LEVEL 00 0.000 LEVEL 01 3.150 ROOF 9.450 LEVEL 02 6.300 LEVEL 00 0.000 LEVEL 01 3.150 ROOF 9.450 LEVEL 02 6.300 LEVEL 00 0.000 LEVEL 01 3.150 LEVEL 02 6.300 LEVEL 00 0.000 LEVEL 01 3.150 ROOF 9.450 LEVEL 02 6.300 LEVEL 00 0.000 LEVEL 01 3.150 ROOF 9.450 LEVEL 02 6.300 LEVEL 00 0.000 LEVEL 01 3.150 ROOF 9.450 LEVEL 02 6.300 2 2 3 3 1 1 4 4 5 6 Percy House, 8th Floor Percy Street, Newcastle NE1 4PW England, UK norr.com S2 - FOR INFORMATION True North Project No. Drawing No. Client Project Drawing Title Detail Symbol North Arrow Detail No. Sheet No. DATE REVISION REV Keyplan ISO A0 - 841mmx 1189mm Consultants DRWCHK Rev. Sheet Status Drawn Checked Date Date Scale This drawing must not be used, reproduced or revised without written permission. This drawing shall not be used for construction purposes until the “CONSTRUCTION” status appears under the Sheet Status. Constructors must only work to figured dimensions which are to be checked on site. Do not scale from hard copy drawings An Ingenium International Company NORR Consultants Limited. 2 As indicated @ A0 GA ELEVATIONS - PROPOSED 1234-NOR-01-ZZ-DR-A-00-1003 HALTWHISTLE PRIMARY SCHOOL PB JB 18.06.19 18.06.19 IANC19-0013 SCALE: 1 : 100 PROPOSED GA ELEVATION - EAST 4 SCALE: 1 : 100 PROPOSED GA ELEVATION - WEST 2 SCALE: 1 : 100 PROPOSED GA ELEVATION - NORTH B 3 SCALE: 1 : 100 PROPOSED GA ELEVATION - SOUTH A 1 SCALE: 1 : 100 PROPOSED GA ELEVATION - SOUTH B 5 SCALE: 1 : 100 PROPOSED GA ELEVATION - NORTH A 6 Existing curtain wall system replaced and fenestration amended incorporating opaque opening lights and glazed look-a-like infill panels *Colours indicative Projecting walls reclad and insulated Extent of window replacement and non classroom opening lights to be confirmed Hall roof to be surveyed and repaired as required Roof insulation increased to current standards Extent of window replacement and non classroom opening lights to be confirmed Existing windows removed and opening increased to facilitate bifolding doors inc. exit door Extent of window replacement and non classroom opening lights to be confirmed Extent of roof insulation increased to be determined Look-a-like infill panel for school logo Hall roof to be surveyed and repaired as required Extent of window replacement and non classroom opening lights to be confirmed Extent of roof insulation increased to be determined Roof insulation increased to current standards Extent of window replacement and non classroom opening lights to be confirmed Extent of roof insulation increased to be determined Extent of window replacement and non classroom opening lights to be confirmed Extent of roof insulation increased to be determined Roof insulation increased to current standards Hall roof to be surveyed and repaired as required Existing curtain wall system replaced and fenestration amended incorporating opaque opening lights and glazed look-a-like infill panels *Colours indicative Condition of existing timber cladding to be assessed and replaced if necessary Condition of existing timber cladding to be assessed and replaced if necessary Condition of existing timber cladding to be assessed and replaced if necessary New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area. New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area. New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area. 20.06.19 FIRST ISSUE 1 PB JB 03.07.19 OBC ISSUE 2 PB JB Existing western gable cladding removed, re-insulated and reclad in keeping with the projecting stair well fins

PROPOSED GA ELEVATION - SOUTH Acommitteedocs.northumberland.gov.uk/MeetingDocs/... · ga elevations - proposed 1234-nor-01-zz-dr-a-00-1003 haltwhistle primary school pb jb 18.06.19

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROPOSED GA ELEVATION - SOUTH Acommitteedocs.northumberland.gov.uk/MeetingDocs/... · ga elevations - proposed 1234-nor-01-zz-dr-a-00-1003 haltwhistle primary school pb jb 18.06.19

LEVEL 00

0.000

LEVEL 01

3.150

ROOF

9.450

LEVEL 02

6.300

LEVEL 00

0.000

LEVEL 01

3.150

ROOF

9.450

LEVEL 02

6.300

LEVEL 00

0.000

LEVEL 01

3.150

LEVEL 02

6.300

LEVEL 00

0.000

LEVEL 01

3.150

ROOF

9.450

LEVEL 02

6.300

LEVEL 00

0.000

LEVEL 01

3.150

ROOF

9.450

LEVEL 02

6.300

LEVEL 00

0.000

LEVEL 01

3.150

ROOF

9.450

LEVEL 02

6.300

2

2

3

3

1 1

4 4

5

6

Percy House, 8th Floor Percy Street,Newcastle NE1 4PWEngland, UKnorr.com

S2 - FOR INFORMATION

Tru

eN

orth

Project No.

Drawing No.

Client

Project

Drawing Title

Detail SymbolNorth Arrow

Detail No.

Sheet No.

DATE REVISION REV

Keyplan

ISO

A0 -

841

mm

x 1

189

mm

Consultants

DRWCHK

Rev.

Sheet Status

Drawn

Checked

Date

Date

Scale

This drawing must not be used, reproduced or revised without written permission.

This drawing shall not be used for construction purposes until the “CONSTRUCTION” status appears under the Sheet Status.

Constructors must only work to figured dimensions which are to be checked on site. Do not scale from hard copy drawings

An Ingenium International Company

NORR Consultants Limited.

2

As indicated @ A0

GA ELEVATIONS - PROPOSED

1234-NOR-01-ZZ-DR-A-00-1003

HALTWHISTLE PRIMARY SCHOOL

PB

JB

18.06.19

18.06.19

IANC19-0013

SCALE: 1 : 100

PROPOSED GA ELEVATION - EAST4

SCALE: 1 : 100

PROPOSED GA ELEVATION - WEST2

SCALE: 1 : 100

PROPOSED GA ELEVATION - NORTH B3

SCALE: 1 : 100

PROPOSED GA ELEVATION - SOUTH A1

SCALE: 1 : 100

PROPOSED GA ELEVATION - SOUTH B5

SCALE: 1 : 100

PROPOSED GA ELEVATION - NORTH A6

Existing curtain wall system replaced and fenestration amended incorporating opaque opening lights and glazed look-a-like infill panels

*Colours indicative

Projecting walls reclad and insulated

Extent of window replacement and non classroom opening lights to be confirmed

Hall roof to be surveyed and repaired as required

Roof insulation increased to current standards

Extent of window replacement and non classroom opening lights to be confirmed

Existing windows removed and opening increased to facilitate bifolding doors inc. exit door

Extent of window replacement and non classroom opening lights to be confirmed

Extent of roof insulation increased to be determined

Look-a-like infill panel for school logo

Hall roof to be surveyed and repaired as required

Extent of window replacement and non classroom opening lights to be confirmed

Extent of roof insulation increased to be determined

Roof insulation increased to current standards

Extent of window replacement and non classroom opening lights to be confirmed

Extent of roof insulation increased to be determined

Extent of window replacement and non classroom opening lights to be confirmed

Extent of roof insulation increased to be determined

Roof insulation increased to current standards

Hall roof to be surveyed and repaired as required

Existing curtain wall system replaced and fenestration amended incorporating opaque opening lights and glazed look-a-like infill panels

*Colours indicative

Condition of existing timber cladding to be assessed and replaced if necessary

Condition of existing timber cladding to be assessed and replaced if necessary

Condition of existing timber cladding to be assessed and replaced if necessary

New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area.

New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area.

New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area.

20.06.19 FIRST ISSUE 1 PB JB

03.07.19 OBC ISSUE 2 PB JB

Existing western gable cladding removed, re-insulated and reclad in keeping with the projecting stair well fins