Projects of Kyzylorda region
requiring investment
Construction of smelter on production of low-aluminum
ferrosilicium in Kyzylorda city
Contact information of the initiator of the project: «JSC «NK «APO «Baikonyr (Baikonur)».RК, . Kyzylorda city, Zheltoksan street, №42, tel: +7(7242) 60-51-60, 60-51-63,е-mail: [email protected]
Main indicators of the project
Gross capital investments in
the project253,6 mln. dollars of the USA
Capacity of plant160 thousand tons of low-aluminum
ferrosilicium a year
Founders
«JSC «NK «APO «Baikonur»
The required volume – 253,6 mln. dollars of
the USA
Payback period 4 years
Founders:
«JSC «NK «APO «Baikonur»
The required volume – 100%
(228,1 mln. dollars of the USA)
Number of workers 600 peopleAPPROXIMATE PLACEMENT
OF SMELTER
Technology of production
The Feasibility study is developed
and directed to State examination.
Negotiations with the companies are held and a number of Memorandums and Agreements on cooperation on implementation of this project is signed:
1) ICMD, Germany;2) CMEC (CHINA);3) ASIA CEMENT (South Korea);4) Trustee (Poland);5) JinZhou TianSheng Heavy Industry CO. LTD
«Kyzylorda Smelter» LLP with
participation of the German
company ICMD and «Ferrosplav
engineering» LLP which will be an
operator of the project is created.Due to the planned considerable participation of the Chinese companies in project implementation, the «Construction of Smelter on Production of Special and Complex Alloys in Kyzylorda city» project is directed for inclusion in the List of the Kazakhstan-Chinese projects, with high extent of study.
In an industrial zone near the settlement Titov is provided for placement of smelter the land plot of 50,0 hectares.
THYSSEN KRUPP HANWA POSCO
Construction of smelter
Creation of machine-building factory in Kyzylorda
Gross investment in
the project18,7 million dollars USD
Required
investments18,7 million dollars USD
Power of the factory 211 985 and more per year
Founders
JSC "NC SEC" Baikonur "
Partner - 20%
Required volume - 80%
Workplaces 116 people
Payback period 5 years
Basic information about project
Contact information of initiators of the
project:
JSC "NC SEC" Baikonur ".
Republic of Kazakhstan,
Kyzylorda, Zheltoksan street, №42,
phone: +7(7242) 60-51-60, 60-51-63,
е-mail: [email protected]
Current status:
- Fesability study of the project is
already ready.;
- Signed a memorandum between
Kyzylorda Oblast Akimat and Partners
about providing of premises.;
- Also signed memorandum between
Kyzylorda Oblast Akimat and JSC "NC"
Kazakhstan Temir Zholy" about
possibility of buying the products of
factory.;
- Signed memorandum between Akimat
of Kyzylorda region and Czech
company «Strojírna TYC, s.ro » about
assistance in deliveries technology
equipment.
Objective of the project:
- Meeting the needs of domestic market and to stimulate
the production of engineering products with high addedvalue in order to increase local content..
A commodity market of products
At the created entity with use of high-technology machines and the equipment with the Numerical
Program Control (NPC) details, spare parts will be made for a railway rolling stock of Joint-stock
company «National company «Kazakhstan Temir Zholy» aggregates, nodes, the equipment and
the non-standard equipment for Joint-stock company «The national atomic company
«Kazatomprom», agro-industrial, oil industries and the entities of the sphere of housing and
communal services.
Housing and communal services
• production and recovery of valves of large diameters
• manufacture of heat exchangers
• production and recovery pumps
Building
• Metal structures and building components
• Supporting steel structures of buildings and structures
• formwork for monolithic production
Agriculture
• drills • header • mower
Oil and gas industry
• Recovery of valves of large diameters
• manufacture of parts of piping systems
• production and recovery pumps
Mechanical engineering
• production and processing of large parts of locomotives and wagons
• spare parts for rolling stock
Automotive
• production of attachments for construction equipment (blades, brushes, screws)
«Production of engine fuels of the K4, K5 ecological classes»
The oil refinery with a productivity up to 2 million tonsof oil a year is planned to be created on the basis of theoil terminal of "Zhosaly" with the available railwayplatform on 60 cars and reservoir park for storage of oilof 90 thousand m3.
Main indicators of the project
Project’s Gross capital
investments 533,3 mln. dollars USD
Plant capacity
fuel oil - 50 thousand tons;
liquefied petroleum gas (LPG) – 40
thousand tons.
gasoline - 900 thousand tons.
diesel fuel - 748 thousand tons.
avia kerosene - 100 thousand tons..
Required investment 533,3 mln. dollars USD
Payback period 10 years
Amount of workers 562 people
Internal norm of IRR 2,518%
Profitability of the
project56,97%
Contact information of the initiator of the project: “Kyzylorda Low-tonnage Oil Refinery “LLPKyzylorda, M. Shokai Street 305 Phone- 8 (701) 0260580 DosymzhanovSerikbai
Location – Kyzylorda region, the Aral region;The main production - Main goods and services is production of the enriched quartz concentrate grade - С-070-1-, ВС-050-1, ОС-30;
The aim of the project - Construction and operation ofmining-processing complex. Getting inriched quartzconcentrate based on dry technology withtechnologicla reglaments, developed by Setsu (USA)
Construction of mining and processing complex for
quartz concentrate production
Gross investment in the project37,0 mln dollars USD
The power of factory 450 thousand tons per year
Required Investments 31,6 mln dollars USD
Payback period 4 years
Workplaces 200 persons
Contact informaton of project initiatorsLLP «FirmaDANA»Kyzylorda, Kadirbekov MamadiarArtukbaevich,phone.: +7 701 723 56 48, e-mail: [email protected]
New planning district of the city of Kyzylordaon a left-bank part of the Syr Darya River
An innovative production of silicon carbide
Gross investment in the project5,0 million dollars USD
The power of factory 700,0 tons per year
Required investments5,0 million dollars USD
FoundersSP ENU named after L.N. Gumilev
Investor Company
Payback period 5 years
Workplaces 100 persons
MarketRussia, European Union countries and other
countries of Central Asia
Production technology of silicon carbide in a reactor with electrothermal fluidised bed has been developed by partners from ENU Innovation Park. L.N. Gumilev - scientists
from the Institute of Heat and Mass Exchange named after A.V. Lykov of the
National Academy of Sciences of Belarus. Innovative and reliable technology is
confirmed by diplomas and certificates of quality.
Technological process of productionsilicon carbide is based on the interaction of particles with petroleum coke
with gaseous derivatives of silica in the reactor with an electrothermal fluidised bed.AS a result:
- Low electro consumption-The process of silicon carbide is 10-12 hours (method
Acheson - 5 days)-- - finished product is 100% (Acheson method, 30%)
- The final product is a silicon carbide in the form of sand. When Acheson method
get final in pieces form, that requires extra expenses for treatmentContact information of the project initiators:
Innovation Park of the Eurasioan National University L.N.
Gumilev
Kazakhstan, Munaitpasova street№5,
Phone - 8 (7172) 472711, 422811
Basic information of the project
Technology of production
Market analysis
The biggest companies in the industry of production silicon carbide and by-
products:
ESK-SIC Gmbh (Germany), ESD-SIC BV (Netherlands), Washington Mills AS
(USA),The Dow Chemical Company (USA), Entegris Inc. (USA), Saint-Gobain
(France), NAVARRO SIC (Spain), and others.
Consumption of silicon carbide in the world will reach 2,377 thousand tons
in 2019
At the average of annual growth 14.5% from 2013 to 2019.
The largest producer of silicon carbide in the CIS is "Volzhsky Abrasive Works",
with a capacity over than 70 thousand tons per year, which in 2007 bought Indian
company «Carborundum Universal India Ltd» (CUMI).
«Construction of the plant on production of a silicate brick»
Gross capital investments in
the project1,8 million dollars USD
Capacity of plant 15 million pieces a year
Required volume of
investment1,03 mln. dollars of the USA
Initiator of the project «Shiyeli tas» LLP
Number of workers 59 people
Sales market internal
Relevance of the project: Now production of
a silicate brick in Kazakhstan isn't capable to cover
the existing demand, the necessary amount of
consumption partially becomes covered at the
expense of the imported products.
Project objective: the purpose of this project
is the construction of the plant on production of a
silicate brick and assumes mining of sand of
Enbekshi for production of a wide range ofconstruction materials.
Main indicators of the project
Contact information of the initiator of the project:
«Shiyeli tas» LLP
Republic of Kazakhstan
Kyzylorda region, settlement of Shiyeli
St. Esabyz No. 2
ph. 8 (7243) 24-48-15, 8 701 744 94 16
Hasanayev Yermek Zharkinovich
"Construction of wind-solar power station capacity of 24,94 MW"
Gross capital investments in
the project46,9 million dollars USD
Capacity of plant 10,0 MW an hour
Required volume of
investment46,9 million dollars USD
Initiator of the project «Global Energy Company» LLP
Number of workers 40 people
Sales market internal
Project objective: the purpose of this project
is development of alternative power engineering,
the global power ecological strategy of the Republic
of Kazakhstan, ensuring power supply of the region
in the declared power range.
For achievement of effective objectives there
are all necessary conditions:
- favorable wind-solar characteristics;
- constantly growing demand for the electric
power;
- the improved partnership with the potential
companies consumers
Main indicators of the project
Contact information of the initiator of the project:
Global Energy Company LLP
Republic of Kazakhstan, Astana, Bogenbay Ave. of the batyr
No. 36, quarter 21.
ph. 8 (707) 777-85-30
Birzhanov Rashat Barlybayevich
«Wind farm construction capacity of 75 MW»
Gross capital investments in
the project135 million dollars USD
Capacity of plant 75 MW perhour
Required volume of
investment135 million dollars USD
Initiator of the project «YuzhShakhtoStroy» LLP
Number of workers 40 people
Sales market internal
Wind as an inexhaustible source of
environmentally friendly energy, finds more and
more broad application and purchases the
increasing public support. Its main benefits are:
- lack of environmental pollution;
- use of a renewable, inexhaustible power
source;
- the territory can be completely used for the
agricultural purposes in close proximity;
- stable expenses per unit of the received
energy.
Main indicators of the project
Contact information of the initiator of the project:
Yuzhshakhtostroy LLP
Republic of Kazakhstan, Southern Kazakhstan area, Mr. Kentau,
St. Pushkin No. 33.
ph. 8 (701) 298-88-05
Toyshibekov Arai Mukhiddinovich
«Construction of the industrial automated hothouse complex on
the area of 3,2 hectares»
Gross capital investments in
the project6,6 million dollars USD
Capacity of plant 1 645 tons year
Required volume of
investment5,0 million dollars USD
Initiator of the project «Highest Agrarian League» LLP
Number of workers 35 people
Sales market internal
The aim of the project : the purpose of this
project is creation of successful agrarian business,
ensuring requirement of the population Kyzylorda
and Kyzylorda region in high-quality vegetable
products, introduction of an essential contribution to
development of a hothouse industry, and also the
region in general.
Social aspect: in case of a project startup, 35
people will be employed. Annually within advanced
training by the entity advanced training of
personnel, including with the invitation of specialists
of «Association of hothouse technologies ofKazakhstan» will be organized.
Main indicators of the project
Contact information of the initiator of the project:
Highest Agrarian League LLP
Republic of Kazakhstan, Kyzylorda region, Kyzylorda,
Musirali Azhikozha St. No. 59
ph. 8 (701) 222-82-28,
E-mail: [email protected]
Imangaliyev G.
«Construction of poultry farm an egg direction
capacity of 110 million eggs per year "
Gross investment in the
project 19,5 million dollars USD
The capacity of farm 110 mln. Eggs per year
Required investments19,5 million dollars USD
Initiators of the project«Syrdarya agroinvest"
"KazAgroFinance» LLP
Workplaces 100 people
Market internal
Basic information of the project
Project Summary:
- poultry house will be equipped with a single
technological system. Equipment: The content of
birds by "techno" - production of Ukraine;
transporting and sorting - Germany; preparation
center - Russia. Raw materials, own feed
production - Northern regions of Kazakhstan
The social - economic importance of the
project:
- production of the farm is intended mainly for
the domestic market of Kyzylorda oblast and
southern regions.
Contact information of project initiators:
Republic of Kazakhstan
TOO "Sirdariya Agroinvest“
Kyzylorda, Auezov street
phone.: (7242) 26-28-24, 8 7773772571 Ulykbanov N.Emai;: [email protected]
"Feedlots for 50 thousand sheep and meat processing plant
with capacity of 7,000 tons / year"
Basic Project information
Contact information of Project initiators: Republic of Kazakhstan
LLP «Eurasia Agro Holding"Kyzylorda cityPhone.: 8-701-796-61-11. Isembayev Sergazy
Gross investment in the
project35,4 mln. Dollars USD
Required investments
28,3 mln. Dollars USD
The power of factory
Total area 5 hectares in feedlots
for 50 thousand sheep and meet
processing factory with capacity
of 2 thousand sheep per day
Payback period 1 year
Workplaces 200 persons
Current production Meat production
Objective of the project
The aim of this project the company «Eurasia agroholding» is
the introduction of a new integrated program for the development
of sheep farming on a single technology on large distant areas (up
to 2 mln. Ha) with optimal grazing in the country namely the
establishment of feedlots meat processing plants in West
Kazakhstan , East-Kazakhstan and Kyzylorda regions.
«Construction of poultry farm on production of broiler chicken
meat»
Project’s Gross capital
investments 22 mln. dollars of the USD
Plant capacity 6 thousand tons per year
The required volume of
investment22 mln. dollars of the USD
Initiator of the project «K-Group LTD.» LLP
Number of workers 300 people
Sales market Domestic
There has been developed the feasibility
statement of the project.
According to the decision of the Regional
coordination commission there has been allocated
the parcel of land with a total area of 500 hectares
in Zhanakorgansky district.
The production technology of meat of broilers
includes the following elements:
-Cultivation of repair young growth;
-content of parent herd;
-cultivation of broilers.
Main indicators of the project
Contact information of the initiator of the project:
K-Group LTD. LLP, Republic of Kazakhstan, Astana.
ph. 8 (777) 220-24-70.
Boranbayev Kairat.
«Construction of the industrial greenhouse on the area of 5,7
hectares»
Gross investment in the project5,3 million dollars USD
The power of factory 3286,3 tons per year
Required investments 5,3 million dollars USD
Initiators of the project «AgroEcoProduct» LLP
Workplaces 130 people
Gross investment in the projectinternal
Basic information of the project
This greenhouse will be equipped with modern
technologies for cultivation of tomatoes and cucumbers, in
50 hectares, and located in Kyzylorda city.
There is a need for leading of transport and
engineering infrastructure on the amount of 550 million
tenge.
Project objectives are:
- receipt of high-quality, competitive products for
domestic sale;
- uninterrupted providing with tomatoes and
cucumbers of the population Kyzylorda;
- generation of profit from results of production and
sales of products.
Contact information of the initiator of the project: «AgroEcoProduct» LLPKyzylorda, ph.: 8 (701) 732-15-71. Zhalgasbayev Zharmedet Zhakenovich
"Construction of a sports and improving complex in the city of
Kyzylorda"
Gross capital investments in the
project
1 million dollars USD
Volume of investment«JSC«NK«APO«Baikonur» - 517 million
dollars USD
The required volume of
investment483 million dollars USD
Main indicators of the project
The idea of the project – construction of the sports and
improving center with halls for carrying out mass a competition,
gym and halls of group programs.
Distinctive characteristics of a complex – The complex is
distinguished by pronounced subject with use of standards of the
international standards (RDS RK 3.02-20.2006g. – Instruction for
design of sports constructions).
Structure of a complex
-2 halls of the focused on carrying out mass a
competition on foot to the hall, volleyball, basketball, handball
and dancing circles;
-athletic gym;
-tribune on 280 people;
-The complex is completely equipped with all
necessary infrastructure.
Contact information of the initiator of the project: ph. 8 (771) 040-22-20. E-mail: [email protected] Bakhyt
Granting the land plot
Compensation of investment costs / Joint financing ofconstruction of the New terminal
The income acquisition right from rendering aviation andnot aviation services.
OBLIGATIONS OF THE PRIVAT PARTNER
trust management of the sharesof JSC “Korkyt-Ata Airport ” withthe right of the subsequentredemption
acceptance of the Airport’sobligations
construction and operation ofthe new airport terminal,including current repairs
preserving a profile of activitiesfor rendering aviation and notaviation services, managementof the operating terminal
OBLIGATIONS OF THE AKIMAT
transfer of the land plot to use
transfer of JSC “Korkyt-Ata Airport”’s shares to the trust managementwith the right of the subsequentredemption
transfer of liabilities of the airportto the Private partner onpreserving the types of activity,control of the operating terminal
the Private partner empowermentfor construction and operation ofthe New terminal of the airport
Possible measures of the statesupport
Capacity not less than 250 passengers an hour
Construction cost ~9 billion KZT (26,76 mln. dollars USD)
Construction term:
Operation term:
2017-2019 y. (18 months)
2020 г. – 2035 y. (15 year)
Contract type DBF(T)MO,
*(T) The project assumes the subsequent
100% privatization of the operating airport
by the investor
The runway has length of
2'700 m and width of 45 m
Dimensions of 2 turn-off
strips -200 x 24 meters
The total area of the platform
- 114’228 sq.m
The guarantee right for
construction of additional
infrastructure
PPP Contract
PRIVAT PARTNER
Project’s characteristics
Characteristic of PPP’s object
Possible measures of the state support from
Akimat:
Obligations of the parties
Project on public-private partnership
«Construction and operation of the new passenger terminal of the international
Airport of Korkyt Ata in Kyzylorda city»
AKIMAT
Provision of design and estimate documentation for the constructionof concession object
The transfer of land on the right of temporary gratuitous land use
Fee for availability (FA), which includes: compensation of investmentexpenses of the concessionaire (CIE), the payment of concessionaire’soperating costs (PCOC), remuneration for the management of theconcession object (RM)
ФУНКЦИИ КОНЦЕССИОНЕРА
financing, construction and equipping ofa concession object
operation and maintenance of the objectof the concession, including repair andoverhaul
ensuring protection and safety ofconcession’s object, observance ofstandards of fire safety, controlling ofmedical waste and chemical means
FUNCTIONS OF THE CONCESSOR
transfer of the object of concession toownership and use for the term ofconcession which has resulted fromthe agreement of concession
Updating of the technologicalequipment
providing state support measures
Capacity College for 600 seats (~ 200
graduated specialists per year), a
dormitory for 200 seats
Construction cost ~ 3,1 billion KZT(specification after
updating of the design and estimate
documentation in 2 sq. 2016)
Construction term:
Operation term:
2018-2019 y. (1years)
2019-2027 y. (8 years)
Contract type: Construction-transfer-operation
The total area of the college building –
22 136, 0 m2
Built-up area of the college building –
6 118, 67 m2
The area of the land plot – 5 hectares
The area of gardening – 21 745, 33
sq.m
Project’s characteristics
Characteristics of the concession object
Possible measures of the state support from
Akimat:
Organizational and legal scheme
«College for 600 seats on the profile «Construction and Municipal services »
with a dormitory for 200 seats in the SPMK-70 district in Kyzylorda city»
Concessionaire/
the project
company
COLLEGE
The contractor on
service of object
Educational
institution
Consumers:
Students/
Employers
Tuition fee and accommodation (paid groups)
concession
Agreement
Contract on
maintenance of
the object
Measures of the
state support
The organization of the learning
process according to the best
practices and the requirements of
employers
Technical operation
Resolution of the
Akim on determining
the institution to
ensure 100% of
public procurement
Concessor
(Akimat)