Upload
johnathan-hunt
View
233
Download
10
Tags:
Embed Size (px)
Citation preview
Provide Facility Management and Maintenance Services 1
FY02 ASA Presentation
Provide Facility Management and Maintenance Services
Presented by: Kelvin LawsonJohn DattoliHerb Jacobi
Team Members:Richard Allen, Jim Bullman, John Dattoli,Jeff Fellows, Herb Jacobi, Frankie Kelly, Kelvin Lawson, William Monath, Bradley Provancha, James Wilson
Office of Research ServicesNational Institutes of Health
18 November 2002
Provide Facility Management and Maintenance Services
2
Table of ContentsMain Presentation
ASA Template ……………………………….………………………………..4Customer Perspective……………………….………………………………..5
Customer Segmentation …………………….……………………………………..7Customer Satisfaction……………………….……………………………………...9Customer Satisfaction Additional Measures……………………………………10Unique Customer Objectives and Measures.…………………………………..12
Internal Business Process Perspective……………………………………14Service Group Block Diagram……………………………………………………15Conclusions from Discrete Services Deployment Flowcharts………………...16Process Measures………………………………………………………………...17
Learning and Growth Perspective………………………………………….27Conclusions from Turnover, Sick Leave, Awards, EEO/ER/ADR Data……...28Analysis of Readiness Conclusions……………………………………………..29
Financial Perspective………………………………………………………..30Unit Cost……………………………………………………………………………31Asset Utilization……………………………………………………………………32
Conclusions and Recommendations………………………………………33Conclusions from FY02 ASA..……………………………………………………34Recommendations…………………………………………………………………35
Provide Facility Management and Maintenance Services
3
Table of Contents
AppendicesPage 2 of your ASA Template
Customer segments graphs
Customer satisfaction graphs
Block diagram
Process maps
Process measures graphs
Learning and Growth graphs
Analysis of Readiness Information
Unit cost graphs
Asset utilization graphs
Any unique measures graphs
Provide Facility Management and Maintenance Services
4
ASA Template - 2002
Customer Value Proposition
Team Leader
Property Management (Provide Facility Management Services)
DS5: Respond to Service Calls
Discrete Services
Service Group
DS3: Provide NIH-wide Pest Management Control
Customer Intimacy Sustain
DS1: Manage Facility Operations and Services
DS2 Provide Sanitation Services
DS9: Manage Residential Facilities
DS4: Operate Dynamic Building Systems
Preserve and maintain the NIH physical assets while serving as a single point of contact between on and off campus building occupants and service providers. Be a time saving resource providing a "one-stop shop" for service-related requests.
Product Leadership Harvest
Kelvin Lawson
Operational Excellence Growth
Service Strategy
DS6: Perform Preventive Maintenance
DS7: Replace Obsolete Building Systems
DS8: Maintain Public Spaces
Team Members
Bradley Provancha, Jeff Fellows, Richard Allen, Jim Bullman, Bill Monath, Frank Kelly, John Dattoli, Herb Jacobi, James Wilson
X
X
Provide Facility Management and Maintenance Services 5
Customer Perspective
Customer Objectives
C1. Increase Understanding of the Customer Base
C2. Increase Customer Satisfaction
C3. Increase Access to Automated Maintenance Services System
Provide Facility Management and Maintenance Services
6
Customer Perspective
Measures For Customer Objectives
C1. Increasing understanding of Customer Base
C1.1 Complete Customer Segmentation Charts for our Discrete Services
C2. Increase Customer Satisfaction
C2.1 Increase Customer Satisfaction Scores from ORS Survey
C2.2 Increase Maintenance Survey Scores
C2.1 Increase Pest Management Survey Scores
C3. Increase Access to Automated Maintenance System
C3.1 Increase % of trouble calls initiated over the Web
Objectives Measures
Provide Facility Management and Maintenance Services
7
C1. Objective: Increase Understanding of the Customer Base
C1.1Measure: Customer Segmentation Chart for DS1-8
0 250000 500000 750000 1000000 1250000 1500000 1750000 2000000
Factored Rentable SF
ORSCCNCI
NIHAIDOTHERNIDDKNHLBINICHD
NLMNINDSCBERNIMH
ODNEICIT
NIH_RENONIDCROD/OANHGRINIAMSNIAAA
CSRIn
stit
ute
Customer Segmentation of Non-Residential Square Footage
Factored SF = 12.76 M
Non Factored SF = 9.48 MFactors: Animal = 2.0, Lab = 1.5
Provide Facility Management and Maintenance Services
8
C1. Objective: Increase Understanding of the Customer Base
C1.1 Measure: Customer Segmentation Chart for DS9
0 5000 10000 15000 20000 25000 30000 35000
SF
CINIH
OD
NCI
DHHS
NICHD
NIDDK
NIDR
CC
VRP
NCCAM
NCRR
NIAID
Ten
ant
Customer Segmentation of Residential Square Footage
Total = 91773 SF
Provide Facility Management and Maintenance Services
9
C2. Objective: Increase Customer Satisfaction
C2.1 Measures: Customer Survey Methodology for DS1-DS9
FY 03 Surveys will be conducted for each Discrete Service Survey Instrument will be the ORS Scorecard
Discrete Service Survey Respondents Targets
Perform FM & Service IC POC’s (AO’s,EO’s,PFM’s) Baseline
Provide Sanitation Services
IC POC’s (AO’s,EO’s,PFM’s) Baseline
Provide NIH-wide Pest Management Control
IC POC’s (AO’s,EO’s,PFM’s) Baseline
Operate Dynamic Building Systems
IC POC’s (AO’s,EO’s,PFM’s) Baseline
Respond to Service Calls IC POC’s (AO’s,EO’s,PFM’s) Baseline
Perform Preventive Maintenance
IC POC’s (AO’s,EO’s,PFM’s) Baseline
Replace Obsolete Building Systems
Sr. Building Engineers Baseline
Maintain Public Spaces IC POC’s (AO’s,EO’s,PFM’s Baseline
Manage Residential Prop Residential Tenants Baseline
Customer Perspective
Provide Facility Management and Maintenance Services
10
Customer Perspective
C2. Objective: Increase Customer SatisfactionC2.2 Measure: Increase Customer Score on DS5 - Respond to
Service Calls SurveysC2.3 Measure: Increase Customer Score on DS3 - Provide Pest
Management Control Surveys
Provide Facility Management and Maintenance Services
11
Customer Perspective
Survey Responses for Maintenace Service Calls
C2. Objective: Increase Customer SatisfactionC2.2 Measure: Increase Agree Strongly scores on Automated Maintenance System Survey
44% - Strongly Agree37% - Agree
8% Neutral
5 % - Disagree
6 % - Disagree Strongly
65% - Not Returned
Satisfaction Scores are Shown as Actual
Percentage of Total Surveys Returned
Provide Facility Management and Maintenance Services
12
Customer Perspective
Pest Management Satisfaction Surveys for Labs
42% 41%
5%
13%
0%
10%
20%
30%
40%
50%
Excellent Satisfactory Poor N.S.
C2. Objective: Increase Customer SatisfactionC2.3 Measure: Increase Satisfactory to Excellent Scores on Pest Management Satisfaction Surveys for Labs
FY03 Target to be Determined
Provide Facility Management and Maintenance Services 13
Customer Perspective
PWB Central Call Desk Work Orders Entered Via Web
0
100
200
300
400
500600
700
800
900
1000
Oct-01
Nov-01
Dec-01
Jan-02
Feb-02
Mar-02
Apr-02
May-02
Jun-02
Jul-02
Aug-02
Sep-02
Months
Wo
rk O
rde
rs
Actual = 33%FY 03 Target = 50%
C3. Objective: Increase Access to Computerized Maintenance Management SystemC3.1. Measure: No. of Service calls submitted via Web
Web based calls= 33%
Avg.
Non-Web based calls
Provide Facility Management and Maintenance Services 14
Internal Business Process Perspective
Internal Business Process Objectives
I1. Increase Understanding of our Processes
I2. Identify methods to measure processes
Provide Facility Management and Maintenance Services
15
Facilities Management and Maintenance Services Block Diagram
The Service Providers
CCMS CST SHOPSBMS
FMU CCFMU GMLS
CCMU RMS
Protecting America’s StrategicHealth Science Assets
Manage FacilityOperations and
Services
ProvideSanitations
Services
ReplaceObsoleteBuildingSystems
Provide PestManagement
MaintainPublic Spaces
OperateDynamicBuildingSystems
PerformPreventive
Maintenance
Respond toService Calls
ManageResidentialFacilities
Sunday, November 17, 2002
Page 1 of 1
Provide Facility Management and Maintenance ServiceService Group Block Diagram
Provide Facility Management and Maintenance Services
16
I1. Objective: Increase Understanding of ProcessesI1.1 Measure: Create 9 Process Deployment Flow Charts
• Change Name of DS# 7 to “Small Purchase Maintenance Repairs”
• Refine and Comply Organizationally to the Workflow SOP’s in the PWB Organization and Operations Manual produced as part of the Central Call Desk initiative
• Re-educate all FM’s and Maintenance Personnel on Closing Out tickets
• Collapse DS# 7 into DS# 6 “Perform Preventive Maintenance”
Analysis and Recommendations
Provide Facility Management and Maintenance Services
17
• DS1: Manage Facility Operations and Services • Reduce weighted Average Time to Close Out Trouble Calls
• DS2: Provide Sanitation Services• Increase % of buildings scoring 90% or higher on inspection
• DS3: Provide NIH-wide pest management control• Reduce # of recommendations over 90 days old
• DS4: Operate Dynamic Building Systems• Define the sq. footage operated and maintained per Maintenance Staff and
compare to industry standards to develop baseline• DS5: Respond to Service Calls
• Increase % of service calls received via web• DS6: Perform Preventive Maintenance
• % of Electrical Maintenance team PM’s done on time• DS7: Replace Obsolete Building Systems and Components
• Reduce the sq footage per Small Purchase Repair $• DS8: Maintain Public Space
• Increase the % of FM public space inspection done on time• DS9: Manage Residential Property
• Reduce the # of repeat service calls
Internal Business Process Perspective
I2. Objective: Identify methods to measure processesI2.2 Measures: 9 Discrete Services
DS1: Manage Facility Operations and Services
Measure: Reduce weighted average days for completion time for trouble calls by section
7.48
8.26
12.03
9.94
0
2
4
6
8
10
12
14
Nu
mb
er
of
Da
ys
BMU CMMU SHOPS WEIGHTED AVERAGE
PWB Sections
Average Days for Trouble Call Completion by Section
Target FY O3
7.0 Days
Provide Facility Management and Maintenance Services
19
DS2: Provide Sanitation Services
Measure: Increase % of buildings scoring 90% on inspection
Sanitation Contract Inspection Results
0
5
10
15
20
25
30
35
40
Months Inspected
Nu
mb
er
of
Bu
ild
ing
s
Buildings Scoring 90%
FY03 Target Mo Avg. = 31FY02 Actual
Mo. Avg. = 28
Provide Facility Management and Maintenance Services
20
DS3: Provide NIH-wide Pest Management Control
Measure: Reduce # of recommendations not adopted after 90 days
Recom
men
dation
s
< 30 days
30 - 60 Day
s
60 - 90 Day
s
> 90 Days
0
20
40
60
80
100
120
Pest Management Control Recommendations By Days Outstanding
Age of Recommendations
FY 02 Total > 90 = 115
FY 03 Target = 100
Oct 01 –Jan 02Inspection Cycle
Feb 02 – May 02Inspection Cycle
Total Recommendations
Provide Facility Management and Maintenance Services
21
DS4: Operate Dynamic Building System (FY03 Measure) Measure: Define the sq. footage operated and maintained per Maintenance Staff and compare to industry standards to develop baseline
FY
03
Ta
rge
t T
o b
e d
ev
elo
pe
d a
nd
co
mp
are
d to
ind
us
try s
tan
da
rds
1
10
100
1000
10000
100000
Square Feet of Facility Space Per Maintenance FTE
Maint Personnel 180 196
Square Feet 63768 60435
FY 01 FY 02
Provide Facility Management and Maintenance Services
22
DS5: Respond to Service Calls
Measure: Increase % of Trouble calls submitted over the Web
PWB Central Call Desk Work Orders Entered Via Web
0
100
200
300
400
500600
700
800
900
1000
Oct-01
Nov-01
Dec-01
Jan-02
Feb-02
Mar-02
Apr-02
May-02
Jun-02
Jul-02
Aug-02
Sep-02
Months
Wo
rk O
rde
rs
Actual = 33%Target = 50%
Web based calls= 33%
Avg.
Non-Web based calls
Provide Facility Management and Maintenance Services
23
DS6: Perform Preventive Maintenance
Measure: Reduce % of Electrical PM Failures
100%7%
100%16%
100%13%
100%7%
100%12%
100%9%
99.3%13%
100%11%
100%3%
100%5%
100%15%
100%12%
99.95%10%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Oct-01
Dec-01
Feb-02
Apr-02
Jun-02
Aug-02
Total FY02
Power Panel PM's - Clinical Center (JCAHO)% Failures
% PM's Completed
Target: Reduce Failure Rate to 7 %
Provide Facility Management and Maintenance Services
24
DS7: Replace Obsolete Building Systems and Components(FY03 Measure)
Measure: Reduce Percentage of PM generated Small Purchase and Repair Work Items that are Incomplete
Recommendation: DS7 be folded into DS6 – Perform Preventive Maintenance. This measure would be retained as a second measure for DS6
Provide Facility Management and Maintenance Services
25
DS8: Maintain Public Space (New Measure For FY 03)
Measure: Equal or Exceed SLA % of square footage inspected by FM’s via an Established PM Program in CMMS
Notional
Qtr 1 Qtr 2 Qtr 3 Qtr 4
Square Footage0
400000800000
120000016000002000000
Public Space Inspection Schedule
Square Footage
Provide Facility Management and Maintenance Services
26
DS9: Manage Residential Property
Measure: New FY03 – Improve Service Call Completion Cycle
Children's Inn38%
Convent (HHMI)34%
NIHAC 116 1%
NIHAC 117 1%Building 61
1%
15 Group 25%
Children's Inn 567Convent (HHMI) 61915 Group 403Building 61 21NIHAC 116 5NIHAC 117 3
Total # of Service Calls
Per Bldg.
This chart shows the distribution of FY02 calls.
The Measure will show the avg. time to close out service calls on residential property.
Provide Facility Management and Maintenance Services 27
Learning and Growth Perspective
Learning and Growth Objectives
L1. Enhance Quality of Work Life for Employees in ORS
L2. Maintain and Enhance Competencies for Future Organization
Provide Facility Management and Maintenance Services
28
Learning and Growth Perspective
L1. Objective: Enhance Quality of Work Life for Employees
L1.1 Measure: Conclusions from L&G Data
Low Turnover indicates high satisfaction with job
Low sick leave indicates work force commitment to the mission
Low ER-ADR-EEO indicates an open atmosphere where employees can discuss issues before they become problems
Provide Facility Management and Maintenance Services
29
L2. Objective: Maintain and Enhance Competencies
L2.1 Measure: Analysis of Readiness Conclusions
Learning and Growth Perspective
Projected Hiring: Need additional maintenance service personnel to reduce amount of square footage under
supervision.
Contractor Requirements: Increasing repair and replacement requirements will require an increase in contractor service for mechanical, electrical improvements.
Training Requirements: A new emphasis on more competency training across the board – especially regarding CMMS for all employees in PWB.
Provide Facility Management and Maintenance Services 30
Financial Perspective
Financial Objectives
F1. Minimize Unit Cost at DS Level
F2. Maximize Asset Utilization
Provide Facility Management and Maintenance Services
31
Discrete Service Unit Cost Targets
Provide Facility Management Opns. & Svs.
$.25 ≤ Inflation rate
Provide Sanitation (Custodial) Services
$2.05 ≤ Inflation rate
Provide NIH-wide Pest Management Control
$.20 ≤ Inflation rate
Operate Dynamic Building Systems $.82 ≤Inflation rate
Respond to Service Calls $1.36 ≤ Inflation rate
Perform Preventive Maintenance $1.60 ≤ Inflation rate
Replace Obsolete Building Systems $1.22 ≤ Inflation rate
Maintain Public Spaces $1.34 ≤ Inflation rate
Manage Residential Prop tbd ≤ Inflation rate
Financial Perspective
Objective: Minimize Unit Cost at DS Level
Measure: Unit Cost for 9 Discrete Services
Provide Facility Management and Maintenance Services
32
Asset Utilization Measures for all Discrete Services
95%
106%
95%
105%
94%
103%97%
108%
94%
113%
94%
109%
95%
105%
95%
107%
95%
111%
97%
109%
95%
108%
93%
107%
95%
108%
0%
20%
40%
60%
80%
100%
120%
% Utilized
Oct-01 Dec-01 Feb-02 Apr-02 Jun-02 Aug-02 Average
Month
Utilization Percentage - FY02
Utilization % Not Including OT
Utilization % Including OT
Provide Facility Management and Maintenance Services 33
Conclusions and Recommendations
•Data Collection via SOP within CMMS is critical to PWB Management Decision Making
•Reinforce Compliance with PWB SOP’s
•Re-educate PWB Personnel on Workflow and Data Collection Protocol
•Centralized Cost Accounting throughout ORS using a cost effective time and cost accounting system such as MS2000
•Combine “Replace Obsolete Systems” with “Perform Preventive Maintenance”
•Establish a Public Space PM program
Provide Facility Management and Maintenance Services 34
Appendices
Provide Facility Management and Maintenance Services
35
Appendices
• Include the following:
• Page 2 of your ASA Template• Customer segments graphs • Customer satisfaction graphs• Block diagram• Process maps• Process measure graphs• Learning and Growth graphs• Analysis of Readiness Information • Unit cost graphs• Asset utilization graphs• Any unique measures graphs
Provide Facility Management and Maintenance Services
36
DS5: Respond to Service Calls Increase # of service calls entered over the web
Decrease the number of Electrical PM failures
NEW FY03 Reduce Backlog on repairs
Reduce Average time of Completion for service calls
Increase # of buildings achieving 90% score
Recuce number of recommendations over 90 days old
Reduce the sqaure footage managed per Maintenance FTE
Equal or exceed SLA inspection requirements
Improve overall service call days for completion
Learning and Growth Perspective Performance Measure
DS3: Provide NIH-wide Pest Management Control
DS4: Operate Dynamic Building Systems
DS2 Provide Sanitation Services
Increase customer satisfaction
Performance Objective
Minimize unit cost at a defined service level.
Analysis of Readiness Index
DS6: Perform Preventive Maintenance
Awards/Recognition
DS9: Manage Residential Facilities
Performance Objective
Survey methodology prepared for each Discrete Service based on ORS survey
Increase Access to Automted Maintenance Management Syst
Performance Measure
Financial Perspective
Maintain & enhance competencies for the future organization.
DS8: Maintain Public Spaces
DS7: Replace Obsolete Building Systems
Identify methods to measure processes.
Performance MeasureInternal Business Process Perspective
Block Diagram of Service Group. 9 Deployment Flow Charts
Identify and report on process measures for Discrete Services (see below)
Increase understanding of processes.
DS1: Manage Facility Operations and Services
DS1, DS2, DS3, DS4, DS5, DS6, DS7, DS8, DS9 cutomer segmentation charts
Customer PerspectivePerformance Measure
Increase understanding of customer base
Increase number of web entered service calls
Asset Utilization of Work Force labor via PWB Shops Model Maximize utilization of assets.
Unit Costs for DS1-8. Manage Residential to be determined
Performance Objective
Provide Facility Management and Maintenance Services
37
C1. Objective: Increase Understanding of the Customer Base
C1.1Measure: Customer Segmentation Chart for DS1-8
0 250000 500000 750000 1000000 1250000 1500000 1750000 2000000
Factored Rentable SF
ORSCCNCI
NIHAIDOTHERNIDDKNHLBINICHD
NLMNINDSCBERNIMH
ODNEICIT
NIH_RENONIDCROD/OANHGRINIAMSNIAAA
CSRIn
stit
ute
Customer Segmentation of Non-Residential Square Footage
Factored SF = 12.76 M
Non Factored SF = 9.48 MFactors: Animal = 2.0, Lab = 1.5
Provide Facility Management and Maintenance Services
38
C1. Objective: Increase Understanding of the Customer Base
C1.1 Measure: Customer Segmentation Chart for DS9
0 5000 10000 15000 20000 25000 30000 35000
SF
CINIH
OD
NCI
DHHS
NICHD
NIDDK
NIDR
CC
VRP
NCCAM
NCRR
NIAID
Ten
ant
Customer Segmentation of Residential Square Footage
Total = 91773 SF
Provide Facility Management and Maintenance Services
39
DS1: Manage Facility Operations and Services
Measure: Reduce weighted average days for completion time for trouble calls by section
7.48
8.26
12.03
9.94
0
2
4
6
8
10
12
14
Nu
mb
er
of
Da
ys
BMU CMMU SHOPS WEIGHTED AVERAGE
PWB Sections
Average Days for Trouble Call Completion by Section
Target FY O3
7.0 Days
Provide Facility Management and Maintenance Services
40
DS2: Provide Sanitation Services
Measure: Increase % of buildings scoring 90% on inspection
Sanitation Contract Inspection Results
0
5
10
15
20
25
30
35
40
Months Inspected
Nu
mb
er
of
Bu
ild
ing
s
Buildings Scoring 90%
FY03 Target Mo Avg. = 31FY02 Actual
Mo. Avg. = 28
Provide Facility Management and Maintenance Services
41
DS3: Provide NIH-wide Pest Management Control
Measure: Reduce # of recommendations not adopted after 90 days
Recom
men
dation
s
< 30 days
30 - 60 Day
s
60 - 90 Day
s
> 90 Days
0
20
40
60
80
100
120
Pest Management Control Recommendations By Days Outstanding
Age of Recommendations
FY 02 Total > 90 = 115
FY 03 Target = 100
Oct 01 –Jan 02Inspection Cycle
Feb 02 – May 02Inspection Cycle
Total Recommendations
Provide Facility Management and Maintenance Services
42
DS4: Operate Dynamic Building System (FY03 Measure) Measure: Define the sq. footage operated and maintained per Maintenance Staff and compare to industry standards to develop baseline
FY
03
Ta
rge
t T
o b
e d
ev
elo
pe
d a
nd
co
mp
are
d to
ind
us
try s
tan
da
rds
1
10
100
1000
10000
100000
1000000
10000000
100000000
Square Feet of Facility Space Per Maintenance FTE
SF/ FTE 60435 63768
Total NIH SFMaintained
11478320 11845320
FY 01 FY 02
Provide Facility Management and Maintenance Services
43
DS5: Respond to Service Calls
Measure: Increase % of Trouble calls submitted over the Web
PWB Central Call Desk Work Orders Entered Via Web
0
100
200
300
400
500600
700
800
900
1000
Oct-01
Nov-01
Dec-01
Jan-02
Feb-02
Mar-02
Apr-02
May-02
Jun-02
Jul-02
Aug-02
Sep-02
Months
Wo
rk O
rde
rs
Actual = 33%Target = 50%
Web based calls= 33%
Avg.
Non-Web based calls
Provide Facility Management and Maintenance Services
44
DS6: Perform Preventive Maintenance
Measure: Reduce % of Electrical PM Failures
100%7%
100%16%
100%13%
100%7%
100%12%
100%9%
99.3%13%
100%11%
100%3%
100%5%
100%15%
100%12%
99.95%10%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Oct-01
Dec-01
Feb-02
Apr-02
Jun-02
Aug-02
Total FY02
Power Panel PM's - Clinical Center (JCAHO)% Failures
% PM's Completed
Target: Reduce Failure Rate to 7 %
Provide Facility Management and Maintenance Services
45
DS7: Replace Obsolete Building Systems and Components(FY03 Measure)
Measure: Reduce Percentage of PM generated Small Purchase and Repair Work Items that are Incomplete
Recommendation: DS7 be folded into DS6 – Perform Preventive Maintenance. This measure would be retained as a second measure for DS6
Provide Facility Management and Maintenance Services
46
DS8: Maintain Public Space (New Measure For FY 03)
Measure: Equal or Exceed SLA % of square footage inspected by
FM’s via an Established PM Program in CMMS
Notional
Qtr 1 Qtr 2 Qtr 3 Qtr 4
Square Footage0
400000800000
120000016000002000000
Public Space Inspection Schedule
Square Footage
Provide Facility Management and Maintenance Services
47
DS9: Manage Residential Property
Measure: New FY03 – Improve Service Call Completion Cycle
Children's Inn38%
Convent (HHMI)34%
NIHAC 116 1%
NIHAC 117 1%Building 61
1%
15 Group 25%
Children's Inn 567Convent (HHMI) 61915 Group 403Building 61 21NIHAC 116 5NIHAC 117 3
Total # of Service Calls
Per Bldg.
This chart shows the distribution of FY02 calls.
The Measure will show the avg. time to close out service calls on residential property.
Provide Facility Management and Maintenance Services
48
Facilities Management and Maintenance Services Block Diagram
The Service Providers
CCMS CMMS SHOPSBMU
FMU CCFMU GMLS
CCMU RMS
Protecting America’s StrategicHealth Science Assets
Manage FacilityOperations and
Services
ProvideSanitations
Services
ReplaceObsoleteBuildingSystems
Provide PestManagement
MaintainPublic Spaces
OperateDynamicBuildingSystems
PerformPreventive
Maintenance
Respond toService Calls
ManageResidentialFacilities
Thursday, November 07, 2002
Page 1 of 1
Provide Facility Management and Maintenance ServiceService Group Block Diagram
Provide Facility Management and Maintenance Services
49
Process Flow Map: DS1 – Manage Facility Operations and Services
Discrete Service: DS1: Manage Facility Operations and ServicesDate: 8/14/02 Participants: ASA Team
ORS Service Providers OccupantsCall-In Desk CommunityFacility Managers
Identify problem Report problem Report problemReport problem Reports problem
Analyze problemand assign to
service providers
Issues withprovider
assignment?
Resolves problemCan service
providersresollve?
Problemaddressed
From call-indesk?
Negativefeedback from
surveyresponse orcomplaint?
No
No
Yes
Generates survey Completes surveyYes
Yes
No
End
No
Provide Facility Management and Maintenance Services
50
Discrete Service: DS 2: Provide Sanitation Services PAGE 1Participants: ASA Team Date:8/14/02
CustomerContract
InspectorsOAS
HousekeepingContractor
RMSProjectOfficer
PWB/FMU/Sanitation Services
Identifies deficiencythrough operations
Identifies deficiencythrough inspections
Reports deficiency
Call housekeepingcontractor
Abates deficiency
Complete survey
Customersatisfied?
End
Appears to bechronic
problem?
Identifyresponsibility for
problem
Is itHousekeeping?
To DS3,"FMs
identifyproblem"
Yes
CMMS generatessurvey
Yes
Originated fromCMSS?
Negativecustomerfeedback?
No
Yes
Yes
End
No
No
Yes
Meet withcustomer
No
No
to p.2
Provide Facility Management and Maintenance Services
51
Process Flow Map: DS3 – Provide NIH-wide Pest Management Control
Provide Facility Management and Maintenance Services
52
Process Flow Map: DS4 – Operate Dynamic Building Systems
Operate Dynamic Building Systems
CMMS Bldg. Engineer Building SystemCustomer/Residents
Complaint orQuestions
Central DeskCreates WorkOrder
Receives Input Alarm or Prompt
Is This aMaintenance Issue/
Trouble Call?
Is This StandardBuilding
Operation work
Operate AppropriateBuilding System
Refer to SCflow chart
No
Yes
Provide Facility Management and Maintenance Services
53
DS 5 Respond to Service Calls
Maintenance Unit ContractorShops SectonCentral Call Desk
Work Request and Closeouts Entered into
MS2000
Central CallRoutes byLocation
Is WorkManitnenance?
First CallInvestigate -
Manintenance Unit
Building EngineerAssigns
yes
PerformsMaintenance andCloses out Work
Request
No
Scopes Job forEffort
Assign ToShops?
Yes
Shops Size Job
Can Perform InHouse?
Yes
Perform WorkRequest
ContractorSchedules and
Performs ServiceSends Close Out
Report to MU
No
No
Process Flow Map: DS5- Respond to Service Calls.
Provide Facility Management and Maintenance Services
54
Process Flow Map: DS6 – Perform Preventive Maintenance
DS6 Perform Preventive Maintenance
Maintenance Unit ContractorShops SectionMS2000
PM Systemproduces
Equipment PMSchedules and PM
Inspection Maps
No
ContractorAccepts Pm
Schedules andreviews Reject
Reports
MU ManagerReviews list. Is thisContractor Service?
Yes
Assigns to MUengineer whoschedules and
reviews parts andmaterial
Will PM requireCustom work or
Shop help?
Shop Foremanschedules labor,
parts, other
No
Maint. Engineerperforms PM and
records info
PM SystemUpdates DB and
ProducesCompletion report
Yes
Contacts MU andcoordinates
delivery
PM Is Complete
Any ORS Shophelp needed?
Yes
ORS ShopForeman and
Contractorcoordinate for
Delivery
ContractorPerforms PM andsubmits report to
MU Clerk
No
Maint Unit Clerkinspects PM report
for Acceptance.
Yes
Is report OK?
No
Provide Facility Management and Maintenance Services
55
DS7 Repair & Replace Obsolete Building Systems and Components
Maintenance Unit ContractorShops SectionMS2000/RMS
PM Systemproduces
Equipment PMSchedules and PMInspection Maps
No
ContractorAccepts Pm
Schedules andreviews Reject
Reports
MU ManagerReviews list. Is thisContractor Service?
Yes
Assigns to MUengineer whoschedules and
reviews parts andmaterial
Will PM requireCustom work or
Shop help?
No
Yes
No
Any ORS Shophelp needed?
Yes
No
Go ToPM
Is This majorrepair or
replacement?
Go ToPM
YesRMS Planning and
Coordinating
Go ToRMS
Process Flow Map: DS7 – Repair & Replace Obsolete Building Systems and Components
Provide Facility Management and Maintenance Services
56
Ds8:Maintain Public Spaces
Facility ManagersRMS CMMS Building EngineerCustomer/Residents
Submit ServiceRequest
ConductBuildingAssessments
Central DeskCreates WorkOrder
Establishes PMInventory
CMMS GeneratesPM Is this a
Service Call?
Refer toAppropriate
Service ProviderNo
Go toSerivce
Call Map
Yes
Go to PMFlow Map
Inspect PublicSpace
Inspects WorkOrder
Provide Facility Management and Maintenance Services
57
Discrete Service: DS9 Manage Residential FacilitiesParticipants: ASA Team Date: 8/14/02
DESManagement
ResidentFacility ManagerService Providers
(Shops, BMU, RMS,Contractors)
PWB/FMUHousing Team
Inform PWB of residence
assignment anddue date
Arrange residentwalk-through
Conduct residentwallk-through andcompile punchlist
Determineassignment to
service providersbased on scopeand complexity
Assign andcoordinate
improvements
Performimprovements
Conduct pre-occupation walk-
through
(manage-ment option)
OK?
Conduct residentwalk-through
OK?
Occupiesresidence
to DS 3,"Occupant
s reportproblem"
Service needarises duringresidency?
Peform cyclicalmaintenance only
until residencereassigned
yes
yes
no
no
yes
no
Provide Facility Management and Maintenance Services
58
Learning and Growth Perspective
L1. Objective: Enhance Quality of Work Life for Employees
L1.1 Measure: Conclusions from L&G Data
Low Turnover indicates high satisfaction with job
Low sick leave indicates work force commitment to the mission
Low ER-ADR-EEO indicates an open atmosphere where employees can discuss issues before they become problems
Provide Facility Management and Maintenance Services
59
L2. Objective: Maintain and Enhance Competencies
L2.1 Measure: Analysis of Readiness Conclusions
Learning and Growth Perspective
Projected Hiring: Need additional maintenance service personnel to reduce amount of square footage under
supervision.
Contractor Requirements: Increasing repair and replacement requirements will require an increase in contractor service for mechanical, electrical improvements.
Training Requirements: A new emphasis on more competency training across the board – especially regarding CMMS for all employees in PWB.
Provide Facility Management and Maintenance Services
60
Utilization Asset Measures
Provide Facility Management and Maintenance Services
61
Unit Costs Measures