Projects of Kyzylorda region

requiring investment

Page 2: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

Construction of smelter on production of low-aluminum

ferrosilicium in Kyzylorda city

Contact information of the initiator of the project: «JSC «NK «APO «Baikonyr (Baikonur)».RК, . Kyzylorda city, Zheltoksan street, №42, tel: +7(7242) 60-51-60, 60-51-63,е-mail: [email protected]

Main indicators of the project

Gross capital investments in

the project253,6 mln. dollars of the USA

Capacity of plant160 thousand tons of low-aluminum

ferrosilicium a year

Founders

«JSC «NK «APO «Baikonur»

The required volume – 253,6 mln. dollars of

the USA

Payback period 4 years

Founders:

«JSC «NK «APO «Baikonur»

The required volume – 100%

(228,1 mln. dollars of the USA)

Number of workers 600 peopleAPPROXIMATE PLACEMENT

OF SMELTER

Technology of production

Page 3: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

The Feasibility study is developed

and directed to State examination.

Negotiations with the companies are held and a number of Memorandums and Agreements on cooperation on implementation of this project is signed:

1) ICMD, Germany;2) CMEC (CHINA);3) ASIA CEMENT (South Korea);4) Trustee (Poland);5) JinZhou TianSheng Heavy Industry CO. LTD

«Kyzylorda Smelter» LLP with

participation of the German

company ICMD and «Ferrosplav

engineering» LLP which will be an

operator of the project is created.Due to the planned considerable participation of the Chinese companies in project implementation, the «Construction of Smelter on Production of Special and Complex Alloys in Kyzylorda city» project is directed for inclusion in the List of the Kazakhstan-Chinese projects, with high extent of study.

In an industrial zone near the settlement Titov is provided for placement of smelter the land plot of 50,0 hectares.

THYSSEN KRUPP HANWA POSCO

Construction of smelter

Page 4: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

Creation of machine-building factory in Kyzylorda

Gross investment in

the project18,7 million dollars USD

Required

investments18,7 million dollars USD

Power of the factory 211 985 and more per year

Founders

JSC "NC SEC" Baikonur "

Partner - 20%

Required volume - 80%

Workplaces 116 people

Payback period 5 years

Basic information about project

Contact information of initiators of the

project:

JSC "NC SEC" Baikonur ".

Republic of Kazakhstan,

Kyzylorda, Zheltoksan street, №42,

phone: +7(7242) 60-51-60, 60-51-63,

е-mail: [email protected]

Current status:

- Fesability study of the project is

already ready.;

- Signed a memorandum between

Kyzylorda Oblast Akimat and Partners

about providing of premises.;

- Also signed memorandum between

Kyzylorda Oblast Akimat and JSC "NC"

Kazakhstan Temir Zholy" about

possibility of buying the products of

factory.;

- Signed memorandum between Akimat

of Kyzylorda region and Czech

company «Strojírna TYC, s.ro » about

assistance in deliveries technology

equipment.

Objective of the project:

- Meeting the needs of domestic market and to stimulate

the production of engineering products with high addedvalue in order to increase local content..

Page 5: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

A commodity market of products

At the created entity with use of high-technology machines and the equipment with the Numerical

Program Control (NPC) details, spare parts will be made for a railway rolling stock of Joint-stock

company «National company «Kazakhstan Temir Zholy» aggregates, nodes, the equipment and

the non-standard equipment for Joint-stock company «The national atomic company

«Kazatomprom», agro-industrial, oil industries and the entities of the sphere of housing and

communal services.

Housing and communal services

• production and recovery of valves of large diameters

• manufacture of heat exchangers

• production and recovery pumps

Building

• Metal structures and building components

• Supporting steel structures of buildings and structures

• formwork for monolithic production

Agriculture

• drills • header • mower

Oil and gas industry

• Recovery of valves of large diameters

• manufacture of parts of piping systems

• production and recovery pumps

Mechanical engineering

• production and processing of large parts of locomotives and wagons

• spare parts for rolling stock

Automotive

• production of attachments for construction equipment (blades, brushes, screws)

Page 6: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

«Production of engine fuels of the K4, K5 ecological classes»

The oil refinery with a productivity up to 2 million tonsof oil a year is planned to be created on the basis of theoil terminal of "Zhosaly" with the available railwayplatform on 60 cars and reservoir park for storage of oilof 90 thousand m3.

Main indicators of the project

Project’s Gross capital

investments 533,3 mln. dollars USD

Plant capacity

fuel oil - 50 thousand tons;

liquefied petroleum gas (LPG) – 40

thousand tons.

gasoline - 900 thousand tons.

diesel fuel - 748 thousand tons.

avia kerosene - 100 thousand tons..

Required investment 533,3 mln. dollars USD

Payback period 10 years

Amount of workers 562 people

Internal norm of IRR 2,518%

Profitability of the

project56,97%

Contact information of the initiator of the project: “Kyzylorda Low-tonnage Oil Refinery “LLPKyzylorda, M. Shokai Street 305 Phone- 8 (701) 0260580 DosymzhanovSerikbai

Page 7: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

Location – Kyzylorda region, the Aral region;The main production - Main goods and services is production of the enriched quartz concentrate grade - С-070-1-, ВС-050-1, ОС-30;

The aim of the project - Construction and operation ofmining-processing complex. Getting inriched quartzconcentrate based on dry technology withtechnologicla reglaments, developed by Setsu (USA)

Construction of mining and processing complex for

quartz concentrate production

Gross investment in the project37,0 mln dollars USD

The power of factory 450 thousand tons per year

Required Investments 31,6 mln dollars USD

Payback period 4 years

Workplaces 200 persons

Contact informaton of project initiatorsLLP «FirmaDANA»Kyzylorda, Kadirbekov MamadiarArtukbaevich,phone.: +7 701 723 56 48, e-mail: [email protected]

Page 8: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

New planning district of the city of Kyzylordaon a left-bank part of the Syr Darya River

Page 9: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

An innovative production of silicon carbide

Gross investment in the project5,0 million dollars USD

The power of factory 700,0 tons per year

Required investments5,0 million dollars USD

FoundersSP ENU named after L.N. Gumilev

Investor Company

Payback period 5 years

Workplaces 100 persons

MarketRussia, European Union countries and other

countries of Central Asia

Production technology of silicon carbide in a reactor with electrothermal fluidised bed has been developed by partners from ENU Innovation Park. L.N. Gumilev - scientists

from the Institute of Heat and Mass Exchange named after A.V. Lykov of the

National Academy of Sciences of Belarus. Innovative and reliable technology is

confirmed by diplomas and certificates of quality.

Technological process of productionsilicon carbide is based on the interaction of particles with petroleum coke

with gaseous derivatives of silica in the reactor with an electrothermal fluidised bed.AS a result:

- Low electro consumption-The process of silicon carbide is 10-12 hours (method

Acheson - 5 days)-- - finished product is 100% (Acheson method, 30%)

- The final product is a silicon carbide in the form of sand. When Acheson method

get final in pieces form, that requires extra expenses for treatmentContact information of the project initiators:

Innovation Park of the Eurasioan National University L.N.

Gumilev

Kazakhstan, Munaitpasova street№5,

Phone - 8 (7172) 472711, 422811

Basic information of the project

Page 10: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

Technology of production

Market analysis

The biggest companies in the industry of production silicon carbide and by-

products:

ESK-SIC Gmbh (Germany), ESD-SIC BV (Netherlands), Washington Mills AS

(USA),The Dow Chemical Company (USA), Entegris Inc. (USA), Saint-Gobain

(France), NAVARRO SIC (Spain), and others.

Consumption of silicon carbide in the world will reach 2,377 thousand tons

in 2019

At the average of annual growth 14.5% from 2013 to 2019.

The largest producer of silicon carbide in the CIS is "Volzhsky Abrasive Works",

with a capacity over than 70 thousand tons per year, which in 2007 bought Indian

company «Carborundum Universal India Ltd» (CUMI).

Page 11: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

«Construction of the plant on production of a silicate brick»

Gross capital investments in

the project1,8 million dollars USD

Capacity of plant 15 million pieces a year

Required volume of

investment1,03 mln. dollars of the USA

Initiator of the project «Shiyeli tas» LLP

Number of workers 59 people

Sales market internal

Relevance of the project: Now production of

a silicate brick in Kazakhstan isn't capable to cover

the existing demand, the necessary amount of

consumption partially becomes covered at the

expense of the imported products.

Project objective: the purpose of this project

is the construction of the plant on production of a

silicate brick and assumes mining of sand of

Enbekshi for production of a wide range ofconstruction materials.

Main indicators of the project

Contact information of the initiator of the project:

«Shiyeli tas» LLP

Republic of Kazakhstan

Kyzylorda region, settlement of Shiyeli

St. Esabyz No. 2

ph. 8 (7243) 24-48-15, 8 701 744 94 16

Hasanayev Yermek Zharkinovich

Page 12: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

"Construction of wind-solar power station capacity of 24,94 MW"

Gross capital investments in

the project46,9 million dollars USD

Capacity of plant 10,0 MW an hour

Required volume of

investment46,9 million dollars USD

Initiator of the project «Global Energy Company» LLP

Number of workers 40 people

Sales market internal

Project objective: the purpose of this project

is development of alternative power engineering,

the global power ecological strategy of the Republic

of Kazakhstan, ensuring power supply of the region

in the declared power range.

For achievement of effective objectives there

are all necessary conditions:

- favorable wind-solar characteristics;

- constantly growing demand for the electric

power;

- the improved partnership with the potential

companies consumers

Main indicators of the project

Contact information of the initiator of the project:

Global Energy Company LLP

Republic of Kazakhstan, Astana, Bogenbay Ave. of the batyr

No. 36, quarter 21.

ph. 8 (707) 777-85-30

Birzhanov Rashat Barlybayevich

Page 13: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

«Wind farm construction capacity of 75 MW»

Gross capital investments in

the project135 million dollars USD

Capacity of plant 75 MW perhour

Required volume of

investment135 million dollars USD

Initiator of the project «YuzhShakhtoStroy» LLP

Number of workers 40 people

Sales market internal

Wind as an inexhaustible source of

environmentally friendly energy, finds more and

more broad application and purchases the

increasing public support. Its main benefits are:

- lack of environmental pollution;

- use of a renewable, inexhaustible power

source;

- the territory can be completely used for the

agricultural purposes in close proximity;

- stable expenses per unit of the received

energy.

Main indicators of the project

Contact information of the initiator of the project:

Yuzhshakhtostroy LLP

Republic of Kazakhstan, Southern Kazakhstan area, Mr. Kentau,

St. Pushkin No. 33.

ph. 8 (701) 298-88-05

Toyshibekov Arai Mukhiddinovich

Page 14: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

«Construction of the industrial automated hothouse complex on

the area of 3,2 hectares»

Gross capital investments in

the project6,6 million dollars USD

Capacity of plant 1 645 tons year

Required volume of

investment5,0 million dollars USD

Initiator of the project «Highest Agrarian League» LLP

Number of workers 35 people

Sales market internal

The aim of the project : the purpose of this

project is creation of successful agrarian business,

ensuring requirement of the population Kyzylorda

and Kyzylorda region in high-quality vegetable

products, introduction of an essential contribution to

development of a hothouse industry, and also the

region in general.

Social aspect: in case of a project startup, 35

people will be employed. Annually within advanced

training by the entity advanced training of

personnel, including with the invitation of specialists

of «Association of hothouse technologies ofKazakhstan» will be organized.

Main indicators of the project

Contact information of the initiator of the project:

Highest Agrarian League LLP

Republic of Kazakhstan, Kyzylorda region, Kyzylorda,

Musirali Azhikozha St. No. 59

ph. 8 (701) 222-82-28,

E-mail: [email protected]

Imangaliyev G.

Page 15: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

«Construction of poultry farm an egg direction

capacity of 110 million eggs per year "

Gross investment in the

project 19,5 million dollars USD

The capacity of farm 110 mln. Eggs per year

Required investments19,5 million dollars USD

Initiators of the project«Syrdarya agroinvest"

"KazAgroFinance» LLP

Workplaces 100 people

Market internal

Basic information of the project

Project Summary:

- poultry house will be equipped with a single

technological system. Equipment: The content of

birds by "techno" - production of Ukraine;

transporting and sorting - Germany; preparation

center - Russia. Raw materials, own feed

production - Northern regions of Kazakhstan

The social - economic importance of the

project:

- production of the farm is intended mainly for

the domestic market of Kyzylorda oblast and

southern regions.

Contact information of project initiators:

Republic of Kazakhstan

TOO "Sirdariya Agroinvest“

Kyzylorda, Auezov street

phone.: (7242) 26-28-24, 8 7773772571 Ulykbanov N.Emai;: [email protected]

Page 16: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

"Feedlots for 50 thousand sheep and meat processing plant

with capacity of 7,000 tons / year"

Basic Project information

Contact information of Project initiators: Republic of Kazakhstan

LLP «Eurasia Agro Holding"Kyzylorda cityPhone.: 8-701-796-61-11. Isembayev Sergazy

Gross investment in the

project35,4 mln. Dollars USD

Required investments

28,3 mln. Dollars USD

The power of factory

Total area 5 hectares in feedlots

for 50 thousand sheep and meet

processing factory with capacity

of 2 thousand sheep per day

Payback period 1 year

Workplaces 200 persons

Current production Meat production

Objective of the project

The aim of this project the company «Eurasia agroholding» is

the introduction of a new integrated program for the development

of sheep farming on a single technology on large distant areas (up

to 2 mln. Ha) with optimal grazing in the country namely the

establishment of feedlots meat processing plants in West

Kazakhstan , East-Kazakhstan and Kyzylorda regions.

Page 17: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

«Construction of poultry farm on production of broiler chicken

meat»

Project’s Gross capital

investments 22 mln. dollars of the USD

Plant capacity 6 thousand tons per year

The required volume of

investment22 mln. dollars of the USD

Initiator of the project «K-Group LTD.» LLP

Number of workers 300 people

Sales market Domestic

There has been developed the feasibility

statement of the project.

According to the decision of the Regional

coordination commission there has been allocated

the parcel of land with a total area of 500 hectares

in Zhanakorgansky district.

The production technology of meat of broilers

includes the following elements:

-Cultivation of repair young growth;

-content of parent herd;

-cultivation of broilers.

Main indicators of the project

Contact information of the initiator of the project:

K-Group LTD. LLP, Republic of Kazakhstan, Astana.

ph. 8 (777) 220-24-70.

Boranbayev Kairat.

Page 18: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

«Construction of the industrial greenhouse on the area of 5,7

hectares»

Gross investment in the project5,3 million dollars USD

The power of factory 3286,3 tons per year

Required investments 5,3 million dollars USD

Initiators of the project «AgroEcoProduct» LLP

Workplaces 130 people

Gross investment in the projectinternal

Basic information of the project

This greenhouse will be equipped with modern

technologies for cultivation of tomatoes and cucumbers, in

50 hectares, and located in Kyzylorda city.

There is a need for leading of transport and

engineering infrastructure on the amount of 550 million

tenge.

Project objectives are:

- receipt of high-quality, competitive products for

domestic sale;

- uninterrupted providing with tomatoes and

cucumbers of the population Kyzylorda;

- generation of profit from results of production and

sales of products.

Contact information of the initiator of the project: «AgroEcoProduct» LLPKyzylorda, ph.: 8 (701) 732-15-71. Zhalgasbayev Zharmedet Zhakenovich

Page 19: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

"Construction of a sports and improving complex in the city of

Kyzylorda"

Gross capital investments in the

project

1 million dollars USD

Volume of investment«JSC«NK«APO«Baikonur» - 517 million

dollars USD

The required volume of

investment483 million dollars USD

Main indicators of the project

The idea of the project – construction of the sports and

improving center with halls for carrying out mass a competition,

gym and halls of group programs.

Distinctive characteristics of a complex – The complex is

distinguished by pronounced subject with use of standards of the

international standards (RDS RK 3.02-20.2006g. – Instruction for

design of sports constructions).

Structure of a complex

-2 halls of the focused on carrying out mass a

competition on foot to the hall, volleyball, basketball, handball

and dancing circles;

-athletic gym;

-tribune on 280 people;

-The complex is completely equipped with all

necessary infrastructure.

Contact information of the initiator of the project: ph. 8 (771) 040-22-20. E-mail: [email protected] Bakhyt

Page 20: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

Granting the land plot

Compensation of investment costs / Joint financing ofconstruction of the New terminal

The income acquisition right from rendering aviation andnot aviation services.

OBLIGATIONS OF THE PRIVAT PARTNER

trust management of the sharesof JSC “Korkyt-Ata Airport ” withthe right of the subsequentredemption

acceptance of the Airport’sobligations

construction and operation ofthe new airport terminal,including current repairs

preserving a profile of activitiesfor rendering aviation and notaviation services, managementof the operating terminal

OBLIGATIONS OF THE AKIMAT

transfer of the land plot to use

transfer of JSC “Korkyt-Ata Airport”’s shares to the trust managementwith the right of the subsequentredemption

transfer of liabilities of the airportto the Private partner onpreserving the types of activity,control of the operating terminal

the Private partner empowermentfor construction and operation ofthe New terminal of the airport

Possible measures of the statesupport

Capacity not less than 250 passengers an hour

Construction cost ~9 billion KZT (26,76 mln. dollars USD)

Construction term:

Operation term:

2017-2019 y. (18 months)

2020 г. – 2035 y. (15 year)

Contract type DBF(T)MO,

*(T) The project assumes the subsequent

100% privatization of the operating airport

by the investor

The runway has length of

2'700 m and width of 45 m

Dimensions of 2 turn-off

strips -200 x 24 meters

The total area of the platform

- 114’228 sq.m

The guarantee right for

construction of additional

infrastructure

PPP Contract

PRIVAT PARTNER

Project’s characteristics

Characteristic of PPP’s object

Possible measures of the state support from

Akimat:

Obligations of the parties

Project on public-private partnership

«Construction and operation of the new passenger terminal of the international

Airport of Korkyt Ata in Kyzylorda city»

AKIMAT

Page 21: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

Provision of design and estimate documentation for the constructionof concession object

The transfer of land on the right of temporary gratuitous land use

Fee for availability (FA), which includes: compensation of investmentexpenses of the concessionaire (CIE), the payment of concessionaire’soperating costs (PCOC), remuneration for the management of theconcession object (RM)

ФУНКЦИИ КОНЦЕССИОНЕРА

financing, construction and equipping ofa concession object

operation and maintenance of the objectof the concession, including repair andoverhaul

ensuring protection and safety ofconcession’s object, observance ofstandards of fire safety, controlling ofmedical waste and chemical means

FUNCTIONS OF THE CONCESSOR

transfer of the object of concession toownership and use for the term ofconcession which has resulted fromthe agreement of concession

Updating of the technologicalequipment

providing state support measures

Capacity College for 600 seats (~ 200

graduated specialists per year), a

dormitory for 200 seats

Construction cost ~ 3,1 billion KZT(specification after

updating of the design and estimate

documentation in 2 sq. 2016)

Construction term:

Operation term:

2018-2019 y. (1years)

2019-2027 y. (8 years)

Contract type: Construction-transfer-operation

The total area of the college building –

22 136, 0 m2

Built-up area of the college building –

6 118, 67 m2

The area of the land plot – 5 hectares

The area of gardening – 21 745, 33

sq.m

Project’s characteristics

Characteristics of the concession object

Possible measures of the state support from

Akimat:

Organizational and legal scheme

«College for 600 seats on the profile «Construction and Municipal services »

with a dormitory for 200 seats in the SPMK-70 district in Kyzylorda city»

Concessionaire/

the project

company

COLLEGE

The contractor on

service of object

Educational

institution

Consumers:

Students/

Employers

Tuition fee and accommodation (paid groups)

concession

Agreement

Contract on

maintenance of

the object

Measures of the

state support

The organization of the learning

process according to the best

practices and the requirements of

employers

Technical operation

Resolution of the

Akim on determining

the institution to

ensure 100% of

public procurement

Concessor

(Akimat)

Page 22: Projects of Kyzylorda region requiring investment - jp-kz. · PDF fileThe Feasibility study is developed ... - Fesability study of the project is ... The oil refinery with a productivity

For more information you

can visit our regional news

web-site www.e-kyzylorda.kz