12
Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

Embed Size (px)

Citation preview

Page 1: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

Proposed Post Reassessment 2014 Work PlanFort Ord Reuse Authority

Page 2: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

2

Completion Items

Feb Mar Apr May June July Aug Sept OctNov -Dec

CAT 1-2BRP Corrections & Clarifications

• STAFF presents 2014 Work Plan & Calendar

• BOARD Accepts Work Plan, Approves Revised PRAC Charge, & Extends PRAC

Public review

draft CAT 1-2 CEQA

BOARD Approval of

CAT 1-2 CEQA

Status Report:

Regional Plan Coord

CAT 3Implementation of Yet-to-be Completed BRP Policies & Programs

ADMIN reviews STAFF recs re: CAT 3 Items

BOARD acceptance of ADMIN

recs to finish w/CAT 3

items

Regional Urban Design Guidelines (RUDG)

STAFF presents RUDG

Orientation

workshop

Status report:

Town & Village Centers

Status report:

Regional Circulation Corridors

Status

report:

Trails

Status report:

Gateways

DRAFT

v1.0 RUD

G

Final RUDG

CAT 4Policy & Program Modifications

PRAC Reviews CAT 4 Items

PRAC Prioritizes

CAT 4 Items

PRAC Finalizes

CAT4 Items

BOARD Review of

CAT 4 items

Cat 5 FORA Procedures & Operations

STAFF Presents CAT 5

Work Plan

Blight Removal Program Development

STAFF presents draft scope to ADMIN re: 1. Surplus II/CSUMB2. Revolving loan

fund/Best Practices

Page 3: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

3

Cat 1-2 Items

PRAC Completed detailed review of recommended text and figure changes during 2013

CEQA Attorney A. Waltner reviewed and recommended a process for completion including CEQA

Will result in usable land use map corrected text

Coordination with Regional Plans (fall 2014 status report)

Page 4: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

4

Completion Items

Feb Mar Apr May June July Aug Sept OctNov -Dec

CAT 1-2BRP Corrections & Clarifications

• STAFF presents 2014 Work Plan & Calendar

• BOARD Accepts Work Plan, Approves Revised PRAC Charge, & Extends PRAC

Public review

draft CAT 1-2 CEQA

BOARD Approval of

CAT 1-2 CEQA

Status Report:

Regional Plan Coord

CAT 3Implementation of Yet-to-be Completed BRP Policies & Programs

ADMIN reviews STAFF recs re: CAT 3 Items

BOARD acceptance of ADMIN

recs to finish w/CAT 3

items

Regional Urban Design Guidelines (RUDG)

STAFF presents RUDG

Orientation

workshop

Status report:

Town & Village Centers

Status report:

Regional Circulation Corridors

Status

report:

Trails

Status report:

Gateways

DRAFT

v1.0 RUD

G

Final RUDG

CAT 4Policy & Program Modifications

PRAC Reviews CAT 4 Items

PRAC Prioritizes

CAT 4 Items

PRAC Finalizes

CAT4 Items

BOARD Review of

CAT 4 items

Cat 5 FORA Procedures & Operations

STAFF Presents CAT 5

Work Plan

Blight Removal Program Development

STAFF presents draft scope to ADMIN re: 1. Surplus II/CSUMB2. Revolving loan

fund/Best Practices

Page 5: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

5

Regional Urban Design Guidelines (RUDG)

Regional urban design guidelines will be prepared and adopted by FORA as a separate implementation action to govern the visual quality of the following areas of regional importance:

The State Highway 1 Scenic Corridor,

The freeway entrances to the former Fort Ord from State Highway 1 (12th Street and the Main Gate areas) and from the east,

Areas bordering the public accessible habitat-conservation areas,

Major through roadways such as Reservation Road and Blanco Road, as well as other areas to be determined.

The urban design guidelines will establish standards for road design, setbacks, building height, landscaping, signage, and other matters of visual importance.

(1997 BRP Context & Framework p61)

• Hwy 1 Scenic Corridor (Board approved 2005)

• Town & Village Centers

• Regional Circulation Corridors

• Trails• Gateways

Page 6: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

6

Completion Items

Feb Mar Apr May June July Aug Sept OctNov -Dec

CAT 1-2BRP Corrections & Clarifications

• STAFF presents 2014 Work Plan & Calendar

• BOARD Accepts Work Plan, Approves Revised PRAC Charge, & Extends PRAC

Public review

draft CAT 1-2 CEQA

BOARD Approval of

CAT 1-2 CEQA

Status Report:

Regional Plan Coord

CAT 3Implementation of Yet-to-be Completed BRP Policies & Programs

ADMIN reviews STAFF recs re: CAT 3 Items

BOARD acceptance of ADMIN

recs to finish w/CAT 3

items

Regional Urban Design Guidelines (RUDG)

STAFF presents RUDG

Orientation

workshop

Status report:

Town & Village Centers

Status report:

Regional Circulation Corridors

Status

report:

Trails

Status report:

Gateways

DRAFT

v1.0 RUD

G

Final RUDG

CAT 4Policy & Program Modifications

PRAC Reviews CAT 4 Items

PRAC Prioritizes

CAT 4 Items

PRAC Finalizes

CAT4 Items

BOARD Review of

CAT 4 items

Cat 5 FORA Procedures & Operations

STAFF Presents CAT 5

Work Plan

Blight Removal Program Development

STAFF presents draft scope to ADMIN re: 1. Surplus II/CSUMB2. Revolving loan

fund/Best Practices

Page 7: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

7

Suggested 2014 PRAC Projects

Local Job Creation Job Creation Through Ecotourism Land Use Policies Adjacent to National Monument Trails Project

Page 8: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

8

Completion Items

Feb Mar Apr May June July Aug Sept OctNov -Dec

CAT 1-2BRP Corrections & Clarifications

• STAFF presents 2014 Work Plan & Calendar

• BOARD Accepts Work Plan, Approves Revised PRAC Charge, & Extends PRAC

Public review

draft CAT 1-2 CEQA

BOARD Approval of

CAT 1-2 CEQA

Status Report:

Regional Plan Coord

CAT 3Implementation of Yet-to-be Completed BRP Policies & Programs

ADMIN reviews STAFF recs re: CAT 3 Items

BOARD acceptance of ADMIN

recs to finish w/CAT 3

items

Regional Urban Design Guidelines (RUDG)

STAFF presents RUDG

Orientation

workshop

Status report:

Town & Village Centers

Status report:

Regional Circulation Corridors

Status

report:

Trails

Status report:

Gateways

DRAFT

v1.0 RUD

G

Final RUDG

CAT 4Policy & Program Modifications

PRAC Reviews CAT 4 Items

PRAC Prioritizes

CAT 4 Items

PRAC Finalizes

CAT4 Items

BOARD Review of

CAT 4 items

Cat 5 FORA Procedures & Operations

STAFF Presents CAT 5

Work Plan

Blight Removal Program Development

STAFF presents draft scope to ADMIN re: 1. Surplus II/CSUMB2. Revolving loan

fund/Best Practices

Page 9: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

9

Completion Items

Feb Mar Apr May June July Aug Sept OctNov -Dec

CAT 1-2BRP Corrections & Clarifications

• STAFF presents 2014 Work Plan & Calendar

• BOARD Accepts Work Plan, Approves Revised PRAC Charge, & Extends PRAC

Public review

draft CAT 1-2 CEQA

BOARD Approval of

CAT 1-2 CEQA

Status Report:

Regional Plan Coord

CAT 3Implementation of Yet-to-be Completed BRP Policies & Programs

ADMIN reviews STAFF recs re: CAT 3 Items

BOARD acceptance of ADMIN

recs to finish w/CAT 3

items

Regional Urban Design Guidelines (RUDG)

STAFF presents RUDG

Orientation

workshop

Status report:

Town & Village Centers

Status report:

Regional Circulation Corridors

Status

report:

Trails

Status report:

Gateways

DRAFT

v1.0 RUD

G

Final RUDG

CAT 4Policy & Program Modifications

PRAC Reviews CAT 4 Items

PRAC Prioritizes

CAT 4 Items

PRAC Finalizes

CAT4 Items

BOARD Review of

CAT 4 items

Cat 5 FORA Procedures & Operations

STAFF Presents CAT 5

Work Plan

Blight Removal Program Development

STAFF presents draft scope to ADMIN re: 1. Surplus II/CSUMB2. Revolving loan

fund/Best Practices

Page 10: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

10

Blight Removal

1.Surplus II/CSUMB2.Revolving loan fund/Best Practices

Page 11: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

11

Budget Impact

Original BRP Post-Reassessment 13-14 Budget

$450,000

Remaining 13-14 Budget $350,000

Recommended Actions:• CEQA Consultant• Regional Urban Design Guidelines (RUDG)

Consultant

Page 12: Proposed Post Reassessment 2014 Work Plan Fort Ord Reuse Authority

12

Action

Accept 2014 Work planApprove PRAC ExtensionApprove Revised PRAC Charge

Receive Colloquium Budget Report