15
PRY Implementation - Contents Fit with Experimental Devices (& services connections) Fit with Tracker Cryo Fit with Floor & Trench Fit with Mezzanine Fit with Services in General ToF1 Assembly Fit with RF Waveguides Absorber Change Jason Tarrant – Integration Engineering

PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Embed Size (px)

Citation preview

Page 1: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

PRY Implementation - Contents

Fit with Experimental Devices (& services connections) Fit with Tracker Cryo Fit with Floor & Trench Fit with Mezzanine Fit with Services in General ToF1 Assembly Fit with RF Waveguides Absorber Change

Jason Tarrant – Integration Engineering

Page 2: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Experimental Devices Spectrometer Solenoid (TD-1189-1791)

General Clearances

Vessel vacuum connection(requires extending)

SS Tie-Down beam

PRYSS

Page 3: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Experimental Devices Spectrometer Solenoid (TD-1189-1791)

SS Tie-Downs Access required to disconnect when

PRY in place

PRY

SS

Page 4: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Experimental Devices Absorber Focus Coil (TD-1189-1790)

General Clearances

H2 transfer line

Vessel vacuum connection(requires extending)

H2 vacuum line

Gate valve

PRY

AFC

Page 5: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Experimental Devices Absorber Focus Coil (TD-1189-1790)

Gate Valve Access required to operate the gate

valve and clearance for the handle H2 System Pipes

Non-flexible services to and from AFC

Page 6: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Floor & Trench False Floor (TD-1189-1771)

General Clearances

False floor

Under floor supports for the PRY

Supports where ramp

to be cut back

Fixed – levelled

plate(s) for the PRY

Current trench roof supports & services

Cuts for South

Mezzanine legs

Base/Platform/Plate DesignJames Watson

Page 7: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Floor & Trench False Floor (TD-1189-1771)

General Clearances

Temporary moving platform guides

AFC offline moving platform

SS offline moving platform

Page 8: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With South Mezzanine South Mezz (TD-1189-1848)

General Clearances

Raised platforms to avoid clash with PRY

Cut in platform

for absorber change &

PRY installation

Front edge

platforms removed for Step

IV (main handrail shown-off for this view)

Page 9: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Services PRY & Services (TD-1189-1794)

General ClearancesServices to be routed along PRY, esp. comp

hoses & magnet cables

Magnet Cable Path

H2 System Pipes

Page 10: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With ToF1 Assembly ToF1 Cage & PRY

ToF1 assembly can only be performed without north-upstream PRY

ToF1 Assembly

Arm

Tracker Cryo

Page 11: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Fit With Waveguides Partial pre-step V / VI installation (TD-1189-1794)

General Clearances

RF System

Waveguides under false

flooring

Pillars and columns

supporting Step IV PRY

Page 12: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Absorber Change Procedure to extract AFC from PRY (TD-1189-1697)

Note times do not include fill/purge of H from the hydrogen system!

• At operation • Remove services obscuring AFC (excluding H purge) [5 days TBC]

• Remove part of handrail, mezzanine cut out & add bar to protect the AFC (when removing the middle plates) [0.5 day]

Page 13: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

• Remove outer-upper doublers south middle-upper plate• Slide out south middle-lower plate at 11.5 degree angle• Before sliding out of lower doublers completely rotate vertically• Lift up and away• [1 day]

Page 14: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

• Remove upper outer doublers & north middle-upper plate • Remove middle legs

• Slide out north middle-lower plate

[1 day] (for north side middle plates)

• Uncouple bellows between AFC & SSs [1 day]• Remove AFC [0.5 day]• Change Absorber [? day TBD]

Page 15: PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine

Conclusion Detailed review of fit of PRY with various ‘components’ of the

MICE Hall have shaped the PRY design to significantly reduce / eliminate the chance of a clash.

The design of the PRY allows for AFC Absorber changes with the minimum of removal of the PRY, reducing time and risk.