August 2017 Proposed Residential & Commercial Project at Village Davdi By M/s Regency Nirman Ltd August 2017 PRE-FEASIBILITY REPORT The Proposed Residential & Commercial Project at Village Davdi By M/s Regency Nirman Ltd Category B1 Project Submitted to Expert Appraisal Committee (EAC) Environmental Consultant Building Environment (India) Pvt. Ltd Office No. 603, Sai Sangam, Plot No. 85, Sector- 15, C.B.D Belapur, Navi Mumbai- 400 614 Tel No.: 022-27578554 Web: www.beipl.co.in Submitted by M/s Regency Nirman Ltd 111 / 11, Anil Complex, New Link Road, Ulhasnagar 421 003

Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

August 2017

Proposed Residential & Commercial Project at

Village Davdi By M/s Regency Nirman Ltd

August 2017

PRE-FEASIBILITY REPORT

The Proposed Residential & Commercial Project at

Village Davdi By M/s Regency Nirman Ltd

Category B1 Project

Submitted to

Expert Appraisal Committee (EAC)

Environmental Consultant

Building Environment (India) Pvt. Ltd

Office No. 603, Sai Sangam, Plot No. 85,

Sector- 15, C.B.D Belapur,

Navi Mumbai- 400 614

Tel No.: 022-27578554

Web: www.beipl.co.in

Submitted by

M/s Regency Nirman Ltd

111 / 11, Anil Complex, New Link Road,

Ulhasnagar 421 003

Page 2: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY 1

2. INTRODUCTION 5

3. PROJECT DESCRIPTION 6

4. SITE ANALYSIS 10

5. PLANNING BRIEF 11

6. PROPOSED INFRASTRUCTURE 12

7. REHABILITATION AND RESETTLEMENT PLAN 14

8. PROJECT SCHEDULE AND COST ESTIMATES 15

Page 3: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

1 BE/PFR-Regency Dombivali /017/004 Rev.00

1. EXECUTIVE SUMMARY

Regency Nirman Ltd is coming up with residential & commercial Project is located on plot

bearing plot bearing S.NO. 101/(3a,3b,3c,3d), 47/1, 47/2pt, 44/2, 48, 49/1, 49/2, 50/1, 50/2, 50/4,

50/5, 51/2, 52/2, 54/1, 97/1 at Village – Davdi, Tal- Kalyan, Dist- Thane, Maharashtra. The

project location on Google is shown below in Figure no. 1.

Figure No.1 Plot Boundary Marked on Google Image

The total cost of the project estimated is 700 crores. The project site comes under Kalyan

Dombivali (KDMC). As per the uniform DCR notification dated 28.02.2017. The development

allowed on this plot as per DCR i.e. Commercial & Residential.

The project will be developed on total plot area of 1,31,190.00 Sq.m. After deducting reservations,

the effective net plot area comes about 1,08,351.00 Sq.m. The total construction built-up area will

be 4,95,000.00 Sq.mt. Their details are as given below:

Item Proposed

Total Plot Area 1,31,190.00

Deduction 22,838.00

Net Plot Area 1,08,351.00

Page 4: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

2 BE/PFR-Regency Dombivali /017/004 Rev.00

Proposed FSI 2,97,500.00

Non FSI Area 1,97,500.00

Total Construction BUA 4,95,000.00

Ground Coverage 17,650.00

Green Area 10% on ground = 10850.00

10%on podium = 10820.00

No of Buildings 24 nos. of new buildings

Configuration of the Building LG + ST + PODIUM + 23 FLOORS

Project Infrastructures

Power Requirement: Electricity will be sourced from MSEB.

Adequate capacity of DG Set will be provided.

i. Water Requirement:

Construction Phase

Total water requirement estimated is 50 KLD. The water demand will be met by local

authority and water tankers.

Operation Phase

Proposed Water Requirement:

Source: KDMC /Recycled water / RWH / tanker

Total Water Demand: 2976.00 KLD

Domestic: 1884.00 KLD

Flushing: 942.00 KLD

Gardening: 108.00 KLD

Car Washing: 42.00 KLD

ii. Manpower Requirement:

Construction Phase

During the construction phase about 500 persons will be deployed on the site from nearby

places. Influx of these people was temporary in nature.

Page 5: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

3 BE/PFR-Regency Dombivali /017/004 Rev.00

Operation Phase

On completion of the project, residents will occupy their property. Total population is expected to

be 20,930 nos.

iii. Wastewater Management:

Total 2543.00 KLD of wastewater will be generated from the project site. After recycling treated

sewage will be used for flushing, gardening & car washing.

v. Solid Waste Management

Construction Phase

During the construction phase, soak pits and septic tanks will be provided for disposal of

waste water. Temporary sanitary toilets will also be provided during peak labor force.

The total quantities of solid waste that will be generated in the project will be 10,120.00

Kg/day. Out of which 2826.00 Kg/day will be non-biodegradable and 7294.00 Kg/day will be

biodegradable. Biodegradable waste will be treated in OWC. Non Bio-degradable waste will

be handed over to authorized local vendor for recycling.

vi. Noise

The construction noise localized, intermittent in nature. This has subsided with the completion

of the foundation work. The resultant ambient air noise levels will be within the tolerable

levels. The operation will be restricted to day time. Adequate measures taken to keep noise

and vibrations under control. No heat or light emission.

Background Study

Environmental Monitoring is planned for better understanding the baseline conditions and

pollution levels so that impacts can be assessed and addressed in environment management plan.

The detailed report will be furnished in EIA.

i. Environmental Attributes

The baseline data collection will be carried out as per EIA notification 2006, CPCB guidelines

and EIA Guidelines Manuals 2010. Results will be depicted in EIA report.

ii. Air Dispersion Modeling

Air Modeling will be carried out for dispersion assessment of pollutants from stack emissions.

Results will be depicted in the EIA report.

Page 6: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

4 BE/PFR-Regency Dombivali /017/004 Rev.00

Safety

Employee’s safety is well maintained by good working practices. PPE will be provided to workers

during construction phase. A well-planned Security Service will be hired. The general safety rules

to be followed by all staff and workers will be documented and made aware to all personnel by the

Safety Officer.

Training will be given at a regular interval to the employees & workers in First Aid, Fire-fighting,

and for action during the emergencies. The records of all accidents will be maintained and cause

of the accident will be investigated and preventive measures will be taken to prevent

reoccurrences.

Portable Fire Extinguishers will be provided at prominent places. Signs indicators for all fire

safety, safe evacuation plan will be provided. Under ground water storage tank of adequate

capacity will be provided exclusively for Fire Fighting. On-site emergency plan will be in place.

Accordingly, Personal protection equipment will be given and use will be insisted. Consulting

Physician will be retained to attain the site. Safety measures will be considered in storage and in

transportation of construction materials as well.

Page 7: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

5 BE/PFR-Regency Dombivali /017/004 Rev.00

2. INTRODUCTION

Regency Nirman Ltd is coming up with residential & commercial Project is located on plot

bearing plot bearing S.NO. 101/(3a,3b,3c,3d), 47/1, 47/2pt, 44/2, 48, 49/1, 49/2, 50/1, 50/2, 50/4,

50/5, 51/2, 52/2, 54/1, 97/1 at Village – Davdi, Tal- Kalyan, Dist- Thane, Maharashtra.

The aforesaid development falls in the Category B1 of Projects and Activity Number 8(a) –

“Building Construction Projects” as per the “List of Projects or Activities requiring Prior

Environmental Clearance” given in the EIA Notification dated 14th September, 2006 &

subsequent amendments.

The Environmental Impact Assessment (EIA) will be based on one season environmental

monitoring data. The EIA will be carried out as per the EIA guidelines and requirements of

Ministry of Environment and Forests. The impacts from the proposed project will be investigated

by establishing baseline conditions, identification, prediction and evaluation of impacts of the

component of the project.

Page 8: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

6 BE/PFR-Regency Dombivali /017/004 Rev.00

3. PROJECT DESCRIPTION

Regency Nirman Ltd is coming up with residential & commercial Project is located on plot

bearing plot bearing S.NO. 101/(3a,3b,3c,3d), 47/1, 47/2pt, 44/2, 48, 49/1, 49/2, 50/1, 50/2, 50/4,

50/5, 51/2, 52/2, 54/1, 97/1 at Village – Davdi, Tal- Kalyan, Dist- Thane, Maharashtra. The

project site comes under Kalyan Dombivali Municipal Corporation (KDMC). The total cost of the

project estimated is 700 Crores.

The project will be developed on total plot area of 1,31,190.00 Sq.m. After deducting

reservations, the effective net plot area comes about 1,08,351.00 Sq.m. The total construction built

up area will be 4,95,000.00 Sq.mt. Their details are as given below:

Item Proposed

Total Plot Area 1,31,190.00

Deduction 22,838.00

Net Plot Area 1,08,351.00

Proposed FSI 2,97,500.00

Non FSI Area 1,97,500.00

Total Construction BUA 4,95,000.00

Ground Coverage 17,650.00

Green Area 10% on ground = 10850.00

10%on podium = 10820.00

No of Buildings 24 nos. of new buildings

Configuration of the Building LG + ST + PODIUM + 23 FLOORS

i. Location Details

Plot bearing S.NO. 2 S.NO. 101/(3a,3b,3c,3d), 47/1, 47/2pt, 44/2, 48, 49/1, 49/2, 50/1, 50/2, 50/4,

50/5, 51/2, 52/2, 54/1, 97/1 at Village – Davdi, Tal- Kalyan, Dist- Thane, Maharashtra. The

geographical coordinates of the site are given below:

Latitude: 19o 14’ 09.49” N

Longitude: 73o 07’ 09.46” E

The project location on Google is shown below.

Page 9: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

7 BE/PFR-Regency Dombivali /017/004 Rev.00

Plot Boundary Marked on Google Image

ii. Connectivity:

Places Aerial Distance

Dombivali Railway Station 2.97 km

Chhatrapati Shivaji Int’l Airport 29.01 km

Proposed new mumbai international Airport 24.86 Km

Asian Institute of medical sciences Hospital 1.11 Km

Jondhale college of engineering 1.20 Km

Omkar Cambridge International School 1.61 Km

Manpada Police Station 0.41 Km

Fire Brigade Station at Dombivali west 3.72 Km

(These are aerial distances as measured on Google Earth)

iii. Details of Alternative Site Considered

No alternative site is been considered for project development.

iv. Project Area Details

Total Plot Area: 1,31,190.00 Sq.m

Net Plot Area: 1,08, 351.00 Sq.m

Proposed Construction Built-up Area: 4,95,000.00 Sq.mt.

v. Process Details

Not Applicable

Page 10: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

8 BE/PFR-Regency Dombivali /017/004 Rev.00

vi. Flow Chart Showing Project Layout

Not Applicable.

vii. Power: Please refer for the details which are already given in Chapter 1 ‘Executive

Summary’.

viii. Water: Please refer for the details which are already given in Chapter 1 ‘Executive

Summary’.

ix. Manpower: Please refer for the details which are already given in Chapter 1 ‘Executive

Summary’.

x. Raw Material Requirement

Not Applicable.

xi. Waste Management/ Disposal

Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.

Page 11: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

9 BE/PFR-Regency Dombivali /017/004 Rev.00

Environmental Impact Assessment (EIA) is a well planned process to predict the environmental

consequences of any kind of development, which is a result of human activities and to suggest

appropriate measures in order to reduce adverse effects and also to augment positive effects. The

EIA procures a rational and ethical approach for sustainable development. However, it is more

scientific process because it not only tells the past, present and the future consequences of going

on development, but also predicts the future events which likely to change due to some reasons, In

terms of the EIA notification of the MoEF dated 14th September 2006, the generic structure of EIA

documents shall be as under:-

Introduction

Project Description

Description of the Environment on the basis of Baseline data

Analysis of Alternatives (Technology & Site)

Anticipated Environmental Impact & mitigation Measures

Environmental Monitoring Program

Additional studies

Project benefits

Environmental Cost benefits Analysis

EMP

Summary & Conclusion

Disclosure of Consultant Engaged

CSR Activity

Page 12: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

10 BE/PFR-Regency Dombivali /017/004 Rev.00

4. SITE ANALYSIS

i. Connectivity

Please refer for the details which are already given in Chapter 3 ‘Project Description’.

ii. Land form and Land Use

As per the DP Plan the site is under commercial and residential zone. The proposed project

will be residential & commercial in nature

iii. Land Ownership

Land ownership is with Regency Nirman Ltd

iv. Existing Land Use Pattern

As per the DP Plan the site is under commercial and residential zone. The proposed site is

an open land & construction activity is going on as per earlier EC.

v. Existing Infrastructure

The site surroundings are quite developed. The site has excellent connectivity in terms of

Rail and Road transport.

vi. Soil Classification

Not Available

vii. Climate data secondary source

The climate is tropical wet and dry climate. Most months of the rainy season are marked

by significant rainfall. Mumbai's climate can be best described as moderately hot with high

level of humidity. Its coastal nature and tropical location ensures temperatures won't

fluctuate much throughout the year. The mean maximum average temperatures in about 32

°C (90 °F) in summer and 30 °C (86 °F) in winter, while the average minimums are 25 °C

(77 °F) in summer and 20.5 °C (68.9 °F) in winter. Mumbai experiences four distinct

seasons: Winter (December–Feb); Summer (March–May); Monsoon (June–Sep); and

Post-Monsoon (Oct–Dec)

viii. Social Infrastructure Available

The social infrastructure surrounding project site is quite developed.

Page 13: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

11 BE/PFR-Regency Dombivali /017/004 Rev.00

5. PLANNING BRIEF

i. Planning Concept – Residential & Commercial Project

ii. Population Projection - On completion of the project, residents will occupy their

property. Total population is expected to be 20930 nos.

iii. Land use planning - As per the DP Plan the site is under commercial and

residential zone.

iv. Amenities or facilities

- Improved Residential Housing

- Improved Internal Roads

- Improved hygenic & sanitation conditions

- Balwadi, Welfare Centres & shops

- Onsite Solid waste and wastewater treatment facility

- Installation of Rain Water Harvesting System

Page 14: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

12 BE/PFR-Regency Dombivali /017/004 Rev.00

6. PROPOSED INFRASTRUCTURE

The proposed project is expansion project. It provides a well-designed residential housing and

improved hygienic and sanitation conditions. Also, supporting development will take place at the

site. The project will also have better internal roads, provision of Rainwater Harvesting system

and onsite Sewage Treatment and solid waste treatment facility.

i. Residential area –

Item Proposed

Total Plot Area 1,31,190.00

Deduction 22,838.00

Net Plot Area 1,08,351.00

Proposed FSI 2,97,500.00

Non FSI Area 1,97,500.00

Total Construction BUA 4,95,000.00

Ground Coverage 17,650.00

Green Area 10% on ground = 10850.00

10%on podium = 10820.00

No of Buildings 24 nos. of new buildings

Configuration of the Building LG + ST + PODIUM + 23 FLOORS

ii. Green belt – RG area provided on ground is 10850.00 Sq.mt.

RG area provided on podium is 10820.00 Sq.mt.

Plantation: Proposed trees on ground 543.00 nos.

iv. Drinking water Management

The water demand will be met by KDMC water supply.

v. Sewerage System

Sewage shall be send to the STP and treated sewage would be used for gardening and non-potable

purposes. STPs with suitable capacity with appropriate technology will be installed depending on

the site conditions and requirement.

Page 15: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

13 BE/PFR-Regency Dombivali /017/004 Rev.00

vi. Industrial Waste Management

Not Applicable

vii. Solid Waste Management

Construction Waste: Please refer for the details which are already given in Chapter 1 ‘Executive

Summary’.

Waste Generated during Operation Phase: Please refer for the details which are already given

in Chapter 1 ‘Executive Summary’.

viii. Power Requirement and Supply

Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.

Page 16: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

14 BE/PFR-Regency Dombivali /017/004 Rev.00

7. REHABILITATION AND RESETTLEMENT PLAN

Page 17: Proposed Residential & Commercial Project at August 2017 ...environmentclearance.nic.in/writereaddata/Online/TOR/06_Sep_2017... · The Proposed Residential & Commercial Project at

Proposed Expansion of Residential & Commercial Project at Mharal By M/s Regency Nirman Ltd 2017

15 BE/PFR-Regency Dombivali /017/004 Rev.00

8. PROJECT SCHEDULE AND COST ESTIMATES

i. Project Schedule The project will be built over a period of approx.10 years.

ii. Project cost estimates - Rs. 700 Crores