Mid-term Review of Business Plan for FY 2014-15 FY 2015-16 FY 2013-14 A 400/220 KV Halvad s/s 400/220KV s/s with 2x315 MVA X'mer, 400KV FB - 6, 220KV FB - 6 400 KV, 63MVAR Bus Reactor 220/66 KV system & 100 MVA ICT and 3 nos of 66KV FB 105.05 24.35 2.71 - 400KV D/C Vadavi- Halvad line 400KV line (D/C) (120) 110.40 11.04 22.08 22.08 400KV FB - 2 Nos. at Vadavi 400KV FB 8.06 1.94 - - 400KV s/c Adani-Hadala LILO at Halvad 400KV line (D/C) (55) 50.60 7.91 11.87 - 66 KV interconnection from 400 KV Halvad substation 66 KV D/C line - Panther 6.60 5.98 - - Total: 6.60 51.21 36.65 22.08 B - - - - LILO of 220KV S/C Talangpore - Navsari line at Utran 220KV D/C line 18.50 9.25 - - 220KV Kosamba-Mobha (D/C) 220KV line (D/C) (87.6) 32.56 - - - 220KV Gavasad - Salejada (D/C) (Instead of Gavasad- Waghodia line) 220KV line (D/C) - AL-59 51.12 15.33 15.33 10.22 220KV FB - 4 Nos. at Mobha & 2 Nos. at Salejada s/s 220KV FB 8.40 3.92 1.68 - Total: 110.58 28.50 17.01 10.22 220KV LILO of single ckt of D/C Jamnagar - Jetpur at Sikka 220KV line (1xD/C)(59.8+ 57.2) 22.13 8.85 13.28 - 220KV Sikka - Motipaneli 220KV line (D/C) 39.18 15.67 23.51 - 220KV FB - 2 Nos. at Motipaneli 220KV FB 2.80 1.12 1.68 - Total: 64.11 25.64 38.46 - 400KV Ukai - Kosamba 400KV line (D/C) 55.25 - - - 400KV Kosamba - Choraniya 400KV line (D/C) 185.48 13.79 7.39 - 400KV FB - 2 Nos. at Chorania 400KV FB 8.06 0.81 - - Total: 248.79 14.60 7.39 - 220KV LILO of Karmsad - Vartej at Dhuvaran 220KV line (D/C) 17.63 1.11 0.56 - 220KV LILO of Kasor - Botad at Dhuvaran 220KV line (D/C) 11.10 3.83 - - Total : 28.73 4.94 0.56 - 400KV Adani - Zerda line-2 400KV line (D/C) 222.14 38.11 12.70 12.70 400KV Adani - Zerda line-1 400KV line (D/C) 222.14 20.46 10.23 20.46 400KV FB - 4 Nos. at Zerda 400KV FB 16.12 7.90 3.39 - 400KV X'mer Bay - 1 No. at Zerda 400KV X'mer Bay 4.03 0.81 3.22 - 400KV X'mer - 1 No. at Zerda 400KV X'mer. - 315 MVA 10.42 2.08 8.34 - BID - II Total : 474.85 69.36 37.88 33.16 400KV Essar-Amreli line 400KV line (1xD/C) 117.32 5.46 12.75 - 400KV FB - 2 Nos. at Amreli 400KV FB 8.06 2.42 5.64 - 400KV X'mer Bay - 1 No. at Hadala 400KV X'mer bay 4.03 1.21 2.82 - 400KV X'mer - 1 No. at Hadala 400KV X'mer. - 315 MVA 10.42 3.13 7.30 - Total : 139.83 12.22 28.51 - 220KV Padva - Botad 220KV line (D/C) 31.96 8.55 12.82 - 220KV Padva - Palitana 220KV line (D/C) 13.94 4.88 - - 220KV LILO of Savarkundla - Vartej at Padva (Single ckt) 220KV line (D/C) 10.20 1.02 - - 220KV FB (2-Botad, 2- Palitana) 220KV FB - 4 Nos. 5.60 2.52 - - Total : 61.70 16.97 12.82 - 8 BECL, Padva, (2x300 MW) 5 Dhuvaran CCPP - III, 360 MW 6 Adani Project, Mundra - Bid - II (1000 MW) 7 ESSAR Power, Vadinar - 1000 MW Evacuation Schemes 2 Utran CCPP Extn. - 360 MW 3 Sikka Extn. 3 & 4, 2x250 MW 4 Ukai Extn, 490 MW FY 2014-15 FY 2015-16 400 KV & 220 KV Sub Stations 1 400KV Halvad s/s Proposed Capital Expenditure PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores) S. N. Name of Project Name of S/S and Transmisssion line Work involved Estimated Cost GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 50

PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

  • Upload
    leanh

  • View
    238

  • Download
    10

Embed Size (px)

Citation preview

Page 1: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14

A

400/220 KV Halvad s/s

400/220KV s/s with 2x315 MVA

X'mer, 400KV FB - 6, 220KV FB -

6 400 KV, 63MVAR Bus Reactor

220/66 KV system & 100 MVA

ICT and 3 nos of 66KV FB

105.05 24.35 2.71 -

400KV D/C Vadavi- Halvad

line400KV line (D/C) (120) 110.40 11.04 22.08 22.08

400KV FB - 2 Nos. at Vadavi 400KV FB 8.06 1.94 - -

400KV s/c Adani-Hadala

LILO at Halvad400KV line (D/C) (55) 50.60 7.91 11.87 -

66 KV interconnection from

400 KV Halvad substation66 KV D/C line - Panther 6.60 5.98 - -

Total: 6.60 51.21 36.65 22.08

B - - - -

LILO of 220KV S/C

Talangpore - Navsari line at

Utran

220KV D/C line 18.50 9.25 - -

220KV Kosamba-Mobha

(D/C)220KV line (D/C) (87.6) 32.56 - - -

220KV Gavasad - Salejada

(D/C) (Instead of Gavasad-

Waghodia line)

220KV line (D/C) - AL-59 51.12 15.33 15.33 10.22

220KV FB - 4 Nos. at Mobha

& 2 Nos. at Salejada s/s220KV FB 8.40 3.92 1.68 -

Total: 110.58 28.50 17.01 10.22

220KV LILO of single ckt of

D/C Jamnagar - Jetpur at Sikka220KV line (1xD/C)(59.8+ 57.2) 22.13 8.85 13.28 -

220KV Sikka - Motipaneli 220KV line (D/C) 39.18 15.67 23.51 -

220KV FB - 2 Nos. at

Motipaneli220KV FB 2.80 1.12 1.68 -

Total: 64.11 25.64 38.46 -

400KV Ukai - Kosamba 400KV line (D/C) 55.25 - - -

400KV Kosamba - Choraniya 400KV line (D/C) 185.48 13.79 7.39 -

400KV FB - 2 Nos. at

Chorania400KV FB 8.06 0.81 - -

Total: 248.79 14.60 7.39 -

220KV LILO of Karmsad -

Vartej at Dhuvaran220KV line (D/C) 17.63 1.11 0.56 -

220KV LILO of Kasor - Botad

at Dhuvaran220KV line (D/C) 11.10 3.83 - -

Total : 28.73 4.94 0.56 -

400KV Adani - Zerda line-2 400KV line (D/C) 222.14 38.11 12.70 12.70

400KV Adani - Zerda line-1 400KV line (D/C) 222.14 20.46 10.23 20.46

400KV FB - 4 Nos. at Zerda 400KV FB 16.12 7.90 3.39 -

400KV X'mer Bay - 1 No. at

Zerda400KV X'mer Bay 4.03 0.81 3.22 -

400KV X'mer - 1 No. at Zerda 400KV X'mer. - 315 MVA 10.42 2.08 8.34 -

BID - II Total : 474.85 69.36 37.88 33.16

400KV Essar-Amreli line 400KV line (1xD/C) 117.32 5.46 12.75 -

400KV FB - 2 Nos. at Amreli 400KV FB 8.06 2.42 5.64 -

400KV X'mer Bay - 1 No. at

Hadala400KV X'mer bay 4.03 1.21 2.82 -

400KV X'mer - 1 No. at

Hadala400KV X'mer. - 315 MVA 10.42 3.13 7.30 -

Total : 139.83 12.22 28.51 -

220KV Padva - Botad 220KV line (D/C) 31.96 8.55 12.82 -

220KV Padva - Palitana 220KV line (D/C) 13.94 4.88 - -

220KV LILO of Savarkundla -

Vartej at Padva (Single ckt)220KV line (D/C) 10.20 1.02 - -

220KV FB (2-Botad, 2-

Palitana)220KV FB - 4 Nos. 5.60 2.52 - -

Total : 61.70 16.97 12.82 -

8BECL, Padva,

(2x300 MW)

5Dhuvaran CCPP

- III, 360 MW

6

Adani Project,

Mundra - Bid -

II (1000 MW)

7

ESSAR Power,

Vadinar - 1000

MW

Evacuation Schemes

2Utran CCPP

Extn. - 360 MW

3Sikka Extn. 3 &

4, 2x250 MW

4Ukai Extn, 490

MW

FY 2014-15 FY 2015-16

400 KV & 220 KV Sub Stations

1400KV Halvad

s/s

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 50

Page 2: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

220KV GSEG, Hazira - Mota 220KV line (D/C) 25.28 2.35 - -

220KV FB - 2 Nos. at Mota 220KV FB - 2 Nos. 2.80 - - -

Total : 28.08 2.35 - -

C City Development Plan - - - -

Bhavnagar 33.00 15.00 - -

Jamnagar 35.00 13.00 21.00 -

Ahmedabad 2.30 - - -

Baroda 21.62 - 3.00 -

Rajkot 1.89 - - -

Total : 93.81 28.00 24.00 -

D R & M Works - - - -

11 R & M Works Total : 839.86 106.95 132.55 132.55

E - - - -

400 KV substation for

upcoming generation

400/220 KV, 1x315 MVA X'mers

GIS with 4 Nos. 400 KV FB120.00 - - 6.00

400 KV D/C Chhara - Keshod

line400 KV D/C line (100 RKM) 211.00 - - 10.55

Total : 331.00 - - 16.55

400 KV substation for

upcoming generation

400/220 KV, 1x315 MVA X'mers

GIS with 4 Nos. 400 KV FB120.00 - - 6.00

400 KV D/C Pipavav - Amreli

line400 KV D/C line (75 RKM) 158.25 - - 7.91

400 KV FB - 2 Nos. at Amreli 400 KV FB - 2 8.06 - - 0.40

Total : 286.31 - - 14.32

400 KV substation for

upcoming generation

400/220 KV, 1x315 MVA X'mers

GIS with 4 Nos. 400 KV FB120.00 - 6.00 24.00

400 KV D/C Bhogat - Kalavad

line400 KV D/C line (120 RKM) 253.20 - 12.66 50.64

Total : 373.20 - 18.66 74.64

400/220/66 KV Kalavad s/s 400/220 KV, 2x315 MVA X'mers,

400 KV FB - 6, 220 KV FB - 691.50 9.15 18.30 27.45

220/66 KV, 1 x 100 MVA Xmer, 66

KV FB - 68.60 0.86 1.72 2.58

LILO of one 400 KV D/C

Essar - Hadala line at Kalavad

substation

400 KV line (D/C) (2x25 RKM) 46.00 4.60 9.20 13.80

220 KV D/C Kalavad -

Kangasiali line220 KV line (D/C) (80 RKM) 30.80 3.08 6.16 9.24

220KV FB - 2 Nos. at

Kangasiali220 KV FB 2.80 0.28 0.56 0.84

66 KV D/C interconnection

lines and bays for Kalavad

substation

66KV line (D/C-Panther) (40

RKM)8.80 0.88 1.76 2.64

66 KV FB - 6 Nos. 2.10 0.21 0.42 0.63

Total : 190.60 19.06 38.12 57.18

400/220 KV Keshod s/s 400/220 KV, 2x315 MVA X'mers,

400 KV FB - 4, 220 KV FB - 678.44 - - 3.92

400 KV D/C Kalavad -

Keshod line400 KV line (D/C) (110 RKM) 232.10 - - 11.61

400 KV FB - 2 Nos. at

Kalavad400 KV FB - 2 8.06 - - 0.40

220 KV D/C Keshod (400 KV)

- Keshod line220 KV line (D/C) (5 RKM) 2.80 - - 0.14

220 KV D/C Keshod (400 KV)

- Timbdi line220 KV line (D/C) (70 RKM) 39.20 - - 1.96

220 KV D/C Keshod (400 KV)

- Visavadar line220 KV line (D/C) (60 RKM) 33.60 - - 1.68

220 KV FB - 2 Nos. each at

Keshod, Timbdi and Visavadar

substations

220 KV FB - 6 Nos. 8.40 - - 0.42

Total : 402.60 - - 20.13

400/220 KV Fedra s/s 400/220 KV, 2x315 MVA X'mers,

400 KV FB - 6, 220 KV FB - 686.50 - 8.65 17.30

LILO of proposed 400 KV

D/C Kasor - Amreli line at

Fedra

400 KV line (D/C) (2x20 RKM) 84.40 - 8.44 16.88

17

400 KV Fedra

substation, Dist:

Ahmedabad

14400 KV Bhogat,

Dist: Jamnagar

15

400 KV Kalavad

substation, Dist:

Rajkot

16

400 KV Keshod

substation, Dist:

Junagadh

400 KV, 220 KV and 66 KV Substations and Transmission lines:

12400 KV Chhara,

Dist: Junagadh

13

400 KV

Pipavav, Dist:

Amreli

9GSEG, Hazira

(Extn), 350 MW

10

City

Development

Plan

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 51

Page 3: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

400 KV D/C Kosamba - Fedra

line instead of earlier approved

400 KV D/C Kosamba -

Chorania line

400 KV line (D/C) (260 RKM) 36.80 - 3.68 7.36

220 KV D/C Fedra - Botad

line220 KV line (D/C) (60 RKM) 33.60 - 3.36 6.72

LILO of 220 KV S/C Kasor -

Vartej line at Fedra substation220 KV line (D/C) (10 RKM) 3.70 - 0.37 0.74

LILO of 220 KV S/C

Karamsad - Vartej line at

Fedra substation

220 KV line (D/C) (10 RKM) 3.70 - 0.37 0.74

220 KV FB - 2 Nos. at Botad 220 KV FB - 2 Nos. 2.80 - 0.28 0.56

Total : 251.50 - 25.15 50.30

400/220 KV Sankhari s/s 400/220 KV, 2x315 MVA X'mers,

400 KV FB - 8, 220 KV FB - 694.56 - 18.91 18.91

LILO of proposed 400 KV

D/C Adani, Mundra - Zerda

line at Sankhari

400 KV line (D/C) (2x50 RKM) 92.00 - 18.40 18.40

LILO of proposed 400 KV

D/C Vadavi - Zerda line at

Sankhari (Reliance line -

IPTC)

400 KV line (D/C) (2x25 RKM) 46.00 - 9.20 9.20

LILO of proposed 220 KV

D/C Sankhari - Jangral line at

Sankhari (400 KV) substation

220 KV line (D/C) (2x25 RKM) 18.50 - 3.70 3.70

LILO of 220 KV S/C

Radhanpur - Mehsana line at

Sankhari (400 KV) substation

220 KV line (D/C) (25 RKM) 9.25 - 1.85 1.85

Total : 260.31 - 52.06 52.06

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

24.90 - - 1.25

220/132 KV, 1 x 100 MVA X'mer

& 2 Nos. 132 KV FB9.50 - - 0.48

220 KV D/C Amreli - Jasdan

line220 KV line (D/C) (55 RKM) 30.80 - - 1.54

LILO of 132 KV S/C Jasdan -

Gondal line at 220 KV Jasdan

substation

132 KV line (D/C) (10 RKM) 2.50 - - 0.13

220 KV FB - 2 Nos. at Amreli 220 KV FB - 2 Nos. 2.80 - - 0.14

66KV line (D/C-Panther) (40

RKM)8.80 - - 0.44

66 KV FB - 6 Nos. 2.10 - - 0.11

Total : 81.40 - - 4.07

220/132/66 KV Sarla (Chotila)

s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6 & 220/132 KV ICT

37.20 - - -

220 KV D/C Halvad (400 KV) -

Sarla line220 KV line (D/C) (45 RKM) 21.28 6.38 - -

LILO of 220 KV S/C Chorania

- Gondal line at 220 KV Sarla

substation instead of Halvad

(400 KV)

220 KV line (D/C) (20 RKM) 10.80 3.24 - -

LILO of 132 KV S/C

Wankaner - Limdi line at 220

KV Chotila s/s

132 KV line (D/C) (15 RKM) 3.75 1.13 - -

220 KV FB - 2 Nos. at Halvad

(400 KV)220 KV FB - 2 Nos. 2.80 0.84 - -

66KV line (D/C-Panther) (40

RKM)8.80 2.64 - -

66 KV FB - 6 Nos. 2.10 0.63 - -

Total : 86.73 14.86 - -

220/132 KV Bhatia substation

220/132 KV substation with 2 x

100 MVA X'mers; 220 KV FB - 2

Nos., 132 KV FB - 2 Nos.

36.50 - - -

220/132/66 KV Jasdan s/s

66 KV D/C interconnection

lines and bays for Jasdan

substation

20

220 KV Sarla

(Chotila)

substation, Dist:

Surendranagar

66 KV D/C interconnection

lines and bays for Sarla

substation

21220 KV Bhatia,

Dist: Jamnagar

17

400 KV Fedra

substation, Dist:

Ahmedabad

18

400 KV

Sankhari

substation,

Patan

19

220 KV Jasdan

substation, Dist:

Rajkot

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 52

Page 4: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

220 KV D/C Bhatia - Kalavad

line220 KV line (D/C) (80 RKM) 66.64 13.33 13.33 39.98

132 KV D/C Bhatia (220 KV) -

Bhatia line132 KV line (D/C) (10 RKM) 2.50 - - -

132 KV FB - 2 Nos. at Bhatia 132 KV FB 1.50 - - -

Total : 107.14 13.33 13.33 39.98

220/66 KV Bhachau s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

25.20 - - -

220 KV D/C Varsana -

Bhachau line220 KV line (D/C) (30 RKM) 17.47 6.99 10.48 -

220 KV D/C Bhachau -

Radhanpur line220 KV line (D/C) (170 RKM) 95.20 38.08 38.08 19.04

220 KV FB - 2 Nos. each at

Varsana and Radhanpur

substations

220 KV FB - 4 Nos. 5.60 2.24 3.36 -

66KV line (D/C-Panther) (40

RKM)8.80 3.52 5.28 -

66 KV FB - 6 Nos. 2.10 0.84 1.26 -

Total : 154.37 51.67 58.46 19.04

220/66 KV Mokha s/s220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 66 KV FB - 622.40 5.77 - -

220 KV D/C Varsana - Mokha

line220 KV line (D/C) (55 RKM) 30.80 12.32 18.48 -

220 KV FB - 2 Nos. at

Varsana220 KV FB - 2 Nos. 2.80 1.12 1.68 -

66KV line (D/C-Panther) (40

RKM)8.80 3.52 5.28 -

66 KV FB - 6 Nos. 2.10 0.84 1.26 -

Total : 66.90 23.57 26.70 -

220/66 KV Suva s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

22.40 3.49 2.33 -

LILO of one circuit of 220 KV

D/C Kosamba - Mobha line at

Suva substation

220 KV line (D/C) (30 RKM) 11.10 3.26 2.17 -

66KV line (D/C-Panther) (40

RKM)8.80 1.82 1.22 -

66 KV FB - 6 Nos. 2.10 1.26 0.84 -

Total : 44.40 9.83 6.56 -

220/66 KV Bhestan s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

22.40 2.36 - -

LILO of 220 KV S/C Navsari -

Vav line at proposed

substation near Bhestan

220 KV line (D/C) (25 RKM) 9.25 3.91 - -

66KV line (D/C-Panther) (40

RKM)8.80 3.52 - -

66 KV FB - 6 Nos. 2.10 0.84 - -

Total : 42.55 10.63 - -

220/66 KV Navera s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

22.40 6.42 14.98 -

LILO of 220 KV S/C Navsari -

Bhilad line at Navera220 KV line (D/C) (30 RKM) 11.10 4.44 6.66 -

66KV line (D/C-Panther) (40

RKM)8.80 3.52 5.28 -

66 KV FB - 6 Nos. 2.10 0.84 1.26 -

Total : 44.40 15.22 28.18 -

220/66 KV Jarod s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

25.20 5.66 13.22 -

Termination of one D/C line of

220 KV 2 x D/C Achhalia -

Jambuva lines at Jarod

220 KV line (D/C) (30 RKM) 11.84 9.47 2.37 -

26

220 KV Navera

substation, Dist:

Valsad

(upgradation

from 132 KV) 66 KV D/C interconnection

lines and bays for Navera

substation

27

220 KV Jarod

substation, Dist:

Vadodara

24

220 KV Suva

substation near

Dahej, Dist:

Bharuch

66 KV D/C interconnection

lines and bays for Suva

substation

25

220 KV

substation near

Bhestan, Dist:

Surat

66 KV D/C interconnection

lines and bays for Bhestan

substation

22

220 KV

Bhachau

substation, Dist:

Kutch

66 KV D/C interconnection

lines and bays for Bhachau

substation

23

220 KV Mokha

substation, Dist:

Kutch

66 KV D/C interconnection

lines and bays for Mokha

substation

21220 KV Bhatia,

Dist: Jamnagar

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 53

Page 5: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

LILO of one circuit of 220 KV

D/C Wanakbori - Asoj line at

Jarod

220 KV line (D/C) (10 RKM) 3.70 2.96 0.74 -

66KV line (D/C-Panther) (40

RKM)8.80 7.04 1.76 -

66 KV FB - 6 Nos. 2.10 1.68 0.42 -

Total : 51.64 26.82 18.50 -

F - - - -

28 400 KV line (D/C) (200 RKM) 213.85 50.66 50.66 25.33

29 400 KV line (D/C) (110 RKM) 100.10 20.02 40.04 40.04

30 400 KV FB - 8 Nos. 32.24 2.90 3.86 9.67

Total : 346.19 73.58 94.56 75.04

G Vadodara City Development Plan - - - -

31 Total : 232.00 40.00 30.00 30.00

H - - - -

LILO of one ckt. Of 400 KV

D/C Kosamba-Chorania line at

Fedra instead of Termination

of Kosamba-Chorania line at

Fedra

400 KV D/C line 22.40 - 4.48 17.92

Additional Cost Total : 22.40 - 4.48 17.92

4 GIS + 3 AIS substations 66 KV Substation 99.40 24.85 - -

300mm2 (3+1) U/G cable 66 KV U/G Cable 35.60 8.90 - -

S/C line - Dog 66 KV S/C line 0.43 0.11 - -

Total : 135.43 33.86 - -

400 KV D/C Wanakbori TPS

(Unit No.8) - Soja line400 KV D/C line - Twin Moose 92.00 18.40 46.00 27.60

2 Nos. of 400 KV feeder bays

at Soja substation400 KV FB 8.06 1.61 4.03 2.42

Interconnection between

existting & new switchyard400 KV D/C line - Twin Moose 0.92 0.18 0.46 0.28

LILO of existing 400 KV S/C

Wanakbori – Soja line at 400

KV Dehgam (PGCIL)

substation

400 KV D/C line - Twin Moose 12.88 2.58 6.44 3.86

2 Nos. of 400 KV feeder bays

at Dehgam (PGCIL) substation400 KV FB 8.06 1.61 4.03 2.42

400 KV D/C Soja - Zerda line 400 KV D/C line - Twin Moose 128.80 25.76 38.64 64.40

2 Nos. of 400 KV feeder bays

each at Soja & Zerda

substations

400 KV FB 16.12 3.22 4.84 8.06

Total : 266.84 53.37 104.44 109.04

400 KV D/C EPGL generating

station - Halvad line400 KV D/C line - Twin Moose 161.00 32.20 48.30 80.50

2 Nos. of 400 KV feeder bays

at Halvad substation400 KV FB - 2 Nos. 8.06 1.61 4.03 2.42

Total : 169.06 33.81 52.33 82.92

400 KV D/C Shapoorji Pallonji

generating station - Amreli line400 KV D/C line - Twin Moose 101.20 20.24 30.36 30.36

2 Nos. of 400 KV feeder bays

at Amreli substation400 KV FB - 2 Nos. 8.06 1.61 2.42 2.42

Total : 109.26 21.85 32.78 32.78

I - - - -

400/220 KV, 2x315 MVA X'mers,

400 KV FB - 6, 220 KV FB - 8, 63

MVAR Bus Reactor

99.30 - 9.93 39.72

220/66 KV s/s with 2x100 MVA

X'mer; 66 KV FB - 617.10 - 3.42 6.84

LILO of 400 KV S/C SSP -

Asoj & SSP-Kasor lines at

Achhalia substation

400 KV D/C line - Twin Moose 36.80 - 7.36 14.72

400 KV D/C Kosamba -

Achhalia line400 KV D/C line - Twin Moose 64.40 - 12.88 25.76

400 KV FB - 2 Nos. at

Kosamba400 KV FB - 2 8.06 - 1.61 3.22

LILO of 220 KV D/C Ukai

(Th) - Achhalia line at 400 KV

Achhalia

220 KV D/C line - ACSR Zebra 3.70 - 0.74 1.48

38

400 KV

Achhalia

substation, Dist:

Bharuch

35

EPGL, Salaya

Phase-II, (3240

MW), 800 MW

PPA-GUVNL

36

Shapoorji

Pallonji,

Kodinar, (2x660

MW), 800 MW

PPA-GUVNL

Comprehensive Plan (Comprehensive Plan-III )

37

400 KV

Achhalia

substation, Dist:

Bharuch

400/220/66 KV Achhalia s/s

32

LILO of one

ckt. Of 400 KV

D/C Kosamba -

Chorania line at

Fedra B.R. No.

61.18/932 dtd.

23.02.10

33

66 KV

substations,

appproved under

R-APDRP

scheme Part-B

34

GSECL,

Wanakbori TPS,

expansion Unit

No.8

Transmission lines:

400 KV D/C Amreli - Kasor line

400 KV D/C Varsana - Halvad line

400 KV FB - 2 Nos. each at Amreli, Kasor,

Vadodara City Development Plan

System strengthening Schemes

27

220 KV Jarod

substation, Dist:

Vadodara

66 KV D/C interconnection

lines and bays for Jarod

substation

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 54

Page 6: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

Termination of 220 KV D/C

GPEC - Haldarva line at

Achhalia (400 KV) instead of

Haldarva substation

220 KV D/C line - ACSR Zebra 16.65 - 3.33 6.66

220 KV D/C Suva - Achhalia

(400 KV) line220 KV D/C line - (AL-59) 31.50 - 6.30 12.60

220 KV FB - 2 Nos. at Suva

substation220 KV FB - 2 Nos. 2.80 - 0.56 1.12

66KV D/C line - ACSR Panther 8.80 - 1.76 3.52

66 KV FB - 6 Nos. 2.10 - 0.42 0.84

Total : (a) 291.21 - 48.31 116.48

400/220 KV, 1 x 315 MVA

ICT at Jetpur (without bay)

due to declaration of 315

MVA ICT No.1 at Jetpur as

failed

1 x 315 MVA ICT without bay 10.42 - 10.42 -

400/220 KV, 1 x 315 MVA

ICT (3rd

) at Vadavi (with bay)

considering loading

1 x 315 MVA ICT with bay 14.45 14.45 - -

400/220 KV, 1 x 315 MVA

ICT (2nd

) at Kosamba (with

bay) considering reliability as

initially only one ICT is

proposed at Kosamba

1 x 315 MVA ICT with bay 14.45 - - -

Total : (b) 39.32 14.45 10.42 -

J - - - -

220/66 KV system along with

2 x 100 MVA ICT at Hadala

substation

2 x 100 MVA ICTs with bay 15.00 7.50 - -

6 Nos. of 66 KV feeder bays at

400 KV Hadala substation66 KV FB - 6 Nos. 2.10 - - -

LILO of 66 KV D/C Nyara -

Navagam line (both ckt.) at

Hadala substation

66 KV D/C line - ACSR Panther

(2x11 Km)4.84 4.84 - -

LILO of 66 KV S/C Nyara -

Popatpara - Navagam line at

Hadala substation and

termination of Hadala - Nyara

line at Ghanteshwar substation

through existing tap line

66 KV D/C line - ACSR Panther 2.42 2.42 - -

1 No. of 66 KV feeder bay at

Ghanteshwar S/S66 KV FB - 1 No. 0.35 0.35 - -

Total : (d-i) 24.71 15.11 - -

132/66 KV s/s with 2x50 MVA

X'mer; 132 KV FB-2, 66 KV FB-711.40 - - 9.12

66/11 KV, 15 MVA ICT at

Padavala substation1.05 - - 0.84

LILO of 132 KV S/C

Dhandhuka - Paliad - Vikram

line at Padavala substation

132 KV D/C line - ACSR Panther 1.25 - - 1.00

LILO of 66 KV Hadmatla -

Kotda'S' line at Padavala

substation

66 KV D/C line - ACSR Panther 2.42 - - 1.94

66 KV D/C line - ACSR Panther 2.42 - - 1.94

66 KV S/C line - ACSR Panther 0.75 - - 0.60

1 No. of 66 KV feeder bay at

Tramba S/S66 KV FB - 1 No. 0.35 - - 0.28

66 KV, 630 sq.mm. (6+1)

Padavala - Veraval-II u/g

cable line

66 KV, 630 Sq.mm. (6+1) u/g cable 10.72 - - 8.58

66 KV, 630 sq.mm. (6+1)

Veraval-II - Veraval u/g cable

line

66 KV, 630 Sq.mm. (6+1) u/g cable 5.36 - - 4.29

40

220/66 KV

system at 400

KV Hadala

substation

41

132/66/11 KV

Padavala

substation

132/66/11 KV Padavala s/s

42

132/66/11 KV

Padavala

substation

66 KV D/C line from Padavala

- one ckt. tap to 66 KV S/C

Sardhar - Faddang line and

2nd ckt. To Tramba with 66

KV S/C line

38

400 KV

Achhalia

substation, Dist:

Bharuch

66 KV D/C interconnection

lines and bays for 400 KV

Achhalia substation

39

Augmentation of

400 KV

substations

Rajkot City Development Plan

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 55

Page 7: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

4 Nos. of 66 KV feeder bays at

Veraval-II and 2 Nos. of 66

KV feeder bays at Veraval

substations

66 KV FB - 6 No. 2.10 - - 1.68

66 KV, 630 sq.mm. (3+1)

Padavala - Shapar u/g cable

line

66 KV, 630 Sq.mm. (3+1) u/g cable 11.20 - - 8.96

1 No. of 66 KV feeder bay at

Shapar S/S66 KV FB - 1 No. 0.35 - - 0.28

Total : (d-ii) 49.37 - - 39.50

220/66 KV Metoda s/s

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

8

32.32 - - 9.70

LILO of 220 KV S/C Jetpur -

Rajkot line at Metoda

substation

220 KV D/C line - ACSR Zebra 1.85 - - 0.56

66 KV D/C line - ACSR Panther 8.80 - - 2.64

66 KV FB - 8 Nos. 2.80 - - 0.84

Total : (d-iii) 45.77 - - 13.73

220/66 KV Rajkot-II s/s

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

8

35.12 - - 7.02

LILO of 220 KV S/C Chorania

- Gondal line at Rajkot-II

substation

220 KV D/C line - ACSR Zebra 9.25 - - 1.85

220 KV D/C Hadala - Rajkot-

II line220 KV D/C line - AL-59 11.25 - - 2.25

66 KV D/C line - ACSR Panther 8.80 - - 1.76

66 KV FB - 8 Nos. 2.80 - - 0.56

Total : (d-iv) 67.22 - - 13.44

66/11 KV, GIS substations at

Nana Mava (Shastrinagar) &

Mota Mava (Ambika Park)

66/11 KV, 15 MVA GIS substations 40.00 - - 4.00

66 KV, 630 sq.mm. (6+1)

Mavdi - Nana Mava u/g cable

line

66 KV, 630 Sq.mm. (6+1) u/g cable 12.06 - - 1.21

66 KV, 630 sq.mm. (6+1)

Kangasiyali - Mavdi u/g cable

line

66 KV, 630 Sq.mm. (6+1) u/g cable 18.76 - - 1.88

66 KV, 630 sq.mm. (6+1)

Nana Mava - Mota Mava u/g

cable line

66 KV, 630 Sq.mm. (6+1) u/g cable 13.40 - - 1.34

66 KV feeder bays - 2 Nos. at

Mavdi and 1 No. each at

Kangasiyali & Nana Mava

substations

66 KV FB - 4 Nos. 1.40 - - 0.14

Total : (d-v) 85.62 - - 8.56

66 KV, 630 sq.mm. (6+1)

Kangasiyali - Punitnagar u/g

cable line by dismentalling 66

KV D/C Vikram - Punitnagar

line from Punitnagar end upto

Vavdi substation

66 KV, 630 Sq.mm. (6+1) u/g cable 18.76 1.88 7.50 5.63

66 KV, 630 sq.mm. (6+1)

Ganteshwar - Raiyadhar u/g

cable line

66 KV, 630 Sq.mm. (6+1) u/g cable 13.40 1.34 5.36 4.02

Conversion of 66 KV D/C

Nyara - Ganteshwar line from

Dog to Panther conductor

Conversion of 66 KV D/C line from

Dog to Panther0.76 0.08 0.30 0.23

Conversion of 66 KV

Dudhsagar - Wankaner H-

frame line in 630 sq.mm (3+1)

u/g cable (1 to 20 Loc. From

Dudhsagar)

66 KV, 630 Sq.mm. (3+1) u/g cable 9.60 3.84 - -

66 KV Dudhsagar -

Sindhavadr line tap to

Kuvadva substation

66 KV S/C line - Panther 1.50 0.60 - -

45

New 66 KV GIS

substations at

Nana Mava

(Shastrinagar)

and Mota Mava

(Ambika Park)

46Strengthening of

existing lines

43

220 KV Metoda

substation, Dist:

Rajkot

66 KV D/C interconnection

lines and bays for Metoda

substation

44

220 KV Rajkot-

II substation,

Dist: Rajkot

66 KV D/C interconnection

lines and bays for Rajkot-II

substation

42

132/66/11 KV

Padavala

substation

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 56

Page 8: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

66 KV feeder bays - 2 Nos.

each at Punitnagar,

Ganteshwar & Raiyadhar and

1 No. each at Navagam,

Dudhsagar & Kuvadva

substations

66 KV FB - 9 Nos. 3.15 1.26 - -

Total : (d-vii) 47.17 8.99 13.17 9.88

132 KV S/C Achhalia -

Tilakwada line (ACSR

Panther)

132 KV S/C - ACSR Panther 6.65 1.33 2.66 2.66

132 KV S/C Tilakwada -

Chhotaudepur line (ACSR

Panther)

132 KV S/C - ACSR Panther 9.50 1.90 3.80 3.80

132 KV feeder bays - 1 No.

each at Achhalia &

Chhotaudepur and 2 Nos. at

Tilakwada substations

132 KV FB - 4 Nos. 3.00 0.60 1.20 1.20

Total : (e) 19.15 3.83 7.66 7.66

400/220 KV, 2x315 MVA X'mers,

400 KV FB - 4, 220 KV FB - 4, 63

MVAR Bus Reactor

85.64 - 4.28 21.41

220/66 KV s/s with 2x100 MVA

X'mer; 66 KV FB - 617.10 - 0.86 4.28

LILO of one ckt. of proposed

400 KV D/C Wanakbori - Soja

line at Prantij substation

400 KV D/C line - Twin Moose 36.80 - 1.84 9.20

400 KV D/C Sankhari - Prantij

line400 KV D/C line - Twin Moose 92.00 - 4.60 23.00

400 KV FB - 2 Nos. at

Sankhari400 KV FB - 2 8.06 - 0.40 2.02

220 KV D/C Prantij - Agiyol

line (AL-59)220 KV D/C line - AL-59 13.50 - 0.68 3.38

220 KV D/C Prantij -

Dhansura line (AL-59)220 KV D/C line - AL-59 15.75 - 0.79 3.94

220 KV FB - 2 Nos. each at

Agiyol & Dhansura substations220 KV FB - 4 Nos. 5.60 - 0.28 1.40

66KV D/C line - ACSR Panther 8.80 - 0.44 2.20

66 KV FB - 6 Nos. 2.10 - 0.11 0.53

Total : (f) 285.35 - 14.27 71.34

220 KV D/C line - AL-59 48.23 28.94 19.29 -

220 KV FB - 2 Nos. 3.00 1.80 1.20 -

400/220 KV switchyard along

with 2x315 MVA ICTs at

Solar Park

400/220 KV s/s with 2x315 MVA

X'mer; 400 KV FBs - 2 Nos.61.08 - 12.22 48.86

400 KV D/C line - Twin Moose 92.00 - 18.40 73.60

400 KV FB - 2 Nos. 8.06 - 1.61 6.45

Total : 212.37 30.74 52.72 128.91

K - - - -

220/66 KV Bagasara s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

22.40 - 2.24 11.20

LILO of 220 KV S/C

Savarkundla - Visavadar line

at Bagasara substation

220 KV line (D/C) (5 RKM) 1.85 - 0.19 0.93

66KV line (D/C-Panther) (30

RKM)6.60 - 0.66 3.30

66 KV FB - 6 Nos. 2.10 - 0.21 1.05

Total: (a-i) 32.95 - 3.30 16.48

220/66 KV Talaja substation

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

22.40 - - 4.48

220 KV D/C Palitana - Talaja

line220 KV line (D/C) (45 RKM) 20.25 - - 4.05

220 KV FB - 2 Nos. at

Palitana220 KV FB - 2 Nos. 2.80 - - 0.56

66 KV S/C Talaja - Talaja (220

KV) line66 KV line (S/C) - Panther 0.73 - - 0.15

66 KV S/C Dihor - Talaja (220

KV) line66 KV line (S/C) - Panther 2.03 - - 0.41

52220 KV Talaja,

Dist: Amreli

53220 KV Talaja,

Dist: Amreli

50

Charanka Solar

Park-1, (590

MW),

220 KV D/C pooling station –

Jangral line (AL-59) with 2

Nos. of 220 KV feeder bays at

400 KV D/C pooling station –

Sankhari (proposed) line (Twin

Moose) with 2 Nos. of 400 KV

feeder bays at 400 KV

12 Hrs. Agri. Supply -New Substation

51

220 KV

Bagasara

substation, Dist:

Amreli

66 KV D/C interconnection

lines and bays for Bagasara

substation

48

132 KV Link

lines for 2nd

Source

49

400 KV Prantij

substation, Dist:

Sabarkantha

400/220 KV Prantij s/s

66 KV D/C interconnection

lines and bays for Prantij

substation

46Strengthening of

existing lines

47

132 KV Link

lines for 2nd

Source

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 57

Page 9: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

66 KV S/C Manar - Talaja

(220 KV) line66 KV line (S/C) - Panther 1.74 - - 0.35

66 KV S/C Tansa - Talaja

(220 KV) line66 KV line (S/C) - Panther 3.63 - - 0.73

66 KV S/C Pasvi - Talaja (220

KV) line66 KV line (S/C) - Panther 1.74 - - 0.35

66 KV feeder bay 1 No. each

at Talaja, Dihor, Manar, Tansa

and Pasvi

66 KV FB - 6 Nos. 2.10 - - 0.42

Total: (a-ii) 57.41 - - 11.48

54

220 KV Modasa

substation, Dist:

Mehsana

220/66 KV Modasa S/S

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

22.40 - - 4.48

LILO of 220 KV D/C Kadana -

Dhansura line at 220 KV

Modasa substation

220 KV line (D/C) (2 x 25 RKM) 18.50 - - 3.70

66KV line (D/C-Panther) (40

RKM) 8.80 - - 1.76

66 KV FB - 6 Nos. 2.10 - - 0.42

Total: (a-iv) 51.80 - - 10.36

220/66 KV Asodar s/s

220/66 KV s/s with 1x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

22.40 - 8.96 8.96

LILO of 220 KV D/C Jambuva

- Karamsad line at Asodar

substation

220 KV line (D/C) (2 x 1 RKM) 0.74 - 0.30 0.30

66KV line (D/C-Panther) (40

RKM) 8.80 - 3.52 3.52

66 KV FB - 6 Nos. 2.10 - 0.84 0.84

Total: (a-v) 34.04 - 13.62 13.62

L 12 Hrs. Agri. Supply -New Transmission Lines - - - -

220 KV D/C Visavadar -

Timbdi line220 KV D/C line - AL-59 27.00 - 2.70 5.40

220 KV D/C Chorania - Botad

line220 KV D/C line - AL-59 36.00 - 3.60 7.20

LILO of 220 KV S/C

Kangasiyali - Nyara line at

Hadala substation

220 KV D/C line - ACSR Zebra 6.29 - 0.63 1.26

220 KV D/C Chikhli - Bhilad

line220 KV D/C line - AL-59 38.25 - 3.83 7.65

220 KV feeder bays - 2 Nos.

each at Visavadar, Timbdi,

Chorania, Botad, Hadala,

Chikhli & Bhilad substations

220 KV FB - 14 Nos. 19.60 - 1.96 3.92

Total: (b-i) 127.14 - 12.71 25.43

LILO of one ckt. of 132 KV

D/C Dhuvaran - Vatwa line at

Mahemdabad substation

132 KV D/C line - ACSR Panther 5.00 - 0.50 1.00

132 KV D/C Achhalia -

Miyagam line132 KV D/C line - ACSR Panther 12.50 - 1.25 2.50

132 KV feeder bays - 2 Nos.

each at Achhalia, Miyagam &

Mahemdabad substations

220 KV FB - 6 Nos. 4.50 - 0.45 0.90

Total: (b-ii) 22.00 - 2.20 4.40

M 12 Hrs. Agri. Supply - Substation Augmentation - - - -

220/66 KV 650 MVA 51.74 48.16 5.17 15.52

132/66 KV 150 MVA 6.93 48.16 0.69 2.08

132/11 KV 12.5 MVA 2.00 48.16 0.20 0.60

66/22 KV 10 MVA 1.05 48.16 0.11 0.32

66/11 KV 705 MVA 53.50 48.16 5.35 16.05

Total: (b-ii) 115.22 240.80 11.52 34.57

N - - - -

220/66 KV s/s with 2x100

MVA X'mer; 220 KV FB-2,

220 KV BC bay-1, 220 KV

TBC - 1, 66 KV FB - 8

220/66 KV, 2x100 MVA

substation + 2 Nos. 220 KV FBs +

8 Nos. 66 KV FBs

32.32 - 1.62 8.08

LILO of one circuit of 220 KV

D/C Salejada - Bhat line at

Kerala substation

220 KV D/C line - ACSR Zebra 1.85 - 0.09 0.46

58 132 KV lines

59Substation

Augmentation

60220 KV Kerala

substation

Ahmedabad City Development Plan

66 KV D/C interconnection

lines and bays for Modasa

substation

56

220 KV Asodar

substation, Dist:

Anand

66 KV D/C interconnection

lines and bays for Asodar

substation

57 220 KV lines

53220 KV Talaja,

Dist: Amreli

55

220 KV Modasa

substation, Dist:

Mehsana

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 58

Page 10: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

66 KV D/C line - ACSR Panther 8.80 - 0.44 2.20

66 KV FB - 8 Nos. 2.80 - 0.14 0.70

Total : 1(c) 45.77 - 2.29 11.44

LILO of 66 KV Bopal -

Sanand line at Vadavi and

Santej substations

66 KV D/C line - ACSR Panther 7.70 7.70 - -

66 KV D/C Khatraj - Santej

line66 KV D/C line - ACSR Panther 0.66 0.66 - -

LILO of Salejada - Bavala line

to Juval Rupavati substation

instead of existing tap

66 KV S/C line - ACSR Panther 0.48 0.48 - -

66 KV FBs - 4 Nos. at Santej,

2 Nos. each at Vadavi &

Khatraj and 1 No. at Juval

Rupavati substations

66 KV FB - 9 Nos. 3.15 - - -

Total : (d) 11.99 8.84 - -

66 KV S/C Dehgam - Vehlal

line

Conversion of 66 KV S/C line from

Dog to Panther 1.33 1.33 - -

66 KV S/C Ranasan - Reliance-

1 line

Conversion of 66 KV S/C line from

Dog to Panther 0.28 0.28 - -

66 KV S/C Sanand - Bopal lineConversion of 66 KV S/C line from

Dog to high Amp. Conductor 8.71 8.71 - -

66 KV S/C Salejada - Juval

Rupavati line

Conversion of 66 KV S/C line from

Dog to Panther 0.98 0.98 - -

66 KV S/C Salejada - Juval

Rupavati - Bavala line

Conversion of 66 KV S/C line from

Dog to Panther 1.26 1.26 - -

66 KV S/C Adalaj - Dhanaj

line by using Sabarmati tap

line

Conversion of 66 KV S/C line from

Dog to high Amp. Conductor 3.35 3.35 - -

66 KV S/C Bhadaj - Dhanaj

line up to LILO point

Conversion of 66 KV S/C line from

Dog to Panther 0.70 0.70 - -

Total : (e) 16.61 16.61 - -

6366/11KV s/s with 10 MVA X'mer;

FB-1 & X'mer Bay-1 192.00 69.00 - -

66KV associated line (15 CKM per

S/S) 80.00 28.75 - -

Total : 272.00 97.75 - -

O - - - -

66/11KV s/s with 10 MVA X'mer;

FB-1 & X'mer Bay-1 222.00 135.00 87.00 -

66 KV S/C line 57.28 34.83 22.45 -

66 KV D/C line 64.38 61.58 2.80 -

Total : 343.66 231.41 112.25 -

66 KV lines & feeder bays 58.00 - - -

Total : 58.00 - - -

P Strengthening of network around Morbi area - - - -

44 Nos. of new 66 KV

substations under Morbi

(O&M) area

66/11KV s/s with 10 MVA X'mer;

FB-1 & X'mer Bay-1 132.00 18.00 114.00 -

66 KV S/C line - ACSR Dog 35.64 4.86 30.78 -

66 KV D/C line - ACSR Dog 39.60 5.40 34.20 -

Conversion of approved 66

KV Vasant Baug substation

from AIS to GIS

66 KV GIS substation 20.00 10.00 - -

Total : (a) 227.24 38.26 178.98 -

220/66 KV Sartanpar s/s

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

13

36.87 18.44 3.69 -

LILO of both circuits of 220

KV D/C Hadala - Halvad line

(under construction) at

Sartanpar substation

220 KV D/C line - ACSR Zebra - 2

x 12 RKM 8.88 6.22 - -

66 KV D/C Sartanpar (220KV

S/S) - Sartanpar (existing) line66 KV D/C line - ACSR Panther 0.44 0.44 - -

67New 66 KV

substations

Associated transmission lines

(15 Km per substation)

68

220 KV

Sartanpar

substation

Creation of 74 Nos. of new 66 KV substations

65

66 KV substations

66 KV lines

66

Tentative investment required for integration of

total 274 MW Solar Power Capacity into

GETCO Grid from 20 Nos. developers under

61 New link lines

62Strengthening of

existing lines

66 KV substations

64 66 KV lines

60220 KV Kerala

substation

66 KV D/C interconnection

lines from Kerala and feeder

bays at far end substations

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 59

Page 11: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

LILO of 66 KV S/C Sartanpar -

Lakaddhar line at 220 KV

Sartanpar substation

66 KV D/C line - ACSR Panther 0.44 0.44 - -

66 KV D/C Sartanpar (220KV

S/S) - Dungarpur line with one

circuit LILO at proposed

Manekwada S/S

66 KV D/C line - ACSR Panther 3.08 1.54 - -

66 KV D/C Sartanpar (220KV

S/S) - Rafleshwar line66 KV D/C line - ACSR Panther 1.32 0.66 - -

66 KV D/C Sartanpar (220KV

S/S) - proposed Rajgadh line66 KV D/C line - ACSR Panther 2.64 1.32 - -

66 KV D/C Sartanpar (220KV

S/S) - Kalikanagar line with

one circuit LILO at proposed

Ratavirda S/S

66 KV D/C line - ACSR Panther 1.10 0.55 - -

Conversion of 66 KV S/C

Sartanpar (existing) -

Lakaddhar line into D/C line

Conversion of 66 KV S/C (Panther)

into D/C (Panther) line 0.45 0.23 - -

66 KV feeder bays: 3 Nos. at

Sartanpar (existing), 2 Nos.

each at Dungarpur,

Rafleshwar, Rajgadh

(proposed), Kalikanagar and 1

No. at Lakaddhar substations

66 KV FB - 12 Nos. 4.20 2.10 - -

Total : (b) 59.42 31.93 3.69 -

220/66 KV Charadava s/s

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

10

35.82 3.58 14.33 17.91

Termination of LILO of one

circuit of 220 KV D/C Halvad -

Morbi line to Bhimasar (PG) at

Charadava substation

220 KV D/C line - ACSR Zebra 1.85 0.19 0.74 0.93

220 KV D/C Halvad (400 KV) -

Charadva line220 KV line (D/C) (30 RKM) 13.50 1.35 5.40 6.75

220 KV FB - 2 Nos. at Halvad

(400 KV)220 KV FB - 2 Nos. 2.80 0.28 1.12 1.40

66 KV D/C (Panther) link line

from 220 KV Charadava s/s to

existing Charadava,

Dungarpur, Morbi - Charadava

lilo line, proposed Mathak,

Ishwernagar & Sarambhada s/s

66 KV D/C line - ACSR Panther 1.54 0.15 0.62 0.77

66 KV S/C (Panther) link line

from 220 KV Charadava s/s to

existing Charadava - Chupani

line and from Ishwarnagar tap

to Ishwernagar & Sarambhada

s/s

66 KV S/C line - ACSR Panther 3.77 0.38 1.51 1.88

66 KV S/C Ishwarnagar -

Devlia line66 KV S/C line - ACSR Panther 0.79 0.08 0.31 0.39

66 KV S/C Sarambhada -

Sundaribhavani line66 KV S/C line - ACSR Panther 1.26 0.13 0.50 0.63

66 KV S/C Khareda -

proposed Unchi Mandal line66 KV S/C line - ACSR Panther 1.26 0.13 0.50 0.63

66 KV feeder bays: 2 Nos.

each at Charadava (existing),

Ishwarnagar, Sarambhada &

Mathak (proposed) and 1 No.

each at Devalia, Khareda,

proposed Sundari Bhavani and

Unchi Mandal substations

66 KV FB - 12 Nos. 4.20 0.42 1.68 2.10

69

220 KV

Charadava

substation

68

220 KV

Sartanpar

substation

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 60

Page 12: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

Total : (c) 66.78 6.68 26.71 33.39

220/66 KV Shapar s/s

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

10

35.82 17.91 14.33 3.58

LILO of 220 KV S/C Chorania

- Sarla and Sarla - Gondal lines

(due to LILO of 220 KV S/C

Chorania - Gondal line at Sarla

substation) at Shapar

substation

220 KV D/C line - ACSR Zebra (2

x 10 RKM) 7.40 3.70 2.96 0.74

66 KV D/C Shapar - Than line

(one circuit to be extended to

Than and other circuit to be

terminated to proposed Than-

II substation)

66 KV D/C line - ACSR Panther 4.40 2.20 1.76 0.44

66 KV, 630mm2 (3+1) u/g

cable for temination of line

from Shapar at Than

substation

66 KV, 630mm2 (3+1) u/g cable 3.20 1.60 1.28 0.32

66 KV S/C Shapar - Chotila

line66 KV S/C line - ACSR Panther 2.20 1.10 0.88 0.22

LILO of 66 KV S/C Chotila -

Thikariyali line at Shapar

substation

66 KV D/C line - ACSR Dog 2.25 1.13 0.90 0.23

Conversion of 132 KV

Sitagadh substation into 66 Kv

level along with 66/11 KV, 2 x

15 MVA ICTs

66/11 KV, 2 x 15 MVA ICTs 2.40 1.20 0.96 0.24

66 KV D/C Shapar - Sitagadh

line66 KV D/C line - ACSR Panther 1.10 0.55 0.44 0.11

LILO of 66 KV S/C Wankaner

- Than - Tarnetar line at Than-

II substation

66 KV D/C line - ACSR Dog 0.45 0.23 0.18 0.05

66 KV feeder bays: 3 Nos. at

Than-II (proposed), 2 Nos. at

Sitagadh and 1 No. each at

Than and Chotila substations

66 KV FB - 7 Nos. 2.45 1.23 0.98 0.25

Total : (d) 61.67 30.83 24.67 6.17

220/66 KV Navlakhi s/s (SIR-

Zone)

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 - - 6.32

LILO of 220 KV S/C Tappar -

Hadala line at Navlakhi

substation

220 KV D/C line - ACSR Zebra 1.85 - - 0.37

66 KV D/C line - ACSR Panther 8.80 - - 1.76

66 KV FB - 6 Nos. 2.10 - - 0.42

Total : (f) 44.37 - - 8.87

73

New link lines

for ring main

system

66KV Transmission line Total : (g) 59.57 - - -

74Strengthening of

existing lines66 KV transmission lines Total : (h) 23.78 - - -

Q - - - -

220/66 KV s/s near Gondal

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 - - 6.32

220 KV D/C Jasdan (proposed

substation) - Gondal line

220 KV line (D/C) (50 RKM) : AL-

59 conductor 22.50 - - 4.50

220 KV FB - 2 Nos. at Jasdan

(400 KV)220 KV FB - 2 Nos. 2.80 - - 0.56

66KV line (D/C-Panther) (30

RKM) 6.60 - - 1.32

66 KV FB - 6 Nos. 2.10 - - 0.42

Total: i 65.62 - - 13.12

Strengthening scheme for Tatkal & Special Agriculture connections- New Sub-

station

75

220 KV

substation near

Gondal

66 KV D/C interconnection

lines and bays for proposed

substation

71220 KV Shapar

substation

72

220 KV

Navlakhi

substation

66 KV D/C interconnection

lines and bays for Navlakhi

substation

69

220 KV

Charadava

substation

70220 KV Shapar

substation

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 61

Page 13: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

220/66 KV s/s near

Khambhalia

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

34.42 - - 6.88

LILO of 220 KV D/C Bhatia -

Kalavad - Kangasiyali line at

proposed substation

220 KV line (D/C) (2x10 RKM) :

AL-59 conductor 9.00 - - 1.80

66KV line (D/C-Panther) (30

RKM) 6.60 - - 1.32

66 KV FB - 6 Nos. 2.10 - - 0.42

Total : ii 52.12 - - 10.42

R - - - -

67 Nos. of new 66 KV

substations under Morbi

(O&M) area

66/11KV s/s with 10 MVA X'mer;

FB-1 & X'mer Bay-1 201.00 - 144.00 57.00

66 KV S/C line - ACSR Dog 54.27 - 38.88 15.39

66 KV D/C line - ACSR Dog 60.30 - 43.20 17.10

Total : D 315.57 - 226.08 89.49

S - - - -

78 66.00 33.00 33.00 -

79 10.50 2.10 - -

80 10.20 2.04 - -

Total 86.70 37.14 33.00 -

T - - - -

220 KV S/C Kawas -

Ichchhapur line

220 KV S/C line (Conductor

replacement) 1.17 - - 1.17

220 KV D/C Hadala - Nyara

line

220 KV D/C line (Conductor

replacement) 4.38 - - -

5.55 - - 1.17

400/220 KVShapar s/s

400/220 KV, 2 x 315 MVA ICTs, 4

Nos. of 400 KV & 4 Nos. of 220

KV feeder bays and 400 KV, 125

MVAR switchable bus reactor

82.48 - - 8.25

400 KV D/C Hadala –

Chorania line with both

circuits LILO at Shapar

substation (Twin Moose

400 KV D/C line - Twin Moose 119.60 - - 11.96

220 KV D/C Shapar – Tankara

line (AL-59)220 KV D/C line - AL-59 22.50 - - 2.25

220 KV D/C Shapar – Jasdan

line (AL-59)220 KV D/C line - (AL-59) 13.50 - - 1.35

400 KV FB - 2 Nos. each at

Hadala and Chorania S/s400 KV FB - 2 Nos. 8.06 - - 0.81

400 KV FB - 2 Nos. at

Vadodara (PG) substations400 KV FB - 2 Nos. 8.06 - - 0.81

220 KV FB - 2 Nos. each at

Tankara and Jasdan S/s220 KV FB - 4 Nos. 5.60 - - 0.56

259.80 - - 25.98

400/220 KV Chharodi s/s

400/220 KV, 2x315 MVA X'mers,

400 KV FB - 4, 220 KV FB - 4, 80

MVAR Bus Reactor

86.14 8.61 17.23 34.46

220/66 KV, 2 x 100 MVA Xmer, 66

KV FB - 6 17.10 1.71 3.42 6.84

LILO of one circuit of 400 KV

D/C Halvad – Vadavi line at

400 KV Chharodi substation

(ACSR Twin Moose – 30

RKM)

400 KV D/C line - Twin Moose (30

RKM) 27.60 2.76 5.52 11.04

KV D/C Kosamba – Chorania

line at 400 KV Chharodi

substation (ACSR Twin Moose

– 20 RKM)

400 KV D/C line - Twin Moose (20

RKM) 18.40 1.84 3.68 7.36

82

400 KV Shapar

substation, Dist:

Rajkot; B.R. No

81.21/1279

Total :

83

400 KV

Chharodi

substation (Near

Sanand)

400 KV, 1 x 125 MVAR switchable bus reactor at 400 KV Chorania, Hadala, Zerda,

Amreli, Vadavi and Varsana substations

400 KV, 1 x 80 MVAR switchable bus reactor at 400 KV Kosamba substations

400 KV, 1 x 63 MVAR switchable bus reactor at 400 KV Jetpur substation

Conductor strengthening

81Conductor

strengthening

Total :

Additional 66 KV substations - DISCOM's requirement

77New 66 KV

substations Associated transmission lines

(15 Km per substation)

Bus Reactor

76

220 KV

substation near

Khambhalia

66 KV D/C interconnection

lines and bays for Charadva

substation

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 62

Page 14: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

LILO of both circuits of 220

KV D/C Viramgam-Bhat line

at 400 KV Chharodi substation

220 KV D/C line - ACSR Zebra (2

x 20 RKM) 14.80 1.48 2.96 5.92

66 KV D/C line - ACSR Panther 8.80 0.88 1.76 3.52

66 KV FB - 6 Nos. 2.10 0.21 0.42 0.84

174.94 17.49 34.99 69.98

220/66 KV Karjan substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 22.13 9.49 -

LILO of one circuit of 220 KV

D/C SLPP Mangrol - Gavasad

line at Karjan substation

220 KV D/C line - ACSR Zebra 3.70 2.59 1.11 -

66 KV D/C line - ACSR Panther 8.80 6.16 2.64 -

66 KV FB - 6 Nos. 2.10 1.47 0.63 -

46.22 32.35 13.87 -

132/66 KV Chandkheda

substation

132/66 KV substation with 2 x 50

MVA X'mer; 132 KV FB - 2 Nos.,

66 KV FB - 5 Nos.

11.05 7.74 3.32 -

66/11 KV, 15 MVA ICT at

Chandkheda substation 2.10 1.47 0.32 -

LILO of one circuit of 132 KV

D/C Ranasan - Sabarmati line

at Chandkheda substation

132 KV line (D/C) 0.10 0.07 0.02 -

66 KV D/C line - ACSR Panther 6.60 4.62 0.07 -

66 KV FB - 6 Nos. 2.10 1.47 0.11 -

21.95 15.37 3.82 -

66 KV

substations

66/11KV s/s with 10 MVA X'mer;

FB-1 & X'mer Bay-1 354.00 70.80 70.80 70.80

66 KV lines 66 KV S/C line 95.58 19.12 19.12 19.12

66 KV D/C line 53.10 10.62 10.62 10.62

Total : 502.68 100.54 100.54 100.54

400/220 KV, 1x315 MVA

X'mers, 400 KV FB - 2, 220

KV FB - 4 each at Pipavav,

Chhara and Bhogat substations

400/220 KV, 1x315 MVA X'mers 75.30 - - 7.53

220 KV D/C Bhogat - Bhatia

line220 KV line (D/C) - AL-59 9.00 - - 0.90

220 KV D/C Bhogat -

Ranavav line220 KV line (D/C) - AL-59 18.00 - - 1.80

220 KV D/C Chhara - Timbdi

line220 KV line (D/C) - AL-59 4.50 - - 0.45

220 KV D/C Chhara -

Dhokadava line220 KV line (D/C) - AL-59 20.25 - - 2.03

220 KV D/C Pipavav - Otha

line220 KV line (D/C) - AL-59 11.25 - - 1.13

220 KV D/C Pipavav -

Bagasara line220 KV line (D/C) - AL-59 18.00 - - 1.80

220 KV FB - 2 Nos. each at

Bhatia, Ranavav, Timbdi,

Dhokadava, Otha and

Bagasara substations

220 KV FB - 12 Nos. 16.80 - - 1.68

173.10 - - 17.31

400 KV D/C Kosamba - Vapi

(PG) line400 KV D/C line - Twin Moose 101.20 - - 30.36

400 KV FB - 2 Nos. each at

Kosamba and Vapi (PG)

substations

400 KV FB - 4 Nos. 16.12 - - 4.84

117.32 - - 35.20

220 KV D/C Dhasa - Botad

line220 KV D/C line - AL-59 20.25 - 4.05 16.20

220 KV FB - 2 Nos. each at

Dhasa and Botad substations220 KV FB - 4 Nos. 5.60 - 1.12 4.48

25.85 - 5.17 20.68

220 KV D/C Jamnagar -

Hadala line220 KV D/C line - AL-59 33.75 - 3.38 13.50

89220 KV Dhasa -

Botad line

Total :

90

220 KV

Jamnagar -

Hadala line

86

87

400/220 KV, 1 x

315 MVA ICT

at Pipavav,

Chhara and

Bhogat

substations

Total :

88

400 KV

Kosamba - Vapi

line

Total :

84220 KV Karjan

substation

66 KV D/C interconnection

lines and bays for Karjan

substation

Total :

85

132 KV

Chandkheda

substation

66 KV D/C interconnection

lines and bays for Karjan

substation

Total :

83

400 KV

Chharodi

substation (Near

Sanand)

66 KV D/C interconnection

lines and bays for 400 KV

Chharodi substation

Total :

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 63

Page 15: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

220 KV FB - 2 Nos. each at

Jamnagar and Hadala

substations

220 KV FB - 4 Nos. 5.60 - 0.56 2.24

39.35 - 3.94 15.74

220 KV D/C Suva - Dahej line 220 KV D/C line - ACSR Zebra 5.55 - 1.11 2.22

LILO of one circuit of 220 KV

D/C Haldarwa - IPCL line at

Suva substation

220 KV D/C line - ACSR Zebra 5.55 - 1.11 2.22

220 KV FB - 4 Nos. at Suva

and 2 Nos. at Dahej

substations

220 KV FB - 6 Nos. 8.40 - 1.68 3.36

19.50 - 3.90 7.80

U - - - -

220/66 KV Gariyadhar

substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

34.42 - - 6.88

LILO of 220 KV S/C

Savarkundla - Sagapara line at

Gariyadhar substation

220 KV D/C line - Zebra 2.59 - - 0.52

LILO of one circuit of 220 KV

D/C Amreli - Dhasa line at

Gariyadhar

220 KV D/C line - Zebra 14.80 - - 2.96

66 KV D/C line - Panther 8.80 - - 1.76

66 KV FB - 6 Nos. 2.10 - - 0.42

62.71 - - 12.54

220/66 KV Vallabhipur

substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

8

35.12 21.07 14.05 -

LILO of 220 KV S/C

Dhuvaran - Fedra - Botad line

at Vallabhipur substation

220 KV D/C line - Zebra 0.37 0.22 0.15 -

LILO of one circuit of 220 KV

D/C BECL - Botad line at

Vallabhipur substation

220 KV D/C line - Zebra 3.70 2.22 1.48 -

66 KV D/C line - Panther 13.20 7.92 5.28 -

66 KV FB - 6 Nos. 2.80 1.68 1.12 -

55.19 33.11 22.08 -

220/66 KV Patan substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 - - 3.16

220 KV GIS / Hybrid system

at Patan220 KV GIS / Hybrid 21.75 - - 2.18

LILO of one circuit of 220 KV

D/C Sankhari - Jangral line at

Patan

220 KV D/C line - Zebra 3.70 - - 0.37

57.07 - - 5.71

220/66 KV Deesa substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 - - 3.16

220 KV GIS / Hybrid system

at Deesa220 KV GIS / Hybrid 21.75 - - 2.18

LILO of one circuit of 220 KV

D/C Zerda - Jangral line at

Deesa substation

220 KV D/C line - Zebra 5.55 - - 0.56

58.92 - - 5.89

220/66 KV Bechraji substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 15.81 3.16 6.32

220 KV D/C Mitha (Jotana) -

Bechraji line220 KV D/C line - AL-59 11.25 5.63 1.13 2.25

2 Nos. 220 KV feeder bays at

Mitha substation220 KV FBs - 2 Nos. 2.80 1.40 0.28 0.56

66 KV D/C line - Panther 8.80 4.40 0.88 1.76

66 KV FB - 6 Nos. 2.10 1.05 0.21 0.42

56.57 28.29 5.66 11.31

96220 KV Bechraji

substation

66 KV D/C interconnection

lines and bays for Bechraji

substationTotal :

94

Up-gradation of

132 KV Patan

substation to

220 KV level

Total :

95

Up-gradation of

132 KV Deesa

substation to

220 KV level

Total :

66 KV D/C interconnection

lines and bays for Gariyadhar

substation (interconnection Total :

93

Up-gradation of

132 KV

Vallabhipur

substation to

220 KV level

66 KV D/C interconnection

lines and bays for Vallabhipur

substation (interconnection Total :

91

220 KV Suva -

Dahej line &

LILO of one

ckt. of 220 KV

Haldarwa -

IPCL line at

Suva

Total :

System Strengthening scheme for 12th FYP

92

220 KV

Gariyadhar

substation

90

220 KV

Jamnagar -

Hadala line

Total :

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 64

Page 16: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

220/66 KV Barejadi substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

34.42 10.33 3.44 13.77

220 KV GIS / Hybrid system

at Barejadi220 KV GIS / Hybrid 21.75 6.53 2.18 8.70

LILO of one circuit of 220 KV

D/C Karamsad - Ranasan line

at Barejadi

220 KV D/C line - Zebra 4.44 1.33 0.44 1.78

220 KV D/C Pirana (PG) -

Barejadi line220 KV D/C line - AL-59 11.25 3.38 1.13 4.50

630 Sq.mm., (6+1) U/g cable

for interconnection with

existing 66 KV bus

66 KV U/g cable : 630 sq.mm.

(6+1) 2.79 0.84 0.28 1.12

66 KV D/C line - Panther 8.80 2.64 0.88 3.52

66 KV FB - 6 Nos. 2.10 0.63 0.21 0.84

85.55 25.67 8.56 34.22

220/66 KV Abdasa substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-6, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

37.22 - - 7.44

LILO of both circuits of 220

KV D/C Jamanwada (Suzlon)

wind farm - Varsana line at

Abdasa substation

220 KV D/C line - AL-59 (2 x 15

RKM) 13.50 - - 2.70

220 KV D/C Abdasa -

Nakhatrana line220 KV D/C line - AL-59 36.00 - - 7.20

220 KV D/C Varsana -

Charanka line220 KV D/C line - AL-59 56.25 - - 11.25

220 KV FB - 2 Nos. each at

Nakhatrana, Varsana &

Charanka substations

220 KV FB - 6 Nos. 8.40 - - 1.68

66 KV D/C line - Panther 8.80 - - 1.76

66 KV FB - 6 Nos. 2.10 - - 0.42

162.27 - - 32.45

220/66 KV Umargaon

substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-4, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

34.42 - - 3.44

220 KV GIS / Hybrid system

at Umargaon220 KV GIS / Hybrid 21.75 - - 2.18

LILO of 220 KV S/C Tarapur -

Vapi line at Umargaon220 KV D/C line - Zebra 3.70 - - 0.37

LILO of 220 KV S/C Tarapur -

Bhilad line at Umargaon220 KV D/C line - Zebra 3.70 - - 0.37

Monopole structures 220 KV D/C structure 5.00 - - 0.50

5.00 - - 0.50

66 KV D/C line - Panther 8.80 - - 0.88

66 KV FB - 6 Nos. 2.10 - - 0.21

84.47 - - 8.45

220/66 KV, 2 x 100 MVA

ICTs at Karamsad

220/66 KV s/s with 2x100 MVA

X'mer; 66 KV FB - 6 20.54 16.43 4.11 -

132 KV Transformer bay for

shifting132/66 KV ICT bay 0.50 0.40 0.10 -

66 KV D/C line - Panther 8.80 7.04 1.76 -

66 KV FB - 6 Nos. 2.10 1.68 0.42 -

31.94 25.55 6.39 -

220/66 KV, 2 x 100 MVA

ICTs at Kasor

220/66 KV s/s with 2x100 MVA

X'mer; 66 KV FB - 6 20.54 10.27 10.27 -

66 KV D/C line - Panther 8.80 4.40 4.40 -

66 KV FB - 6 Nos. 2.10 1.05 1.05 -

31.44 15.72 15.72 -

220/66 KV, 2 x 100 MVA

ICTs at Jambuva

220/66 KV s/s with 2x100 MVA

X'mer; 66 KV FB - 6 20.54 10.27 10.27 -

66 KV D/C line - Panther 8.80 4.40 4.40 -

66 KV FB - 6 Nos. 2.10 1.05 1.05 -

31.44 15.72 15.72 -

220/132 KV, 2 x 150 MVA

ICTs at Sikka220/132 KV, 2x150 MVA 20.00 - 20.00 -

20.00 - 20.00 -

103

220/132 KV, 2 x

150 MVA ICTs

at Sikka TPS Total :

101

220/66 KV, 2 x

100 MVA ICTs

at Kasor

66 KV D/C interconnection

lines and bays for Kasor

substation

Total :

102

220/66 KV, 2 x

100 MVA ICTs

at Jambuva

66 KV D/C interconnection

lines and bays for Jammbuva

substation

Total :

Total :

100

220/66 KV, 2 x

100 MVA ICTs

at Karamsad66 KV D/C interconnection

lines and bays for Karamsad

substation

Total :

98

220 KV Abdasa

substation

(Kutch)

66 KV D/C interconnection

lines and bays for Abdasa

substation Total :

99

Up-gradation of

66 KV

Umargaon

substation to

220 KV level

Modifications in existing 66 KV substations and demolition and 66 KV D/C interconnection

lines and bays for Umargaon

substation

97

Up-gradation of

66 KV Barejadi

substation to

220 KV level

66 KV D/C interconnection

lines and bays for Barejadi

substationTotal :

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 65

Page 17: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

220 KV switchyard with 4

Nos. of 220 KV feeder bays

220 KV switchyard and 4 Nos. of

feeder bays 10.60 - - -

220 KV D/C Tappar - Varsana

line220 KV D/C line - AL-59 1.80 - - -

2 Nos. of 220 KV Feeder bays

at 220 KV Tappar substation220 KV FB - 2 Nos. 2.80 - - -

400 KV, 50 MVAR Bus

Reactor with bay400 KV, 50 MVAR Reactor 10.00 - - -

LILO of one circuit of 400 KV

D/C APL Mundra - Zerda line

at Varsana

400 KV D/C line - Twin Moose 2.76 2.76 - -

2 Nos. of 400 KV feeder bays

at Varsana substation400 KV FB - 2 Nos. 8.06 8.06 - -

400/220 KV, 1 x 315 MVA

ICT at Split-bus

400/220 KV, 315 MVA ICT along

with bay 14.45 14.45 - -

50.47 25.27 - -

LILO of one circuit of 220 KV

D/C Nanikhakhar - Tappar line

at Mokha

220 KV D/C line - Zebra 4.07 4.07 - -

220 KV FBs at Mokha 220 KV FB - 2 Nos. 2.80 2.80 - -

6.87 6.87 - -

LILO of 220 KV S/C

Bhimasar - Morbi line at

Bhachau S/S

220 KV D/C line - Zebra 1.85 1.85 - -

220 KV FBs at Bhachau 220 KV FB - 2 Nos. 2.80 2.80 - -

4.65 4.65 - -

220/132 KV, 2 x 100 MVA

ICTs at Bhestan220/132 KV, 2x100 MVA 21.50 10.75 10.75 -

220/66 KV, 1 x 100 MVA

(2nd ) ICT at Bhestan220/66 KV, 1x100 MVA 9.22 4.61 4.61 -

LILO of both circuits of 132

KV D/C Navsari - Bhestan line

at 220 KV Bhestan

132 KV D/C line - ACSR Panthar

(2 x 10 RKM) 5.00 2.50 2.50 -

132 KV FBs at Bhestan 132 KV FB - 4 Nos. 3.00 1.50 1.50 -

38.72 19.36 19.36 -

220/66 KV, 1 x 100 MVA

(2nd ) ICT at Bhestan220/66 KV, 1x100 MVA 9.22 4.61 4.61 -

220 KV GIS system 220 KV GIS 21.75 10.88 10.88 -

220 KV D/C Navsari (PG) -

Atul line220 KV D/C line - AL-59 31.50 15.75 15.75 -

2 Nos. 220 KV FBs each at

Bhestan & Navsari (PG)

substations

220 KV FB - 4 Nos. 5.60 2.80 2.80 -

68.07 34.04 34.04 -

220/132 KV, 2 x 100 MVA

ICTs at Sartanpar220/132 KV, 2x100 MVA 21.50 10.75 10.75 -

220 KV & 132 KV GIS /

Hybrid system220 KV & 132 KV GIS 21.75 10.88 10.88 -

LILO of 220 KV S/C Morbi -

Lalpar line at 220 KV

Sartanpar substation

220 KV D/C line - Zebra 3.33 1.67 1.67 -

LILO of 132 KV S/C Lalpar -

Wankaner line at 220 KV

Sartanpar substation

132 KV D/C line - Panther 2.00 1.00 1.00 -

2 Nos. 220 KV FBs at

Sartanpar220 KV FB - 2 Nos. 2.80 1.40 1.40 -

2 Nos. 132 KV FBs at

Sartanpar132 KV FB - 2 Nos. 1.50 0.75 0.75 -

52.88 26.44 26.44 -

220/66 KV, 2 x 100 MVA

ICTs at Bhatia

220/66 KV, 2 x 100 MVA ICTs

including bays & 6 Nos. of 66 KV

FBs

20.54 16.43 4.11 -

66 KV D/C line - Panther 8.80 7.04 1.76 -

66 KV FB - 6 Nos. 2.10 1.68 0.42 -

31.44 25.15 6.29 -

220/66 KV, 1 x 100 MVA

(2nd) ICT at 220 KV Mokha,

Bhachau, Suva, Jarod and

Halvad (400 KV S/s)

substations

220/66 KV, 1 x 100 MVA ICT

along with bay 46.10 - - 13.83

46.10 - - 13.83

111

220/66 KV, 1 x

100 MVA

additional (2nd)

ICT

Total :

109

Additional

scheme for 220

KV Sartanpar

S/S

Total :

110

Additional

scheme for 220

KV Bhatia S/S66 KV D/C interconnection

lines and bays for Bhatia

substationTotal :

107

Additional

scheme for 220

KV Bhestan S/S

Total :

108

Additional

scheme for 220

KV Atul S/S

Total :

105

Additional

scheme for 220

KV Mokha S/S

Total :

106

Additional

scheme for 220

KV Bhachau S/S

Total :

104

Additional

scheme for 400

KV Varsana S/S

Total :

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 66

Page 18: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

132/66 KV s/s with 2x50 MVA

X'mer; 132 KV FB-2, 66 KV FB-4 10.35 2.07 4.14 4.14

132/11 KV, 2x25 MVA ICT at

Makansar substation 4.00 0.80 1.60 1.60

LILO of 132 KV S/C

Sartanpar - Wankaner line at

Makansar S/s

132 KV D/C line - Panther 0.25 0.05 0.10 0.10

66 KV D/C line - Panther 6.60 1.32 2.64 2.64

66 KV FB - 4 Nos. 1.40 0.28 0.56 0.56

22.60 4.52 9.04 9.04

132/66 KV s/s with 2x50 MVA

X'mer; 132 KV FB-2, 66 KV FB-4 10.35 2.07 4.14 4.14

132/11 KV, 2x25 MVA ICT at

Vaghasia substation 4.00 0.80 1.60 1.60

LILO of 132 KV S/C

Sartanpar - Wankaner line at

Vaghasia substation

132 KV D/C line - Panther 0.25 0.05 0.10 0.10

66 KV D/C line - Panther 6.60 1.32 2.64 2.64

66 KV FB - 4 Nos. 1.40 0.28 0.56 0.56

22.60 4.52 9.04 9.04

132 KV D/C Ode - Manusar

line

132 KV D/C line - Panther

conductor 8.75 0.88 1.75 1.75

2 Nos. 132 KV feeder bays

each at 132 KV Ode &

Manjusar substations

132 KV FB - 4 Nos. 3.00 0.30 0.60 0.60

11.75 1.18 2.35 2.35

400/220 KV, 1 x 315 MVA

OR 1 x 500 MVA ICT

400/220 KV, 315 MVA OR 500

MVA ICT with bay 72.25 - - -

220/132 KV OR 220/66 KV, 1

x 100 MVA ICT (five

substations each year)

220/132 KV OR 220/66 KV, 100

MVA ICT along with bay 230.50 46.10 23.05 46.10

132/66 KV, 1 x 50 MVA ICT

(three substations each year)

132/66 KV, 50 MVA ICT along

with bay 41.25 8.25 8.25 8.25

344.00 54.35 31.30 54.35

66 KV S/C Sagbara - Nizar line 66 KV S/C line - Panther 6.00 3.60 2.40 -

1 No. 66 KV feeder bay each

at 66 KV Sagbara & Nizar

substations

66 KV FB - 2 Nos. 0.70 0.42 0.28 -

6.70 4.02 2.68 -

new 66 KV substations (41

Nos. in MGVCL + 19 Nos.

PGVCL + 7 Nos. UGVCL)

66/11KV s/s with 10 MVA X'mer;

FB-1 & X'mer Bay-1 201.00 - - 100.50

66 KV S/C line 36.18 9.05 9.05 9.05

66 KV D/C line 90.45 22.61 22.61 22.61

327.63 31.66 31.66 132.16

V - - - -

400/220 KV, 2x315 MVA X'mers,

400 KV FB - 4, 220 KV FB - 6, 80

MVAR Bus Reactor

88.94 - - 17.79

220/66 KV, 2 x 100 MVA X'mer,

66 KV FB - 6 20.54 - - 4.11

LILO of one circuit of 400 KV

D/C Kosamba - Vapi (PG) line

at 400 KV Chikhli substation

400 KV D/C line - Twin Moose

(15 RKM) 15.98 - - 3.20

LILO of one circuit of planned

400 KV D/C Ukai -Kosamba

line at new s/s near Chikhli

400 KV D/C line - Twin Moose

(60 RKM) 63.90 - - 12.78

220 KV D/C Chikhli - Chikhli

(400 KV) line220 KV D/C line - (AL-59) 7.28 - - 1.46

220 KV D/C Bhilad - Chikhli

(400 KV) line220 KV D/C line - (AL-59) -- - - -

220 KV D/C Atul - Chikhli

(400 KV) line220 KV D/C line - (AL-59) 19.40 - - 3.88

System Strengthening scheme for 12th FYP

118

400 KV Chikhli

substation at

Dist. Navsari

400/220 KV Chikhli s/s

116

66 KV link line

for Nizar

substation

Total :

11766 KV

substations

66 KV lines

Total :

114

2nd Source of

power supply for

132 KV Ode &

Manjusar

substationsTotal :

115

EHV

Transformer

augmentation

during 12th FYP

Total :

66 KV D/C interconnection

lines and bays for Makansar

substationTotal :

113132 KV

Vaghasia

132/66 & 132/11 KV Vaghasia

s/s

66 KV D/C interconnection

lines and bays for Vaghasia

substationTotal :

112132 KV

Makansar

132/66 & 132/11 KV

Makansar s/s

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 67

Page 19: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

220 KV FB - 2 Nos. each at

Chikhli (220 KV),Bhilad and

Atul substations

220 KV FB - 6 Nos. 9.48 - - 1.90

66 KV D/C line - ACSR Panther 10.00 - - 2.00

66 KV FB - 6 Nos. 2.10 - - 0.42

237.61 - - 47.52

220/66 KV Santej substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 - 6.32 9.49

220 KV Hybrid switchyard 21.75 - 4.35 6.53

LILO of 220 KV S/C Vadavi -

Chhatral line at 220 KV Santej

substation

220 KV D/C Line - AL-59

Conductor 12.13 - 2.43 3.64

66 KV D/C line - ACSR Panther 10.00 - 2.00 3.00

66 KV FB - 6 Nos. 2.10 - 0.42 0.63

77.60 - 15.52 23.28

220/66 KV Balasinor

substation

220/66 KV s/s with 2x100 MVA

X'mer; 220 KV FB-2, 220 KV BC

bay-1, 220 KV TBC - 1, 66 KV FB -

6

31.62 - 6.32 9.49

LILO of one circuit of 220

KV D/C Wanakbori - Asoj line

at 220 KV Balasinor substation

220 KV D/C Line - ACSR Zebra

Conductor 9.20 - 1.84 2.76

66 KV D/C line - ACSR Panther 10.00 - 2.00 3.00

66 KV FB - 6 Nos. 2.10 - 0.42 0.63

52.92 - 10.58 15.88

132/11 KV Vakhatpar

substation

132/11 KV s/s with

2x12.5 MVA X'mer;

132 KV FB-2,

5.93 5.93 - -

LILO of 132KV S/C Sitagadh -

Limbdi line at 132KV

Vakhatpar substation

132 KV D/C Line - ACSR Panther

Conductor 0.02 0.02 - -

5.95 5.95 - -

132/66 KV Pipli substation

132/66 KV s/s with

2x50 MVA X'mer;

132 KV FB-2, 66 KV FB - 6, 66/11

KV, 2 X 15 MVA X'mer

13.55 - - 10.84

LILO of one ckt of

132 KV D/C Dhuvaran -

Dhandhuka line at

132 KV Pipli substation

132 KV D/C Line - ACSR Panther

Conductor 1.20 - - 0.96

66 KV D/C line -

ACSR Panther 10.00 - - 8.00

66 KV FB - 6 Nos. 2.10 - - 1.68

26.85 - - 21.48

28.90 - 2.89 8.67

- - - -

86.70 - 8.67 26.01

- - - -

40.00 - 4.00 12.00

- - - -

155.60 - 15.56 46.68

220 KV FB - 2 Nos. 3.16 - - 1.26

220 KV D/C Line - AL -59

Conductor 19.40 - - 7.76

22.56 - - 9.02

220/132 KV, 2 x 100 MVA

ICTs at Vallabhipur220/132 KV, 2x100 MVA 21.50 8.60 12.90 -

21.50 8.60 12.90 -

220 KV GIS / Hybrid system

at Suva220 KV GIS / Hybrid 21.75 21.75 - -

21.75 21.75 - -

126

220 KV Suva

substation

Dist. Bharuch Total:

124

220 KV D/C

Vataman

(PGCIL) -

Kerala line

220 KV D/C line

Total:

125

220/132 KV

System at 220

KV Vallabhipur

substationTotal:

123

EHV

Augmentation at

400 KV

substation

400/220 KV, 1 X 315 or 1 X

500 MVA ICT with Bay

400/220 KV, 1 X 315 MVA ICT at

400 KV Vadavi, 400 KV Hadala

Total:

121

132/11KV,

2X12.5 MVA

ICTs at

Vakhatpar

substation at

Dist. Surendra-

nagar

Total:

122

132/66KV,

2X50 MVA

ICTs at Pipli

substation at

Dist. Ahmedab-

ad66 KV D/C interconnection

lines and bays for Pipli

substation

Total:

400/220 KV, 1 X 500 MVA ICT at

400 KV Soja, 400 KV Chorania

400/220 KV, 2 X 315 MVA ICT at

400 KV Kosamba, Kasor, Amreli

119

220/66KV,

2X100 MVA

ICTs at 220KV

Santej at Dist.

Gandhinagar

66 KV D/C interconnection

lines and bays for Santej

substation

Total:

120

220/66KV,

2X100 MVA

ICTs at 220KV

Balasinor at

Dist. Kheda

66 KV D/C interconnection

lines and bays for Balasinor

substation

Total:

118

400 KV Chikhli

substation at

Dist. Navsari

66 KV D/C interconnection

lines and bays for 400 KV

Chikhli substation

Total:

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 68

Page 20: PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO Mid-term... · PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY

Mid-term Review of Business Plan for FY 2014-15 FY 2015-16

FY 2013-14 FY 2014-15 FY 2015-16

Proposed Capital Expenditure

PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)

S.

N.

Name of

Project

Name of S/S and

Transmisssion lineWork involved

Estimated

Cost

127

OPGW BR. No.

71.10/1116

dated on 23-2-

11, 81.25/1283

dated 4-7-12,

54.7/476 dated 7-

1-13

Laying and installation of

OPGWOPGW fiber 145.06 7.25 7.25 29.01

145.06 7.25 7.25 29.01

13,497.55 2,210.92 2,232.03 2,411.33

Total:

Grand Total (1 to 127)

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 69