CAMBOURNE TO CAMBRIDGE
BETTER PUBLIC TRANSPORT PROJECT
Project Update
Peter Blake, GCP Transport Director
Project Update
• Extensive work to develop the Cambourne to Cambridge scheme - 3 public consultations
• Since the Local Liaison Forum in November 2018:
o Consultation on Phase 2 - Madingley Mulch roundabout to Cambourne, including over 30 public
events, speaking with over 800 residents
o Workshops with the LLF Technical Group, on the following subjects
• Modelling
• Wider Economic Impacts
• Environmental Scoring and Mitigation – two workshops held;
• Madingley Hill ‘Quick Wins’ – two workshops held;
• Northern Route – two workshops held
• Non Motorised Access and Landscape and Ecology Working Groups to inform the scheme design
• Publication of technical notes in response to stakeholder feedback to -
• Explore ‘quick-win’ options along Madingley Hill. Viable projects avoid land take and significant
environmental impact and minimise input from, or impact on, third parties, restricting options to a
short section of public transport lane, extension of cycling improvements and review of signal
timings.
• Provide further clarification on why a northern alignment via Girton was previously discounted.
Technical papers available on the LLF Cambourne to Cambridge section on the GCP website.
Project Update
• Work is ongoing; in particular around environmental and mitigation issues
• Continued dialogue with LLF and further Tech Group workshops
• Continuing stakeholder engagement - meetings and council and community
presentations
• A further LLF meeting in the Autumn in advance of an Outline Business
Case being presented to the GCP Executive Board for decision on a
preferred scheme
CAMBOURNE TO CAMBRIDGE
BETTER PUBLIC TRANSPORT PROJECT
Phase 2 Consultation Findings
Mike Soper, Research Team Manager
• 968 responses, drawn mainly from the A428 Corridor
• 32% from Cambourne and further west.
• 31% from Coton to Caldecote (see map below)
Response
Demographics
1%
3%
11%
19%
22%
17%
17%
7%
3%
0% 5% 10% 15% 20% 25%
Under 15
15-24
25-34
35-44
45-54
55-64
65-74
75 and above
Prefer not to say
4%
57%
9%
3%
1%
25%
3%
1%
0% 10% 20% 30% 40% 50% 60% 70%
In education
Employed
Self-employed
A home-based worker
A stay at home parent, carer or similar
Retired
Prefer not to say
Other
Economic Status
Age Range
Yes, 5%
No, 91%
Prefer not to say, 4%
Disability
Stakeholders
• 35 written submissions (in addition to on-going engagement).
Abbotsley Parish Council Barton Parish Council Bourn Parish Council British Horse Society Cambridge Connect Cambridge Local Access Forum Cambridge Past, Present & Future Caxton Parish Council CB3 Ltd CBAG Cllr Gavin Clayton Cllr Markus Gehring Comberton Parish Council Coton Parish Council Coton View Countryside Properties (UK) Ltd Dry Drayton Parish Council East Anglian Haulage Ltd / Madingley Mulch / Madmix
Great Gransden Parish Council Hardwick Parish Council Heidi Allen, MP Hill Residential Ltd and Chivers Farms (Hardington) LLP Historic England K4One Consulting National Trust Natural England Omobono Ltd Paragon Land and Estates Ltd Pigeon Investment Management Ltd Road Haulage Association Save Coton Corridor Save the West Fields Smarter Cambridge Transport Toft Parish Council Wildlife Trust
Stake holder response list (summarised in the report)
Preferred link between Madingley Mulch roundabout and Bourn
Airfield
Option 1: Off-road, 48%
Option 2: On-road with junction improvements, 19%
Option 3: On-road with public transport priority lanes, 21%
Don't know, 4%
None of the above, 9%
Park and Ride location preference
Option A - Scotland Farm, 63%
Option B - Waterworks, 17%
Neither site, 8%
No preference, 12%
Importance of walking, cycling and equestrian routes
59% 21% 10% 6% 4%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Very important Quite important Neutral Not very important Not at all important
CAMBOURNE TO CAMBRIDGE
BETTER PUBLIC TRANSPORT PROJECT
Environment & Landscape
James Montgomery
Mott McDonald
Openness Screening/Integration
Left hand represents open area treatment Right hand represents treatment with screening
Discussion on mitigation
Indicative general route design optionsRoad surfacing is under discussion -determined by vehicle and guidance type
Illustrative sketch only
Not for scaling purposes
Discussion on mitigation
Broadway to Sterling Way
Illustrative sketch only
Not for scaling purposes
Discussion on mitigation
St Neots Road – Option 1
Illustrative sketch only
Not for scaling purposes
Discussion on mitigation
St Neots Road – Option 2
Illustrative sketch only
Not for scaling purposes
Discussion on mitigation
St Neots Road – Option 3
Madingley Rise Options
1. Screen route or leave open as shown here
2. Increase hedge planting down from Madingley Road towards Coton (red arrow)
Discussion on mitigation
Route Alignment Options - Coton Orchard and west of Cambridge Road:
Discussion on mitigation
St Neots Road
This distance is open for discussion –
could be between 12m and 40m
Illustrative sketch onlyNot for scaling purposes
Discussion on mitigation
Cambridge Road @ Coton
Environment and landscape
Key environmental issues
• Internationally and Nationally significant – American Cemetery
• Nationally significant – Madingley Wood SSSI
• Listed buildings (St Peters Church, and 17 other lower grade structures in proximity to off-route
alignment)
• Landscape impacts of construction and during operation (views from Red Meadow Hill, for
example)
• Potential for buried archaeology in West Fields, Waterworks and Scotland Farm
• Local wildlife sites (West Cambridge/M11 area)
• Coton Orchard (habitat and commercial activity)
• Noise concerns around St Neots Road (Waterworks to Scotland Farm area), Coton and Rifle
Range Road
• TPO trees
• Flood risk around Bin Brook
• Some protected species – mobile and variable along the route
Environment and landscape
Community drop-in sessions at Hardwick Primary School
We are holding two community drop-in sessions at Hardwick Primary School,
Thursday 11th July, 5pm-8pm
Saturday 13th July from 10.30am-1.30pm.
This will be an opportunity to see proposed features to protect and potentially enhance
biodiversity, ask questions of the project team and share views.
CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT