9
Proposal for changes in the Availability Reports David Collados 22 Jan 2013, WLCG Management Board

Proposal for changes in the Availability Reports

  • Upload
    brendy

  • View
    46

  • Download
    0

Embed Size (px)

DESCRIPTION

22 Jan 2013, WLCG Management Board. Proposal for changes in the Availability Reports. David Collados. Introduction. SAM monitoring – Current S ituation ~36 distributed OPS t ests submission instances: 4 HEP tests submission instances at CERN. Introduction. - PowerPoint PPT Presentation

Citation preview

Page 1: Proposal for changes in the Availability Reports

Proposal for changes in the Availability Reports

David Collados

22 Jan 2013, WLCG Management Board

Page 2: Proposal for changes in the Availability Reports

2

SAM monitoring – Current Situation– ~36 distributed OPS tests submission instances:

– 4 HEP tests submission instances at CERN

Introduction

22 Jan 2013

Page 3: Proposal for changes in the Availability Reports

3

SAM monitoring - Current Situation– OPS: CEs (ARC, CREAM, OSG), SRMv2, Site-BDII– HEP VOs: CEs (ARC, CREAM, OSG), SRMv2

• ALICE: CREAM-CE• ATLAS: CREAM-CE, OSG-CE, OSG-SRMv2, SRMv2• CMS: ARC-CE, CREAM-CE, OSG-CE, OSG-SRMv2, SRMv2• LHCb: CE, CREAM-CE, SRMv2

Introduction

22 Jan 2013

Page 5: Proposal for changes in the Availability Reports

5

• OPS infrastructure part of EGI-InSPIRE– Not sure how it will be after end of project

• OPS tests do not reflect how sites are doing for experiments

• Maintenance of OPS tests not clear after EMI• Reduce effort in availability re-computations• Homogenize and reduce number of monthly

reports

Motivation

22 Jan 2013

Page 6: Proposal for changes in the Availability Reports

6

• Remove OPS numbers from all reports• Replace existing reports with:– One summary report per VO including T0/T1s/T2s– One history report per VO including T0/T1s

• Having similar content to existing ones

Proposal

22 Jan 2013

Page 7: Proposal for changes in the Availability Reports

7

• Funding agencies and RRB bodies will have more than one monthly number per Site

• In case of test failure, site admins should be notified and be able to understand what the problem is based on the test output

Impact

22 Jan 2013

Page 8: Proposal for changes in the Availability Reports

8

• Generate new reports for evaluation (March)• Review how T2s are evaluated compared to

official OPS report (March/April)– Test may need changes (more verbose)?– Follow up on open issues

• Present results and re-iterate process until confident with new reports (2/3 months)

• Decide when to switch to new reports

Adoption Plan

22 Jan 2013

Page 9: Proposal for changes in the Availability Reports

9

Questions?