24
154 Projects Indian Edition: Annual Subscription Rates: Online Edition: `3500/-, Frequency: Fortnightly (1st & 15th of every month) India’s Project Database Vol. 9 No. 20 l April 15, 2014 Waiting for Revival Road Sector:

Project Reporter April 2014

Embed Size (px)

DESCRIPTION

Project Reporter April 2014

Citation preview

Page 1: Project Reporter April 2014

154Project

s

Indian Edition: Annual Subscription Rates: Online Edition: `3500/-, Frequency: Fortnightly (1st & 15th of every month)

India’s Project DatabaseVol. 9 No. 20 l April 15, 2014

Waiting for RevivalRoad Sector:

Page 2: Project Reporter April 2014

Contents: Database of more than 300 central PSUs in India and contact numbers, email ids of over 5000 key executives.

The SCOPE directory, thus is a highly useful data source for companies wanting to sell to the cash-rich PSUs

PSUS ARE GOING TO SPEND `1,00,000 CRORES MAKING THEM

BIGGEST INSTITUTIONAL BUYERS IN INDIA

For India to achieve its 8-8.5% growth target, the government has directed the PSUs to bail the country out of the investment arrears. With combined profits at record-level of Rs. 1 lakh crore and Rs. 2.5 lakh crore investible surpluses, PSUs have been asked to invest heavily.

Thus the PSUs have now become highly important target sector for con-tractors, utility providers, banks and other organizations.

To get a copy of the SCOPE Directory – call at +91 24193000 or 022 65267837/838 email at [email protected]

SCOPE, the regulatory body of PSUs in India, has launched the latest edition of its directory.

To order online : www.ASAPPmedia.com/subscribe

Page 3: Project Reporter April 2014

Project Reporter • 3 • April 15, 2014

Highlights

project Sno.SectorIndia’s project Database

projectS are claSSIfIeD aS followS:

conceptual / planning Stage (1 to 46)

contract award (47 to 63)

project Update / commissioned project (64 to 79)

Under Implementation Stage (80 to 90)

realty projects (91 to 103)

consultancy Bids (104 to 117)

B2B opportunities (118 to 154)

To subscribe digital edition of Project Reporter log on to:

www.ProjectReporter.co.in/Magzter

realty Zone....................................pg 12-14

www.ProjectReporter.co.inPublished by: ASAPP Media Pvt Ltd, A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Tel: 022-24193000. Fax: 022-2417 5734.

editor-in-chief Pratap Vijay PadodeE-mail: [email protected]@ProjectReporter.co.in

executive editorSandeep Sharma*[email protected]

[email protected].: 022-2419 3000 / 6526 7838

Branch Offices• Delhi: Tel: 011 - 4131 5000 / 4656 1818• Bangalore: Tel: 080 - 4556 4556• Pune: Tel: 020 - 2605 2987 / 020-6602 5990• Chennai: 044 - 4299 1234Representative Offices • UAE: Ikan MediaE-mail: [email protected]

*Responsible for selection of news under the PRB Act. All rights reserved. While all efforts are made to ensure that the information published is correct, PROJECT REPORTER holds no responsibility for any unlikely errors that might have occurred. Printed and Published by Tarun Pal on behalf of ASAPP Media Pvt Ltd, printed at M.B. Graphics, A-38, Shri Ram Industrial Estate, G.D. Ambekar Marg, opp. Wadala Udyog Bhawan, Mumbai - 400 031 and Published from A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Editor : Pratap Vijay Padode.The information on products and projects on offer is being provided for the reference of readers. However, readers are cautioned to make inquiries and take their decisions on purchase or investment after consulting experts on the subject. PROJECT REPORTER holds no responsibility for any decision taken by readers on the basis of information provided herein. Subject to Mumbai Jurisdiction only.

airport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (80)Terminal at Chandigarh Airport. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80automobile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (81)Banking & finance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (1)9,000 White Label ATMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1chemicals & fertilizers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (64)cold chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (2)construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3, 47 to 50)Major residential project in Bangalore . . . . . . . . . . . . . . . . . . . . . . . . . . . 47effluent treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4)equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (51)Healthcare . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5, 82)Super speciality hospitals at Navi Mumbai . . . . . . . . . . . . . . . . . . . . . . . 82Housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (6 to 10)1072 dwelling units under RAY scheme. . . . . . . . . . . . . . . . . . . . . . . . . . . 6Industrial products. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (52, 62)Bharat Gears commence production at Lonand . . . . . . . . . . . . . . . . . . . 65Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .oil & Gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (53)Paradip-Haldia-Durgapur LPG Pipeline Project . . . . . . . . . . . . . . . . . . . . 53ports & Shipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (12 to 14)Ro-Pax vessels cum terminal operator at Dahej . . . . . . . . . . . . . . . . . . . 12Two multipurpose berths at Dighi. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66power. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (15 to 20, 54 to 59, 67 to 73)4000 MW super thermal power project . . . . . . . . . . . . . . . . . . . . . . . . . . 15Sewage treatment plant at Raiyadhar . . . . . . . . . . . . . . . . . . . . . . . . . . . 17Transmission Lines in Madhya Pradesh . . . . . . . . . . . . . . . . . . . . . . . . . 55Solapur-Aurangabad transmission line project . . . . . . . . . . . . . . . . . . . . 56Refurbish High Voltage Direct Current at Bhadrawati . . . . . . . . . . . . . . . 58120 MW Vyasi Hydro Electric Project . . . . . . . . . . . . . . . . . . . . . . . . . . . 59railways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (21, 60)real estate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(22, 23, 61, 83, 84)Luxurious residential project Gurgaon Hills . . . . . . . . . . . . . . . . . . . . . . . 61refinery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (74)renewable energy . . . . . . . . . . . . . . . . . . . . . . . . (24 to 26, 75 to 78, 85)50 MW wind energy project at Duliajan . . . . . . . . . . . . . . . . . . . . . . . . . . 2410 MW Solar PV Power Station at Unchahar . . . . . . . . . . . . . . . . . . . . . 78roads/Highways/Bridges . . . . . . . . . . . . (27 to 36, 62, 63, 79, 86 to 89)Four laning of Kazhakkootam to Mukkola junction . . . . . . . . . . . . . . . . . 29Flyovers on the Kalewadi phata-Dehu Alandi road . . . . . . . . . . . . . . . . . 31Four laning of Sultanpur-Varanasi section . . . . . . . . . . . . . . . . . . . . . . . . 34Strengthening of Jodhpur-Barmer Section. . . . . . . . . . . . . . . . . . . . . . . . 62Chennai Outer Ring Road Phase I Project . . . . . . . . . . . . . . . . . . . . . . . 79Four laning of Solapur to Yedeshi section . . . . . . . . . . . . . . . . . . . . . . . . 87Santacruz-Chembur Link Road (SCLR) project . . . . . . . . . . . . . . . . . . . . 88Sewerage treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (37)theme park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (38)transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (39 to 42)Bus terminal cum commercial complex at Bhopal . . . . . . . . . . . . . . . . . . 39Metro Line 3 project in Mumbai . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40Elevated section of east west corridor . . . . . . . . . . . . . . . . . . . . . . . . . . . 42warehousing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (43, 44)water Sector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (45, 46)

Page 4: Project Reporter April 2014

Project Reporter • 4 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

1 Srei Infrastruc-ture Finance Ltd

The company got RBI's approval to set-up, own and operate 9,000 White Label ATMs (WLAs). Initially a pilot roll out of 200 WLAs in Tier 3, Tier 4 and Tier 5 towns will be done in the next six to eight months before scaling up.

Multiple NA Siddhartha Somani-Associate VP (Liability & Treasury Management), 86C, Topsia Road (South), Kolkata - 700046. T: 033-66023920, 033-61607734, F: 22857542, [email protected]

Banking & Finance

2 Directorate of Horticul-ture and Farm Forestry

Plans to develop cold chain in Madhya Pradesh on PPP mode.

Madhya Pradesh

NA R K Namdev - Deputy Director, Department of Horticulture, Plot No.-92 Zone-II,M.P Nagar, Bhopal, Madhya Pradesh. T : 0755-2576960, 2578491, M: 930262699

Cold Chain

3 National Highways Authority of India

Plans construction of culvert at Km.537.755 on left hand side of NH-16 of Kolkata – Chennai corridor from Ichapuram to Srikakulam.

Srikakulam Andhra Pradesh

0.21 Project Director, NHAI, PIU(GQ), Visakhapatnam, Andhra Pradesh. T: 0891-2707600, 2714119, www.nhai.org.

Construc-tion

4 Northern Coalfields Ltd

Plans to set up integrated effluent treatment plant (ETP) for block b opencast project (4.375 MTPA), NCL, Singrauli (MP) on turnkey basis.

Singrauli Madhya Pradesh

NA Singeshwar Singh, General Manager, PO-Singrauli Distt- Sidhi--486889, Madhya Pradesh. T: 07805-266670, F: 266640, M: 9425176630

Effluent Treatment

5 Sri Jayadeva Institute of Cardiovas-cular Scien ces and Research

Plans construction of new 350 bedded hospital and allied facilities for Sri Jayadeva institute of cardiovascular sciences and research complex at KRS road, Mysore.

Mysore Karnataka

NA Premlatha Rao, Public Relation Officer, Jayanagar 9th Block, Bannerghatta Road, Bangalore - 560069, Karnataka. T: 080-22977267, F: 26534477, [email protected]

Healthcare

6 Karnataka Slum Clearance Board (KSCB)

Plans construction of 1072 dwelling units (G+3) including infrastructure at five locations of Hubli-Dharwad city under Rajiv Awas Yojana (RAY) scheme by adopting Fast Track Technology. The completion is targeted in 15 months.

Hubli Karnataka

59.38 Ranga Murti, Superintending Engineer, No. 55, Abhaya Complex, 3rd Floor, Risaldar Street, Seshad-ripuram, Bangalore, Karnataka. T: 080-23460085, F:23563506, M: 8884492335, [email protected]

Housing

7 Karnataka State Police Housing Corporation Ltd

Plans to undertake construction of 110 nos police quarters in Shimoga district under police gruha 2020 scheme. Tenders are currently invited for this project.

Shimoga District Karnataka

NA R Prakash, Executive Engineer, Davangere Division, 8th main,P J Extn, Brahma kumari Road, Davan-gere - 577002. T: 08192-253065, M: 9448328900, [email protected]

Housing

8 Karnataka Slum Develop-ment Board

Construction of 444 (G+3) dwelling units at Laggere Sy. No.9/1 (in-situ) in Bangalore under Rajiv Awas Yojana scheme by adopting fast Track Technology. Completion period: 15 months.

Bangalore Karnataka

53.39 Srinivas Babu, Asst Executive Engineer, Abhaya Complex, 3rd Floor, No.55, Risaldar Street, Seshadripu-ram, Bangalore-560020, Karnataka. T: 080-23460085, 23564651, M: 9341225250

Housing

9 Govern-ment Of Karnataka

Bids are called for architectural and engineering services for the proposed composite housing scheme at Gaddankeri, Bagalkot taluk & district (52 acre 37 guntas).

Bagalkot Karnataka

NA T Bijay Gowda - Chief Engineer, III Floor Cauvery Bhavan, Bangalore-9, Karnataka. T: 080-22100077, F: 22215125

Housing

10 Balapur Municipal Council

Plans construction of 759 housing units at Sr. No. 65, 66 areas Balapur. Completion period: 15 months.

Balapur Maharashtra

NA Prabhakar Labade, Executive Engineer, Balapur Municipal Council, Akola Dist, M: 9423721503

Housing

11 Indian Oil Corporation Ltd

Plans to undertake development of tourist infrastructure facilities including site management at world/national heritage sites for IOF projects. Consultancy bids are invited currently.

NA NA Sidhartha Mukherjee, General Manager (Corp Comm), 3079/3, J B Tito Marg, Sadiq Nagar, New Delhi - 110049. T: 011-26260000, 26260140

Infrastruc-ture

12 Gujarat Maritime Board

Bids are invited for the selection of integrated Ro-Pax vessels cum terminal operator at Gogha-Dahej for the Ro-Ro ferry service across the Gulf of Cambay.

Dahej Gujarat

NA Ram Patel, Executive Engineer, Block O-20, New Civil Hospital Annex, Meghaninagar Ahmedabad, Gujarat. T: 079-23238346, 2376270, 9925053090

Ports & Shipping

Page 5: Project Reporter April 2014

Project Reporter • 5 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

13 Vivus Global Australia Pty Ltd

Plans to set up a shipbuilding facility along the Konkan coast in Maharash-tra. The investment is planned in the shipyard that will built by its unit Rajapur Shipyards Pvt Ltd in Ratnagiri district.

Maharashtra 15000.00 R Balasubramaniam, Downtown, Auckland 1143, New Zealand. M: +64 223090013, [email protected]

Ports & Shipping

14 V. O. Chidam baranar Port Trust

Plans construction of rubble bund for dumping dredged materials at north side of North break water at VOC Port, Tuticorin. The completion is targeted in 5 months.Bids are currently invited.

Tuticorin Tamil Nadu

6.47 K Ramachandra Rao, Chief Engineer, V.O. Chidambaranar Port Trust, Tuticorin, Tamil Nadu - 628004. T: 0461-2352290, F: 2352301, M: 9848190797, [email protected]

Ports & Shipping

15 NTPC Ltd Plans to set up imported coal based 4000 MW super thermal power project at Pudimadaka. The project is not moving ahead as the APIIC has yet to allocate 1,500 acre.

Visakhapa-tnam Andhra Pradesh

NA K.V. Rama Rao, Executive Director-Commercial, NTPC Bhawan, SCOPE Complex, Institutional Area, Lodhi Road, New Delhi-110003, T: 011-24360100, [email protected]

Power

16 Andhra Pradesh Power Generation Corp Ltd

Setting up of 1x700 MW gas based combined cycle power plant on EPC basis at Nedunoor village in Karimna-gar dist., A.P. Completion period: 36 months.

Karimna-gar District Andhra Pradesh

NA C Radha Krishna - Director (Projects), Vidyutsoudha, Khairatabad, Hy-derabad-500082, T: 040-23499000, 39839000, [email protected]

Power

17 Rajkot Municipal Corporation (RMC)

Plans to setup sewage treatment plant at Raiyadhar and Bedigam. The Rajyadhar STP will have 56 MLD capacity while the Bedigam STP will have 76 MLD capacity.

Rajkot Gujarat

86.00 M H Ghoniya, Deputy Executive Engineer, Dhebarbhai Road, Rajkot, Gujarat T: 0281-2239973, 2224133, F: 2224258, M: 9624055885, [email protected]

Power

18 Maharash-tra State Electricity Transmis-sion Co. Ltd

MSETCL plans 400/220kV sub-station at Alkud and 2 nos 400 kV line bays at 400 kV Jejuri sub-station on turnkey basis. Bids are currently invited.

Jejuri Maharashtra

NA R D Chavan, Chief Engineer (C & M), Prakashganga, Plot no .C-19, E-Block, BKC, Bandra, Mumbai - 400051. T:022-26595000, F:26591254, M: 9769006280

Power

19 Coal India Ltd (CIL)

Plans to set up 1.6 GW pit-head power plant by 2015-16 in joint venture by 2015-16 near one of its coal mines where the rail connectivity is poor and evacuation of coal is not happening.

NA NA C B Sood, Executive Director,10 Netaji Subhas Road, Kolkata - 700001, West Bengal, T: 033-22435542, F:22435316, [email protected]

Power

20 Rajasthan Rajya Vidhyut Utpadan Nigam Ltd

EPC bids are called for 160 MW gas based combined cycle power project Stage - IV of RRVUNL at Ramgarh district Jaisalmer.

Jaisalmer Rajasthan

NA Z A Attari, Chief Engineer, Ramgarh, Dist. Jaisalmer, Rajasthan. T: 02991-270411

Power

21 Rail Land Develop-ment Authority

Plans to engage a consultant to conduct feasibility study and bid process management for commercial development of railway land at Mahalaxmi Wadala, Mumbai.

Mumbai Maharashtra

NA Virendra Kumar, General Manager, Projects, Next to Safdarjung Railway Station, Moti Bagh I, New Delhi - 110021, T: 011-24104789

Railways

22 Kolte-Patil Developers Ltd

Plans to develop residential housing project at Pune on 30 acre land parcel at Kondhwa.

Pune Maharashtra

NA Ram Amate - DGM, 201, City Point, Dhole Patil Road, Pune. T: 020-66226622, 66226500, F: 66226626, [email protected]

Real Estate

23 SSPDL Ltd SSPDL Green Acres LLP has entered into partnership with Godrej Properties Ltd to develop a residential project in Padur, OMR, Chennai on profit sharing model.

Chennai Tamil Nadu

NA A Shailendra Babu, Company Secretary cum Compliance Officer, SSPDL, 8-2-595 / 3/6, Eden Gardens, Road No 10 Banjara Hills ,Hyderabad -500034 Andhra Pradesh, Tel: 040-66637560,65507567

Real Estate

24 Oil India Ltd Plans to set up 50 MW wind energy project at Duliajan in the state of Assam. EPC bids are currently invited.

Duliajan Assam

NA Shantanu Saikia- BDM, Plot No. 19, Near Film City, Sector 16A, Noida - 201301. T: 0120 - 2488325, 2488333 to 2488347, F: 2488310, [email protected]

Renewable Energy

Page 6: Project Reporter April 2014

Project Reporter • 6 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

25 Gujarat State Electricity Corp Ltd

Plans to set up 2x10 MW solar photovoltaic grid-connected power plant at Gujarat solar park, Village Charanka, taluka Santalpur.

Patan District Gujarat

NA M L Patel, Chief Engineer (P&P), Vidyut Bhavan, Race Course, Vadodara - 390007, T: 0265-6612154, 6612131, [email protected]

Renewable Energy

26 Ministry of New & Renewable Energy

Plans to invite consultants for providing services on grid connected SPV rooftop power plants to MNRE.

Nationwide NA G Prasad, Director, Lodhi Road, CGO Complex, Block 14, MNRE Office New Delhi-110504, T: 011-24361151, [email protected]

Renewable Energy

27 National Highways Authority of India

Plans construction of flyover at Derabassi from km 29.830 to km 30.970 of NH-22 (Ambala-Chandigarh section) on EPC basis. Bids were recently invited.

Ambala Chandi-garh (U.T.)

146.00 M.K Jain, General Manager, G-5 & 6, Sector-10, Dwarka, New Delhi - 110075 Delhi. T: 011-25074100-1449, F: 250741100, 200, [email protected]

Roads/Highways/Bridges

28 IL&FS Transporta-tion

The company has emerged as lowest bidder for Road Infrastructure Com-pany Kerala Ltd project comprising rehabilitation of state highways and MDR - package III (A), Total 96.72 km and package III (B) Total 97.54 km under DBFMT on annuity basis. The concession period is of 15 years.

Kerala 289.60 Tarun Udwala, Sr Manager-CC,6-3-1186 / 1&2, Plot # 12, IL&FS Engineering House, Begumpet, Hyderabad - 500016. T: 040-40409333, 40409540, F: 40409444, tarun_udwala@ilfsengg. com (K Ramchand, Managing Director)

Roads/Highways/Bridges

29 National Highways Authority of India

Plans four laning of Kazhakkootam to Mukkola junction of NH-47 along the Trivandrum bypass from km 0.000 to km 26.500 on bot (toll) basis in Kerala.

Kazhak-kootam Kerala

577.95 M.K Jain, General Manager, G-5 & 6, Sector-10, Dwarka, New Delhi - 110075 Delhi. T: 011-25074100-1449, F: 250741100, 200, [email protected]

Roads/Highways/Bridges

30 Brihan-mumbai Municipal Corporation (BMC)

The Maharashtra Govt ambitious coastal road project comprises 35.6-km long coastal road connecting Nariman Point to Kandivali. BMC is the nodal agency to implement this project. The civic body has appointed a consultant to undertake feasibility study and prepare design that will constrain scope of work that requires NOC from the MoEF. Once all the approval is in place, the project is expected to complete in five years.

Mumbai Maharashtra

8000.00 D Dixit,Chief Engineer-Roads, 3rd floor, NX Bldg, Mahanagarpalika Marg, Opp, CST Station, ,Fort, Mumbai, Maharashtra-4000001. T: 022-24919252, 22620451,F:22620451, M: 09820068081

Roads/Highways/Bridges

31 Pimpri Chinchwad Municipal Corporation (PCMC)

PCMC decides to construct two parallel flyovers at KSB Junction. The flyovers on the Kalewadi phata-Dehu Alandi road will each be 810 metre long and 8 metre wide. The two parallel grade separators on Telco Road will be 510 metre long and 9.5 metre wide. The 45 metre BRT route of Kalewadi Phata-Dehu Alandi Road crosses Telco road. The work is expected to complete by September 2016.

Pimpri, Chinchwad Maharashtra

109.26 Shrikant Saune,Executive Engineer, Mumbai-Pune Road, Pimpri, Pune, Maharashtra-411018. T: 020- 27425511-14, F: 27425600, M: 09922501723, [email protected],

Roads/Highways/Bridges

32 National Highway Authority of India (NHAI)

Plans to undertake repair work on the 40-km stretch from Mansar to Kha-wasa on NH-7.

Nagpur Maharashtra

NA NY Wadetwar, Project Director, PIU, Amravati, Matruchhaya, Plot No.33, Raguvir Co-op Housing Society, Badnera Road, Sai Nagar, Amravati, Gujarat-444607 T:0721-2510035,F: 2510035, M: 09764003380

Roads/Highways/Bridges

33 Rajasthan Public Works Department

Plans to undertake construction of road under PMGSY (World bank assisted projects RRP-II (Tranch-II Phase-X) in Jaipur district, (Tranch-V Phase-XII) in Dausa and Udaipur District. The completion will take 240 days. Bids are currently invited.

Jaipur Rajasthan

NA AK Singhvi, Chief Engineer, Jacob Road, Jaipur 302006, Rajasthan. T: 0141-5110544, F: 0141- 5110554. M: 9829128389, [email protected]

Roads/Highways/Bridges

Page 7: Project Reporter April 2014

Project Reporter • 7 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

34 National Highways Authority of India

Plans four laning of Sultanpur-Varanasi section of NH-56 from km 134.700 (design chainage 134.700) to km 271.300 (design chainage 280.925) under NHDP Phase IV through public private partnership (ppp) on DBFOT Toll basis.

Varanasi Uttar Pradesh

1564.73 M.K Jain, General Manager, G-5 & 6, Sector-10, Dwarka, New Delhi - 110075 Delhi. T: 011-25074100-1449, F: 250741100, 200, [email protected]

Roads/Highways/Bridges

35 National Highways Authority of India

Plans four laning of Ghaghar bridge to Varanasi section from Km 121.800 to Km 299.350 of nh-233 in the state of Uttar Pradesh under NHDP Phase-IV to be executed as bot (toll) project on DBFOT pattern.

Varanasi Uttar Pradesh

1895.95 M.K Jain, General Manager, G-5 & 6, Sector-10, Dwarka, New Delhi - 110075 Delhi. T: 011-25074100-1449, F: 250741100, 200, [email protected]

Roads/Highways/Bridges

36 National Highways Authority of India

Plans construction of temporary toll plaza - Guabari at Km 243.00 of nh-31c in the state of West Bengal.

Guabari West Bengal

NA Chief General Manager, White House, Block-A, 2nd Floor, 119 Park Street, Kolkata - 700016 West Bengal. T: 033-22268133, F: 22268135

Roads/Highways/Bridges

37 Ahmedabad Municipal Corporation

Plans to set up 55 MLD output capacity tertiary treatment plant including upgradation of 60 MLD stream of existing 180 MLD STP to produce Industrial Grade Water for Ahmedabad textile processors association at New Pirana, Ahmedabad. Completion period: 18 months.

Ahmedabad Gujarat

NA Dr. Guruprasad Mohapatra, IAS, Commissioner, Municipal Commis-sioner P.W.A. Office, Municipal Corporation, Sardar Patel Bhavan, Danapith, Ahmedabad - 380001, Gujarat, T: 079-25391811 to 25391830, F: 25350926, [email protected]

Sewerage Treatment

38 Uttar Pradesh State Indust rial Develop ment Corp

Plans development of theme park at Agra under a public private partner-ship/ joint venture mode. Bids are currently invited.

Agra Uttar Pradesh

NA V K Nanda, Chief Manager, UPSIDC Complex, A-1/4 Lakhanpur, Kan-pur-208024. T: 0512-2582851, 2582852, 2582853, F: 2580797, M: 09935441764

Theme Park

39 Bhopal Municipal Corporation

Plans development of bus terminal cum commercial complex at Putligha-rin, Bhopal in the state of Madhya Pradesh.

Bhopal Madhya Pradesh

NA Sunil Shrivastav, Chief Engineer (Project), Sadar Manzil, Nagar Nigam, Bhopal. T: 0755-2542070, 2701671, 2701410, M: 9424499880

Transport

40 Mumbai Metro Rail Corporation (MMRCL)

Plans to implement underground metro corridor named 'Metro Line 3' covering 32.5 km having 26 stations under-ground and one at ground level. The corridor will start from Colaba in south Mumbai till SEEPZ in the north. JICA is funding 57 per cent while Govt of India and MMRDA will bear the rest. Fourteen international and domestic companies have registered their interest in the pre-qualification round. Tenders will be issued by July 2014.

Mumbai Maharashtra

23136.00 PRK Murthi - Chief Transportation and Communication, Bandra Kurla Complex, Bandra (East), Mum-bai-400051, T: 022-26594000, F: 26594182, [email protected] (Sanjay Sethi, MD)

Transport

41 Lucknow Metro Rail Corporation Ltd (LMRC)

Plans to execute metro-rail project in Lucknow city. The foundation stone was laid in March 2014. The project is expected to complete in three years. The first phase of the project com-prises North South (N-S) metro corridor from Amausi Airport to Charbagh covering approximately 23 km. The stretch from airport to Alambagh will be taken up on priority as part of first phase. LMRC has currently invited request of proposal to appoint a commercial consultant - cum-property development advisor for Lucknow metro rail project-Part 1 A (North-South Corridor).

Lucknow Uttar Pradesh

18000.00 Rajeev Agarwal, MD, 1st Floor, Jantpath Market, Hazrat Ganj, Lucknow, 226001, M: 9918771111

Transport

Page 8: Project Reporter April 2014

Project Reporter • 8 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

42 Kolkata Metro Rail Corporation Ltd

Plans construction of 365.646 m viaduct from (Ch 8958.405m to 9324.051 m) on either side along the elevated section of east west corridor of Kolkata Metro. Bids are invited.

Kolkata West Bengal

NA Biswanath Dewanjee, Dy Chief Engineer (Civil), HRBC Complex, KMRCL Bhawan, 2nd & 3rd Floor, Munsi Premchand Sarani, Kolkata, T: 033-22134342, M: 9051399329

Transport

43 Central Warehous-ing Corporation

Plans to set up 10000 MTC godowns at Munger and Khagariya in the state of Bihar. Bids are currently invited to carry out sub-soil investigation. Another 1800 MTC Godown along with internal roads and electrical installation at CW, Nokha.

Munger Bihar

NA B B Pattnaik, MD, 4/1 Siri Institutional Area, Hauz Khas, New Delhi-110 016. T: 011-26566107, F: 26967256, [email protected], [email protected]

Warehous-ing

44 Madhya Pradesh Warehous-ing and Logistics Corporation

Consultant bids are called for world class centre for perishable cargo to be set up at Devi Ahilya Bai international airport, Indore.

Indore Madhya Pradesh

NA J K Dubey, Chief Engineer, Office Complex, Block A, Gautam Nagar, Bhopal-462023, Madhya Pradesh, 0755-2600524, 2600509, 510, F: 2600384, M: 9425382942, [email protected]

Warehous-ing

45 Krishna Bhagya Jala Nigam Ltd (KBJNL)

KBJNL plans to undertake remodelling of the Narayanapura Left Bank Canal (NLBC) and the network extension, renovation and modernisation (ERM) programme of the Upper Krishna Project (UKP). The project will be taken up under the Accelerated Irrigation Benefit Programme (AIBP) and the National Water Mission.

Narayan-pura Karnataka

3752.00 Pramod Reddy Patil, Chief Engineer, PWD Office Annexe Building, III Floor, K.R.Circle, Bangalore ,Karnata-ka-560001. T: 080-22277393, 488, F: 22219470, [email protected],

Water Sector

46 Bengaluru Mahana-gara Palike

Plans remodelling of storm water drains, flood mitigation & sewage diversion to improve environment condition near waterbodies in Yela-hanka zone under project - II (Gedala-halli Kere watershed region)

Bangalore Karnataka

NA V Yashwant - Special Commissioner Projects, South, 9th cross 9th main 2nd block, Jaynagar Bangalore – 560 011, Karnataka. T: 080-22975708, 22975551, [email protected]

Water Sector

Contract Award (Sno. 47 to 63)47 Larsen &

Toubro (L&T)

Bagged construction of a major residential project in Bangalore. The scope of work involves construction of 24 towers and 271 villas. The towers will comprise two basements and a ground floor with levels varying from 18 to 29 floors. The project is scheduled to be completed in 42 months.

Bengaluru Karnataka

1981.00 S N Subrahmanyan,Whole- time Director & Sr. EVP, (Infrastructure & Construction), Mount Poonamallee Road, Manapakkam, P B no 979, Chennai - 600089, Tamil Nadu. T:044-2528000, F:22493888, [email protected]

Construction

48 Era Infra Engineering Ltd

Bagged construction contract from Department of Atomic Energy for the construction of phase II hostel complex consisting of 376 bachelors and 144 married accomodation for trainees of Bhabha Atomic Research Centre (BARC) / Homi Bhabha National Institute at Anushaktinagar in Mumbai.

Mumbai Maharashtra

48.98 Anirudh Kumar, General Manager (Contracts), 370-371/2, Sahi Hospital Road, Jungpura, Bhoga, New Delhi - 110014, T: 011-40637000, F: 24378784

Construction

49 Vascon Engineers Ltd

Bagged an order from Sheth Creators Pvt Ltd for the construction of residen-tial building at Mumbai.

Mumbai Maharashtra

115.00 M Krishnamurthi,Company Secretary, Phoenix, Bund Garden Road, Camp, Pune - 411001 Maharashtra. T: 020-30562100, 200, 400, 500, F: 26131071, [email protected]

Construction

50 Vascon Engineers Ltd

Bagged housing contract from Uttar Pradesh Housing and Development Board for the construction of multisto-ried flats in Lucknow.

Lucknow Uttar Pradesh

130.00 M Krishnamurthi,Company Secretary, Phoenix, Bund Garden Road, Camp, Pune - 411001 Maharashtra. T: 020-30562100, 200, 400, 500, F: 26131071, [email protected], http://vascon.com (R Vasudevan, Managing Director)

Construction

Page 9: Project Reporter April 2014

Project Reporter • 9 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Contract Award

51 Kilburn Engineering Ltd

The company has got letter of intent (LOI) from a large fertilizer company for supply of equipment for a new DAP/NPK fertilizer project.

NA 31.00 D P Sarvadhikari,V.P. (Works), Plot No. 6, MIDC - Saravali, Kalyan Bhiwandi Road,Taluka, Bhiwandi District, Thane, Maharashtra. T: 02522-22241800, F:22280166

Equipment

52 Kilburn Engineering Ltd

Bagged NPCIL's orders for nuclear reactor building cooling systems in Gujarat and Rajasthan.

Gujarat 18.00 D P Sarvadhikari, V.P. (Works), Plot No. 6, MIDC - Saravali, Kalyan Bhiwandi Road,Taluka, Bhiwandi District, Thane, T: 02522-22241800

Industrial Products

53 Jaihind Projects Ltd

Bagged Paradip-Haldia-Durgapur LPG Pipeline Project from Indian Oil Corporation Ltd. The project envisages laying of mainline for Paradip-Haldia-Durgapur LPG Pipeline Project (PHDPL)-Group A.

Paradip, Haldia Gujarat

114.83 Vinod Kumar Bhogayata, GM, 3rd Floor, Venus Atlantis, Corporate Park, Nr Prahladnagar, AUDA Garden, Satellite, Gujarat-380015. T: 079-40501300, F:40501310/11, [email protected],,

Oil & Gas

54 Transform-ers and Rectifiers (India) Ltd

Bagged an order for supply of 66KV class transformers aggregating to 1290 MVA from Gujarat Energy Transmis-sion Corporation Ltd (GETCO).

Gujarat 66.00 Darshan Shah GM Marketing, Survey No: 345-350, Sarkhej Bavla Highway, Vill: Changodar, Tal: Sanand, Ahmedabad-382410, Gujarat. T: 02717-661661, M: 9687659521

Power

55 BS Ltd Bagged several orders from power utilities. These orders are for turnkey/EPC contractors for 220 KV & 132 KV transmission lines & associated substations in Madhya Pradesh. The projects funded by Asian Development Bank are for strengthening the grid and enhancing transmission capacity, bringing much-needed electricity to the region to meet growing domestic and industrial demand.

Madhya Pradesh

722.00 Sarin Paul, Corporate Communica-tion, 504, Trendset Towers, Road No.2, Banjara Hills, Hy-derabad-500034 Andhra Pradesh. Tel: 040-44558888, Fax: 040-66667268, M: 09949960508, [email protected], www.bslimited.in (Rajesh Agarwal, Chairman & Managing Director)

Power

56 Kalpataru Power Transmis-sion Ltd

Bagged order for supply & erection of 765KV D/C Solapur-Aurangabad transmission line of 140km worth from PGCIL

Solapur Maharashtra

350.00 Rahul Shah, Company Secretary, 101, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (E), Mumbai - 400055, T: 022-30645000

Power

57 ABB Ltd ABB bags GIS substation contract worth US$18 million to construct a 400 kV gas-insulated switchgear (GIS) substation at Kolhapur. The completion is targeted in 2016.

Kolhapur Maharashtra

NA Sanaj Natarajan, Manager-CC, No.49 Race Course Road, Bangalore, Karnataka-560001, T:080-22949195, 22949150, F:22949148, M:09972800477

Power

58 Alstom T&D India

Bagged a contract from PGCIL to supply and refurbish HVDC converter transformers at Bhadrawati.

Bhadra-wati Uttar Pradesh

182.00 Aparna Srivastava, DGM-Corp Comm, IHDP Bldg, Sector-127, Noida -201301, Uttar Pradesh T: 0120-4732535, 4731141, M: 9560646622, [email protected],

Power

59 Bharat Heavy Electricals Ltd

Bagged a contract for setting up a 120 MW Vyasi Hydro Electric Project (HEP) from UJVNL in Uttarakhand. The order is for setting up of Hydro Generating sets and associated Electro-Mechani-cal works for this project.

Uttarakhand 125.00 Inder Pal Singh, CS & Compliance Of-ficer, BHEL House, Siri Fort, New Delhi-110049. T: 011-66337000, 26001046, F: 011-66337533, [email protected], www.bhel.com ( B P Rao, CMD)

Power

60 GMR Infrastruc-ture Ltd

GMR led consortium bagged rail line doubling contract from RVNL between Jhansi and Bhimsen stations. The work included construction of roadbed, major & minor bridges, track linking, outdoor S&T works, OHE, TSS & general electrical works from Jhansi to Erich Road. The work is likely to start shortly and complete in 42 months.

Jhansi Uttar Pradesh

267.00 Sowmya Shenoy, Corp Comm, GMR Group, IBC Knowledge Park,,Phase 2, D Block, 9th Floor, 4/1, Ban-nerghatta Road, Bangalore - 560029, T:080-40432000, 40432507, F: 40432180, M: 9663699991, [email protected],

Railways

Page 10: Project Reporter April 2014

Project Reporter • 10 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

61 IL & FS Engineering and Construc-tion Company Ltd

Bagged a letter of intent (LoI) from Ireo Pvt Ltd for construction of its luxurious residential project Gurgaon Hills located at Sec-02, Gurgaon, Haryana. The project comprises six towers (20 to 26 Storey) with total built-Up area of around 1.77 million sq feet including basement, EWS, Club House, and so on. The completion is targeted in 39 months.

Gurgaon Haryana

175.80 G Venkateswar Reddy, Company Secretary, D.No. 8-2-120/113/3 4th Floor, Sanaili Info Park, Road No. 2, Banjara Hills, Hyderabad - 500033 Andhra Pradesh. T: 040-40409333, F: 040-40409444, [email protected], [email protected], www.ilfsengg.com(Murli Dhar Khattar, Managing Director)

Real Estate

62 Sadbhav Engineering Ltd

Bagged order from NHAI for the widening & strengthening of Jodhpur-Barmer Section of NH-112 (Jodhpur to Pachpadra Pkg-I) with two lane with paved shoulder/four lane from km 140.00 to km 225.615 (Length 85.615 ) under NHDP-IV in Rajasthan on EPC Mode. The construction period is 910 days. The maintenance period is 4 years from the date of the provisional certificate.

Jodhpur Rajasthan

212.40 Vijay J Kalyani, CS & Compliance Officer, Sadbhav House, Ellisbridge , Ahmedabad - 380006, T: 079-26463384, F: 26400210, [email protected], www.sadbhaveng.com (Vishnubhai M Patel, MD)

Roads/Highways/Bridges

63 Sadbhav Engineering Ltd

Bagged EPC contract for highways project from NHAI for widening and strengthening of Jodhpur- Barmer Section of NH-112. The project is being implemented under NHDP, Phase IV. The maintenance period for the project is for four years.

Jodhpur Rajasthan

212.00 Parul Shah,Sr. Business Development Officer, Sadbhav House, Opp Law Garden Police Chowki, Ellisbridge, Ahmedabad, Gujarat-380006. T:079-26463384, F: 26400210, [email protected],

Roads/Highways/Bridges

Project Update / Commissioned Project Stage (Sno. 64 to 79) 64 SRF Ltd The company has recently commis-

sioned the following units: 1) Captive-Power-Plant (15 MW) 2) HFC-134a/125 plant (12500 TPA). 3) AHF-Plant (20000 TPA) 4) Specialty Chemical Plant (800 TPA) and 5) Specialty chemicals Plant for agro-chemical industry (500 TPA).

NA NA Anoop K Joshi, VP & CS, Block - C, Sector - 45, Gurgaon - 122003, T: 0124-4354400, F: 4354500, [email protected], www.srf.com (Ashish Bharat Ram, Managing Director)

Chemicals & Fertiliz-ers

65 Bharat Gears Ltd

The company has commenced production at Lonand plant in Satara.

Satara Maharashtra

NA S G Gandri, Plant Head, Lonand, Taluka ,Khandala, Satara District - 415521, Maharashtra, T: 02169-226285, 225285, [email protected]

Industrial Products

66 Dighi Port Pvt Ltd

Dighi Port has commissioned two multipurpose berths having a single linear quay length of 650 m. The port already has two multipurpose berths on the South Bank, three more multipurpose berths having a total quay length of 1100 m are under construction on the North Bank and will be commissioned by the last quarter of 2014.

Raigad District Maharashtra

NA Oman Khosla, BDM, New Excelsior Building, 6th Floor, A.K. Nayak Marg, Fort, Mumbai- 400001. T: 022- 22074824/25, F: 2072124 (Vijay Kalantri, CMD)

Ports & Shipping

67 Jindal Power Ltd

The company has commissioned the second unit of 600 MW out of the 4x600 MW expansion project at Tamnar in Raigarh district. The first unit of 600 MW was commissioned on March 14, 2014. The third unit of 600 MW is complete and ready for synchronization.

Raigarh District Chhattis-garh

NA Jindal Centre, 12, Bhikaiji Cama Place, New Delhi 110066 Delhi. T: 011-2618 8340-50, F: 011-26161271, www.jindalpower.com (R. S. Sharma, Managing Director)

Power

Contract Award

Page 11: Project Reporter April 2014

Project Reporter • 11 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Epage 15

68 Reliance Power Ltd

The company has recently commis-sioned third unit with 660 MW unit of the 3,960 MW (6x660 MW) Sasan Ultra Mega Power Plant (UMPP) being developed by SPV-Sasan Power Ltd. Balance three units of this project are in advanced stages of construction. The commissioning is targeted over the next couple of months.

Sasan Madhya Pradesh

19400.00 Nagraj Rao,Corp Comm, Dhirubhai Ambani Knowledge City (DAKC), Thane-Belapur Road, Koparkhairne, Navi Mumbai - 400710, T: 022-30386600, F:30386999, M: 9323342576, www.reliancepower.co.in (J P Chalasani, Chief Executive Officer)

Power

69 NTPC Ltd The company has declared commer-cial operations of the Unit #2 of 500 MW of Mouda Super Thermal Power Station, Stage-I. With this the total commercial capacity of Mouda STPS has become 1000 MW and the total commercial capacity of NTPC has become 41814 MW.

Nagpur District Maharashtra

NA B P Singh, Director (Projects), NTPC Bhawan, Scope Complex, 7, Institu-tional Area, Lodi Road, New Delhi - 110003, T: 011-24360100, 011-24361018, [email protected], [email protected], [email protected] (Arup Roy Choudhary, CMD)

Power

70 NTPC Ltd The company has declared commer-cial operation of Unit # 12 of 500 MW of Vindhyachal Super Thermal Power Station.

Singrauli District Maharashtra

NA B P Singh, Director (Projects), NTPC Bhawan, Scope Complex, 7, Institu-tional Area, Lodi Road, New Delhi - 110003, T: 011-24360100, 24361018, [email protected] (Arup Roy Choudhary, CMD)

Power

71 Adani Power Ltd

The company has commissioned the fourth unit of 660 MW at its power plant at Tiroda in Maharashtra.

Tiroda Maharashtra

NA Roy Paul, DGM,Sambhav Building, Judges Bungalow Road, Bodakdev, Ahmedabad. T: 079- 25556628, F: 25557177, [email protected]

Power

72 Reliance Power Ltd

The Butibori power plant comprising 2x300 MW capacity developed by Vidarbha Industries Power Ltd, a subsidiary company is now fully operational.

Butibori Maharashtra

2076.00 Nagraj Rao, Corp Comm, Dhirubhai Ambani Knowledge City (DAKC), Thane-Belapur Road, Koparkhairne, Navi Mumbai - 400710, T: 022-30386600, F:30386999, M: 9323342576, www.reliancepower.co.in (J P Chalasani, Chief Executive Officer)

Power

73 NTPC Ltd The company has declared commer-cial operation of Unit # 6 of 500 MW of Rihand Super Thermal Power Station.

Soneb-hadra District Uttar Pradesh

NA B P Singh, Director (Projects), NTPC Bhawan, Scope Complex, 7, Institu-tional Area, Lodi Road, New Delhi - 110003, T: 011-24360100, 24361018, [email protected] (Arup Roy Choudhary, CMD)

Power

74 Mangalore Refinery and Petrochemi-cals Ltd

The company has commissioned the delayed coker unit (DCU) of 3.0 MMTPA, which is part of the refinery up-gradation cum expansion project.

Mangalore Karnataka

NA Dinesh Mishra, Company Secretary & Compliance Officer, Kuthethur P O Via Katipalla, Moodapadav ,Manga-lore-575030, T: 0824-2270400, F: 0824-2270382, 2270013, [email protected], www.mrpl.co.in. (P P Upadhya, Managing Director)

Refinery

75 NTPC Ltd The company has recently com-menced commercial operations of 5 MW Solar PV Power Station at Faridabad.

Faridabad Haryana

NA S C Pandey, Director (Projects), NTPC Bhawan, Scope Complex, 7, Institutional Area, Lodi Road, New Delhi - 110003, T: 011-24360100, 24361018, [email protected] (Arup Roy Choudhary, CMD)

Renewable Energy

76 NTPC Ltd The company has recently com-menced commercial operations of 30 MW Solar PV Power Station at Rajgarh.

Rajgarh Madhya Pradesh

NA S C Pandey, Director (Projects), NTPC Bhawan, Scope Complex, 7, Institutional Area, Lodi Road, New Delhi - 110003, T: 011-24360100, 24361018, [email protected] (Arup Roy Choudhary, CMD)

Renewable Energy

Project Update / Commissioned Project

Page 12: Project Reporter April 2014

Project Reporter • 12 • April 15, 2014

Realty Zone

Could you tell us about your company, achievements and core competencies?

S Raheja Realty, the name that speaks trust and tradition, has been a prominent player in the Indian real estate market for more than 5 decades now. Our business policies have ensured purity not only in the quality of our construction but also in the nature of our practices. Associations with leading international and domestic consultants enable the group to continually innovate, and create architectural landmarks.

The company primarily has four verticals; redevelopment, corporate, luxury mid-level housing and second homes. The strategies for each of these segments are different. Keeping pace with the changing concepts of luxury, our second-home projects like the Cascades have been designed with keeping privacy and relaxation in mind.

While real estate is S Raheja’s key business vertical, the group’s portfolio also includes a diversified range of services in the construction and architecture industries. These verticals act as the backbone and work in sync with all other departments ensuring strong project execution.

Could you provide us insight about the emerging trends in the Indian real estate sector?

Indian real estate market is going through a very interesting phase with the general economic development. With buyers getting more of international

exposure, the nature of the demands are changing as the consumers want quality projects that have all the amenities at par with the rest of the world. This is true not only for the metros but also tier-II cities. The concept of luxury is also evolving with far greater emphasis on personal space and comfort.

One of the emerging trends in the Indian realty segment is mixed-use developments. There has been a considerable rise in mixed-use projects which encompass residential, commercial and even other facilities

like healthcare. Their main benefit is reduced distances between housing, workplaces, retail businesses, and other destinations.

I see a huge growth in the smaller cities with each youth wanting to have his own home at a very early phase of his career. With many big companies coming into the real estate market, only good quality housing will survive as the investors are far more conscious and know exactly what they want. Sustainable architecture and green

buildings are also a trend expected to become pre-dominant with concerns about the environment growing. In terms of innovation, I foresee a lot of improvement in terms of technology and demand for smart-homes. The process of construction is also undergoing changes with pre-fabricated materials and alternatives to raw materials like cement being used by developers to speed up the process. Thus, real estate sector in India will only grow into a larger and better market in the coming years.

How is the real estate space shaping up in the Mumbai Metropolitan Region?

With space being a major concern in a metro like Mumbai, there are two major trends that are shaping up in the real estate segment. One is redevelopment projects and another is expansion towards the outskirts. The MMR region has now started expanding and the farther suburbs are witnessing a metamorphosis. Most developers are opting for luxury projects in the

redevelopment space. Also, the central suburbs are coming up in a big way with new retail and real estate projects.

Which are your signature projects in the luxury segment? Do you plan to launch new projects in the near term?

One of S.Raheja Realty signature luxury projects, ‘Cascades’ is an exclusive 15-villa-project with a total campus area of 2 acres. The size of each villa is 3500-5000 sq ft. The amenities that these villas offer includes

Ram Raheja, Director, S. Raheja Realty shares his views with Sandeep Sharma about his company, achievements, core competencies, emerging realty trends in MMR, signature projects, affordable housing, sustainable design and architecture, re-development opportunities, increase in building material prices, pilot housing start up index (HSUI), real estate as an asset class, government initiatives and solution to India’s growing housing deficit. Edited excerpts...

“In the current scenario, bringing in foreign funds will benefit the sector immensely. The original FDI guidelines issued attracted large amounts of foreign funds to the Indian real estate sector; however, subsequent amendments to the FDI policy relating to real estate have created unwanted apprehensions and confusion in the minds of global investors thereby affecting FDI inflows adversely. It is therefore, essential for the policy makers to look into this matter.”

Page 13: Project Reporter April 2014

Project Reporter • 13 • April 15, 2014

Realty Zone

landscaped gardens, clubhouse, Table Tennis Room, Snooker Room, Cricket Pitch with Nets, Children’s Play area with a Tree House, Recreation for the mind and body, Yoga Centre, Outdoor Spa, Library, Card Room, Terrace spaces provide a transition between the hard materials of the architecture and softer ones of the garden. Amongst others, the villa features includes private thirty feet waterfall, swimming pool with sunken seats, reflection ponds and provision for an outdoor hot tub that enhances both your experience & the environment in the villa.

Ideal for a romantic rendezvous or a fun evening with your friends& family, these villas are also equipped with other facilities like home automation, two car parks, Laundry Room, Room and bathroom for servants, automated security systems, WIFI and cable, Modular Kitchen, International fixtures and fittings.

Being one of the very few projects in the city with a 360 degree view of the park, Natraj is a premium luxury address located at the green and serene suburb of Khar in Mumbai. Natraj is spread across 25, 000sq. ft & houses 12 apartments (one on each floor) and a penthouse.

Gurukripa, located at the bustling area of Kalina, Santacruz which has an easy accessibility to the highway & Sea Link is spread over 30,000 sq ft. The affluent residency comprises of two& three bedroom apartments with beautifully landscaped terrace garden for each. Each of the flat is designed keeping in mind the requirement of the new age working class buyers offering the best amenities in terms of floorings, bathroom fittings, club house facilities amongst others.

S. Raheja is also a pioneer in the affordable luxury segment. SDS Raheja

Residency in Varanasi and Raheja Prime in Palghar are two instances of such projects. Being the tallest approved buildings in the city and the only one with two-level basement parking facilities, SDS residency is a premium luxury address located at the green and serene Panchkoshi area of Varanasi. Planned with utmost care and crafted with discerning neutral palettes, the residency is spread over an

area of lakh square feet(approximately) with 2 BHK and 3 BHK blocks ranging from 1010 sq ft to 1600 sq ft. the apartments are designed keeping in mind the requirement of the new age working class buyers offering the best amenities in terms of vitrified floorings, high-end bathroom fittings, semi modular kitchens with granite tops& stainless steel sinks amongst others.

Set to change the definition of luxury

housing, Raheja Prime, located at Palghar is the first residential facility in the vicinity to have an elevator. The project has revamped Palghar and changed the dynamics of the location. The USP of the project is the fact that it offers latest technology and has state-of-the-art amenities at an affordable price. Raheja prime’s 1 bhk and 2 bhk apartments are complete with fine vitrified tiles (RAK), granite platform stainless, dado tiles, superior quality sanitary fixtures, chrome plated fittings, and antiskid flooring.

How would you define affordable housing keeping in mind the Tier-I, II and III cities customer? What kind of projects are you doing in the affordable segment?

Be it Tier-I, II, or II, today’s

consumer is well-aware and demands the best quality at an affordable price. Higher disposable incomes, increased aspirational values for a better standard of living and also the infrastructural development and general economic growth have given a boost to affordable and mid-level real estate. Considering the pyramid of society, the demand in mid-income housing is bound to be high but in outskirts and tier-II cities, there is a lack in the supply of quality projects. S Raheja is primarily into luxury housing but having identified the potential of Mid-cap housing in the country, we ventured into this segment with projects on the outskirts of Mumbai and tier-II cities. We aim at bridging this gap by providing luxury housing at affordable prices and the success of our projects in Palghar and Varanasi are testimonies to that.

Could you comment on the need for sustainable design and architecture?

Sustainable architecture or ecological design is to ensure that our actions and decisions today do not inhibit the opportunities of the coming generations. Sustainable architecture or green design is a philosophy of designing buildings to comply with the principles of social, economic and ecological sustainability.

We at S Raheja seek to minimize the negative environmental impact of buildings by using materials, energy and space in a way that is least

damaging for the environment. Creating sustainable buildings starts with proper site selection as the location, orientation, and landscaping of a building affect local ecosystems, transportation and optimize energy use .Fresh water is an increasingly scarce resource and as a developer, we try to optimize its use or recycle water for on-site use, when feasible. We make sure that the

Page 14: Project Reporter April 2014

Project Reporter • 14 • April 15, 2014

Realty Zone

materials used in our constructions minimize environmental impacts such as global warming, resource depletion, and human toxicity. The indoor environmental quality (IEQ) of a building has a significant impact on occupant health, comfort, and productivity and as an architect, I design keeping in mind optimal operations and maintenance of the building. As a real estate firm, we implement all possible methods to simplify and reduce maintenance requirements, reduce usage of water, energy and toxic chemicals to ensure sustainability of all our projects.

How big is the re-development space in Mumbai? Are you active in the re-development segment?

As I mentioned earlier, due to the space crunch and rapidly rising development and population in Mumbai, redevelopment is the only way forward for the housing segment. Also, it is the best solution to convert Mumbai’s old, ill maintained buildings and uplift the city’s skyline. Our projects like Gurukripa (Kalina) and Natraj (Khar) are redevelopment projects.

How far increase in building material, equipment and labour cost has contributed to rise in construction cost considering period of last 2-3 years? What is the way forward to control these prices?

Since building material, equipment and labour form the base of any construction, the rise in prices has definitely led to a rise in construction. One way of improving efficiency and reducing costs is using new construction techniques. Pre-fabricated materials, brickless technology, partition wall systems are a few examples of such techniques. India is gaining prominence in the global map as a place for investment

and we can expect a lot of foreign real estate companies entering the market. These companies will introduce pre-fabricated products and new age technologies which will not be as labour intensive and make construction a lot faster. Post election reforms by the new government should boost the infrastructure industry and their policies are hopefully going to tackle the issues of inflation, cash flow, transparency in the approvals and acquisition processes, to uplift the sector.

The Pilot Housing Start Up Index (HSUI) released by Ministry of Housing and Urban Poverty Alleviation and RBI recently has indicated decline in housing for Kolkata, Bengaluru and Chennai. What’s your take on this index?

It’s the first time that this index has been released and I think it’s a good initiative. I will help in analyzing the scenario and deciding future course of action. The decline is housing in Kolkata, Bengaluru and Chennai calls for government attention and intervention. Schemes like Rajiv Awas Yojana, which focuses on construction of houses for the urban poor and Rajiv Rinn Yojana, which offers loans for construction of houses to the urban poor need to be implemented

in these cities.

The stock market is throwing mixed signals and investors are looking forward for safe investment. In the current scenario, do you think real estate as an asset class can be an attractive proposition?

Real estate is a tangible asset and will always be a good bet to invest in. However, in the absence of

instruments like REITS, it is advisable to invest for long-term in realty to get best returns.

What kind of Government initiatives can go a long way in boosting the real estate sector growth?

In the current scenario, bringing in foreign funds will benefit the sector immensely. The original FDI guidelines issued attracted large amounts of foreign funds to the Indian real estate sector; however, subsequent amendments to the FDI policy relating to real estate have created unwanted apprehensions and confusion in the minds of global investors thereby affecting FDI inflows

adversely. It is therefore, essential for the policy makers to look into this matter.

Further, lack of consistency in rules relating to development of SEZs, increased monitoring of the sector by regulatory agencies, tightening of rules for lending to the real estate sector and increase of key rates by the RBI several times during the last one year, have arrested the growth of the sector. There is a need to streamline government policies and introduce reforms to boost the real estate sector.

What is the solution to India’s growing housing deficit?

Apart from streamlining current policies like FDI in real estate, the Government must provide incentives to the public and private sectors to take up R&D activities for new building materials and technologies so that the industry can deliver low cost, affordable, sustainable and environment-friendly housing and building structures. Also, developers must try to bridge the gap between supply and demand. They need to research and identify the need in the area they are developing; low-income, affordable, or luxury, and build accordingly.

Page 15: Project Reporter April 2014

Project Reporter • 15 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update / Commissioned Project

77 NTPC Ltd The company has recently commis-sioned 10 MW Solar PV power plant at Talcher.

Angul District Odisha

NA S C Pandey, Director (Projects), NTPC Bhawan, Scope Complex, 7, Institutional Area, Lodi Road, New Delhi - 110003, T: 011-24360100, 24361018, [email protected] (Arup Roy Choudhary, CMD)

Renewable Energy

78 NTPC Ltd The company has recently com-menced commercial operations of 10 MW Solar PV Power Station at Unchahar in Raebareli district.

Raebareli District Uttar Pradesh

NA S C Pandey, Director (Projects), NTPC Bhawan, Scope Complex, 7, Institutional Area, Lodi Road, New Delhi - 110003, T: 011-24360100, 24361018, [email protected] (Arup Roy Choudhary, CMD)

Renewable Energy

79 GMR Infrastruc-ture Ltd

The company has recently completed 29.65 km Chennai Outer Ring Road Phase I Project. The project was executed on DBFOT basis. The ORR connects Vandulur on NH-45 to Nemilllicheri on NH-205 via Nazaratpet on NH-4. The concession period of the project is 20 years including 30 months of construction.

Chennai Tamil Nadu

1100.00 Sowmya Shenoy, Manager-Corporate Communications, GMR Group, IBC Knowledge Park, Phase 2, "D" Block, 9th Floor, 4/1, Bannerghatta Road, Bangalore - 560 029, Karnataka. T: 080-40432000, [email protected], www.gmrgroup.in (BVN Rao, Business Chairman)

Roads/Highways/Bridges

Project Under Implementation Stage (Sno. 80 to 90)80 Airports

Authority of India (AAI)

AAI is constructing 60,591 sq mtr terminal at Chandigarh Airport located at Jhurjeri village of Mohali district. L&T is undertaking the construction work. The terminal will have the capacity to accommodate 1600 passengers at a time with eight parking bays for aircrafts. The construction work is progressing well and the completion of the apron and taxiways work is likely by year-end.

Mohali Chandi-garh (U.T.)

452.00 Harish Mathur, Joint GM-Engineering, Chandigarh Airport, Chandigarh (U.T.) T: 0172-2659886, F:2659887, [email protected]

Airport

81 Mahindra Trucks and Buses Ltd

Plans to invest Rs 300 crore on development of a completely new platform for intermediate commercial vehicle (ICV) in the 8-12 tonne range. Another Rs. 200 crore will be used for strengthening current product line-up of trucks and buses including the refurbishing of existing LCVs.

NA 500.00 Mahindra & Mahindra, Truck & Bus Division Marketing Department,2nd Floor Mahindra & Mahindra Ltd. Towers Worli, Mumbai -400018 Maharashtra, T: 020-27473600, www.mahindratrucksandbuses.com

Automobile

82 CIDCO Bids are called for the development, operation and management of greenfield general and super speciality hospitals and multispecialty at Navi Mumbai, Maharashtra

Navi Mumbai Maharashtra

NA Dr. B S Bawaskar- Chief Help Officer, CIDCO Bhavan, CBD-Belapur, Navi Mumbai-400614. T: 022-67918100, F: 67918166, M: 9833232233 (Sanjay Bhatia, VCMD)

Healthcare

83 Godrej Properties Ltd (GPL)

GPL enters into a partnership to develop a residential project in Mundhwa, Keshavnagar, Pune. The project spread over 43 acre, will offer approximately 2,60,000 sq meter (2.8 million sq ft) of saleable area and will be developed as a premium residential development comprising 1,2,3, and 4 BHK apartments.In this joint venture project.

Pune Maharashtra

NA Shodhan A Kembhavi, Company Secretary & Compliance Officer, Godrej Bhavan, 4th Floor, 4-A, Home Street, Fort ,Mumbai-400001 Maharashtra. T: 022-66510200, F: 022-22072044, [email protected], www.godrejproperties.com (K T Jithendran, Executive Director)

Real Estate

Page 16: Project Reporter April 2014

Project Reporter • 16 • April 15, 2014

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation

84 PBEL PBEL City Chennai is an integrated township project coming up at OMR. The construction of all the 4 towers Argent, Daytona, Aroa, and Matira launched in the first phase are in full swing and as per schedule.

Chennai Tamil Nadu

NA T Tulasiram Theeda, Marketing Manager, # 1/212, Thaiyur (OMR), Kelambakkam, Tamil Nadu - 603103. T :044 - 39151500, 39151515, M: 09282444003, [email protected] (Surya Reddy, MD)

Real Estate

85 Ujaas Energy Ltd

Ujaas Energy is setting up 'Ujaas Park' at Rajgarh in Madhya Pradesh. This project promises to provide complete plug & play solution for putting up a solar power plant at an affordable cost. The investor would get services like land identification, registration, EPC, O&M, power sale, identifying third party buyer, REC trading, etc.

Rajgarh Madhya Pradesh

NA Monika Choukse, Company Secre-tary, Survey No 211/1, Sanwer Road,Opp Sec-C & Metalman Indl Area ,Rajgarh - 452015, Madhya Pradesh, T: 0731-4715330, F: 2721693, [email protected] (Shyam S Mundra, Chairman & Managing Director)

Renewable Energy

86 IRB Infrastruc-ture Developers Ltd

IRB Westcoast Tollway Pvt Ltd - whol-ly-owned subsidiary of the company is executing NHAI project comprising four laning of Goa/Karnataka Border to Kundapur section of NH-17 from Km 93.700 to Km 283.300 in Karnataka under NHDP phase IV on DBFOT basis. The work on this project has started.

Karnataka 2639.00 Vinod Menon, Sr VP (Business Development), IRB Complex, Chandivli Farm, Chandivli Village, Andheri (East), Mumbai - 400072, T: 022-67335900, 66404220, F: 66751024, [email protected], (Virendra D Mhaiskar, Managing Director)

Roads/Highways/Bridges

87 IRB Infrastruc-ture Developers Ltd

Solapur Yedeshi Tollway Pvt Ltd - wholly-owned subsidiary of the company is executing NHAI project comprising four laning of Solapur to Yedeshi section of NH-211 from km 0.000 to km 100.000 (Design Length 98.717 km) in Maharashtra under NHDP Phase IV on DBFOT (Toll) basis. The work on this project

Maharashtra 1500.00 Vinod Menon, Sr VP (Business Development), IRB Complex, Chandivli Farm, Chandivli Village, Andheri (East), Mumbai - 400072, T: 022-67335900, 66404220, F: 66751024, [email protected], (Virendra D Mhaiskar, Managing Director)

Roads/Highways/Bridges

88 Mumbai Metropoli-tan Region Develop-ment Authority (MMRDA)

The Santacruz-Chembur Link Road (SCLR) project is under implementa-tion. The flyover connects east-west corridor. The project is likely to complete by mid-April, 2014.

Mumbai Maharashtra

428.00 Sanjay Karadi, Media Advisor, Bandra-Kurla Complex, East, Mumbai -400051, T:022-26590001, F: 26591264, M: 8108190077

Roads/Highways/Bridges

89 Tamil Nadu Highways Department

The department hopes to complete the construction of the Radha Nagar subway in Chromepet, Chennai.The box portion of the subway is 30-metre long, 2.5 metre wide and 5 metre high. The subways is likely to complete in three months.

Chennai Tamil Nadu

NA S Ramesh,Asst Divisional Engineer, PWD Complex, Kamarajar Salai, Chepauk, Chennai,Tamil Nadu-600005. T:044-24320657, 28558999, M: 09444266697

Roads/Highways/Bridges

90 Mumbai Metro One Pvt Ltd

The Mumbai metro project is all set to be launched in April. The Versova-Andheri-Ghatkopar (VAG) corridor has recently received the penultimate clearance from the Research, Design and Standards Organisation (RDSO). The Mumbai Metro One Private Ltd (MMOPL) is likely to approach the commissioner of metro rail safety (CMRS) for final approval. In case this is cleared, the commuters in Mumbai can expect a joyous ride in the metro thus easing out congestion on roads.

Mumbai Maharashtra

3893.00 Amit Biswas, Manager-Public Relation, Mumbai Metro One Depot, D N Nagar, J.P. Road, 4 Bungalows Andheri (West), Mumbai 400053. T: 022- 33789895, 30766632, 30091410, F: 33789820, [email protected]

Transport

Page 17: Project Reporter April 2014

Realty Projects

Project Reporter • 17 • April 15, 2014

91 | Agrim VistaThis project is under construction at Guwahati. It comprises of 8 towers of G+8 floors of 1-3 BHK total 230 apartments and commercial complex with all modern amenitiesLocation: Guwahati, AssamCompletion: August 2015Agrim Infrasproject Pvt LtdContacts: Rubal Sharma, Sales Executive, 2nd Floor, Aditya Plaza, G.S. Road, Christian Basti, Guwahati - 781005. T: 0361-2341356, 2349872, [email protected]

92 | Magnolia SkyviewThis project is under construction at Rajarhat. It comprises of 7 towers of G+4 floors of 2-3 BHK total 300 apartments with amenities like swimming pool, landscaped garden, gym, spa etcLocation: Guwahati, AssamCompletion: June 2016Magnolia Infrastructure Developments LtdContacts: 93,Dr.Suresh Chandra Banerjee Road, Kolkata-700010. T: 033-64581844, M: 974871156

93 | Alice LegacyThis project is under construction at Thrissur. It comprises a tower of 3 BHK with amenities like gym, parking etcLocation: Thrissur, KeralaCompletion: December 2016Cheloor Property Development Projects LtdContacts: Jiju, Marketing, Cheloor Residency, Sankarankulangara Jn, Punkunnam, Thrissur – 680 002, Kerala.T : 0487 - 2388168, 2388180, F: 2388179

94 | Beverly ParkThis project is under construction at Kadavanthra. It comprises of a tower of G+10 floors of 3-4 BHK with amenities like swimming pool, club house etcLocation: Cochin, KeralaCompletion: December 2015SFS HomesContacts: Abhilash, Marketing Executive, Karikkamuri Cross Road, Cochin - 682011, Kerala. T: 0484-4118888, 2377885, M: 9947355555

95 | Center CoveThis project is under construction at Kadavanthra. It comprises of a tower of G+10 floors of 2-4 BHK with amenities like swimming pool, club house etcLocation: Cochin, KeralaCompletion: December 2016SFS HomesContacts: Abhilash, Marketing Executive, Karikkamuri Cross Road, Cochin - 682011, Kerala. T: 0484-4118888, 2377885, M: 9947355555

96 | RanchThis project is under construction over 12.5 acres of land at Tripunithura. It comprises of 72 bungalows of 3-4 BHK with amenities like barbeque, swimming pool, health spa, games room, table tennis etcLocation: Kochi, KeralaCompletion: December 2015Skyline BuildersContacts: Skyline House, Rajaji Road, Kochi-682035, T: 0484-2363695, F: 2374176, M: 09744045700, [email protected]

97 | Mahavir KalpavrukshaThis project is under construction at Thane (West). It comprises of 7 towers of G+14 and G+17 floors of 2-3 BHK with amenities like club house, swimming pool, jacuzzi, steam & sauna, banquet hall, landscaped garden etcLocation: Mumbai, MaharashtraCompletion: December 2015Damji Shamji Shah GroupContacts: Rahul, Sales Executive, Meghdoot, Vallabh Baug Lane, Damji Shamji Shah Chowk, Ghatkopar (East), Mumbai - 400 077. T: 022-21027711, 21027722, F: 21027755, [email protected]

98 | Good MorningPlans to construct at Panvel. It comprises of 3 towers of G+40 floors of 2-3 BHK with all modern amenities.Location: Mumbai, MaharashtraCompletion: December 2015Mega Fortune DevelopersContacts: Dipen Thakkar, 23, Anmol Plaza, Near Hiranandani, Sector - 8 Kharghar, Navi Mumbai - 410 210. T: 9029580173

99 | Valencia HomesThis project is under construction at Sector 1 in Noida. It comprises of 12 towers of G+19, G+15 and G+21 floor of 2-3 BHK with amenities like swimming pool, gym, club house etcLocation: Noida, Uttar PradeshCompletion: December 2015Civitech Developers Pvt LtdContacts: Kuldip Singh, Sr Sales Executive, H-71, Sec-63, Noida, Uttar Pradesh-201301, T: 07838505052, [email protected]

100 | Atri Green ValleyThis project is under construction at Rajpur. It comprises 8 blocks of G+4 floors having 2/3 BHK total 192 apartments with amenities like swimming pool, club house, gym etc.Location: Kolkata, West BengalCompletion: December 2015Atri GroupContacts: 131,Park Street, Kolkata-700017, West Bengal, T: 033-32216589, 22641208, [email protected]

101 | Ivory TowerThis project is coming up near Kudghat Metro Station. It comprises a tower of G+11 floors having 2/3 BHK total 41 apartments with amenities like gym, childrens play area, community hall etc.Location: Kolkata, West BengalCompletion: November 2015N K RealtorsContacts: 17/1 Chandi Ghosh Road, Beside “Netaji” (Kundghat) Metro Station. T: 033-40401010, 66201010

102 | Bou Thaurani HaatThis project is under construction at Rajarhat. It comprises of 2 blocks of G+4 floors of 1-3 BHK with amenities like gym, courtyard, banquet hall, creche etc.Location: Kolkata, West BengalCompletion: December 2015Team TaurasContacts: Debarutti, Sales Executive, Room D 302, 3rd Floor, D Block, City Centre, Saltlake, Kolkata - 700064. T: 033-40048013, F: 4004 8012, [email protected]

103 | Panchsheel HynishThis project is under construction at Sector 75. It comprises of 12 towers of G+12 and G+23 floors of 2-3 BHK total 1100 apartments with amenities like amphitheatre, banquet, etc.Location: Kolkata, West BengalCompletion: December 2016Panchsheel Buildtech Pvt LtdContacts: Mukul Mishra, Sales, H- 169, Sector 63, Noida - 201301, Plot No. 8, Sector-1, Greater Noida. T: 0120- 4777700, 4777777, F: 4777798

Page 18: Project Reporter April 2014

Project Reporter • 18 • April 15, 2014

Consultancy Bids

104 | Naval Air Station Ministry of Defence has invited expression of interest for design consultancy for creation of naval air station on the west coast in phase IIA of project seabirdSubmission Date: 30/06/2014Contact Details: Director General, Project seabird, West Block V, RK Puram, New Delhi 110605, Delhi.

105 | Widening of Existing CarriagewayGovernment of West Bengal has invited bids for consultancy services for appointment of authority engineer for the work widening and strengthen-ing of the existing carriageway.Submission Date: 03/06/2014Contact Details: Superintending Engineer, Khadya Bhavan, 3rd Floor, Block-A, 11A, Mirza Galib Street, Kolkata-700087, West Bengal. T: 033-22520346/47, F: 22520346

106 | Housing Scheme at BadamiKarnataka Housing Board has invited bids for architectural and engineering services for the proposed composite housing scheme at Badami, Badami taluk & Bagalkot district (30 acres 01 guntas).Submission Date: 19/05/2014Contact Details: Asst Director Town Planning, 3rd floor, Cauvery Bhavan, Bagalkot District, Karnataka. T: 080-22273511

107 | High Level Major Bridge at Hatania National Highway Division has invited consul-tants for supervision of construction of high level major bridge on river Hatania Doania at Km. 113.297 of NH 117 in South 24 Parganas.Submission Date: 28/04/2014Contact Details: Superintending Engineer, National Highway Division, Khadya Bhavan, 3rd Floor, 11A, Mirza Ghalib Street, Kolkata-700087, West Bengal. T: 033-22520346,47, F:22520346

108 | Infrastructure Work at Anik Chembur YardMazagon Dock Ltd has invited bids for consul-tancy services for project planning design and supervision during construction of civil structural works and associated infrastructure at Anik Chembur yard.Submission Date: 14/05/2014Contact Details: Office of the Additional General Manager, Capital Works Department, 1st Floor, Project Office Building, Alcock Yard, Dock Yard Road, Mumbai 400010, Maharashtra

109 | Sewerage Network at AllahabadUP Jal Nigam has invited bids for survey, review the design, redesign where necessary & build new sewerage network of about 242 km, 3 sewage pumping stations incl all appurtenant structures, & O & M of sewerage network & pumping stations for 10 years in sewerage district-A of Allahabad.

Submission Date: 13/05/2014Contact Details: General Manager, Ganga Pollution Control Unit, U. P. Jal Nigam, Mahewa Patti Purab, Naini, Allahabad, Uttar Pradesh 211007. T: 0532-2684691, 2684179, [email protected]

110 | Hassan – Arakalagud Road ProjectKarnataka Road Development Corporation Ltd has invited bids for design, build, finance, operation and maintenance of “Road No 3: Hassan - Arakalagud- Ramanathpura Gangur - Piriyapatna” on DBFOMT annuity basisSubmission Date: 23/04/2014Contact Details: Chief Engineer, 1st Floor, # 16 / J, Thimmaiah Road Cross, Miller Tank Bed Area, Vasanthanagar, Bangalore– 560052. T: 080-49071400

111 | Residential Infrastructure FacilitatiesNuclear Power Corporation of India Ltd has invited consultancy service for architectural planning and design of type iii spl category housing block along augmenting residential infrastructure facilities in RR site colonies.Submission Date: 03/05/2014Contact Details: Station Director, Rawatbhata Rajasthan Site, Post Office: Anushakti,Via Kota-: 323303, Rajasthan. T: 0147-5242001, F: 5282030

112 | Cable Stay Bridge at Kamla Park Bhopal Municipal Corporation has invited bids for supervision and quality control consultancy for construction of cable stay bridge at Kamla Park on design and build basis.Submission Date: 01/05/2014Tender Value (`): 25,56,00,000Contact Details: Sadar Manzil, Bhopal, Madhya Pradesh. T: 0755-2701222

113 | Commercial Development of Railway LandRail Land Development Authority has invited bids for engagement of consultant for feasibility study and bid process management for commercial development of railway land at Mahalaxmi, Wadala in MumbaiSubmission Date: 21/04/2014Contact Details: Director General Manager/Project, Near Safdarjung Railway Station, Moti Bagh-I, New Delhi-110021, Delhi. T: 011-24102063, F: 24104793

114 | Solar Power Project at Chennai PortChennai Port Trust has invited bids for appoint-ment of consultant for 100 KW solar power plants in Chennai Port Trust.Submission Date: 07/05/2014Contact Details: Chief Mechanical Engineer, Mech Eng Department, Chennai 600001, Tamil Nadu. T: 044-25362070/2539, F: 044 25360955, [email protected]

INFRASTRuCTuRE

115 | Ship Recycling unit MSTC Ltd has invited bids for appointment of consultant for preparation of feasibility study report & detailed project report for setting up of an integrated ship recycling unitSubmission Date: 30/05/2014 Tender Value (`): 2,477,200,000Contact Details: 225-C, A.J.C Bose Road, Kolkata-700020, West Bengal. T: 033-22900964, 22877557, F: 22878547

116 | Multi Modal Logistic Hub at VizagBalmer Lawrie and Company Ltd has invited bids for survey and soil investigation work for proposed multi modal logistic hub at Visakhapatnam in Andhra Pradesh Submission Date: 30/04/2014Contact Details: General Manager, Materials Management Division, Coal Bhavan Annexe, 10, Netaji Subhas Road, Kolkata-700001, West Bengal. T: 033-22225435, F:22225353

117 | Rajiv Gandhi National Aviation universityMinistry of Civil Aviation has invited consultant for the work relating to setting up of Rajiv Gandhi National Aviation University under Ministry of Civil Aviation Submission Date: 28/04/2014Contact Details: Under Secretary, Rajiv Gandhi Bhawan, New Delhi-110003, Delhi. T: 011-24610359

Page 19: Project Reporter April 2014

Project Reporter • 19 • April 15, 2014

B2B Opportunities

AVIATION

118 | upgradation of HangerHindustan Aeronautics Ltd has invited bids for extension of annexe and upgradation of Kiran MK I/IA hangar at overhaul division, HAL [BC]. including civil, electrical & fire alarm worksSubmission Date: 10/05/2014 Contacts: Deputy General Manager, Ground Floor, Facilities Management Division, Next to HAL Sports Club, Old Airport Road, Vimanapura Post, HAL (BC), Bangalore – 560017,T: 080-22322285, 22322288

CONSTRuCTION

119 | Computer Repair CentreMilitary Engineer Services has invited bids for provision of computer repair centre (Crc) for Ccc at Hqtc Bangalore.Submission Date: 15/05/2014 Contacts: Sebeena Augustine, Garrison Engineer (AF) Hebbal, Bangalore -06. T: 080-23416401, F: 23416401

120 | Godowns at CK RoadCentral Warehousing Corporation has invited bids for construction of 14500 mtc godowns along with internal roads, drains and electrical installations at central warehouse, CK.RoadSubmission Date: 07/05/2014 Tender Value (`): 3,69,36,648Contacts: Construction Cell, CMC Building, 6th Floor,Phase-i, 15 N,Nellie Sengupta Sarani, Kolkata, West Bengal. T: 033-22520426, F: 22520425

121 | Main Institute Building at FaridabadCentral Public Works Department has invited bids for construction of main institute building vertical extension under modernization and upgradation of training facilities at Npti V.O at Sector 33 Faridabad including providing electrical installation and fans.Submission Date: 05/05/2014 Tender Value (`): 2,68,08,479Contacts: Executive Engineer, Faridabad Central Division-I, Faridabad, Haryana, T: 0129-23370919

COAL HANDLING

122 | Maintenance of Coal HandlingUttar Pradesh Rajya Vidyut Utpadan Nigam Ltd has invited annual break down & preventive maintenance of auxiliaries of coal handling plant of ‘a’tps, Obra thermal power

station.Submission Date: 28/04/2014 Contacts: Executive Engineer, Central Work Contract Division-IV, BTPS, Obra-Sonebhadra, Uttar Pradesh. T: 05445-262282

123 | Renovation of Coal Handling Plant Rajasthan Rajya Vidyut Utpadan Nigam Ltd has invited consultancy services for monitoring of renovation works of coal handling plant stage I & II of KSTPS, KotaSubmission Date: 24/04/2014 Contacts:Suprintending Engineer, RRVUNL, Jaipur Rajasthan. T: 0141-2740692

124 | Coal Handling Plant at TNPL Tamil Nadu Newsprint and Papers Ltd for providing civilworks for construction of water treatment plant and coal handling plant at Tnpl Unit II project, Mondipatti VillageSubmission Date: 25/04/2014 Contacts:Kagithapuram–639136, Karur District, Tamil Nadu. T: 04324-277027, F: 277001 (10 lines) Extn: 2402/2295

HOuSING

125 | 3 BHK Housing Project at ValagerhalliBangalore Development Authority has invited bids for construction of 3 bhk housing project at Valagerhalli phase-v in sy. no. 101/2b and 71/2 under Gnanabharathi layout 1st block, Kengeri, Hubli, Bangalore south taluk, Bangalore on lump sum turnkey basis.Submission Date: 23/04/2014 Contacts: Navinchand G, Bangalore, Karnataka. T: 09845620349

HEALTHCARE

126 | Maintenance and Management of Meso HospitalsJharkhand State Tribal Cooperative Development Corporation Ltd has invited bids for selection of suitable private sector operators for operation, maintenance and management of Meso hospitals in jharkhand.Submission Date: 31/05/2014Contacts: Secretary, Balihar Road, Morabadi, Ranchi-834008, Jharkhand. T:0651-2552398, F: 2551686

127 | Development of Diagnostic CentresGovernment of Haryana, Health Department has invited bids for development, operation and maintenance of radiology imaging diagnostic centres in selected district hospitals and government medical college of

MINING

128 | Extraction of Coal Bharat Coking Coal Ltd has invited bids for drafting Pookee Balihar and extraction of coal by mass production technology package with a guaranteed minimum of 9 million tons of mining on turnkey basis.Submission Date: 28/04/2014Contacts: Koyla Bhawan, Koyla Nagar, Dhanbad – 826 005, T: 0326-2230206

129 | Crushing and Screening Plant Odisha Mining Corporation Ltd has invited bids for carrying out geo technical investigations as per the scope of work of the tender schedule at its Gandhamardan-B Mining lease area for setting up a 9.12 MTPA crushing & screening Plant.Submission Date: 30/04/2014Contacts: AGM, Post Box No.34, Bhubaneswar, Odisha

130 | Turnkey Mining Contract Gujarat Mineral Development Corporation Ltd has invited bids for turnkey mining contract involving overburden/ inter burden removal, excavation and/or loading of lignite from mines face and ancillary activities at lignite project, Umarsar.Submission Date: 21/04/2014Contacts: General Manager, Khanij Bhavan 132 Ft. Ring road, Ahmedabad 380 052 Gujarat. T: 079-27912746, F: 27912195

Page 20: Project Reporter April 2014

Project Reporter • 20 • April 15, 2014

B2B Opportunities

RENEWABLE

141 | Wind Power ProjectNHPC has invited bids for engineering, procurement and construction (EPC) contract for 50 (+5%) MW capacity wind power project at suitable site at one location in any of the states of Tamilnadu, Andhra Pradesh, Maharashtra, Madhya Pradesh or Gujarat with its comprehensive operation and maintenance.Submission Date: 20/05/2014Contacts: Narender, Chief Engineer Room No.209, Faridabad -121003T: 0129-2270974, [email protected]

142 | Solar Water Heating SystemTripura Renewable Energy Development Agency has invited bids for supply, installation & commissioning of 3000 LPD solar water heating system at Tripura Bhawan, New Delhi Submission Date: 15/05/2014Contacts: Vigyan Bhawan, Gorkhabasti, Agartala,Tripura. T: 0381-2326139

143 | Solar Power Supply SystemKarnataka State Natural Disaster Monitoring Centre has invited bids for supply, installation, commissioning and five years maintenance of solar power supply system for the psms network of KarnatakaSubmission Date: 29/04/2014Contacts: S Jagadeesh, Bangalore, Karnataka. T: 080-67355000

Haryana on public private partnership basis. Submission Date: 15/05/2014Contacts: Director, Sector-6 Panchkula, Haryana. T: 0172-2584549, 2584189

POWER

131 | Power Supply for NFC Nuclear Fuel Complex has invited bids for construction of power supply for NFC, Kota at Rawatbhata, Chithorgarh Dist at RajasthanSubmission Date: 04/06/2014Contacts: Senior Superintending Engineer(CED,PD&EP), Hyderabad, Andhra Pradesh. T: 040-27184083, F: 27122532

132 | upgradation of Main SubstationChittaranjan Locomotives Works has upgradation of main substation for reliable power supply by providing additional VCBsSubmission Date: 21/05/2014Contacts: Deputy Chief Electrical Engineer (Maintenance), Central Power House, P.O- Chittaranjan, Dist.- Bardhaman-713331, West Bengal. T: 0341-2525542, F: 2525560

133 | Supply of Power TransformerWest Bengal State Electricity Transmission Co Ltd has invited bids for supply of 10 MVA, 33/11 KV.3ph power transformer complete with all fittings and accessories as detailed in our technical specification Submission Date: 06/05/2014Contacts:Procurement Department, Wbsetecl, Vidyut Bhavan, Kolakata-700091, West Bengal . T: 033-23197395

PORTS

134 | Main Terminal for Barge Indian Oil Corporation Ltd has invited bids for surveyor contract at Kandla main terminal for barge bunker and tanker - at Kandla port, Bedi port, Sikka port and Vadinar port. Submission Date: 07/05/2014Contacts: Gujarat state office operations department (4th floor), Shikhar complex, Mithakhali six road, Navrangpura, Ahmedabad -380009, Gujarat

135 | Concrete Platform at JNPTJawarharlal Nehru Port Trust has invited bids for construction of concrete platform at empty container stacking yard & auto-garage along with replacement of rolling shutters at workshop, auto garage and main stores at JN Port. Completion in 6 months.Submission Date: 05/05/2014Contacts: Chief Manager, (JNPT) Mumbai, Maharashtra. T: 022-27244081

136 | Electrical Load Centre at Kamarajar PortKamarajar Port Ltd has invited bids for providing technical consultancy to identify the electrical load centre at Kamarajar Port. Submission Date: 02/05/2014Contacts: Deputy General Manager, Vallur (Post), Chennai- 600120, Tamil Nadu. T: 044-27950029.

137 | Hiring of Harbour Mobile CraneVisakhapatnam Port Trust has invited bids for hiring of 2 nos of 100 metric tonnes capacity harbour mobile cranes of model 2009 and later including operation and maintenance staff for 24 hours for a period of 5 (five) years initially for a period of 3 years and then extendable by upto another 2 years as per VPTs requirement for the use of Stevedores / Port Users at West Quay berths and other VPT berths.Submission Date: 30/05/2014Contacts: Traffic Manager, Traffic Department, 1st Floor, Ambedkar Bhavan, Visakhaptnam-530035, Andhra Pradesh. T: 022-2873713, 2563247

138 | Merger of Cargo BerthParadip Port Trust has invited bids for merger of cargo berth substation I & II, Paradip Port Trust. Submission Date: 22/04/2014Tender value (`): 2,43,72,221Contacts: Belalasen Naik, Port Electrical division, Paradip Port Trust, PO Paradip, dist. Jagatsinghpur, Odisha. T: 0672-2222075, F: 222075

RAILWAYS

139 | Aunrihar- Manduadih doubling projectNorth Eastern Railway has invited bids for linking of bg track, carting of p. way material, spreading of ballast & other miscellaneous track works between Rajwari (incl.) to Sarnath (incl.) in Aunrihar-Varanasi section of Varanasi division of railway in connection with Aunrihar- Manduadih doubling project.Submission Date: 21/05/2014Contacts: Secy to cao/con, Office of Chief administrative officer, Gorakhpur, Uttar Pradesh

140 | Terminal Block at KolkataEastern Railway has invited bids for terminal block for railway signalling, Pbt suitbale compound 25Mm [6 Way] to Drg. No. Sa-23756 [Alt-3] Submission Date: 22/05/2014

Page 21: Project Reporter April 2014

Project Reporter • 21 • April 15, 2014

B2B Opportunities

TRANSPORT

153 | Elevated Section of East West CorridorKolkata Metro Rail Corporation Ltd has invited bids for design, construction of 365.646m viaduct from (Ch 8958.405m to 9324.051m) connecting via-duct constructed on either side along the elevated section of east west corridor of Kolkata Metro.Submission Date: 15/05/2014 Contacts: Managing Director, KMRCL Bhaban, 2nd & 3rd Floor, Munshi Premchand Sarani, Kolkata-700021, West Bengal. T: 033-22134345

154 | Gandhinagar-Ahmedabad Metro Rail ProjectMetro Link Express For Gandhinagar and Ahmedabad Co Ltd has invited bids for appointment of general engineering consultant for Gandhinagar-Ahmedabad metro rail project for phase- 1 of the metro rail project.Submission Date: 28/05/2014 Contacts: 5th Floor Nirman bhavan, Opp. Gate No -4, Sachivalaya, Sector -10, A Gandhinagar -382010, Gujarat. T: 079-26800000,F: 23248573, [email protected]

Contacts: Fairley Place, Kolkata, West Bengal. T: 033-22227400

144 | Solar Photovoltaic Grid PlantGujarat State Electricity Corporation Ltd has invited bids for engineering, procurement , construction, operation and maintenance of 2x10 MW solar photovoltaic grid connected power plant at Gujarat Solar Park in Charanka village in Patan Submission Date: 29/04/2014Contacts: CE P and P, Vidyut Bhavan, Race Course, Vadodara-390007, Gujarat. T: 0265-6612131, F: 0265-2341588, cepnpgsecl@gebmailcom

ROADS/HIGHWAYS/BRIDGES

145 | Nelamangala –Chikkaballapura RoadGovernment of Karnataka has invited bids for development of road Nelamangala –Chikkaballapura from km 0.00 to km 64.05 of SH – 74 in the state of Karnataka under PPP-DBFOT-VGF(Toll) basis Submission Date: 05/05/2014Contacts: Chief Engineer, Bangalore 560052, Karnataka. T: 080-22382360, 2238 0141, F: 22382360

146 | Improvements to NH 4Govt of Karnataka, Public Works Department has invited bids for improvements to NH-4 to Pandrahally road via Hullur, Bettadanagenahally road from km 29.00 to 33.60 in Chitradurga Taluk (Chitradurga constituency).Submission Date: 25/4/2014Contacts: C.Thimmappa, Executive Engineer, M.S.Building, 3rd Floor, Vikasa Soudha, Dr.Ambedkar Road, Bangalore - 560001, Karnataka. T: 08194-222446

147 | Maintenance of State HighwaysGovt of Gujarat, Roads and Buildings Department has invited bids for upgrading and maintenance of state highways under design, build, finance, operate, maintain and transfer on annuity basis. Submission Date: 15/05/2014Contacts:Superintending Engineer, PIU, Ground Floor, Nirman Bhavan, Gandhinagar, Gujarat. T: 079-23252986

148 | Improvement to Surdi Sadola MajalgaonGovt of Maharashtra, Public Works Department has invited bids for Improvement to Surdi Sadola Majalgaon Road Km. 5/00 to 10/00 MDR-30 (Actual Km. 5/600 to 9/200)

Tq. Majalgaon Dist. Beed Submission Date: 30/04/2014Tenders Value (Rs): 60,86,550Contacts: Superintending Engineer, Public Works Circle, Osmanabad. T: 02472-222882-84, F: 224129

SPORTS INFRASTRuCTuRE

149 | Sports Facilities in Rawatbhata StadiumNuclear Power Corporation of India Ltd has invited bids for construction developing of playground and various sport facilities in Rawatbhata stadiumSubmission Date: 07/05/2014 Tender Value (Rs): 2,03,80,284Contacts: Station Director, Rawatbhata Rajasthan Site, Post Office: Anushakti, Via Kota-323303, Rajasthan. T: 0147-5242001, F: 5282030

150 | Repairs to Gallery at KridanganOrdnance Factory Board has invited bids for special repairs to gallery of sports ground at propex Kridangan at o.f. BhandaraSubmission Date: 07/05/2014 Tender Value (Rs): 42,27,758Contacts: Ordnance Factory, Jawaharnagar, Bhandara, Mumbai, Maharashtra. T: 0718-4275018, F: 4275242

SOLID WASTE

151 | Municipal Solid Waste in MumbaiBrihanmumbai Mahanagarpalikal has invited bids for request for qualification (RFQ) for development of municipal solid waste (MSW processing & disposal facilities at Greater MumbaiSubmission Date: 29/05/2014 Contacts: Deputy Chief Manager, Solid Waste Mangement-Projects, Bai Padmabai Thakkar Marg, Kotwadi, Mahim Shivaji Park, Mumbai Maharashtra.

152 | Solid Waste to Energy at KochiKochi Municipal Corporation has invited bids for design, build, finance, operate and transfer (DBFOT) of municipal solid waste to energy project for Kochi city and adjoining areas “using thermal technologies in gastication or pyrolisis or its advanced variants through PP mode.Submission Date: 21/04/2014 Contacts: AB Selam Road, Jew Town, Mattancherry, Kochi-682002, Kerela. T: 0484-2369007, [email protected]

Page 22: Project Reporter April 2014

Power Statistics

Project Reporter • 22 • April 15, 2014

Requirement Energy met Surplus(+)/Deficit(-) Requirement Energy met Surplus(+)/

Deficit(-)%

Shortage Requirement Peak Demand

Surplus(+)/Deficit(-)

% Shortage

Chandigarh 4 4 0 98 98 0 0.0 214 214 0 0.0

Delhi 61 61 0 1695 1694 -1 -0.1 3670 3670 0 0.0

Haryana 101 101 0 2828 2824 -5 -0.2 5919 5919 0 0.0

H.P. 24 24 0 666 666 0 0.0 1384 1384 0 0.0

J&K 49 39 -10 1374 1099 -304 -20.0 1374 1099 -275 -20.0

Punjab 91 90 -1 2553 2533 -22 -0.8 5552 5552 0 0.0

Rajasthan 190 189 -1 5307 5281 -29 -0.5 10047 10038 -9 -0.1

U.P. 251 220 -31 7033 6157 -970 -12.5 12821 10526 -2295 -17.9

Uttarakhand 33 33 -1 937 920 -20 -1.9 1826 1826 0 0.0

NFF/Railway 2 2 0 59 59 0 0.0 94 94 0 0.0

TOTAL 795 759 -36 22250 21254 -1103 -4.5 40675 38330 -2345 -5.8

Gujarat 240 240 0 6711 6709 -2 0.0 11560 11532 -28 -0.2

Madhya Pradesh 158 158 0 4415 4415 0 0.0 9385 9346 -39 -0.4

Chhattisgarh 67 66 0 1870 1860 -10 -0.5 3246 3210 -36 -1.1

Maharashtra 379 369 -10 10607 10341 -266 -2.5 19622 18510 -1112 -5.7

Goa 8 8 0 222 222 0 0.0 434 434 0 0.0

D&D 6 6 0 162 162 0 0.0 268 268 0 0.0

DNH 14 14 0 404 403 -1 -0.2 644 644 0 0.0

ESIL 8 8 0 222 219 -3 -1.4 487 487 0 0.0

TOTAL 879 869 -10 24613 24333 -280 -1.1 43106 42253 -853 -2.0

AP-TRANSCO 287 266 -21 8034 7446 -588 -7.3 13367 12671 -696 -5.2

KPTCL 201 189 -12 5625 5282 -343 -6.1 9873 9223 -650 -6.6

KSEB 62 61 0 1731 1718 -13 -0.8 3541 3467 -74 -2.1

TNEB 266 254 -12 7446 7116 -330 -4.4 12581 12037 -544 -4.3

PONDICHERRY 6 6 0 163 164 1 0.6 322 322 0 0.0

TOTAL 821 776 -45 22999 21727 -1272 -5.5 36893 35466 -1427 -3.9

Bihar 41 42 0 1155 1164 9 0.8 2370 2135 -235 -9.9

JSEB 25 21 -4 700 580 -120 -17.1 1220 1013 -207 -17.0

DVC 56 57 1 1555 1595 40 2.6 2755 2659 -96 -3.5

Odisha 78 66 -12 2190 1851 -339 -15.5 3700 3568 -132 -3.6

West Bengal 118 115 -3 3295 3218 -77 -2.3 7008 6713 -295 -4.2

TOTAL 318 300 -17 8895 8408 -487 -5.5 16668 16090 -578 -3.5

Arunachal Pradesh 2 1 0 44 42 -2 -5.1 119 116 -3 -2.7

Assam 20 18 -1 547 507 -40 -7.4 1095 1085 -10 -0.9

Manipur 2 2 0 46 44 -3 -6.0 129 128 -1 -0.9

MeSEB 5 5 -1 147 131 -16 -11.0 297 296 -1 -0.3

Mizoram 1 1 0 37 36 -1 -3.6 79 77 -2 -2.6

Nagaland 2 2 0 45 43 -2 -4.0 104 104 0 -0.3

Tripura 3 3 0 81 80 -2 -2.0 207 206 -1 -0.5

TOTAL 34 31 -2 948 881 -66 -7.0 2031 2012 -19 -0.9

2847 2734 -111 79704 76550 -3208 -4.0 139373 126189 -13184 -9.5

ACTUAL POWER SUPPLY POSITION - FEBRUARY 2014

REGION STATE

Requirement/Availability in MU/DAY Requirement/Availability in MU Peak Demand/Peak Met in MW

NR

WR

ALL INDIA

SR

ER

NER

Page 16 of 31

Source: Central Electricity Authority

Page 23: Project Reporter April 2014

Project Reporter - Electronic Edition

Tenure Cover Price Discount You pay Assured Gift1 Year (24 Issues) 3,500 550 2,950 Waist Pouch

2 Years (48 Issues) 7,000 2,000 5,000 Sling Bag

3 Years (72 Issues) 10,500 3,500 7,000 Waist Pouch + Sling Bag

PROJECT REPORTER B2B Multisector, newsletter providing more than 100+ projects which are arranged

stage wise & presented in a tabular format along with the contact details, comes in electronic edition.

India’s trusted magazines on Project opportunitiesSUBSCRIBE NOW!

To SubscribeCall: 022 - 2419 3000 / Email: [email protected] Online: www.ASAPPmedia.com/subscribe

ASAPP MEDIA PVT. LTD.A - 303, Navbharat Estate, Zakaria Bunder Road, Sewri (West), Mumbai 400 015. Tel: + 91 22 2419 3000 | Email: [email protected]

1 year : Multi Utility. Waist Pouch

2 years: Multi Utility Sling Bag

155Proje

cts

CMYKIndian Edition: Annual Subscription Rates: Print Edition: `1950/-,

Frequency: Fortnightly (1st & 15th of every month)

India’s Project Database

Vol. 9 No. 14 l January 15, 2014

PORTOPPORTUNITIES

Page 24: Project Reporter April 2014

Regd. No. MCW/192/2012-2014. Posted at Mumbai Patrika Channel Sorting Office. Mumbai - 400 001. 1st fortnightly on 1st & 2nd every month & 2nd fortnightly on 15th & 16th of Every month. RNI No. MAHENG/2005/19320. ISSN 2277-6532 Date of Publication: 1st & 15th of Every Month. 24