16
TRAFFIC CONTROL NOTES AND QUANTITIES THE CONSTRUCTION SIGNING PLANS ARE TO SERVE AS A GUIDE ONLY. OTHER SIGNS MY BE REQUIRED DURING VARIOUS PHASES OF CONSTRUCTION. THIS TRAFFIC CONTROL PLAN DOES NOT RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITY OF INSTALLING TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE CURRENT EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES." THE CONTRACTOR IS TO MAINTAIN ACCESS TO ALL LOCAL PROPERTY OWNERS. PROPOSED CONSTRUCTION SEQUENCE TRAFFIC PHASE 1 2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON THE APPROPRIATE PLAN SHEETS. 1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND AS DIRECTED BY THE ENGINEER. 6. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR SHALL INSTALL PHASE 2 TRAFFIC CONTROL. 3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER. 4. THE TEMPORARY PAVEMENT ON THE NORTH SIDE OF SR 71/US 441 AS SHOWN TO THE EAST OF FORD HILL LANE ON THE PLAN SHEETS SHALL BE CONSTRUCTED PRIOR TO WORK TO THE SOUTH OF THE EXISTING ROAD IN ORDER TO SHIFT TRAFFIC. PORTIONS OF THE EXISTING PAVED SHOULDER PRIOR TO THE TEMPORARY PAVEMENT WILL BE UTILIZED AS PART OF A TEMPORARY TRAVEL LANE. 5. AFTER TRAFFIC IS SHIFTED TO THE NEWLY CONSTRUCTED TEMPORARY PAVEMENT, THE OTHER WORK AS SHOWN ON THE CORRESPONDING PLAN SHEETS CAN BE CONSTRUCTED INCLUDING THE PROPOSED TRAVEL LANES, WALL, AND TEMPORARY PAVEMENT TO BE USED IN PHASE 2. TRAFFIC PHASE 2 2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON THE APPROPRIATE PLAN SHEETS. 1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND AS DIRECTED BY THE ENGINEER. 3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED IN PHASE 2 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER. 6. ONCE ALL OF PHASE 2 CONSTRUCTION IS COMPLETE THE CONTRACTOR SHALL INSTALL PHASE 3 TRAFFIC CONTROL. 5. AFTER TRAFFIC IS SHIFTED, THE REMAINING FULL DEPTH PAVEMENT AREA ALONG THE PROPOSED SR 71/US 411 IS TO BE CONSTRUCTED. 4. TRAFFIC IS TO BE SHIFTED TO THE NEWLY CONSTRUCTED TRAVEL LANES AND TEMPORARY PAVEMENT TO THE SOUTH OF EXISTING SR 71/US 441 BUILT IN PHASE 1. 5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL DEVICES SHALL BE REMOVED. 4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES. 3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL ASPHALT LAYER CONSTRUCTED IN PHASE 3. TRAFFIC PHASE 3 2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON THE APPROPRIATE PLAN SHEETS. 1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND AS DIRECTED BY THE ENGINEER. 6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND PAVEMENT MARKING PLANS. TENNESSEE D.O.T. DESIGN DIVISION FILE NO. TYPE YEAR PROJECT NO. SHEET NO. 26-JAN-2017 14:41 Y:\Roadways\01100005\Design\044.sht STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION HPP/NH-71(16) 44 2017 CONST. SEALED BY FIELD REVIEW CONSTRUCTABILITY

PROPOSED CONSTRUCTION SEQUENCE

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

TRAFFIC

CONTROL

NOTES AND

QUANTITIES

THE CONSTRUCTION SIGNING PLANS ARE TO SERVE AS A GUIDE ONLY.

OTHER SIGNS MY BE REQUIRED DURING VARIOUS PHASES OF CONSTRUCTION.

THIS TRAFFIC CONTROL PLAN DOES NOT RELIEVE THE CONTRACTOR OF THEIR

RESPONSIBILITY OF INSTALLING TRAFFIC CONTROL DEVICES IN ACCORDANCE

WITH THE CURRENT EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL

DEVICES."

THE CONTRACTOR IS TO MAINTAIN ACCESS TO ALL LOCAL PROPERTY OWNERS.

PROPOSED CONSTRUCTION SEQUENCE

TRAFFIC PHASE 1

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON THE

APPROPRIATE PLAN SHEETS.

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

6. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 2 TRAFFIC CONTROL.

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

4. THE TEMPORARY PAVEMENT ON THE NORTH SIDE OF SR 71/US 441 AS

SHOWN TO THE EAST OF FORD HILL LANE ON THE PLAN SHEETS SHALL

BE CONSTRUCTED PRIOR TO WORK TO THE SOUTH OF THE EXISTING ROAD

IN ORDER TO SHIFT TRAFFIC. PORTIONS OF THE EXISTING PAVED

SHOULDER PRIOR TO THE TEMPORARY PAVEMENT WILL BE UTILIZED AS

PART OF A TEMPORARY TRAVEL LANE.

5. AFTER TRAFFIC IS SHIFTED TO THE NEWLY CONSTRUCTED TEMPORARY

PAVEMENT, THE OTHER WORK AS SHOWN ON THE CORRESPONDING PLAN

SHEETS CAN BE CONSTRUCTED INCLUDING THE PROPOSED TRAVEL LANES,

WALL, AND TEMPORARY PAVEMENT TO BE USED IN PHASE 2.

TRAFFIC PHASE 2

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON THE

APPROPRIATE PLAN SHEETS.

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 2 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

6. ONCE ALL OF PHASE 2 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 3 TRAFFIC CONTROL.

5. AFTER TRAFFIC IS SHIFTED, THE REMAINING FULL DEPTH PAVEMENT

AREA ALONG THE PROPOSED SR 71/US 411 IS TO BE CONSTRUCTED.

4. TRAFFIC IS TO BE SHIFTED TO THE NEWLY CONSTRUCTED TRAVEL LANES

AND TEMPORARY PAVEMENT TO THE SOUTH OF EXISTING SR 71/US 441

BUILT IN PHASE 1.

5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL

DEVICES SHALL BE REMOVED.

4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL

BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES.

3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

TRAFFIC PHASE 3

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON THE

APPROPRIATE PLAN SHEETS.

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND

PAVEMENT MARKING PLANS.

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

Y:\R

oadw

ays\01100005\D

esign\044.s

ht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

HPP/NH-71(16) 44 2017 CONST.

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

PAVEMENT EDGE

DROP-OFF

TRAFFIC CONTROL

NOTES

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

Y:\R

oadw

ays\01100005\D

esign\044A

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

HPP/NH-71(16) 44A 2017 CONST.

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

W. M

AC

ON

LA

NE

S

R

7

1

/

U

S

4

4

1

SR 71/US 441SR 71/US 441

E. M

ACO

N L

AN

E

S 6

6%

%d 3

7' 08" W

S 6

8%

%d 2

1' 2

5"

W

S 6

4%

%d 0

4' 52" W

S 6

8%

%d 0

8' 4

8" W

10

15

20

S

7

0

%

%

d

5

4

'

3

0

"

E

1

5

0

155

SR 71/US 441 STA. 151+28.64 =

MACON LANE STA. 15+99.51

N 570136.4414

E 2627512.4675

BEGIN PROJ. NO. HPP/NH-71(16)

STA. 149+91.20 (R.O.W.)

WW

C-1

/EPH

-1

WW

C-3

/

EP

H-3

WWC-2/EPH-2

WW

C-1

/EPH

-1

THE CONSTRUCTION SIGNING PLANS ARE TO SERVE AS A GUIDE ONLY.

OTHER SIGNS MY BE REQUIRED DURING VARIOUS PHASES OF CONSTRUCTION.

THIS TRAFFIC CONTROL PLAN DOES NOT RELIEVE THE CONTRACTOR OF THEIR

RESPONSIBILITY OF INSTALLING TRAFFIC CONTROL DEVICES IN ACCORDANCE

WITH THE CURRENT EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL

DEVICES."

THE CONTRACTOR IS TO MAINTAIN ACCESS TO ALL LOCAL PROPERTY OWNERS.

TRAFFIC CONTROL NOTES

TRAFFIC CONTROL - PHASE 1

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

4. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 2 TRAFFIC CONTROL.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

2600' 1600' ROAD

WORK

1000 FT

ROAD

WORK

1 MILE

ROAD

WORK

1/2 MILE

500'

1

0

0

0

'

END

ROAD WORK

SIGN (CONSTRUCTION)

500'

500'

500'

500'

ROAD

WORK

1/2 MILE

1600'ROAD

WORK

1000 FT

ROAD

WORK

500 FT

500'

ROAD

WORK

1/2 MILE

1600'ROAD

WORK

1000 FT

ROAD

WORK

500 FT

500'

END

ROAD WORK

END

ROAD WORK

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

G20-2

48" X 24"

G20-2

36" X 18"

W20-1

36" X 36"

W20-1

48" X 48"

W20-1

48" X 48"

W20-1

36" X 36"

W20-1

36" X 36"

W20-1

48" X 48"

W20-1

36" X 36"

W20-1

36" X 36"

W20-1

36" X 36"

G20-2

36" X 18"

FLEXIBLE DRUMS (CHANNELIZING)

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\045.s

ht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 156+

50 S

EE

SH

T. N

O. 45A

BEGIN TO STA.156+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 1

HPP/NH-71(16) 45

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

S 16%%d 02' 41" WS

35%

%d 5

2' 28" W

30SR 71/US 441 SR 71/US 441SR 71/US 441

S

R

7

1

/

U

S

4

4

1

CH

AP

MA

N V

IEW

DR

IVE

S 6

6%

%d 3

7' 0

8"

W

10

S 73%%d 57' 19" E

155160 1651

7

0

S 4

0%

%d 2

8' 34" WS 16%%d 02' 41" W 4

0

VA

LE

RIE

WA

Y

SR 71/US 441 STA. 162+99.97 =

CHAPMAN VIEW DRIVE STA. 30+00.00

N 569785.8628

E 2628629.8233

SR 71/US 441 STA. 168+65.00 =

VALERIE WAY STA. 42+48.78

N 569629.6960

E 2629172.8456

WW

C-1

/EPH

-1

WW

C-3

/

EP

H-3

WW

C-4

/

EPH

-4

WW

C-2/E

PH

-2

WWC-2/EPH-2

TRAFFIC CONTROL - PHASE 1

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

THIS PLAN.

4. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 2 TRAFFIC CONTROL.

TO BE USED IN PHASE 2.

ITEM

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

500'

500'

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

END

ROAD WORK

ROAD

WORK

AHEAD

ROAD

WORK

AHEAD

END

ROAD WORK

W20-1

36" X 36"

G20-2

36" X 18"

G20-2

36" X 18"

W20-1

36" X 36"

G20-2

36" X 18"

SIGN (CONSTRUCTION)

FLEXIBLE DRUMS (CHANNELIZING)

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\045A

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MATCH LINE STA. 169+50 SEE SHT. NO. 45B

45A

STA.156+50 TO STA.169+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 1

HPP/NH-71(16)

MATCH LINE STA. 156+50 SEE SHT. NO. 45

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

SR 71/US 441

SR 71/US 441

SR 71/US 441

HUTCHESON ROAD

FO

RD

HIL

L L

AN

E

SH

AD

Y L

AN

E

170

175180

S 4

0%

%d 2

8' 34" W

S 1

6%

%d 0

2' 41" W

S 4

3%

%d 3

8' 59" W

S 1

8%

%d 3

2' 59" W

50

S 4

7%

%d 3

3' 15" W

S 2

0%

%d 4

6' 53" W

40

60

VA

LE

RIE

WA

Y

SR 71/US 441 STA. 171+75.00 =

SHADY LANE STA. 52+17.77

N 569539.6717

E 2629469.4517

SR 71/US 441 STA. 173+60.00 =

FORD HILL LANE STA. 61+88.03

N 569477.4176

E 2629643.6502

TRAFFIC CONTROL - PHASE 1

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

6. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 2 TRAFFIC CONTROL.

5. AFTER TRAFFIC IS SHIFTED TO THE NEWLY CONSTRUCTED TEMPORARY

PAVEMENT THE OTHER WORK AS SHOWN ON THIS PLAN CAN BE

CONSTRUCTED INCLUDING THE PROPOSED WALL AND TEMPORARY PAVEMENT

TO BE USED IN PHASE 2.

4. THE TEMPORARY PAVEMENT ON THE NORTH SIDE OF SR 71/US 441 AS

SHOWN ON THIS PLAN SHALL BE CONSTRUCTED PRIOR TO WORK TO THE

SOUTH OF THE ROAD IN ORDER TO SHIFT TRAFFIC. PORTIONS OF THE

EXISTING PAVED SHOULDER PRIOR TO THE TEMPORARY PAVEMENT WILL

BE UTILIZED AS PART OF A TEMPORARY TRAVEL LANE.

AS DIRECTED BY THE ENGINEER. THIS PLAN.

SOUTH OF THE ROAD IN ORDER TO SHIFT TRAFFIC.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

SYMBOL

TRAFFIC CONTROL LEGENDITEMWORK ZONE

TRAFFIC FLOW

TEMPORARY PAVEMENT

SEE STEP 5

TEMPORARY PAVEMENT

SEE STEP 4

TEMPORARY PAVEMENTSEE STEP 4

TEMPORARY PAVEMENTSEE STEP 5

EXISTING PAVEMENT TO BE

SCARIFIED BACK FILLED

SEEDED & MULCHED

SIGN (CONSTRUCTION)

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

10'

10'

10'

10'

8" RDSYL

8" RDSYL

8" RSSWL

8" RSBWL

8" RSSWL

ROAD

WORK

AHEAD

END

ROAD WORK

ROAD

WORK

AHEAD

END

ROAD WORK

G20-2

36" X 18" G20-2

36" X 18"

G20-2

36" X 18"

W20-1

36" X 36"

W20-1

36" X 36"

SIGN (CONSTRUCTION)

10'

10'

10'

10'

FLEXIBLE DRUMS (CHANNELIZING)

PORTABLE BARRIER RAIL

TEMPORARY ATTENUATOR

FLEXIBLE DRUMS (CHANNELIZING)

PORTABLE BARRIER RAILTEMPORARY ATTENUATOR

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\045B

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 169+

50 S

EE

SH

T. N

O. 4

5A

MA

TC

H L

IN

E S

TA

. 182+

50 S

EE

SH

T. N

O. 45C

45B

STA.169+50 TO STA.182+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 1

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

SR 71/US 441

SR 71/US 441

SIM

MO

NS

RO

AD

HU

TC

HE

SO

N R

OA

D

HUTCHESON ROAD

MU

RP

HY

RO

AD

HIL

LT

OP

VIE

W D

RIV

E

S 53%%d 55' 05" E

S 3

0%

%d 5

9' 26" W

S 4

6%

%d 0

4' 55" W

S 3

6%

%d 0

6' 04" W

1

8

5

190

195

S 4

2%

%d 3

6' 33" W

70

75

SR 71/US 441 STA. 189+84.81 =

HUTCHESON ROAD/SIMMONS ROAD STA. 72+17.86

N 568665.4120

E 2631043.8018

TRAFFIC CONTROL - PHASE 1

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

6. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 2 TRAFFIC CONTROL.

4. THE TEMPORARY PAVEMENT ON THE NORTH SIDE OF SR 71/US 441 AS

SHOWN ON THIS PLAN SHALL BE CONSTRUCTED PRIOR TO WORK TO THE

SOUTH OF THE ROAD IN ORDER TO SHIFT TRAFFIC.

5. AFTER TRAFFIC IS SHIFTED TO THE NEWLY CONSTRUCTED TEMPORARY

PAVEMENT THE OTHER WORK AS SHOWN ON THIS PLAN CAN BE CONSTRUCTED

INCLUDING THE TEMPORARY PAVEMENT TO BE USED IN PHASE 2.

ITEM

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

TEMPORARY PAVEMENT

SEE STEP 4

TEMPORARY PAVEMENT

SEE STEP 5

EXISTING PAVEMENT TO BE

SCARIFIED BACK FILLED

SEEDED & MULCHED

SIGN (CONSTRUCTION)

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

10' 10' 10'

10'

8" RDSYL

8" RSBWL

8" RSSWL

ROAD

WORK

AHEAD

END

ROAD WORK

END

ROAD WORKROAD

WORK

AHEAD

G20-2

36" X 18"

G20-2

36" X 18"

W20-1

36" X 36"

W20-1

36" X 36"

FLEXIBLE DRUMS (CHANNELIZING)

PORTABLE BARRIER RAIL

TEMPORARY ATTENUATOR

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\045C

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 182+

50 S

EE

SH

T. N

O. 45B

MA

TC

H L

IN

E S

TA

. 195+

50 S

EE

SH

T. N

O. 45D

45C

STA.182+50 TO STA.195+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 1

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

S 53%%d 55' 05" ESR 71/US 441 SR 71/US 441 SR 71/US 441

195 200 205 210

ST

R-1

TRAFFIC CONTROL - PHASE 1

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

4. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 2 TRAFFIC CONTROL.

SYMBOL

WORK ZONE

TRAFFIC FLOW

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

FLEXIBLE DRUMS (CHANNELIZING)

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oad

way

s\0

11

00

00

5\D

esig

n\0

45

D.s

ht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 195+

50 S

EE

SH

T. N

O. 45C

MA

TC

H L

IN

E S

TA

. 2

08

+5

0 S

EE

SH

T.

NO

. 4

5E

45D

STA.195+50 TO STA.208+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 1

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

N 6

6%

%d 1

2' 32" E

N 7

1%

%d 2

6' 19" E

100

90

SR 71/US 441 SR 71/US 441SR 71/US 441

SR

338

SR

35/U

S 4

11

S 53%%d 55' 05" E

210

END PROJ. NO. HPP/NH-71(16)

STA. 210+55.00 (R.O.W.)

TRAFFIC CONTROL - PHASE 1

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

4. ONCE ALL OF PHASE 1 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 2 TRAFFIC CONTROL.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 1 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

500'

END

ROAD WORK

G20-2

48" X 24"

SIGN (CONSTRUCTION)

FLEXIBLE DRUMS (CHANNELIZING)

W20-1

48" X 48"

2600' ROAD

WORK

1/2 MILE

W20-1

48" X 48"

1600'ROAD

WORK

1000 FT

W20-1

48" X 48"

ROAD

WORK

1 MILE

1000'

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\045E

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 2

08

+5

0 S

EE

SH

T.

NO

. 4

5D

45E

STA.208+50 TO END

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 1

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

SR 71/US 441

SR 71/US 441

SR 71/US 441

HUTCHESON ROAD

FO

RD

HIL

L L

AN

E

SH

AD

Y L

AN

E

170

175180

S 4

0%

%d 2

8' 34" W

S 1

6%

%d 0

2' 41" W

S 4

3%

%d 3

8' 59" W

S 1

8%

%d 3

2' 59" W

50

S 4

7%

%d 3

3' 15" W

S 2

0%

%d 4

6' 53" W

40

60

VA

LE

RIE

WA

Y

SR 71/US 441 STA. 168+65.00 =

VALERIE WAY STA. 42+48.78

N 569629.6960

E 2629172.8456

SR 71/US 441 STA. 171+75.00 =

SHADY LANE STA. 52+17.77

N 569539.6717

E 2629469.4517

SR 71/US 441 STA. 173+60.00 =

FORD HILL LANE STA. 61+88.03

N 569477.4176

E 2629643.6502

THE CONSTRUCTION SIGNING PLANS ARE TO SERVE AS A GUIDE ONLY.

OTHER SIGNS MY BE REQUIRED DURING VARIOUS PHASES OF CONSTRUCTION.

THIS TRAFFIC CONTROL PLAN DOES NOT RELIEVE THE CONTRACTOR OF THEIR

RESPONSIBILITY OF INSTALLING TRAFFIC CONTROL DEVICES IN ACCORDANCE

WITH THE CURRENT EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL

DEVICES."

THE CONTRACTOR IS TO MAINTAIN ACCESS TO ALL LOCAL PROPERTY OWNERS.

TRAFFIC CONTROL NOTES

TRAFFIC CONTROL - PHASE 2

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

6. ONCE ALL OF PHASE 2 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 3 TRAFFIC CONTROL.

4. TRAFFIC IS TO BE SHIFTED TO THE NEWLY CONSTRUCTED TRAVEL LANES

AND TEMPORARY PAVEMENT BUILT IN PHASE 1.

THIS PLAN.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

TEMPORARY PAVEMENT

SEE STEP 4

SEE STEP 4

SYMBOL

WORK ZONE

TRAFFIC FLOW

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 2 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

5. AFTER TRAFFIC IS SHIFTED, THE REMAINING FULL DEPTH PAVEMENT

AREA ALONG THE PROPOSED SR 71/US 411 IS TO BE CONSTRUCTED.

10'10'10'10'

10'10'10'10'

8" RSSWL

8" RSSWL

8" RSBWL8" RDSYL

ROAD

WORK

AHEAD

W20-1

36" X 36"

END

ROAD WORK

G20-2

36" X 18"

W20-1

36" X 36"

ROAD

WORK

AHEAD

END

ROAD WORK

G20-2

36" X 18"

FLEXIBLE DRUMS (CHANNELIZING)

SIGN (CONSTRUCTION)

w/ TYPE A

WARNING LIGHTS

ROAD

CLOSED

TYPE III BARRICADE ROAD CLOSURE

A AR11-2

48" X 30"

TEMPORARY BARRICADE (TYPE III)

W20-1

36" X 36"

ROAD

WORK

AHEAD

END

ROAD WORK

G20-2

36" X 18"

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oad

way

s\0

11

00

00

5\D

esig

n\0

46

.sh

t

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 182+

50 S

EE

SH

T. N

O. 46A

STA.168+00 TO STA.182+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 2

HPP/NH-71(16) 46

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

SR 71/US 441

SR 71/US 441

SIM

MO

NS

RO

AD

HU

TC

HE

SO

N R

OA

D

HUTCHESON ROAD

MU

RP

HY

RO

AD

HIL

LT

OP

VIE

W D

RIV

E

S 53%%d 55' 05" E

S 3

0%

%d 5

9' 26" W

S 4

6%

%d 0

4' 55" W

S 3

6%

%d 0

6' 04" W

1

8

5

190

195

S 4

2%

%d 3

6' 33" W

70

75

SR 71/US 441 STA. 189+84.81 =

HUTCHESON ROAD/SIMMONS ROAD STA. 72+17.86

N 568665.4120

E 2631043.8018

EXISTING PAVEMENT TO BE

SCARIFIED BACK FILLED

SEEDED & MULCHED

TRAFFIC CONTROL - PHASE 2

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

6. ONCE ALL OF PHASE 2 CONSTRUCTION IS COMPLETE THE CONTRACTOR

SHALL INSTALL PHASE 3 TRAFFIC CONTROL.

4. TRAFFIC IS TO BE SHIFTED TO THE NEWLY CONSTRUCTED TRAVEL LANES

AND TEMPORARY PAVEMENT BUILT IN PHASE 1.

ITEM

TEMPORARY PAVEMENT

SEE STEP 4

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

SIGN (CONSTRUCTION)

3. ALL NEW PAVEMENT, PAVEMENT WIDENING, AND SHOULDERS CONSTRUCTED

IN PHASE 2 SHALL BE BUILT UP TO THE INTERMEDIATE ASPHALT LAYER.

5. AFTER TRAFFIC IS SHIFTED, THE REMAINING FULL DEPTH PAVEMENT

AREA ALONG THE PROPOSED SR 71/US 411 IS TO BE CONSTRUCTED.

10'10'10'10'

8" RSSWL

8" RSBWL

8" RDSYL

G20-2

36" X 18"

END

ROAD WORKROAD

WORK

AHEAD

W20-1

36" X 36"

ROAD

WORK

AHEAD

W20-1

36" X 36"

END

ROAD WORK

G20-2

36" X 18"

FLEXIBLE DRUMS (CHANNELIZING)

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oad

way

s\0

11

00

00

5\D

esig

n\0

46

A.s

ht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST. 46A

STA.182+50 TO STA.195+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 2

HPP/NH-71(16)

MA

TC

H L

IN

E S

TA

. 182+

50 S

EE

SH

T. N

O. 46

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

W. M

AC

ON

LA

NE

S

R

7

1

/

U

S

4

4

1

SR 71/US 441SR 71/US 441

E. M

ACO

N L

AN

E

S 6

6%

%d 3

7' 08" W

S 6

8%

%d 2

1' 2

5"

W

S 6

4%

%d 0

4' 52" W

S 6

8%

%d 0

8' 4

8" W

10

15

20

S

7

0

%

%

d

5

4

'

3

0

"

E

1

5

0

155

SR 71/US 441 STA. 151+28.64 =

MACON LANE STA. 15+99.51

N 570136.4414

E 2627512.4675

BEGIN PROJ. NO. HPP/NH-71(16)

STA. 149+91.20 (R.O.W.)

WW

C-1

/EPH

-1

WW

C-3

/

EP

H-3

WWC-2/EPH-2

WW

C-1

/EPH

-1

THE CONSTRUCTION SIGNING PLANS ARE TO SERVE AS A GUIDE ONLY.

OTHER SIGNS MY BE REQUIRED DURING VARIOUS PHASES OF CONSTRUCTION.

THIS TRAFFIC CONTROL PLAN DOES NOT RELIEVE THE CONTRACTOR OF THEIR

RESPONSIBILITY OF INSTALLING TRAFFIC CONTROL DEVICES IN ACCORDANCE

WITH THE CURRENT EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL

DEVICES."

THE CONTRACTOR IS TO MAINTAIN ACCESS TO ALL LOCAL PROPERTY OWNERS.

TRAFFIC CONTROL NOTES

5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL

DEVICES SHALL BE REMOVED.

TRAFFIC CONTROL - PHASE 3

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL

BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

SIGN (CONSTRUCTION)

ROAD

WORK

1/2 MILE

1600'ROAD

WORK

1000 FT

ROAD

WORK

500 FT

500'

500'

END

ROAD WORK

500'

2600' 1600' ROAD

WORK

1000 FT

ROAD

WORK

1 MILE

ROAD

WORK

1/2 MILE

1

0

0

0

'

500'

END

ROAD WORK

END

ROAD WORK

500'

500'

ROAD

WORK

1/2 MILE

1600' ROAD

WORK

1000 FT

ROAD

WORK

500 FT

500'

3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND

PAVEMENT MARKING PLANS.

W20-1

36" X 36"

W20-1

36" X 36"

W20-1

36" X 36"

G20-2

36" X 18"

W20-1

48" X 48"

W20-1

48" X 48"

W20-1

48" X 48"

G20-2

48" X 24"

G20-2

36" X 18"

W20-1

36" X 36"

W20-1

36" X 36"

W20-1

36" X 36"

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\047.s

ht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 156+

50 S

EE

SH

T. N

O. 47A

BEGIN TO STA.156+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 3

HPP/NH-71(16) 47

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

S 16%%d 02' 41" WS

35%

%d 5

2' 28" W

30SR 71/US 441 SR 71/US 441SR 71/US 441

S

R

7

1

/

U

S

4

4

1

CH

AP

MA

N V

IEW

DR

IVE

S 6

6%

%d 3

7' 0

8"

W

10

S 73%%d 57' 19" E

155160 1651

7

0

S 4

0%

%d 2

8' 34" WS 16%%d 02' 41" W 4

0

VA

LE

RIE

WA

Y

SR 71/US 441 STA. 162+99.97 =

CHAPMAN VIEW DRIVE STA. 30+00.00

N 569785.8628

E 2628629.8233

SR 71/US 441 STA. 168+65.00 =

VALERIE WAY STA. 42+48.78

N 569629.6960

E 2629172.8456

WW

C-1

/EPH

-1

WW

C-3

/

EP

H-3

WW

C-4

/

EPH

-4

WW

C-2/E

PH

-2

WWC-2/EPH-2

TRAFFIC CONTROL - PHASE 3

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

THIS PLAN.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

ITEM

500'

500'

5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL

DEVICES SHALL BE REMOVED.

4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL

BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES.

3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

DEVICES SHALL BE REMOVED.

6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND

PAVEMENT MARKING PLANS.

G20-2

36" X 18"

END

ROAD WORK

G20-2

36" X 18"

W20-1

36" X 36"

ROAD

WORK

AHEAD

ROAD

WORK

AHEAD

W20-1

36" X 36"

END

ROAD WORK

G20-2

36" X 18"

SIGN (CONSTRUCTION)

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\047A

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MATCH LINE STA. 169+50 SEE SHT. NO. 47B

47A

STA.156+50 TO STA.169+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 3

HPP/NH-71(16)

MATCH LINE STA. 156+50 SEE SHT. NO. 47

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

SR 71/US 441

SR 71/US 441

SR 71/US 441

HUTCHESON ROAD

FO

RD

HIL

L L

AN

E

SH

AD

Y L

AN

E

170

175180

S 4

0%

%d 2

8' 34" W

S 1

6%

%d 0

2' 41" W

S 4

3%

%d 3

8' 59" W

S 1

8%

%d 3

2' 59" W

50

S 4

7%

%d 3

3' 15" W

S 2

0%

%d 4

6' 53" W

40

60

VA

LE

RIE

WA

Y

SR 71/US 441 STA. 171+75.00 =

SHADY LANE STA. 52+17.77

N 569539.6717

E 2629469.4517

SR 71/US 441 STA. 173+60.00 =

FORD HILL LANE STA. 61+88.03

N 569477.4176

E 2629643.6502

TRAFFIC CONTROL - PHASE 3

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

AS DIRECTED BY THE ENGINEER. THIS PLAN.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL

DEVICES SHALL BE REMOVED.

4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL

BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES.

3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

DEVICES SHALL BE REMOVED.

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND

PAVEMENT MARKING PLANS.

G20-2

36" X 18"

ROAD

WORK

AHEAD

W20-1

36" X 36"

END

ROAD WORK

G20-2

36" X 18"

W20-1

36" X 36"

ROAD

WORK

AHEAD

END

ROAD WORK

G20-2

36" X 18"

SIGN (CONSTRUCTION)

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\047B

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 169+

50 S

EE

SH

T. N

O. 4

7A

MA

TC

H L

IN

E S

TA

. 182+

50 S

EE

SH

T. N

O. 47C

47B

STA.169+50 TO STA.182+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 3

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

SR 71/US 441

SR 71/US 441

SIM

MO

NS

RO

AD

HU

TC

HE

SO

N R

OA

D

HUTCHESON ROAD

MU

RP

HY

RO

AD

HIL

LT

OP

VIE

W D

RIV

E

S 53%%d 55' 05" E

S 3

0%

%d 5

9' 26" W

S 4

6%

%d 0

4' 55" W

S 3

6%

%d 0

6' 04" W

1

8

5

190

195

S 4

2%

%d 3

6' 33" W

70

75

SR 71/US 441 STA. 189+84.81 =

HUTCHESON ROAD/SIMMONS ROAD STA. 72+17.86

N 568665.4120

E 2631043.8018

EXISTING PAVEMENT TO BE

SCARIFIED BACK FILLED

SEEDED & MULCHED

TRAFFIC CONTROL - PHASE 3

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

ITEM

5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL

DEVICES SHALL BE REMOVED.

4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL

BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES.

3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

SIGN (CONSTRUCTION)

6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND

PAVEMENT MARKING PLANS.

END

ROAD WORK

G20-2

36" X 18"

ROAD

WORK

AHEAD

W20-1

36" X 36"

W20-1

36" X 36"

ROAD

WORK

AHEAD

END

ROAD WORK

G20-2

36" X 18"

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\047C

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 182+

50 S

EE

SH

T. N

O. 47B

MA

TC

H L

IN

E S

TA

. 195+

50 S

EE

SH

T. N

O. 47D

47C

STA.182+50 TO STA.195+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 3

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

S 53%%d 55' 05" ESR 71/US 441 SR 71/US 441 SR 71/US 441

195 200 205 210

ST

R-1

TRAFFIC CONTROL - PHASE 3

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

SYMBOL

WORK ZONE

TRAFFIC FLOW

5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL

DEVICES SHALL BE REMOVED.

4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL

BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES.

3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND

PAVEMENT MARKING PLANS.

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oad

way

s\0

11

00

00

5\D

esig

n\0

47

D.s

ht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 195+

50 S

EE

SH

T. N

O. 47C

MA

TC

H L

IN

E S

TA

. 2

08

+5

0 S

EE

SH

T.

NO

. 4

7E

47D

STA.195+50 TO STA.208+50

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 3

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY

N 6

6%

%d 1

2' 32" E

N 7

1%

%d 2

6' 19" E

100

90

SR 71/US 441 SR 71/US 441SR 71/US 441

SR

338

SR

35/U

S 4

11

S 53%%d 55' 05" E

210

END PROJ. NO. HPP/NH-71(16)

STA. 210+55.00 (R.O.W.)

TRAFFIC CONTROL - PHASE 3

1. INSTALL CONSTRUCTION SIGNAGE FOR PROJECT AS PER THIS PLAN AND

AS DIRECTED BY THE ENGINEER.

2. THE CONTRACTOR SHALL CONSTRUCT THE HATCHED AREA AS SHOWN ON

THIS PLAN.

SYMBOL

TRAFFIC CONTROL LEGEND

ITEM

WORK ZONE

TRAFFIC FLOW

5. ONCE ALL OF PHASE 3 CONSTRUCTION IS COMPLETE THE TRAFFIC CONTROL

DEVICES SHALL BE REMOVED.

4. THE REQUIRED OVERLAY AND REMAINING SIDE ROAD CONSTRUCTION SHALL

BE PERFORMED WITHOUT REQUIRING ANY ROAD CLOSURES.

3. ALL PAVEMENT CONSTRUCTED IN PREVIOUS PHASES SHALL HAVE THE FINAL

ASPHALT LAYER CONSTRUCTED IN PHASE 3.

6. INSTALL FINAL SIGNING AND MARKING AS SHOWN IN THE SIGNING AND

PAVEMENT MARKING PLANS.

500'

END

ROAD WORK

G20-2

48" X 24"

ROAD

WORK

1/2 MILE

1600'ROAD

WORK

1000 FT

ROAD

WORK

500 FT

500'

W20-1

48" X 48"

W20-1

48" X 48"

W20-1

48" X 48"

500'

SIGN (CONSTRUCTION)

TE

NN

ES

SE

E D

.O.T

.

DE

SIG

N D

IV

IS

IO

N

FIL

E N

O.

TYPE YEAR PROJECT NO.SHEET

NO.

26

-JA

N-2

01

7 1

4:4

1

2017

Y:\R

oadw

ays\01100005\D

esign\047E

.sht

STATE OF TENNESSEE

DEPARTMENT OF TRANSPORTATION

COORDINATES ARE NAD/83(1995),

ARE DATUM ADJUSTED BY THE

THE TGRN. ALL ELEVATIONS ARE

REFERENCED TO THE NAVD 1988.

N

FACTOR OF 1.00001 AND TIED TO

CONST.

MA

TC

H L

IN

E S

TA

. 2

08

+5

0 S

EE

SH

T.

NO

. 4

7D

47E

STA.208+50 TO END

SCALE: 1"=50'

TRAFFIC

CONTROL PLAN

PHASE 3

HPP/NH-71(16)

SEALED BY

FIELD

REVIEW

CONSTRUCTABILITY