LEVEL 00
0.000
LEVEL 01
3.150
ROOF
9.450
LEVEL 02
6.300
LEVEL 00
0.000
LEVEL 01
3.150
ROOF
9.450
LEVEL 02
6.300
LEVEL 00
0.000
LEVEL 01
3.150
LEVEL 02
6.300
LEVEL 00
0.000
LEVEL 01
3.150
ROOF
9.450
LEVEL 02
6.300
LEVEL 00
0.000
LEVEL 01
3.150
ROOF
9.450
LEVEL 02
6.300
LEVEL 00
0.000
LEVEL 01
3.150
ROOF
9.450
LEVEL 02
6.300
2
2
3
3
1 1
4 4
5
6
Percy House, 8th Floor Percy Street,Newcastle NE1 4PWEngland, UKnorr.com
S2 - FOR INFORMATION
Tru
eN
orth
Project No.
Drawing No.
Client
Project
Drawing Title
Detail SymbolNorth Arrow
Detail No.
Sheet No.
DATE REVISION REV
Keyplan
ISO
A0 -
841
mm
x 1
189
mm
Consultants
DRWCHK
Rev.
Sheet Status
Drawn
Checked
Date
Date
Scale
This drawing must not be used, reproduced or revised without written permission.
This drawing shall not be used for construction purposes until the “CONSTRUCTION” status appears under the Sheet Status.
Constructors must only work to figured dimensions which are to be checked on site. Do not scale from hard copy drawings
An Ingenium International Company
NORR Consultants Limited.
2
As indicated @ A0
GA ELEVATIONS - PROPOSED
1234-NOR-01-ZZ-DR-A-00-1003
HALTWHISTLE PRIMARY SCHOOL
PB
JB
18.06.19
18.06.19
IANC19-0013
SCALE: 1 : 100
PROPOSED GA ELEVATION - EAST4
SCALE: 1 : 100
PROPOSED GA ELEVATION - WEST2
SCALE: 1 : 100
PROPOSED GA ELEVATION - NORTH B3
SCALE: 1 : 100
PROPOSED GA ELEVATION - SOUTH A1
SCALE: 1 : 100
PROPOSED GA ELEVATION - SOUTH B5
SCALE: 1 : 100
PROPOSED GA ELEVATION - NORTH A6
Existing curtain wall system replaced and fenestration amended incorporating opaque opening lights and glazed look-a-like infill panels
*Colours indicative
Projecting walls reclad and insulated
Extent of window replacement and non classroom opening lights to be confirmed
Hall roof to be surveyed and repaired as required
Roof insulation increased to current standards
Extent of window replacement and non classroom opening lights to be confirmed
Existing windows removed and opening increased to facilitate bifolding doors inc. exit door
Extent of window replacement and non classroom opening lights to be confirmed
Extent of roof insulation increased to be determined
Look-a-like infill panel for school logo
Hall roof to be surveyed and repaired as required
Extent of window replacement and non classroom opening lights to be confirmed
Extent of roof insulation increased to be determined
Roof insulation increased to current standards
Extent of window replacement and non classroom opening lights to be confirmed
Extent of roof insulation increased to be determined
Extent of window replacement and non classroom opening lights to be confirmed
Extent of roof insulation increased to be determined
Roof insulation increased to current standards
Hall roof to be surveyed and repaired as required
Existing curtain wall system replaced and fenestration amended incorporating opaque opening lights and glazed look-a-like infill panels
*Colours indicative
Condition of existing timber cladding to be assessed and replaced if necessary
Condition of existing timber cladding to be assessed and replaced if necessary
Condition of existing timber cladding to be assessed and replaced if necessary
New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area.
New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area.
New PPC steel/ glazed rainwater canopies provided to early years entrances and external learning area.
20.06.19 FIRST ISSUE 1 PB JB
03.07.19 OBC ISSUE 2 PB JB
Existing western gable cladding removed, re-insulated and reclad in keeping with the projecting stair well fins