Upload
conrad-snow
View
214
Download
1
Tags:
Embed Size (px)
Citation preview
1st and 2nd row right + left (Ford Galaxy)
Execution Period: 6 weeks
Price (4): 188.678 €
Hot runner system: Moldmaster
Steel: 1.2711
1 cavity each mould
1- Joint 2 - Duct
Execution Period: 4 weeks
Price: 18.000 €
Cold Runner
Steel: 1.2711
2 cavities
1
2
Execution Period: 4 weeks
Price: 32.500 €
Cold runner
Steel: 1.2711
2 cavities
Ecran sous Reservoir (sandwich mould)
Execution Period: 10 weeks
Price: 170.500 €
Hot runner system: Moldmaster
Steel: 1.2311
1 + 1 cavities
Colector (sandwich mould)
Execution Period: 13 weeks
Price: 156.000 €
Hot runner system: Incoe
Steel: 1.2344 hardened
2 + 2 cavities
Carcasa Volvo
Execution Period: 6 weeks
Price: 98.000 €
Hot runner system: Dan Tip
Steel: 1.2311
1 + 1 cavities
Lens Holder
Execution Period: 6 weeks
Price: 22.000 €
Hot runner system: Hasco
Steel: 1.2344 hardened
2 cavities
Cañon Retinidor de Sonido
Execution Period: 5 weeks
Price: 29.000 €
Cold Runner
Steel: 1.2711
2 cavities
Bas de Caisse
Execution Period: 12 weeks
Price: 213.000 €
Hot runner system: Incoe sequential
Steel: 1.2738 HH
1 + 1 cavities
Bracket G2
Execution Period: 5 weeks
Price: 88.000 €
Hot Runner System: EMP
Steel: 1.2311
2 cavities
Multibutton
Execution Period: 4 weeks
Price: 21.500 €
Injection System of 3 Plates
Steel: 1.2311
4 cavities
Stand Foot
Execution Period: 6 weeks
Price: 18.750 €
Hot Runner System: EMP
Steel: 1.2311
2 cavities
1. Mascara 2. Cristal
Execution Period: 6 weeks
Price: 27.100 €
Cold Runner
Steel: 1.2711
Execution Period: 6 weeks
Price: 37.000 €
Hot Runner System: Moldmaster
Steel: 1.2711
12
Support (Sandwich mould)
Execution Period: 13 weeks
Price: 155.000 €
Hot Runner System: Incoe
Steel: 1.2344 hardened
2 + 2 cavities