Project profiles of reference projectsGermany and abroad countriesGU-Projekte
October 2020 | Berlin
Contents.
2
1. Renewal of railway overpass, Potsdamer Street Saarmund2. North Cross Karow3. German Unity Transport Project 8.1, Nuremberg Ebensfeld4. Double track extension and electrification project, Knappenrode Horka5. Building project, Node Magdeburg6. Renewal Central Station, Oslo.7. Dugo Selo, Croatia.8. Mesilot, Israel.
Renewal of railway overpass Potsdamer Street Saarmund –rail line 6117 | km 6,351
3
Displacement of a 1,250 t reinforced concrete bridge
Renewal of railway overpass Potsdamer Street Saarmund –rail line 6117 | km 6,351
4
Traffic clearanceCompletion of road construction
North Cross Karow 2nd stage
5
Description
Client: DB Netz AGContractor: DB Bahnbau Gruppe GmbHPeriod: 01/2017 – 03/2022
Services:
− Track superstructure− Overhead contact line (catenary)− Noise barrier walls− Control and safety technology− Telecommunications− Electrical power systems− Underground cable installation
Discussion of further steps of the large-scale construction site
North Cross Karow 2nd stage
6
Installation of the overhead line with two-way trucks Working with the stuffing machine on the tracks in the large-scale project
North Cross Karow 2nd stage
7
Bridge pushPreparatory work of the bridge push
German Unity Transport Project 8.1 upgraded line NurembergEbensfeld
8
Description
Client: DB Netz AGContractor: DB Bahnbau Gruppe GmbHPeriod: 06/2014-05/2018
Services:
− Track superstructure− Overhead contact line (catenary)− Noise barrier walls− Control and safety technology− Telecommunications− Electrical power systems− Underground cable installation
Noise barrier walls along the route
Double track extension and electrification project Knappenrode – Horka, construction stage 2.2, Station Niesky (a) - Lohsa (e), rail line 6207, km 28.5 - km 61.6+1500
9
Description
Client: DB Netz AGContractor: Consortium of DB Bahnbau Gruppe
GmbH and Hentschke Bau GmbHPeriod: 10/2015 – 07/2020
Services:
1. Technical Management of the consortium2. Execution planning of all trades except railway
overpasses and Signal boxes3. Execution:
− Electrical power system− Telecommunication− 70 km Overhead contact line (catenary)− 68 km Track superstructure incl. 6 points− 34 km Cable trough system− 34 Drainage channels− 21 Level crossings− 11 km Noise barrier walls− 5 Stopping points− Civil and underground engineering on 34 km
of track incl. dams and KBE- retaining walls with gabion or half-gabion front
New track construction with rapid conversion machine SUM 314 "Mammut"
10
Aerial view of the functioning route
Double track extension and electrification project Knappenrode – Horka, construction stage 2.2, Station Niesky (a) - Lohsa (e), rail line 6207, km 28.5 - km 61.6+1500
Double track extension and electrification project Knappenrode - Horka, constructionstage 2.3 freight station Horka (a) - Station Niesky (e), rail line 6207, km 22,300 - km 28,500
11
Description
Client: DB Netz AGContractor: DB Bahnbau Gruppe GmbHPeriod: 09/2017 – 03/2020
Services:
1. Technical Management of the consortium2. Execution planning civil and underground
engineering, track superstructure, equipment, noise barrier walls
3. Execution:− Telecommunication− Electrical power system− km Cable duct system− 5 km Noise barrier wall− Track construction: 13 km incl. 13 pcs.
points
Mounting Overhead contact line (catenary) on track 1 Mounting Overhead contact line (catenary)on track 1
Building project Node Magdeburg, 2nd stage of expansion, conversion of the middle track position, Construction of a newtraffic station and Establishment of midle voltage ring part B
12
Description
Client: DB Netz AGContractor: DB Bahnbau Gruppe GmbHPeriod: 10/2014 – 03/2021
Services:
− Execution planning civil and underground engineering
− Strack superstructure− Drainage− Execution planning of Traffic routes, traffic
station− Execution planning equipment (electric
power system, overhead line-catenary,telecommunications)
− Maintenance of the passenger tunnel− Revitalisation of station buildings− Deconstruction, recycling and new
construction of the following assets and assets parts:
• Track and traffic way´s• Track works• Platforms and platform equipment
• Lifts• Platform roofs• Civil engineering (Rail bridges,
Platform bridges, colonnades, Tunnel)• Control and safety technology• Telecommunications technology• Turnout heating system and track
lighting system• Overhead contact line (catenary)• Electrical power installations of the
platforms
Construction of platforms, platform roofing, tracks, turnouts, track lighting and turnout heating
Building project Node Magdeburg, 2nd stage of expansion, conversion of the middle track position, Construction of a newtraffic station and Establishment of midle voltage ring part B
13
Finished platform systems incl. lighting Track superstructure and underground cable services in parallel
Renewal Central Station, Oslo.
14
Description
Client: Bane Nor (formerly Jernbaneverket)Contractor: DB Bahnbau Gruppe GmbHPeriod: 2010 – 2012
Services:
− 100 % Own performance BBG− 6.000 m Track renewal− 60 pcs. turnout renewal− Tamping works− Welding− Compensation of rail tensions
Installation of a turnout with KRC 810
Dugo Selo, Croatia.
15
Description
Client: Hrvatske željeznice (HŽ)Contractor: DB Bahnbau Gruppe GmbHPeriod: 2015 – 2018
Services:
− Provision of machines incl. crews− Tamping works− Turnout mounting‒ Sleepers laying 8,000 m track‒ Welding
Rail way renewal
Mesilot, Israel.
16
Description
Client: Netivai IsraelContractor: DB Bahnbau Gruppe GmbH Period: 2014 – 2018
Services:
− 141.681 m new track construction− 12,869 m slab track new construction in the
tunnel (LVT – Low Vibrations Track System)− 49 pcs. Turnout renewal− Tamping works− Welding− Compensation of rail tensions
Map of designed routing
Mesilot, Israel.
17
Rail way renewalGravel levelling machine in use at Gilon tunnel on the road AC