appointment and at least once in five years. Medical camps will be organized for this activity. Insurance of all employees as per the rules

Page 13: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

Pre- Feasibility Report

Sand (Minor Mineral) Mining project at “Nagla Rangran Block/ YNR B 14” over an area of 89.48 ha with Production Capacity of 39,00,000 TPA near Village- Nagla Rangran, Tehsil- Radaur, District- Yamuna Nagar (Haryana).

Vardan Environet, Gurgaon Page | 27

will be carried out.

10. ANALYSIS OF PROPOSAL (RECOMMENDATIONS)

Project will create direct and indirect employment opportunities within the surrounding region. Unit will use good faith efforts to employ local people from the nearby villages depending upon the availability of skilled and un-skilled man-power surrounding the project site.

In this proposed mining project workforce of non-technical and technical persons are required. Migration of highly education and skilled experience will result in increase of literacy in the surrounding villages.

Assessment of the potential socioeconomic benefits during mining focused primarily on work force requirements, acquisition of supplies, and the temporary increased demand for services related to the mining project like food, housing, communications, law enforcement, medical care, local transportation etc. Due to these, additional revenue to local suppliers for required products and services related to the construction and operation phases of the project will generate.

Thus, mining activities will provide numerous new, although temporary, work opportunities for both skilled and unskilled labor, as well as contribute significantly to the local economy.

Additional government revenue expected from royalty, taxes, duties and other fees. .

Page 14: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining
Page 15: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining
Page 16: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining
Page 17: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining
Page 18: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining
Page 19: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining
Page 20: Project Name: Baseri & Bari, Bajri MineApplicant Name ...environmentclearance.nic.in/writereaddata/Online/TOR/18_Jul_2017... · Pre- Feasibility Report Sand (Minor Mineral) Mining

STUDY AREA MAP OF THE 10 KM RADIUS

TOPOSHEET NO. H43R1, H43R5, H43L4, H43L8

µ

Key Plan

1:50,000

Lease Area

LegendStudy Area

Lease Area

Project Proponent:M/s Tirupati Earth & Project Works Pvt Ltd.

Project:Sand minor mineral mine(Area- 89.48 Hectare)Nagla Rangran Block/YNR B-14District- Yamunanagar, Haryana

Environment Consultant:Vardan EnvironetQCI-NABET Accrediated Environement Consultant Cetificate No. NABET/EIA/1316/IA001

PREPARED BY: REVIEWED BY: APPROVED BY:

MR. BHAGWAN

SAHAY

DR. V.N. SINGH MR. R.S. YADAV

77°18'30"E

77°18'30"E

77°13'0"E

77°13'0"E

77°7'30"E

77°7'30"E

30°5

'0"N

29°5

9'30

"N

29°5

9'30

"N

29°5

4'0"

N

29°5

4'0"

N

Lease Area

BAC

D EF

G

H

IJ

KL

MNO

PQRSTUV

WX

YZ

S.No. Latitude Longtitude

A 29° 58' 56.000" N 77° 13' 52.000" EB 29° 58' 55.000" N 77° 13' 54.500" EC 29° 59' 6.000" N 77° 13' 54.500" ED 29° 59' 24.000" N 77° 13' 59.000" EE 29° 59' 19.494" N 77° 14' 5.123" EF 29° 59' 17.000" N 77° 14' 6.800" EG 29° 59' 8.000" N 77° 14' 4.300" EH 29° 59' 1.000" N 77° 14' 4.300" EI 29° 59' 9.500" N 77° 14' 14.100" EJ 29° 59' 8.600" N 77° 14' 15.000" EK 29° 59' 12.000" N 77° 14' 19.000" EL 29° 59' 6.372" N 77° 14' 18.067" EM 29° 58' 35.526" N 77° 13' 58.447" EN 29° 58' 27.000" N 77° 13' 59.400" EO 29° 58' 30.909" N 77° 13' 54.347" EP 29° 58' 31.805" N 77° 13' 49.786" EQ 29° 58' 30.257" N 77° 13' 46.081" ER 29° 58' 26.367" N 77° 13' 41.892" ES 29° 58' 19.000" N 77° 13' 40.000" ET 29° 58' 14.500" N 77° 13' 42.500" EU 29° 58' 10.000" N 77° 13' 38.600" EV 29° 58' 10.600" N 77° 13' 32.000" EW 29° 58' 18.000" N 77° 13' 32.000" EX 29° 58' 30.000" N 77° 13' 34.500" EY 29° 58' 40.000" N 77° 13' 39.400" EZ 29° 58' 51.000" N 77° 13' 46.800" E