FINAL PROJECT REPORT
“SALES AND BILING SYSTEMS” IN SAP
(PRODUCTION PLANNING)
SUBMITTED TO: SUBMITTED BY:
ICAII NAME : HARJINDER SINGHLC CODE:01687 ROLL NO : 520841039COURSE : MBA( PM )(SIKKIM MANIPAL UNIVERSITY)
1
TABLE OF CONTENTS
1. Preface2. Acknowledgment
3. Declaration
4. Abstract
5. Company profile
6. Introduction to ERP concepts
6.1 What is ERP ? 6.2 Benefits of the ERP software
7. SAP Concepts 7.1 SAP-Company and Software Package 7.2 SAP R/3 Client Server Architecture 7.3 SAP database organization 7.4 Application Modules of SAP 7.5 Advantages of SAP8. Introduction to PP Module 8.1 What is PP? 8.2 Enterprise Structure 8.3 Customization9. Define plant10. Define company code11. Define MRP Controller12.Production Planning13.Bibliography
2
PREFACE
I am the student of Sikkim manipal university, Ludhiana studying in 4th
semester. As a part of 2-year MBA course, I have undergone a project as a
Major project Work on “Introduction to SAP PP Module & SALES AND
BILLING SYSTEM” to facilitate them with an automated software
besides the error prone manual work.
Enterprise Resource Planning is that growing segment of information
technologies that fulfill needs of the enterprises like quality, time to
market, customer satisfaction, performance and profitability very
effectively and efficiently.
The aim of the project is to provide an integrated environment to an
enterprise with SAP software with all its advantages over the manual
system. All the operations of the company can be integrated into an overall
system for planning, controlling and monitoring.
The work done in this project has been done using the SAP ECC4.7 tool.
SAP R/3 SD module is a very effective tool for SALES AND BILLING
SYSTEM . This report provides the knowledge regarding the technology
used in the project.
3
ACKNOWLEDGEMENT
To matter what accomplishment we achieve somebody
helps us. For every accomplishment we need the
cooperation and help of others. As knowledge advances by
steps not by leaps so, ability advances by encouragement
and guidance.
First of all would like to thank ICMHRD for providing an
opportunity to create this project. Then I would like to
thank OSWAL GROUP Ltd, Ludhiana for providing such
working environment.
I express my deep sense of gratitude and feeling of
indebtedness to OSWAL for providing all the facilities and
its staff. I also express my gratitude to Mr. SIDDHARTH
SHARMA (PP Consultant) my project guide, for their bold
attention in this particular time of the project and guide me
as per according to progress of my project work on “SALES
AND BILLING SYSTEM of PP Module in SAP”.
HARJINDER SINGH Sikkim Manipal university
4
DECLARATION
This is to certify that this project entitled “Billing System in SAP” submitted as the partial fulfillment of the requirement for degree of MBA. in sikkim manipal university, submitted to the Institute is authentic record of our own work carried out at the end of third semester Ludhiana, has been approved by the project in charge after an oral examination on the same, in collaboration with an Head of I.T Department .
HARJINDER SINGH Above statements by the candidate are true to the best of our knowledge.
Signature Signature
(Head of I.T Department) (Advisor)
5
ABSTRACT
This report covers the introductory concepts about the ERP software. The
ERP software used is SAP Software. Enterprise Resource Planning, a
software solution that addresses the enterprise needs taking the process view
of an organization to meet the organizational goals tightly integrating all
functions of an enterprise.
Enterprise Resource Planning, a business management system that integrates
all facets of the business, including planning, manufacturing, sales, and
marketing. ERP had its origins in manufacturing and production planning. In
the mid -90’s it was extended to other back-office functions such as
financial management and human resource management. More recently
these systems have addressed applications specific to higher education such
as student systems and grants management.
SAP is an ERP software product capable of integrating multiple business
applications, with each application representing a specific business area.
These applications update and process transactions in real time mode.
This report covers the pp Module in SAP for a new enterprise. The
customization includes the customization of the Master Data as well as that
6
of the transaction Data. After this, the enterprise would be ready to run SD
Module in SAP.
Systems DEPARTMENTS
I am undergoing training in the Systems Department, which is well equipped with
the latest software technologies. There are around 250 workstations. The Application
Implementation is done in SAP R/3 with database in Oracle. The company has SAP R/3
4.7 application, which enables the effective and streamlined operations of the department,
in an online integrated way.
The staff skills are enhanced through proper training and deploying the appropriate
resources of the company to get the maximum result.
The team members are highly motivated and professionals, who have been the most
helpful to me. They are always open to any queries and problems that I face during the
course of my training and guide me suitably. I am very impressed by their style of
functioning and feel very privileged at being here in such a professional atmosphere,
which shall help me, a lot in guiding and shaping my future in the industry.
The Systems Department Team
Mr. Nitesh kumar General Manager, IT
Mr. Narinder Singh Manager, IT
7
Mr. Sunish Gupta ABAP Consultant
Mr. Adhish Prabhakar ABAP Consultant
Mr. Siddharth Sharma pp
8
2. Project Review
2.1 EVOLUTION OF ERP
Automation was a magic word in the beginning. The focus then shifted to computers and
the trends were to replace the human power with the microprocessor power, pink slip the
employee and hopefully the faults and the costs will come down. From then onwards,
automation was considered the panacea for all ills of business. But there was much that
was wrong with this approach. As these automation packages use to come in different
forms and in a non-integrated fashion, loading too much Information Technology on to
these in- efficient processes and packages that leads to double entendre.
Actually confusion was that companies developed separate computer applications to
satisfy the needs of their particular functional segment. e.g. Accounts, Purchase,
Inventory and Planning. Such systems grew as inconsistent islands of information, and
hence their consolidation was not possible which lead to numerous organizational
problems and data inconsistencies are likely to occur. As a result the decision-makers
were denied of access to timely information for making urgent business decisions. This
gave rise to the need of an integrated system (ERP) that would address the information
requirements of the entire enterprise.
9
DEFINE ERP
Enterprise Resource Planning, a software solution that addresses the enterprise needs
taking the process view of an organization to meet the organizational goals tightly
integrating all functions of an enterprise.
Fig 3:- Enterprise Resource Planning
Short for Enterprise Resource Planning, a business management system that integrates
all facets of the business, including planning, manufacturing, sales, and marketing. As the
ERP methodology has become more popular, software applications have emerged to help
Business managers implement ERP in business activities such as inventory control, order
tracking, customer service, finance and human resources.
10
ERP had its origins in manufacturing and production planning . In the mid -90’s it was
extended to other back-office functions such as financial management and human resource
management. More recently these systems have addressed applications specific to higher
education such as student systems and grants management .
Enterprise Resource Planning software, or ERP, doesn't live up to its acronym. Forget
about planning—it doesn't do much of that—and forget about resource, a throwaway term.
But remember the enterprise part. This is ERP's true ambition. It attempts to integrate all
departments and functions across a company onto a single computer system that can serve
all those different departments' particular needs.
11
SCOPE OF ERP
The various areas that can be covered under the concept of Enterprise Resource
Planning (ERP) are discussed below:-
Fig4:-Areas covered under ERP
Customer Relations
o Sales Support
o Delivery
o Billing
o Credit
Logistics
o Procurement
o Production
o Materials Mgt.
12
Human Resources
o Payroll
o Organization
o Hiring
Treasury
o Commitments
o Investments o Currencies
.
2.2 EXPLORING ERP’S BENEFITS
13
Integrated, uniform, relevant and up-to-date information is vital for the existence for the
enterprise. ERP brings together people who work on share tasks within the same
enterprise. Some of the tangible benefits of ERP are
Reduction of lead-time by 60%
99% on time shipments
Doubled business
Increase of inventory turns to over 30%
Manufacturing of single bicycle time reduced to 80%
Better customer satisfaction
Improved vendor performance
Increase flexibility
Reduced quality cost
Improved workflow and efficiency.
Improved access to information.
Improved controls and program alerts.
Improved resource utility
Improved information accuracy
Improved decision making capability
Another reason to consider ERP is to improve workflow and efficiency. As an example,
online requisitions can be completed and workflow processes can forward the form along
the approval path more rapidly than with traditional paper processes. Another reason to
consider ERP is the ability to improve controls and to program alerts. Alerts, for
example, can be programmed to warn budget managers about budgets that are in danger
of running out of funds and to implement controls that prevent individuals from
overspending budgets.
SHORTCOMINGS OF ERP
14
Problems with ERP systems are mainly due to inadequate investment in ongoing training
for the involved IT personnel - including those implementing and testing changes - as
well as a lack of corporate policy protecting the integrity of the data in the ERP systems
and the ways in which it is used.
Disadvantages
Customization of the ERP software is limited.
Re-engineering of business processes to fit the "industry standard" prescribed by
the ERP system may lead to a loss of competitive advantage.
ERP systems can be very expensive leading to a new category of "ERP light"
solutions
ERP’s are often seen as too rigid and too difficult to adapt to the specific
workflow and business process of some companies—this is cited as one of the
main causes of their failure.
Many of the integrated links need high accuracy in other applications to work
effectively. A company can achieve minimum standards, then over time "dirty
data" will reduce the reliability of some applications.
Resistance in sharing sensitive internal information between departments can
reduce the effectiveness of the software.
Some large organizations may have multiple departments with separate,
independent resources, missions, chains-of-command, etc, and consolidation into
a single enterprise may yield limited benefits.
2.3INTRODUCTION TO SAP R/3 - ENTERPRISE SOFTWARE
15
Integrated software that supports the information flows among the processes in the supply chain.
Sap R/3 is an ENTERPRISE SOFTWARE.
Fig5:- Flow of information in Enterprise Software
Enterprise software is integrated software that facilitates the flow of information
among all the processes of an organization’s supply chain.
A supply chain describes the chronological and logical relationships of business
transactions from original supply to final consumption.
A value chain encompasses those activities in the supply chain that add value to a product or service of
an organization.
A value chain views all the business events from the receipt of a customer order to
the delivery of that order. For example, value is added when the production process
takes raw materials and transforms them into a finished product, when the product is
sold to the customer. A company is profitable if the price consumers are willing to
pay for a product exceeds the costs of creating value.
THREE -TIER CLIENT/SERVER ARCHITECTURE
16
The R/3 Basis is the business operating system software that resides on the database
server, the application server, and the clients of the end user of the R/3 installation.
The SAP R/3 Basic system is a multi-tier client/server system. The classic configuration
of a SAP R/3 System contains the following software layers:
Presentation Layer
Application Layer
Database Layer
PRESENTATION LAYER
Presentation Layer contains the software components that make up the SAPGUI
(Graphical User interface). This layer is the interface between the SAP R/3 Systems and
its users. The SAP R/3 system uses the SAPGUI to provide an intuitive graphical user
interface for entering and displaying data. The presentation layer sends the users input to
the application server, and receives data from it.
APPLICATION LAYER
The application layer consists of one or more application servers and a message server.
Each application server contains a set of services used to run in the SAP R/3 System.
Theoretically, you only need one application server to run a SAP R/3 System. In practice,
the services are distributed across more than one application server. This means that not
all application servers will provide the full range of services. The message server is
responsible for communication between the application servers. It passes requests from
17
one application server to another within the system. It also contains information about
application server groups and the current load balancing within them. It uses this
information to choose an appropriate server when a user logs onto the system.
DATABASE LAYER
The database layer consists of a central database system containing all of the data in the
SAP R/3 System. The database system has two components - the database management
system (DBMS), and the database itself. SAP does not manufacture its own database.
Instead, the SAP R/3 System supports the following database systems from other
suppliers: ADABAS D, DB2/400 (on AS/400), DB2/Common Server, DB2/MVS,
INFORMIX, Microsoft SQL Server, ORACLE, and ORACLE Parallel Server.
The database does not only contain the master data and transaction data from your
business applications, all data for the entire SAP R/3 System is stored there. For example,
the database contains the control and Customizing data that determine how your SAP R/3
System runs. It also contains the program code for your applications. Applications
consist of program code, screen definitions, menus, function modules, and various other
components. These are stored in a special section of the database called the SAP R/3
Repository, and are accordingly called Repository objects. You work with them in the
ABAP Workbench.
18
The following diagram depicts the whole scenario -
Fig 6:- Software layers of R/3 system
19
FEATURES OF 3-TIER ARCHITECTURE
SCALABILITY
Adding more applications or more users to the system. When more users are added to the
system, another application server may be added to handle the additional processing
demands of those users.
FLEXIBILITY
The number of application modules may be increased without changing the Basis System
software that runs on the application servers and the database server.
ON-GOING MAINTENANCE
Business functions included in the system may be removed and replaced by other
functions that better match current business practices. Also, changes in organization
structure can be made using the R/3 Reference Model and does not require changes in the
Basis Software system.
20
2.4 ADVANTAGES OF SAP R/3
Fig 7:- Advantages of SAP R/3
The SAP R/3 software helps in providing the various functions in the system
SECURITY THROUGH INTEGRATION
It helps in providing full-fledged integration of the various data transfers and high
quality reports can be made easily.
SAVING TIME WITH INTEGRATION
The consolidation software helps to shorten the time needed to close the books, The
financial transactions in the ledger are integrated with the consolidation database and
helps in getting the required information at any time.
AUTOMATION OF CONSOLIDATION PROCEDURE
It helps in reducing the time and expenses to manually enter all the documents
especially in the area of consolidation investments.
COST EFFECTIVE AUDITS
21
The system generates printed audit reports and allows the auditor to perform
interactive analysis of special detailed information directly on the screen.
CUSTOMIZING THE SOFTWARE AS PER THE NEEDS
It is helpful in making new programs as per the requirements.
PRE-FIGURED FOR THE FAST IMPLEMENTATION
System comes with a variety of useful consolidations, which can be put to use
immediately or can be employed after minimal adjustments. The system includes
several industry-related plans.
EASY TO LEARN AND USE
The system is user friendly and context-sensitive help functions and extensive online
documentation allows learning the system easily.
ACCOUNTING AUTONOMY
Running your consolidation on a separate computer increases the accounting
department’s autonomy. This is very helpful during the closing period when there is
lot of workload.
INFORMATION SYSTEM
The controlling component includes versatile reporting functions. Exception
reporting and interactive navigation through the database enhances the preparation of
information.
22
APPLICATION MODULES
SAP has several layers. The Basis System is the heart of the data operations and should
be not evident to higher level or managerial users. Other customizing and implementation
tools exist also. The heart of the system from a manager’s view point is the application
modules.
Fig 8:- R/3 Core business processes
These modules may not all be implemented in a typical company but they are all related
and are listed below:
FI Financial Accounting-designed for automated management and external
reporting of general ledger, accounts receivable, accounts payable and other sub-
ledger accounts with a user defined chart of accounts. As entries are made relating to
23
sales production and payments journal entries are automatically posted. This
connection means that the "books" are designed to reflect the real situation.
CO Controlling--represents the company's flow of cost and revenue. It is a
management instrument for organizational decisions. It too is automatically updated
as events occur.
AM Asset Management--designed to manage and supervise individual aspects of
fixed assets including purchase and sale of assets, depreciation and investment
management
PS Project System--is designed to support the planning, control and monitoring of
long-term, highly complex projects with defined goals.
WF Workflow--links the integrated SAP application modules with cross-application
technologies, tools and services
IS Industry Solutions--combine the SAP application modules and additional
industry-specific functionality. Special techniques have been developed for industries
such as banking, oil and gas, pharmaceuticals, etc.
HR Human Resources--is a complete integrated system for supporting the planning
and control of personnel activities.
PM Plant Maintenance--In a complex manufacturing process maintenance means
more than sweeping the floors. Equipment must be services and rebuilt. These tasks
affect the production plans.
MM Materials Management--supports the procurement and inventory functions
occurring in day-to-day business operations such as purchasing, inventory
management, reorder point processing, etc.
24
QM Quality Management--is a quality control and information system supporting
quality planning, inspection, and control for manufacturing and procurement.
PP Production Planning--is used to plan and control the manufacturing activities of
a company. This module includes; bills of material, routings, work centers, sales and
operations planning, master production scheduling, material requirements planning,
shop floor control, production orders, product costing, etc.
SD Sales and Distribution--helps to optimize all the tasks and activities carried out
in sales, delivery and billing. Key elements are; pre-sales support, inquiry processing,
quotation processing, sales order processing, delivery processing, billing and sales
information system.
2.5 MODULES IMPLEMENTED AT HERO
The ERP package implementation at Hero Cycles covers the following seven modules :-
1. Cost Controlling
2. Sales and Distribution
3. Material Management
4. Production Planning & Control
5. Plant Maintenance
6. Quality Management
7. Financial Accounting
25
3.1 SAP CONFIGURATION
Oswal Group has implemented SAP R/3 having following features:
SAP R/3 release 4.7 Enterprise
SAP version 4.7 Enterprise upgrade from 4.0B as Front-end.
Currently supporting 150 users
All the departments work under the environment of
IBM AIX with RS/6000 SP Server, IBM P630 Server.
Oracle 8.0.6 upgraded to Oracle 9.2.0.4 as Backend RDBMS for R/3 system.
ABAP/4 as application programming language.
Windows 98 as client operating system.
Three-tier architecture
Class B IP addressing
Core Builder 9000 (switch from 3COM) is used to provide networking (Client
Server) connections to various department within organization.
26
3.2 TRAINEE SERVER (IDES)
SAP IDES – the "Internet Demonstration and Evaluation System" in the R/3 System,
represents a model company. SAP IDES is a normal R/3 but with lots of DEMO data. It
is purely for education .It is a training server, used to give training to users. When sap is
implemented in company, first IDES is installed so that users become familiar with
different screens and transaction codes. It is simple to use and has a variety of master and
transaction data, and is used for demos, online/classroom training, and presentations.
IDES uses easy-to-follow business scenarios to show you the comprehensive functions of
the R/3 System. The focal point of IDES, however, is not the functionality itself, but the
business processes and their integration. SAP regularly updates the IDES data (master
data, transaction data, and customizing). Above all, IDES shows you the possibilities of
the integrated applications in the SAP System. IDES cover all aspects of a business
enterprise, including Human Resources, Financial Accounting, Product Cost Planning,
Overhead Management, Profitability Analysis, Planning, Sales and Distribution,
Materials Management, Production and much more.
System Requirement to install IDES
For installing IDES 46C on a Laptop, you need:-
Windows server 160 GB HDD 512 MB RAM
27
INTRODUCTION TO
(PRODUCTION
PLANNING)
28
3.3 PHASES OF IMPLEMENTATION OF SAP
Accelerated SAP (ASAP) is an approach specifically developed by SAP to help
customers implement the SAP software as quickly and efficiently as possible.
The Accelerated SAP Roadmap consists of the following phases
• Project Preparation
• Business Blueprint
• Realization
• Final Preparation
•Go-Live&Support
Fig9:-various phases for implementing sap
29
1. Project Preparation
It consists of identifying team members and development strategy as how to go.
AS – IS (Existing Process followed, requirements)
TO – BE (Requirement analysis and best process recommended)
Difference between (AS – IS) & (TO – BE) is GAP analysis
2. Business Blueprint
It is a legal documentation between client and the company (implementer/service
provider) .We has to understand the current business process of client and analyzing the
business and prepare documentation. It is a detailed documentation for the client.
3. Realization
This phase is used to implement or migrate the entire business of client from Non-SAP
environment to SAP environment.
4. Final Preparation (Preparation for Production Use)
This phase is used for testing and end user training. After successfully completion of this
phase client is ready to run business in SAP R/3.
5. Go-Live & Support
In this phase we deliver the project end date and end user training at client site.
30
4.1 ENTERPRISE STRUCTURE
In enterprise structure we learn how to portray the specific organizational structure of our
company in r/3 system. First we analyze the structures and procedures in our company
and then match them to the SAP structures .To help us portray our structures various
organizational elements are defined as eg. In standard version .Normally these would not
cover all our needs thus we extend the elements and define them as required .as soon as
our organizational units are ready; access is located so that no other changes can be
made.
The enterprise structure consists of:
DEFINE:-
Controlling area
Company
Company code
Plant
Storage location
Purchase organization
Sales area
Sales organization
Distribution Channel
Division
Company:-
A Company is an organizational unit in accounting which represents a business
organization according to the requirements of commercial law in a particular country.
Company code :-
31
A company code is a smallest independent accounting unit that represents an individual
company.
Plant :-
A Plant is an organizational unit where we can manufacture the goods, store goods, sale
our goods, and we can also provide services & we can do purchasing also.
Storage Location :-
It is a place where products before and after manufacturing are stored.
Purchasing Organization:-
Organizations that discuss with Vendor terms and conditions of purchase.
Sales organization:-
Sales organization is an organizational unit which is responsible of certain product and
liability of that product. A company code can have several sales organizations
Distribution channel :-
Distribution channel is the way in which products or services reaches the customers.
Division: - Division is the way of grouping materials, products or services. This
represents company’s product line like nature of material. It tells about spectrum of
products.
Controlling area:-It is the highest organization with reference to costing material. Just
like the company itself, each company code in a company has a controlling area.
Sales area:- It comprises of sales org , distribution channel & division.
32
4.2 FLOW CHART OF ENTERPRISE STRUCTURE
Sales area
Fig10:-Flow chart of Enterprise Structure
33
SL 1 SL 2
SALES ORGANIZATION
COMPANY
COMPANY CODE 1 COMPANY CODE 2
COMPANY CODE 3
PLANT 1 PLANT 2
PLANT 1 PLANT 2 PLANT3
SL 2
CONTROLLING AREA
PURCHASING
ORGANIZATION
DISTRIBUTION CHANNEL
DIVISION
PLANT
MAINTENANCE
34
SNAPSHOTS OF ENTERPRISE STRUCTURE
LOGON SCREEN OF SAP
When we double click the sap logon icon on the desktop the following screen appears
which prompts you to logon on following servers –
1. IDES (Internal Demonstration Evaluation Server):-Purely for educational purposes
2. Production Server:– The checked project are used here with the live data.
Double click on ides server
35
USER AUTHENTICATION CHECK
Fields entered are:-
1. User name
2. Password
36
SAP WELCOME SCREEN
The SAP Easy Access screen is where you will start every session, and is the primary user
navigation area.
37
ENTERPRISE STRUCTURE
TRANSACTION CODE – SPRO INITIAL SCREEN
38
1. DEFINE COMPANY
Company:- A Company is an organizational unit in accounting which represents a
business organization according to the requirements of commercial law in a particular
country.
Menu Path: PRO Enterprise Structure Definition Financial Accounting
Define Company
After following this path then execute (dbl click ) then go to New Entries
39
Details of Added Entries
Fields Entered are:-
Company:- 4444
Company name:- G & G Enterprises
Country:- IN (India)
Language Key:- EN (English)
Currency:- INR (Indian Rupee)
40
Prompt for Creation of Request
41
To save your entries click on save. Then a request number is generated .This request
number is stored on the main server and thus later with the help of this number we can
trap the transaction performed.
Always write down the SAP document number. If you need to view a document in the
future, using the document number is the easiest way to find to it.
42
View of Created Company
Our Company 4444- G & G Enterprises is added in the list.
Thus after generation of request our company is added in the list of existing companies
43
DEFINING COMPANY CODE
Company code :- A company code is a smallest independent accounting unit that
represents an individual company.
Menu Path:- Enterprise Structure Definition Financial AccountingEdit,
Copy, Delete Company Code Edit Company Code Data
After navigating through the above menu path the list of already existing company codes
is displayed. To define your own company code click on new entries and make the above
shown entries
44
Details Of Added Entries
45
Request generated
After making required entries, click on save a request code is generated and our company
code is added in the list of existing company codes.
46
DEFINE PLANT
Plant : - A Plant is an organizational unit where we can manufacture the goods, store
goods, sale our goods, and we can also provide services & we can do purchasing also.
Menu Path:- Enterprise Structure Defination Logistic General Define, Copy,
Delete, Check Plant Define Plant
After that go to New Entries
47
Details of added Entries
Fields Entered are:-
City Code:- 0001
Factory calendar:- 01
48
Editing Plant
In this screen we add additional information about the plant like who is running this
plant.
Fields Entered are:-
Title:- Ms.
Name:- Gurpreet
Country:- IN (India)
Language:- EN (English)
After making required entries, click on save a request code is generated and our plant is
added in the list of existing company codes.
49
Customizing of Plant Parameters
Menu Path:- Spro Production MRP Plant Parameters Carry Out Overall
Maintenance
We need to do all these customizing so that Enterprise Structure we create should support
all the planning & scheduling functions we need to perform.
50
Maintenance of Number Range
51
Maintenance of MRP Controller
52
Details of MRP Controller:-
In this details we add Plant Name, MRP Controller, Telephone no. , Recipient Name,
Business Area, Recipient Type. These are some of the mandatory fields which we have to
fill so that we can see all the details at the end report.
53
Maintenance of Floats
It specify extra time to be allowed for ProductionFields Entered:-
1. Schedule Margin Key:-000
2. Opening Period:-003
3. Float Before Period:-003
4. Float After Production:-005
5. Release Period:-010
54
Maintenance Of Conversion
55
Conversion of Planned Order to Production Order on clicking on this we get
Fields Entered:-
Production order: PP01 (Standard Production Order (Int no.))
Process order: PI01 (Process Order (Internal Number Assignment))
After this click on save button & then go back to conversion screen so that we can
maintain second option in same way.
56
Maintenance of BOM/Routing Selection
Fields Entered:-
Plant:- 4447
BOM select Id:- 01
Routing select Id:- 01
57
Maintenance of Param: Detailed Scheduling
For this we have to enter following Fields which we have to define by our own:-
Plant 4447
Production Scheduler 420
Name of Production Scheduler ABC
Production Profile 111111
Name of Production Profile PP Scheduling
58
After maintaining all Parameters
59
DEFINE STORAGE LOCATION
Storage Location:- It is a place where products before and after manufacturing are
stored.
Menu Path:- Enterprise Structure Definition Material Management
Maintain Storage Location
Now we have to enter Work area or plant where we work i.e. 4447
60
Details of Added Entries
Fields Entered are:-
Storage Location No. :- SL1
Description:- Storage Location
After making required entries, click on save a request code is generated and our Storage
Location is added in the list of existing Storage locations.
61
DEFINE PURCHASING ORGANIZATION
Purchasing Organization:-Organizations that discuss with Vendor terms and conditions
of purchase.
Menu Path:- Enterprise Structure Definition Material Management
Maintain Purchasing Organization
62
Details of Added Entries
Fields Entered are :-
Purchasing Organization:- 4445 & 4446
Purchasing Organization Description:- Product Purchasing
After making required entries, click on save a request code is generated and our
Purchasing Organization is added in the list of existing Purchasing Organizations.
63
DEFINE SALES ORGANIZATION
Sales organization:-Sales organization is an organizational unit which is responsible of
certain product and liability of that product. A company code can have several sales
organizations
Menu Path:-Enterprise Structure Definition Sales & Distribution Define,
Copy, Delete Sales Organization
64
Details of Added Entries
After making required entries, click on save a request code is generated and our Sales
Organization is added in the list of existing Sales Organizations.
65
DEFINE DISTRIBUTION CHANNEL
Distribution channel:- Distribution channel is the way in which products or services
reaches the customers.
Menu Path:-Enterprise Structure Definition Sales & Distribution Define,
Copy, Delete Check Distribution Channel Define Distribution Channel
66
Details of Added Entries
Fields Entered are:-
Distribution Channel:- 42 & 43
Description:- Product Distribution & For Billing
After making required entries, click on save a request code is generated and our
Distribution Channels is added in the list of existing Distribution Channels.
67
DEFINE DIVISION
Division: - Division is the way of grouping materials, products or services. This
represents company’s product line like nature of material. It tells about spectrum of cts.
Menu Path:- Logistic Material Master Settings for keyfields Define Divsion
Details of Added Entries
68
Fields Entered are:-
Division:- D0 & D2
Description:- Product & Electricity
After making required entries, click on save a request code is generated and our
Distribution Channels is added in the list of existing Distribution Channels
DEFINE CONTROLLING AREA
69
Controlling area:-It is the highest organization with reference to costing material. Just
like the company itself, each company code in a company has a controlling area.
MenuPath:- Enterprise Structure Definition Controlling Maintain
Controlling Area Maintain Controlling Area
Details of Added Entries
70
Fields Entered are:-
Controlling Area:- 4445
Currency Type:- 10
Chart of Accounts:- INT (Integer)
Fiscal Year Variant:- K4
After making required entries, click on save a request code is generated and our
Controlling Area is added in the list of existing Controlling Area.
ASSINGMENTS
71
The Process of Assignment builds Relationships among plant, Storage location,
Purchasing Organization, Sales Area.
Assignment of Company Code to Company
Menu Path:- Enterprise Structure Assignment Financial Accounting Assign
Company Code to Company
After this we have to enter Company i.e4444 against Company code i.e4445. Then we
have to save after that request will generate which will result in final screen.
Final Screen
72
Now your Company Code has been assigned to your Company.
Assignment of Controlling Area to Company
73
Menu Path:- Enterprise Structure Assignment Controlling Assign Company
Code to Controlling Area
After this we have to click on Assignment of Company Code to Controlling Area, then
on NEW ENTRIES.
Details of Added Entries
74
Final Screen
75
Now your Company Codes has been assigned to your Controlling area.
76
Assignment of Plant to Company Code
Menu Path:- Enterprise Structure Assignment Logistic(General) Assign
Plant to Controlling Area
77
Company Code 4445 get selected
Now click on your Company Code then a list of plant will appear & then select Your
Plant which you have to assign to your Company Code.
List of Plants
78
Now click on Continue, then a request will be generated and then and your plant i.e
plant1 get assigned to your Company Code 4445.
Final Screen
79
80
Assignment of purchasing Organization to Company Code
Menu Path:- Enterprise Structure Assignment Material Management Assign
Purchasing Organization to Company Code
After going through the above path then a list of Company code screen will be opened &
then we have to select our Company code & then click on that so that a list of Purchasing
Organizations will be opened.
81
List of Purchasing Organizations
Now we have to select our Purchasing Organization i.e4446 so that it could be assigned
to Company Code. After that we have to save & a request will be generated and then
Purchasing Organization will be assigned to Company Code.
82
Final Screen
83
Assignment of purchasing Organization to Plant
Menu Path:- Enterprise Structure Assignment Material Management Assign
Purchasing Organization to Plant
After going through the above path then a list of Purchasing Organization screen will be
opened & then we have to select our Purchasing Organization & then click on that so that
a list of Plant will be opened.
List of Plants
84
Now we have to select our plant i.e4447 so that it could be assigned to Purchasing
Organization. After that we have to save & a request will be generated and then Plant
will be assigned to Purchasing Organization.
Final Screen
85
Assignment of Sales Organization to Company Code
86
Menu Path:- Enterprise Structure Assignment Sales & Organization Assign
Sales Organization to Company Code
After going through the above path then a list of Company Code screen will be opened &
then we have to select our Company Code & then click on that so that a list of Sales
Organization will be opened.
87
List of Sales Organizations
Now we have to select our Sales Organization i.e4449 so that it could be assigned to
Company Code. After that we have to save & a request will be generated and then Sales
Organization will be assigned to Company Code.
Final Screen
88
4.4 PRODUCTION PLANNING MODULE
89
SAP PP is the Production Planning module of the SAP ERP software package from SAP
AG. Production Planning is integrated with other modules such as SD, MM and QM.
Production Planning is looks after planning part in industry.
The production planning is concerned with the planning and programming of materials
and equipment, start & ending dates of activities undertaken in industry, procurement of
materials (Raw materials, Semi Finished goods), Storage and inventory control, goods
recipt, goods transfer from one location to other location.
Production Planning is one of the functional modules in SAP. It is the branch of logistics
that deals with the tangible components of a supply chain interdependent collection of
organizations that supply materials. Specifically, production planning covers the Planned
Independent Requirements, Production orders, Production requisitions of different
materials present in the storage location.
SAP PP is all about Planning & scheduling. These resources include man, manpower and
materials. The main functionality within PP includes Planned Independent
Requirement(PIR), Material Requirement planning(MRP),Planned Order, Production
Order, Confirmation, Goods receipt.The module has important master data – material
master, Bill of material, Routing & Work Center. Broadly, the various levels that can be
defined for a SAP PP implementation are: Company, Company Code, Plant, Storage
Location and Purchasing Organization, Controlling area, Sales Organization.
DATA IN SAP
90
There are two types of data in SAP:-
1. Master data
2. Transaction data
1. Master data:-
These data can not change frequently and are basic for execution of trasaction.eg:-
Material master, BOM , Routing and Work center etc.
Master Data in PP Module are as Follows:-
o Material Master
o Bill Of Material (BOM)
o Work Center
o Routing
2. Transaction data:-
There are perpetual data which can change, generated with time and generated from
transaction e.g. planned order, production order, purchase requisition order etc.
MATERIAL MASTER
91
Businesses related information is maintained in material master. The information of
material is arranged in logically view depending upon business function. There is a
transaction code for creating, editing, displaying and deleting.
It include Various Views:-
Basic View
MRP View
Workscheduling View
Accounting View
Quality View
Sales View
Costing View
Table3:-T-codes for Material Master
Create Change Display Display Changes Set Deletion Flag
MM01 MM02 MM03 MM04 MM06
MINIMUM REQUIREMENT TO CREATE A MATERIAL MASTER
1. Industry sector
2. Material type
3. Base unit of measurement or stock keeping unit
4. Material description
5. Material number
MATERIAL TYPES
92
There is a standard material type in sap. We can create our material type. It can be done
in customizing using transaction code :- SPRO.
Standard material types are:-
Finished goods- FERT
Semi finished- HALB
Raw material- ROH
Non value aided materials- UNBW
Services- DIEN
Non stocked material-NLAG
Configurable material- KMAT
Extending and copying the material master:-
We can extend and copy the various materials .In extended material master we can add
different views that are created by different department.
Transaction code for extending the material master- mm50
Copy of material master- mm01.
Material status:-
It controls for which application the material can be used. Messages can be sent in
material status for each application.
1. No messages (green)
2. Warning messages (yellow)
3. Error messages (red)
SCREEN FOR CREATING MATERIAL MASTER
93
Material master is a file which contains information of a particular material depending
upon the views selected from the user department
Transaction Code-MM01
94
CREATE MATERIAL – INITIAL SCREEN
Fields Entered Are:-
1. Industry Sector- M (Mechanical engineering)
2. Material Type- FERT (Finished product)
Hit enter
95
SELECT VIEW SCREEN
SELECTED VIEWS:- Basic Data 1 Basic Data 2 Purchasing MRP 1 MRP 2 MRP 3 MRP 4 Work Scheduling Accounting Costing
96
Organizational Level
Fields Entered:-
Plant:- 4447
Storage Location:- SL1
97
Basic Data 1
Fields Entered:-
Material Description:-Fan
Base Unit of Measure:-pc
Material Group:-00120
98
Base Data 2
99
Purchasing Screen
Fields Entered:-
Purchasing Group :- 000
100
MRP 1 Screen
Fields Entered:-
MRP Type:- PD( Planned)
MRP Controller:- 111
Lot Size:- EX(lot for lot Order Quantity)
101
MRP 2 Screen
Fields Entered:-
Procurement Type:- X(Internal as well as External procurement)
Special Procurement:- 11
In-house Production:- 10 days
Goods Receipt processing:- 10 days
Planned Delivery Time:- 5 days
Schedule Margin Key:- 000
102
MRP 3 Screen
Fields Entered:-
Period Indicator:- M
Strategy Group:- 10
Availability Check:- 01
103
MRP 4 Screen
104
Work Scheduling
Fields Entered:-
Production Scheduler:- 420
Production Scheduler Profile:- 111111
105
Accounting 1 Screen
Fields Entered:-
Valuation Class:- 7920
Price Control:- S(Standard Price)
Standard Price:- 100
106
Costing 1 Screen
After this we will save & then FERT Material will be created by giving a message
ie. Material 1798 created like this we can create other material also.
107
Bill of Material(BOM)
Components used in making a product and quantity of components. It can be at one level
not multiple level. There is a transaction code of creating, editing, and displaying the
BOM.
Transaction codes :
Creation- CS01
Change- CS02
Display- CS03
Minimum requirement to create BOM
1. Material code
2. Plant code that is for which plant, which create BOM usage
3. BOM usage/type
NOTE:-
BOM can be created for in-house produced products, finished/semi finished products but
not for the raw material.
One material can have multiple BOM.
Structure of BOM:-
Header:-
For which material/product BOM is created. In this, we mention:
Base quantity: For how much quantity, BOM is being created.
Administrative data: who has created and date of creation.
108
Item overview :- List of components used in BOM.
Sub Item :- It is the Installation point of item in the BOM.
BOM status :- It tells us whether BOM is active or inactive for particular application. It
is mentioned in BOM Header.
Types of BOM category:-
Production BOM:
Sales BOM
Functional Location BOM
Engineering/Design BOM
Universal BOM
BOM Group:-
Several BOM can be groups together in BOM group using head of material .We can
create BOM by using variant BOM .They should be in same plant.
Group BOM:-
If a BOM is created without maintaining a plant ,then group BOM is created. Later this
BOM is required for allocation of plant.Using plant transaction ,Group BOM is allocated
to plant.Group BOM can be allocated to any number of plants.
T code for plant allocation of Group BOM:CS07
Variant BOM:-It is created for different material where most of the component of the
material are same, only few vary. Variant BOM of material is created as a variant of
already created material .Variant BOM and Multiple BOM are mutually exclusive to
each other.
109
Customizing of BOM
Menu Path:- SPRO Logistics- General Material Master Basic Settings
Material Types Define Attributes of Material Types
110
Screen For Creating of Bill of Material(BOM)
Transaction Code:- cs01
Menu Path :- Logistics Production Master Data Bill of Material Bill of
Materials Material BOM CS01(Create)
111
CREATE BOM – INITIAL SCREEN
Fields Entered Are:-
Plant :- 4447
BOM Usage :- 1
Hit enter
112
Components Added to BOM
Fields Entered Are:-
Component:- 1793, 1799
Quantity:- 5, 5
Hit Enter
After this click on save a request will be generated and the BOM will be created.
113
WORK CENTER
Work center is a place where operation is carried out. It is created at plant level.In this,
we have to maintain an External No.
Transaction code :-
Create :- CR01
Change :- CR02
Display :- CR03
Work center Category:-
It is a mandatory entry while creating work center, which contrasts the maintenance of
fields default Value of the fields in work center.
Views in Work Center:
o Basic Data
o Default views for Operation. (Values set in this will get copied in the Routing automatically)
o Capacity
o Scheduling
o Costing
Standard Value Key:
It activates which activity is to be consumed at the work center
If reference indicator is set, then the value of control key cannot be changed in routing
In Work center, we assign the cost center
Many work centers can be assigned to one cost center. But the same work centers can't be
assigned to another cost center keys
114
Max. 6. can be maintained, for more activities Two work centers can be made
with divided activities.
Control Key:
It is a mandatory entry for an operation which controls:
Whether the operation is relevant to Scheduling
CRP i.e. Capacity Requirement Planning
Inspection Characteristics.
Auto G.R. (Goods Received)
Rework, (Work Again For Improvement)
Costing.
Standard Text Key.
Pooled Capacity:-
It is the capacity category which is shared by Several Work centers.
E.g. One man- many M/c's
Back flush is present in.
-Material Master. (In MRP2, View)
-Work center
-Routing
-Production order
115
Customizing of Work Center
116
Screen for Creating of Work Center
Transaction Code:- CR01
Menu Path:- Logistics Production Master Data Work Centers
WorkCenter CR01(Create)
117
CREATE WORK CENTER – INITIAL SCREEN
Fields Entered Are:-
Work Center:- 1555
Work Center Category:- 0001
Hit enter
118
Basic Data
Fields Entered Are:-
Person Responsible:- 777
Usage:- 009
119
Default Value
Fields Entered are:-
Control Key:- PP01
Setup:- MIN (Minute)
Machine:- MIN (Minute)
Labor:- MIN (Minute)
Hit Enter
120
Capacities
Fields Entered Are:-
Setup Formula:- SAPR05
Processing Formula:- SAPR06
Teardown Formula:- SAPR03
Hit Enter
121
Scheduling
Fields Entered Are:-
Capacity Category:- 001
Setup Formula:- SAP001
Processing Formula:- SAP002
Teardown Formula:- SAP007
Hit Enter
122
Costing
Fields Entered Are:-
Cost Center:- 4220
Activity Type:- 4221, 4220, 4223
After this we have to save and then Work Center is created.
123
ROUTING
Sequence of operations to create a material is called routing.
VARIOUS OPERATIONS PERFORMED:-
Sampling:-
We take particular of material, we inspect it and AQL (Acceptance Quality level) is made
by R& D department.AQL means which parameters are to be used i.e. Mechanical,
chemical Parameters etc and these are defined in SAP as Inspection characteristics.
Supply Chain:-
Customer Plant Vender
SCM (Supply Chain Mgt.) Components :
SAP R/3
mySAP SCM.
APO ( Advance Planning Optimizer
ICH ( International Collaborated Hub)
EM (Event Mgmt.)
SAP BW (Business Info Warehouse)
Routing:-
Work centers are used in Routing.
ADVANTAGES:-
1. We know process of Production.
2. Scheduling
3. Capacity Planning
4. Costing
124
5. To book the Production
Task List:-
Different Types of Task list (we call Routing as Task list)
1. Routing (N)
2. Reference Operation set (s):-These are used in Discrete Mfg.
3. Rate Routing (R)
4. Reference Rate Routing Operation Set (m):- Used in Repetitive mfg.
5. Standard N/W (0):-Used in Project System
6. Inspection Plant (Q):- Used in quality mfg
7. Master Recipe:-Used in Process Industries
Reference Operation set :- It is a kind of task list which is created without maintaining a
material.
Structure of Routing:-
Header Materials with Group No &Group Counter
Sequence
Operation
Work Center PRT Component allocation Inspection characteristics Control key
125
Screen For Creating Routing
Transaction Code:- CA01
Menu Path :- Logistics Production Master Data Routing Routings
Standard Routing CA01(Create)
126
CREATE ROUTING – INITIAL SCREEN
Fields Entered Are:-
Usage :- 1 (Production)
Status:- 4 (Released)
Hit enter and then click on Operation so that we assign Work Centers to different
Operations.
127
Assigning of Work Centers
Fields Entered Are:-
Work Centers:- 1555, 1556
Standard Key :- 46, 47
Hit Enter then save your Routing will be saved.
128
4.5 FLOW OF PP
For Discrete Manufacturing
129
PIR/SO
MRP
Planned Orders
Production Orders
Confirmation
GR
Planned Independent Requirement
Planned Independent Requirement (PIR):-
PIR is used for maintaining the requirement which could be week wise, monthly wise or
yearly wise. For estimating the requirement forecasting is done.
T code for PIR is: MD61
T code for changing PIR is: MD62
Planned order:-
A request created in the planning run for a plant to trigger the procurement of a plant
material for a certain quantity for a specific date.
Initial Screen for Creating PIR
Hit Enter
130
Creating Requirement
After this we have to Enter and to see the requirement we have to run MRP
MRP:-Material requirement Planning:
-MRP is the planning coverage of shortage with the suitable receipt element.
T Code for MRP: MD02
MRP contain the following steps:
NRC(Net Requirement Calculation)
PQC(Procurement Quantity Calculation)
Procurement Type
Scheduling
BOM explosion
131
MRP Procedures:-
Whether and how material is planned.
-MRP—PD--- planning will take place.
Consumption Base Planning.
Reorder point lavel planning.
Forcast based planning.
Time based planning.
-Master production scheduling
-MRP in external procurement
-GR Processing time.
Execution in MRP:-
(1) Total Planning:-
All Material are planned, it can be run online or background.
T Code is: MD01
(2) Single item Planning:-
Only selected material are planned.
Single item single level planning
T Code is: MD02
Single item multi level planning
T Code is: MD03
Single item iterative planning
T Code is: MD43
132
Customizing of MRP
133
Stock Requirement List
To change this requirement to Planned Order we have to run Single Item Multiple Level
MRP.
134
MRP Screen
135
Planned Order
Now we have to Double click on planned order so that we can change that into
Production Order.
136
Stock Requirement List
Now we have to Dbl click on Production Order to convert planned order to production order.
137
Customizing of Production Parameters
Menu Path:- Production Shop floor control Master Data Order Define
Order Type Dependent Parameter
138
Production Order
Production Order:- These are used in Discrete Manufacturing scenario where product
Stability is less it is basically the order given by MRP Controller to the Shop floor people
to start production.
139
Customizing of Release Production Order
Menu Path:- Production Shop Floor Control Operation Avail Check
Define Checking Control
140
Production Order after Release
141
Confirmation
Confirmation:- Declaring completion of an operation consumption of an activity is
called confirmation. It can be at order level or at operation level. Confirmation is saved
against already created confirmation.
-Even if full Qty. Confirmed, then also PCNF status will come, if partial
confirmation is selected during CNF.
-Even if partial is confirmed, then also CNF status will come if final
confirmation is selected during CNF.
-In automatic conformation, system itself selects the status i.e. PCN for CNF.
Types of Confirmation T Code
1. Time Ticket Confirmation CO11n
2. Time Even Confirmation CO19
3. Collective Confirmation CO12
4. Progressive Confirmation CO1f
Effects of confirmation:-
1. Order gets updated
2. Capacity Requirement gets required (In capacity Planning in orders)
3. Actual costs gets debited
4. HR data gets posted.
5. Material document may get (if auto GR is done. Then it will be posted, otherwise
not).
Note:-When confirmation is posted
6. GI of back flush component takes place.
7. GR of header material takes place if auto GR is set
142
Customizing of Confirmation Parameter
Menu Path:- Production Shop Floor Control Master Data Operations
Confirmation Define Confirmation Parameters
143
Stock before Confirmation
144
Time Ticket Confirmation
145
After Confirmation Production Order
Here we can check the status of Production Order.
GMPS:- Goods Moment Posted.
It means final Confirmation has been done.
146
Goods Receipt
Goods Issued:- Goods can be issued with codes
T Code:MB1A
Movement Type:-
1. 201- Goods issued against cost center.
2. 202- For Reversal.
3. 261- Goods issued to product.
4. 262- For Reversal
5. 551- Goods issued for Scrap
Goods Received (GR) – MBIC.
Movement Types:-
1. 101- Goods Received from Production order Purchase Order.
2. 102- For Reversal.
3. 501- GR without Purchase Order.
4. 502- Reversal.
5. 521- GR without Production Order.
6. 522- Reversal
7. 131- GR for Repetitive Mfg.
8. 132- For Reversal.
9. 103- GR to Inspection.( Quality Chick will be there)
10. 104- Reversal.
11. 105- GR from Inspection.
12. 106-Reversal.
13. 561- Initial Stock Update.
Transfer Posting to Stock Transfer:- MB1B
1. 311- For stock transfer from storage location to Storage location.
2. 312-Reversal of 311.
3. 301-Transfer from Plant to Plant
147
4. 302-Reversal of 301.
5. 309-Transfer from Material to Material.
6. 310-Reversal of 309.
7. 313-Removal of stock from one Storage Location.
8. 314- Reversal of 313.
9. 315- Placement of Stock in another Storage Location.
10. 316- Reversal of 315.
148
Customizing of Goods Receipt
Menu Path:- Material Management Inventory Management Plant parameters
149
Goods Receipt
150
Stock after Confirmation
151
5. FUTURE SCOPE
In SAP PP Planning is done through MRP or MPS, but there is a limitation in PP that the
planning is not done across supply chain i.e. vendor ,plants and customers so its
advanced version is APO(Advanced Planning and Optimizing), in this planning is done
across the supply chain. In APO there are many planning tools i.e.:-
DEMAND PLANNING:-It is based on historical data which is taken from BW
(Information warehouse).
GATP (Global Available to Promise):- IT is checking the availability/feasibility to meet
sales order quantity while creating sales order.
SNP (Supply Network Planning):- It is mid to long term planning across the supply chain.
It is finite planning.
PPDS (Production Planning and Detailed Scheduling):- This is the detailed Production
Planning with the location in shorter horizon.
TVPS (Transport Planning Vehicle Schedule):-IT means to select the shortest path for
transportation so that the transportation cost is reduced.
The limitations of the PP module are overcome by the advanced version APO.
152
6. Appendix
Account
assignment
category
Key indicating whether an item is to be assigned to an auxiliary
account (such as a cost center). The account assignment category
determines which account assignment data (e.g. cost center, account
number, etc.) is required for the item.
Account group The account group determines:
The data that is relevant for the master record
A number range from which numbers are selected for the
master records
An account group must be assigned to each master record.
Base unit of
measure
Unit of measure in which the stock of a material is managed.
The system converts all quantities entered in other units into the base
unit of measure
BOM explosion Function for determining all the components of a bill of material and
listing them.
You can explode a BOM to show the structure of the product or to
show the total quantity of each component
BOM explosion
date
Defines date to be used for selecting the bill of material.
BOM select ID Indicator determines which BOM is to be used and with which
priority for BOM selection.
Document An electronic record of a transaction. In addition, several documents
can be created from one single action in the R/3 system. For
example, when an "Invoice" is entered into R/3, which references a
153
Purchase Order document in R/3, an Accounting document is also
automatically created. Each document is linked to the other and
provides different pieces of information. In R/3, each document has
it's own unique document number that is Company Code and Fiscal
Year dependent.
External
Procurement
Procurement of raw materials, operating supplies (MRO items),
trading goods/merchandise or services from an external supplier for
the organizational units within a firm that need such items.
Floats after
production
Number of workdays allocated to this order as a safety margin after
production.
Floats before
production
Number of workdays allocated to this order as float before
production.
Goods Issue
(GI):
- It is goods movement in which material withdrawal is posted for
consumption or for customer. A GI posted in system will leads to
decrease in stock.
Goods
movement:
It is a process in which transaction resulting change in stocks. It is
further sub-divided into three categories
1. Goods Receipt (GR)
2. Goods Issue (GI)
3. Transfer Posting (TP)
Goods Receipt
(GR): -
It is a goods movement in which receipt of goods is posted for
vendor or for production. A GR posted in the system will leads to
increase in stock. No Concept of Price or value
GUI Graphical User Interface. Windows like feel and look. User friendly
screens to develop and use are provided. The user can simply point
the cursor and click the mouse to operate
154
IDES International Demonstration and Education System. A sample
application provided for faster learning and implementation
IMG Implementation Guide Hierarchical structure reflecting the R/3
component hierarchy and contains all configuration activities
Industry
Sectors
When you create a material master record, you are required to
classify the material according to industry sector and material type.
Industry sectors have control functions in the R/3 System. For
example, it is factor determining the screen sequence and field
selection in a material master record. Once you have assigned an
industry sector to a material, you cannot change the industry sector
again afterwards. The standard R/3 System contains the following
industry sectors. The ID used to identify the industry sector internally
appears in parentheses.
Plant engineering and construction (A)
Chemical industry (C)
Mechanical engineering (M)
Pharmaceuticals (P)
Invoice: Invoice is a document, which is issued to a buyer (Company) from
the supplier (vendor) for the payment. The following information is
maintained in invoice
Invoice date, Posting date, Invoice ref number, tax amount, amount,
tax code, terms of payments, vendor address, banking accounting
information etc
Lot size Quantity to be produced or to be procured.
155
Material
Description
Text of up to 40 characters that briefly describes a material. You may
have only one description for each material, but it may exist in as
many different languages as you like.
Material group Grouping of materials and services according to their characteristics.
Material type Groups together materials with the same basic attributes, for
example, raw materials, semi finished products, or finished products.
When creating a material master record, you must assign the material
to a material type
Moving average
price
Price that changes in consequence of goods movements and the entry
of invoices, and which is used to valuate a material. The moving
average price is calculated by dividing the value of the material by
the quantity of material in stock. It is recalculated automatically by
the system after each goods movement or invoice entry.
Movement
Type: -
- It is a three-digit code, which plays a role of important control
function in inventory management. It acts as a central role in
automatic account determination. It determines which stock account
or consumption account is updated in financial accounting.
MRP controller. The person responsible for a group of materials within MRP in a
plant or company. Any material that takes part in material
requirements planning must be assigned to an MRP controller
MRP type Key that controls the MRP procedure (MRP or reorder point) to be
used for planning a material. It contains additional control
parameters, for example, for using the forecast for the materials
156
planning, for firming procurement proposals and so on.
Number
Ranges:
Number ranges are maintained for each & every document, Posted in
the SAP System. The maximum numbers of digit allowed are
18digits (99, 9999, 9999, 9999, and 9999).
Two types of number ranges: -
Internal number ranges - System will automatically define numbers
to all documents
External number ranges - User has to give doc number externally
while creating document
Opening period Number of workdays subtracted from the order start date ,to
determine the creation date
Price control Indicator determining the procedure used for material valuation.
Two procedures are available in the standard system:
Valuation at standard price
Valuation at moving average price or (if the material ledger
has been activated) periodic unit price
Procurement
type
Classification determining whether a material is produced in-house,
procured externally, or both.
Purchase
requisition
Request or instruction to Purchasing to procure a certain quantity of a
material or a service so that it is available at a certain point in time.
Purchasing
group
(MM) A Purchasing Group is a grouping of departments or areas that
purchase in R/3 used for assigning Purchase Requisition approval
rules. The Purchasing Group field is a required field on a Purchase
157
Requisition and is assigned to each authorized R/3 user that is part of
that Purchasing Group. For example, several users from the same
department or area may use the same Purchasing Group.
Purchasing
procurement
time
Time that purchasing department requires to convert a purchase
requisition into a purchase order
Purchasing
value key
Key defining the valid reminder days and tolerance limits applicable
to this material for the purchasing department.
The purchasing value key serves as an entry aid.
Reconciliation
account
G/L account, to which transactions in the subsidiary ledgers, (such as
in the customer, vendor or assets areas), are automatically updated. It
is generally the case that several sub ledger accounts post to a
common reconciliation account. This ensures that the developments
in the sub ledger accounts are accurately reflected in the general
ledger (i.e. in line with balance sheet conventions).
Release period Number of workdays between the planned start date of the
production order and the date for releasing the order. If the order
release indicator is set, the production order is released by a
background program that takes all dates into account.
Reservation: - It stores requisition created from particular cost center to particular
department for issuing the material reservation posted in the system.
It leads to decrease in stock.
R/3 R/3 is an ERP system offered by the SAP company. The R/3 stands
158
for real-time / three-tiered architecture, defined as follows:
The "R" in R/3 = real time. During real-time processing, data is
processed immediately, the moment the data is entered into the
system. This is different than a "batch mode", in which data is stored
and all transactions are processed together, at a later time.
The "3" in R/3 = A three-tier computer architecture comprised of
three operational layers as outlined below. The SAP R/3 system uses
a special type of client/server architecture consisting of three well-
defined and separate processes, each running on a different platform
Scheduling
Agreement
Outline agreement on the basis of which materials are procured at a
series of predefined points in time over a certain period.
Schema Group It allows to group together the purchasing organizations, which uses
the same calculation schema.
Schema Group
Vendor
The main function of it is to identify or to pick the right process and
conditions for a particular vendor
Special
procurement
type
An indicator in the material master record that defines external
procurement or in-house production of the material more precisely.
Stock Transfer
(ST):
It is method of removal of material from one location and
transferring it to another location. This process is performed between
two plants and two storage locations.
Stock types The different stock types are
1. Unrestricted use stock
2. Quality inspection stock
159
3. Blocked stock
4. Warehouse stock
Transfer Posting
(TP): -
- It is a general term of stock transfer that changes the stock type or
stock categories. The difference between transfer posting and stock
transfer is: -
TP is logical stock transfer and ST is a physical stock transfer.
VALUATION
AREA
THE VALUATION AREA SETTING IS USED TO CALCULATE TOTAL
STOCK VALUE.
Valuation Class It is used to determine which stock account is updated during the
goods movement of a material. It is maintained in Accounting 1 view
in material master record
SAP TRANSACTIONS
For performing any kind of task in the SAP R/3 ERP system, a transaction is used. SAP
provides a standard set of transactions to manipulate i.e. insert, update, delete and display
data in the system. A transaction code is a four-character command that tells the system
location of a task. Each SAP screen has a unique transaction code. A transaction code
160
may contain only letters such as zstm or a combination of letters and numbers such as
me51. In SAP, you can use transaction codes as a shortcut or alternative to using the
navigation path to get to a system task.
Listed below are the commands used in combination with the transaction codes.
Command + Trans
CodeDescription
/n + Transaction code End current system task and go to new system task
/o + Transaction codeCreate a new session and go to new system task without closing
prior session
/o List open sessions
/i or /nend Log off
BIBLIOGRAPHY
BOOKS:-
161
SAP PP ( FUNCTIONALITY AND TECHNICAL CONFIGURATION) BY
MARTIN
SAP ONLINE LIBRARY HELP
WEBLINKS:-
www.sap.com
www.sapinfo.com
www.sapzone.com
www.sap-img.com
www.sapgenei.com
www.help.sap.com
162