Protocol Revision Subcommittee. Presentation to the ERCOT Technical Advisory Committee August 2, 2007. 7 PRRs for Approval Non-System Changes – IAs only 2 Notices of Withdrawal 1 Notices of Rejection. PRS Summary. PRR 713 – Resource Outage Notification. - PowerPoint PPT Presentation

Citation preview

Page 1: Protocol Revision Subcommittee

Protocol Revision Protocol Revision SubcommitteeSubcommittee

Presentation to the Presentation to the

ERCOT Technical Advisory ERCOT Technical Advisory CommitteeCommittee

August 2, 2007August 2, 2007

Page 2: Protocol Revision Subcommittee

PRS SummaryPRS Summary

• 7 PRRs for Approval7 PRRs for Approval• Non-System Changes – IAs onlyNon-System Changes – IAs only

• 2 Notices of Withdrawal2 Notices of Withdrawal• 1 Notices of Rejection1 Notices of Rejection

Page 3: Protocol Revision Subcommittee

PRR 713PRR 713 – Resource Outage – Resource Outage NotificationNotification

PurposePurpose

(ERCOT)(ERCOT)PRR clarifies and further details the long-PRR clarifies and further details the long-term Outage notification submission process term Outage notification submission process for Resources.for Resources.

BenefitBenefit Expands explanation options for LT outages Expands explanation options for LT outages to improve transmission modeling accuracyto improve transmission modeling accuracy

Market ImpactMarket Impact UnknownUnknown

System ChangeSystem Change NoNo N/AN/A

AssumptionsAssumptions N/AN/A

PRS VotePRS Vote PRS recommended approval unanimously; all PRS recommended approval unanimously; all market segments were presentmarket segments were present

Effective DateEffective Date October 1, 2007October 1, 2007

Page 4: Protocol Revision Subcommittee

PRR 713PRR 713 – Resource Outage – Resource Outage NotificationNotification

Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact

Credit Monitoring/Credit Monitoring/LiabilityLiability

BudgetBudget

StaffingStaffing

Computer SystemsComputer Systems

Business FunctionsBusiness Functions

Grid OperationsGrid Operations

ImpactImpact

Page 5: Protocol Revision Subcommittee

PRR 717 PRR 717 – EILS Disputes & – EILS Disputes & ResettlementsResettlements

PurposePurpose

(ERCOT)(ERCOT)Adds EILS Contract Period definition, adds Adds EILS Contract Period definition, adds process for disputing and resettling EILS; process for disputing and resettling EILS; reformats as requiredreformats as required

BenefitBenefit Greater confidence in EILS Settlement Greater confidence in EILS Settlement processprocess

Market ImpactMarket Impact NoneNone

System ChangeSystem Change NoNo N/AN/A

AssumptionsAssumptions N/AN/A

PRS VotePRS Vote PRS recommended approval with 2 PRS recommended approval with 2 abstentions; all market segments were abstentions; all market segments were presentpresent

Effective DateEffective Date October 1, 2007October 1, 2007

Page 6: Protocol Revision Subcommittee

PRR 717 PRR 717 – EILS Disputes & – EILS Disputes & ResettlementsResettlements

Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact

Credit Monitoring/Credit Monitoring/LiabilityLiability

BudgetBudget

StaffingStaffing

Computer SystemsComputer Systems

Business FunctionsBusiness Functions

Grid OperationsGrid Operations

ImpactImpact

May require minor changesMay require minor changes

Page 7: Protocol Revision Subcommittee

PRR 721PRR 721 – Provision of – Provision of Customer Billing Information Customer Billing Information

to TDSPsto TDSPsPurposePurpose

(Direct Energy, IREP)(Direct Energy, IREP)Requires ERCOT to provide customer billing Requires ERCOT to provide customer billing information to TDSPs (ESI ID, Customer Name information to TDSPs (ESI ID, Customer Name and phone number – all other data removed) and phone number – all other data removed) during a mass transition eventduring a mass transition event

BenefitBenefit Provide TDSPs customer data needed for Provide TDSPs customer data needed for outage purposesoutage purposes

Market ImpactMarket Impact NoneNone

System ChangeSystem Change NoNo N/AN/A

AssumptionsAssumptions N/AN/A

PRS VotePRS Vote PRS recommended approval unanimously; all PRS recommended approval unanimously; all market segments were presentmarket segments were present

Effective DateEffective Date Upon System ImplementationUpon System Implementation

Page 8: Protocol Revision Subcommittee

PRR 721PRR 721 – Provision of – Provision of Customer Billing Information Customer Billing Information

to TDSPsto TDSPsItem ReviewedItem Reviewed DescriptionDescriptionNoNo

ImpactImpact

Credit Monitoring/Credit Monitoring/LiabilityLiability

BudgetBudget

StaffingStaffing

Computer SystemsComputer Systems

Business FunctionsBusiness Functions

Grid OperationsGrid Operations

ImpactImpact

Costs part of another projectCosts part of another project

Page 9: Protocol Revision Subcommittee

PRR 724 PRR 724 – Removal of the Drop to – Removal of the Drop to AREP ReferencesAREP References

PurposePurpose

(Direct Energy, IREP)(Direct Energy, IREP)Removes Drop to AREP referencesRemoves Drop to AREP references

BenefitBenefit Conforms to PUC Rules (25.43)Conforms to PUC Rules (25.43)

Market ImpactMarket Impact Complies with PUC RulesComplies with PUC Rules

System ChangeSystem Change NoNo N/AN/A

AssumptionsAssumptions N/AN/A

PRS VotePRS Vote PRS recommended approval unanimously; all PRS recommended approval unanimously; all market segments were presentmarket segments were present

Effective DateEffective Date Upon System ImplementationUpon System Implementation

Page 10: Protocol Revision Subcommittee

PRR 724 PRR 724 – Removal of the Drop to – Removal of the Drop to AREP ReferencesAREP References

Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact

Credit Monitoring/Credit Monitoring/LiabilityLiability

BudgetBudget

StaffingStaffing

Computer SystemsComputer Systems

Business FunctionsBusiness Functions

Grid OperationsGrid Operations

ImpactImpact

$50K Cost – O&M$50K Cost – O&M

Page 11: Protocol Revision Subcommittee

PRR 725PRR 725 – EILS Formula & – EILS Formula & Standard FormStandard Form

PurposePurpose

(ERCOT)(ERCOT)Corrects availability factor formula for EILS Corrects availability factor formula for EILS resources under the alternate formula, resources under the alternate formula, eliminates undefined term from EILS QSE eliminates undefined term from EILS QSE AgreementAgreement

BenefitBenefit Eliminates potential market confusionEliminates potential market confusion

Market ImpactMarket Impact NoneNone

System ChangeSystem Change NoNo N/AN/A

AssumptionsAssumptions N/AN/A

PRS VotePRS Vote PRS recommended approval with 1 PRS recommended approval with 1 abstention; all market segments were abstention; all market segments were presentpresent

Effective DateEffective Date October1, 2007October1, 2007

Page 12: Protocol Revision Subcommittee

PRR 725PRR 725 – EILS Formula & – EILS Formula & Standard FormStandard Form

Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact

Credit Monitoring/Credit Monitoring/LiabilityLiability

BudgetBudget

StaffingStaffing

Computer SystemsComputer Systems

Business FunctionsBusiness Functions

Grid OperationsGrid Operations

ImpactImpact

Minor costs – O&MMinor costs – O&M

Page 13: Protocol Revision Subcommittee

PRR 726 PRR 726 – DC Tie Scheduling – DC Tie Scheduling ClarificationsClarifications

PurposePurpose

(ERCOT)(ERCOT)Clarifies DC-Tie scheduling language to Clarifies DC-Tie scheduling language to reflect ERCOT treatment of ties, eliminates reflect ERCOT treatment of ties, eliminates term “Back to Back Tie (BtB Tie)”term “Back to Back Tie (BtB Tie)”

BenefitBenefit Eliminates inconsistencies between ERCOT Eliminates inconsistencies between ERCOT treatment of ties and Protocols, syncs zonal treatment of ties and Protocols, syncs zonal and nodal protocol termsand nodal protocol terms

Market ImpactMarket Impact NoneNone

System ChangeSystem Change NoNo N/AN/A

AssumptionsAssumptions N/AN/A

PRS VotePRS Vote PRS recommended approval unanimously; all PRS recommended approval unanimously; all market segments were presentmarket segments were present

Effective DateEffective Date October 1, 2007October 1, 2007

Page 14: Protocol Revision Subcommittee

PRR 726 PRR 726 – DC Tie Scheduling – DC Tie Scheduling ClarificationsClarifications

Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact

Credit Monitoring/Credit Monitoring/LiabilityLiability

BudgetBudget

StaffingStaffing

Computer SystemsComputer Systems

Business FunctionsBusiness Functions

Grid OperationsGrid Operations

ImpactImpact

Page 15: Protocol Revision Subcommittee

PRR 728PRR 728 – Proposal to Allow ERCOT – Proposal to Allow ERCOT Discretion When Processing Discretion When Processing

Renewable Production Values -- Renewable Production Values -- URGENTURGENT

PurposePurpose

(ERCOT)(ERCOT)Allows ERCOT discretion to process Allows ERCOT discretion to process Renewable Production Potential values when Renewable Production Potential values when submitted by QSEs with only Uncontrollable submitted by QSEs with only Uncontrollable Renewable ResourcesRenewable Resources

BenefitBenefit Frees up resources that can be redirected to Frees up resources that can be redirected to nodal market, $4K/month cost savingsnodal market, $4K/month cost savings

Market ImpactMarket Impact NoneNone

System ChangeSystem Change NoNo N/AN/A

AssumptionsAssumptions N/AN/A

PRS VotePRS Vote PRS recommended approval with 2 opposed PRS recommended approval with 2 opposed and 5 abstentions; all market segments were and 5 abstentions; all market segments were presentpresent

Effective DateEffective Date September 1, 2007 (Urgent vote approved September 1, 2007 (Urgent vote approved with 5 opposed and 2 abstentions)with 5 opposed and 2 abstentions)

Page 16: Protocol Revision Subcommittee

PRR 728PRR 728 – Proposal to Allow ERCOT – Proposal to Allow ERCOT Discretion When Processing Discretion When Processing

Renewable Production Values -- Renewable Production Values -- URGENTURGENT

Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact

Credit Monitoring/Credit Monitoring/LiabilityLiability

BudgetBudget

StaffingStaffing

Computer SystemsComputer Systems

Business FunctionsBusiness Functions

Grid OperationsGrid Operations

ImpactImpact

Page 17: Protocol Revision Subcommittee

PRR SummaryPRR Summary• PRRs Recommended for ApprovalPRRs Recommended for Approval

• PRR 713PRR 713 – Resource Outage Notification – Resource Outage Notification• PRR 717PRR 717 – EILS Disputes & Resettlements – EILS Disputes & Resettlements• PRR 721PRR 721 – Provision of Customer Billing – Provision of Customer Billing

Information to TDSPsInformation to TDSPs• PRR 724PRR 724 – Removal of the Drop to AREP References – Removal of the Drop to AREP References• PRR 712PRR 712 – Emergency Interruptible Load Service – Emergency Interruptible Load Service

Formula & Standard FormFormula & Standard Form• PRR 726PRR 726 – DC Tie Scheduling Clarifications – DC Tie Scheduling Clarifications• PRR 728PRR 728 – Proposal to Allow ERCOT Discretion – Proposal to Allow ERCOT Discretion

When Processing Renewable Production ValuesWhen Processing Renewable Production Values -- -- URGENTURGENT

Page 18: Protocol Revision Subcommittee

PRR NoticesPRR Notices• WithdrawalsWithdrawals

• PRR 712 – Local Congestion Replacement PRR 712 – Local Congestion Replacement Reserve Payment MethodologyReserve Payment Methodology

• NPRR 040 – Synchronization of Emergency NPRR 040 – Synchronization of Emergency Electric Curtailment Plan (EECP) EventElectric Curtailment Plan (EECP) Event

• RejectionsRejections• PRR 730 – Balancing Energy Price PRR 730 – Balancing Energy Price

Adjustment for Deployment of Adjustment for Deployment of Replacement Reserve ServiceReplacement Reserve Service

Page 19: Protocol Revision Subcommittee

TAC Assignment UpdateTAC Assignment Update

• PRR Appeals ProcessPRR Appeals Process• PRS subgroup reported discussion PRS subgroup reported discussion

status on 7/19status on 7/19• Subgroup reported on possible Subgroup reported on possible

timelines and procedural requirements timelines and procedural requirements to provide a record to the BODto provide a record to the BOD

• PRS requested more information on PRS requested more information on proposed timelinesproposed timelines

• Subgroup meets 8/6Subgroup meets 8/6

Page 20: Protocol Revision Subcommittee