www.eps.rs Public Enterprise Electric Power Industry of Serbia Belgrade, February 19 th 2013 ЕPS Strategic Directions up to 2025 Miloš Stojanović Manager Strategy and Investments Department

ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

► www.eps.rs

Public Enterprise Electric Power Industry of Serbia

Belgrade, February 19th 2013

ЕPS Strategic Directions up to 2025

Miloš Stojanović

Manager Strategy and Investments Department

Page 2: ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

► www.eps.rs 2

Austrian Business Circle, Belgrade, February 19th 2013

LEADING ELECTRICITY COMPANY IN SERBIA

Facts**

o Employee count: 29.136*

o Generation capacities: 7.124 MW*

o Electricity generation: 36.050 GWh*

o Coal production: 40,3 mill t*

o Gross consumption: 34.450 GWh*

o Number of customers: 3,5 million **data for 2011

Organizational structure

o Vertically organized company which incorporated 12 subsidiaries and 3 Kosovo and Metohija PEs*

o Has shares in subsidiaries: Energija Novi Sad (50%), Ibarske HPPs (49%), Moravske HPPs (49%)

TPP

TPP UNDER CONSTRUCTION

CHP

HPP

COAL MINE

*without Kosovo and Metohija capacities,

as of June 1999 EPS does not operate its

facilities in this province

Core business

o Electricity generation, distribution and distribution system control, trading

o Coal production, processing and transport

o Steam and hot water generation

o Designing, construction and maintenance of energy, mining and other facilities

Page 3: ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

► www.eps.rs 3

Austrian Business Circle, Belgrade, February 19th 2013

LEGAL FRAMEWORK

Relevant legislation and strategies o South East Europe Energy Treaty (ratified in 2006) o Energy Law (2011) o Energy Sector Development Strategy by 2015 (2005) and Program (2009) o Public-Private Partnerships and Concessions Act (2011) o Proposals are prepared for:

• Energy Development Strategy by 2025, with the perspective by 2030 • Efficent Energy Use Act

By-laws promoting the use of renewable energy sources, adopted on 24 January 2013 with feed-in tariffs (€ cents/kWh) : o wind 9,2; solar 16,25 - 20,66; geothermal 6,92 - 10,35;

SHPP* 5,9 -13,72; biomass 8,82-13,82;biogas 12,31-16,49; feed-in tariffs introduced for combined coal-fired power plants 8,04

SHPP* - small hydro power plant

o PE EPS is fully owned (100%) by the Republic of Serbia

o EPS business plans are approved by the Goverment

Page 4: ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

► www.eps.rs 4

Austrian Business Circle, Belgrade, February 19th 2013

EPS ONGOING TRANSFORMATION

- STRATEGIC GOALS -

Market o Dominant position in the electricity value

chain in Serbia

o Competitive company on the European market and regional market share

Finance o Stabilize financial situation

and liquidity

Business Environment o Clear corporate structure and corporate

governance principles within the EPS group

o Compliance with the relevant regulations including legal unbundling of DSO** and Public Suplier

o Centralization of planning, control, finance, key human resources policies

o Partnership with investors, strategic partners

Processess o Low cost electricity

producer, regionally competitive

o Implementation of best practices in all processes

Human Resources o Professional employee

development o Improve company culture

and HSE* *HSE- Health, Safety & Environment **DSO – Distribution System Operator

Page 5: ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

► www.eps.rs 5

Austrian Business Circle, Belgrade, February 19th 2013

Provision of financing sources

for new capacities MW/mill t € mill

Nikola Tesla B3 ТPP 740 1.600

Radljevo OCM 13 mill t/year 700

Kostolac B3 ТPP 350/600 600

Bistrica РSHPP 4x170 560

POSSIBLE INVESTMENTS

IN NEW CAPACITIES

5

Timely construction of new facilities (HPPs, TPPs and open cast mines)

Projects with

strategic partners MW € mill

Kolubara B ТPP EDISON 750 1.500

5 HPPs on V. Morava River RWE 150 360

10 HPPs on Ibar River SECI 117 302

Novi Sad CCGHT CONSORTIUM 450 MWe+350MWt 450

Page 6: ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

► www.eps.rs 6

Austrian Business Circle, Belgrade, February 19th 2013

INVESTMENTS IN

MAINTANING SYSTEM PERFORMANCE

6

o Revitalization of HPPs (Zvornik, Bajina Bašta, Djerdap 1)

o Capital maintenanace of ТPPs (TENT A3, B1, B2)

o Revitalization and ESP* reconstruction (Kostolac B1, B2)

o Desulphurization TENT A3-A6, TENT B1-B2, Kostolac B1, B2

o Opening of alternative open cast mines

o Modernization, revitalization, procurement of new equipment for

open cast mines in Kolubara and Kostolac mining basins

o Coal quality management system and homogenization in Kolubara Mining

Basin

o Distribution network modernization and replacement of metering

infrastructure

System performance preservation activities

ESP*- Еlectrostatic percipitators

Page 7: ЕPS Strategic Directions up to 2025...Radljevo OCM 13 mill t/year 700 Kostolac B3 ТPP 350/600 600 Bistrica РSHPP 4x170 560 POSSIBLE INVESTMENTS IN NEW CAPACITIES Timely construction

► www.eps.rs

PE Electric Public Industry of Serbia

13 Balkanska Street, 11000 Belgrade, Serbia

Phone: +381 11 2424600

Contact email: [email protected]