WORKS IN PROGRESS Architectural Aluminium Framing Complex Architectural Framing Pre-Fabricated Top Level Wall and Roof Truss Framing Pre-Fabricated Balustrade Framing Pre-Fabricated Facade and External Framing Pre-Fabricated Bulkhead and Internal Framing Pre-Fabricated Wall Framing Smart Hob Formwork Framing ® PROJECT REPORT Pre-Fabricated Light Gauge Steel Framing Systems Spring Malvern Maison Apartments 474 Beach Rd, Beaumaris OCTOBER 2017 © 2017 SBS Group Project / The Kingston Central Park Apartments Builder / Samssons Projects When structural steel is replaced with a superior lightweight alternative, there are significant savings involved for the builder. On this apartment project, pre- fabricated framing alternatives for the balustrade, feature boxes and fins achieved multiple smarts. The combined SBS Smart Frame system incorporated the front balustrade and box feature for ease of installation. For structural fixings back to the building, brackets and cleat systems were designed with diagonal bracing to increase and strengthen structural integrity. Fully customised to the building requirements, the SBS Smart Frame system included in house detailing and framing layouts with full engineering. Framing was fabricated using light gauge steel in a controlled factory environment before being transported to site for simple and efficient installation. SBS Smart Frame…smarter off site solutions for easier on site construction.

PROJECT REPORT - Pre-Fabricated Light Gauge Steel Framing

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT REPORT - Pre-Fabricated Light Gauge Steel Framing

WORKS IN PROGRESS

Architectural Aluminium Framing

Complex Architectural Framing

Pre-Fabricated Top Level Wall and Roof Truss Framing

Pre-Fabricated Balustrade Framing

Pre-Fabricated Facade and External Framing

Pre-Fabricated Bulkhead and Internal Framing

Pre-Fabricated Wall Framing

Smart Hob Formwork Framing

®

PROJECT REPORT

Pre-Fabricated Light Gauge Steel Framing Systems

Spring Malvern

Maison Apartments

474 Beach Rd, Beaumaris

OCTOBER 2017

© 2017 SBS Group

Project / The Kingston Central Park Apartments

Builder / Samssons Projects

When structural steel is replaced with a superior lightweight alternative, there are significant savings involved for the builder.

On this apartment project, pre-fabricated framing alternatives for the balustrade, feature boxes and fins achieved multiple smarts.

The combined SBS Smart Frame system incorporated the front balustrade and box feature for ease of installation. For structural fixings back to the building, brackets and cleat systems were designed with diagonal bracing to increase and strengthen structural integrity.

Fully customised to the building requirements, the SBS Smart Frame system included in house detailing and framing layouts with full engineering.

Framing was fabricated using light gauge steel in a controlled factory environment before being transported to site for simple and efficient installation.

SBS Smart Frame…smarter off site solutions for easier on site construction.

Page 2: PROJECT REPORT - Pre-Fabricated Light Gauge Steel Framing

PROJECT REPORT

Pre-Fabricated Light Gauge Steel Framing Systems Unit 1, 308-310 Maroondah Hwy, Chirnside Park VIC 3116

T: 1300 782 950 F: 1300 782 960

E: [email protected]

W: sbsgroup.com.au© 2017 SBS Group

OCTOBER 2017

Project / City Life Church - Wantirna South

Builder / Figurehead Constructions

Building smarter starts with designing systems that solve real common construction difficulties.

After reviewing the project documentation and engineering, SBS Group proposed a pre-fabricated cantilevered trussed solution for the box facade. The use of light gauge steel materials eliminated the traditional structural steel and concrete slabs.

The SBS Smart Frame system was designed to incorporate the revealed box windows and fascia facade with a unique spanning advantage.

Following initial design approval and sign off, framing was manufactured true and straight. Engineered lifting points were concealed within the framework for easy lifting and fixing off to the building structure. Once installed, cladding was then directly applied using a mixture of cladding products.

SBS Smart Frame…pre-fabricated alternatives for on site cost and time savings.