Upload
hoangbao
View
215
Download
2
Embed Size (px)
Citation preview
Agenda Training Bandung 2017No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING1 SAFETY INSTRUMENTED SYSTEM (SIS) AND
CONTROL 4 23-26 20-23 21-24 24-27 02-05 12-15 24-27 31-03 25-28 23-26 21-24 18-21 7.950.000
2 PRODUCTION SAFETY SYSTEM 4 17-20 14-17 14-17 18-21 30-02 06-09 18-21 28-31 19-22 17-20 14-17 11-14 7.950.000
3 Statistical Process Control BERBASIS MINITAB14 4 17-20 14-17 14-17 18-21 16-19 05-08 18-21 21-24 19-22 17-20 14-17 19-22 7.950.000
4 BASIC CIVIL 4 10-13 07-10 28-31 10-13 09-12 12-15 11-14 08-11 12-15 10-13 28-01 05-08 7.950.0005 CARTOGRAFI 4 02-05 30-02 14-17 03-06 02-05 05-08 03-06 31-03 04-07 02-05 14-17 04-07 7.950.000
6 CATHODIC PROTECTION CORROSION CONTROLAND PREVENTION 4 09-12 06-09 21-24 10-13 08-11 12-15 10-13 07-10 11-14 09-12 21-24 12-15 7.950.000
7 CIVIL CONSTRUCTION OBSERVATION ofEXECUTION BUILDING 4 10-13 07-10 13-16 10-13 09-12 12-15 11-14 08-11 12-15 10-13 13-16 18-21 7.950.000
8 CIVIL CONSTRUCTION PENGAWASANPELAKSANAAN BANGUNAN 4 17-20 14-17 20-23 18-21 16-19 06-09 18-21 22-25 19-22 17-20 20-23 04-07 7.950.000
9 CONTROL VALVE AND VALVE OPERATION ANDSIZING 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 19-22 7.950.000
10 DOKUMEN KONTROL 4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 18-21 7.950.00011 FUZZY LOGIC CONTROL 4 24-27 21-24 13-16 25-28 30-02 13-16 25-28 28-31 26-29 24-27 13-16 05-08 7.950.00012 GAS AND LIQUID FLOW MEASUREMENT 4 02-05 30-02 20-23 03-06 02-05 05-08 03-06 31-03 04-07 02-05 20-23 11-14 7.950.000
13 PROCESS CONTROL SYSTEMS APPLICATION,DESIGN, AND TUNING 4 23-26 20-23 27-02 24-27 29-01 13-16 24-27 28-31 25-28 23-26 30-02 12-15 7.950.000
14 SUPERVISORY CONTROL AND DATAACQUISITION (SCADA) 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 04-07 7.950.000
15 Survey & Mapping 4 09-12 06-09 07-10 10-13 08-11 12-15 10-13 07-10 11-14 09-12 07-10 12-15 7.950.000
16 PRESSURE SAFETY VALVE SELECTION ANDSIZING 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.000
17 CHOKE AND CONTROL VALVE 4 17-20 14-17 27-02 18-21 15-18 05-08 18-21 21-24 19-22 17-20 30-02 11-14 7.950.000
18 MARINE CORROSION AND PREVENTION FOROFFSHORE STRUCTURE 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.500.000
19 ADVANCED FLOW MEASUREMENT 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 8.500.00020 ADVANCED PID CONTROLLER 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 8.500.00021 CONTROL AND CHOKE VALVES 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000
PT. MAIRODI MANDIRI SEJAHTERATRAINING, CONSULTING & ENGINEERING SERVICES
Alamat: Gedung Dapenpos Lt.2, Jl. PH.H. Mustofa No.35 , Bandung, Indonesia, 40124Telp/Fax: +62-22- 7215416 / 7215668 Homepage: www.mairodi-training.com
2
22 CONTROL SYSTEM FUNDAMENTALS 4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 8.500.000
23 FIELDBUS AND INDUSTRIAL DATACOMMUNICATION 4 03-06 31-03 21-24 04-07 02-05 13-16 04-07 01-04 05-08 03-06 21-24 18-21 8.500.000
24 FISCAL AND CUSTODY METERING 4 09-12 06-09 28-31 10-13 08-11 06-09 10-13 07-10 11-14 09-12 28-01 04-07 8.500.00025 FLOW ASSURANCE IN PIPING SYSTEMS 4 16-19 13-16 27-02 17-20 15-18 12-15 17-20 21-24 18-21 16-19 30-02 12-15 8.500.000
26 FLUID FLOW – GAS METERING AND CUSTODYTRANSFER 5 23-27 20-24 06-10 24-28 29-02 05-09 24-28 31-04 25-29 23-27 06-10 18-22 9.500.000
27 HUMAN MACHINE INTERFACE (HMI) 4 02-05 30-02 13-16 03-06 02-05 13-16 03-06 28-31 04-07 02-05 13-16 05-08 8.500.00028 OPC (OPEN PROCESS CONTROL) 4 10-13 07-10 20-23 10-13 09-12 05-08 11-14 08-11 12-15 10-13 20-23 11-14 8.500.00029 ROOT CAUSE FAILURE ANALYSIS (RCFA) 4 03-06 31-03 06-09 04-07 02-05 13-16 04-07 31-03 05-08 03-06 06-09 12-15 8.500.00030 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 09-12 06-09 14-17 10-13 08-11 05-08 10-13 07-10 11-14 09-12 14-17 19-22 8.500.00031 SCADA SYSTEMS 4 16-19 13-16 21-24 17-20 15-18 12-15 17-20 21-24 18-21 16-19 21-24 05-08 8.500.00032 Ultrasonic Gas Flow Meter 5 23-27 20-24 27-31 24-28 29-02 05-09 24-28 31-04 25-29 23-27 27-01 11-15 9.500.000
33 WELLHEAD INSTRUMENTATION ANDHYDRAULIC CONTROL SYSTEMS 4 02-05 30-02 27-02 03-06 02-05 13-16 03-06 28-31 04-07 02-05 30-02 18-21 8.500.000
34 WIRELESS LAN IN INDUSTRIAL AUTOMATION &ISA 100.11a 4 10-13 07-10 07-10 10-13 09-12 05-08 11-14 08-11 12-15 10-13 07-10 04-07 8.500.000
35 CALIBRATION ISO IEC 17025 4 17-20 14-17 13-16 18-21 16-19 12-15 18-21 22-25 19-22 17-20 13-16 11-14 8.500.000
36 DESIGN OF EXPRIMENTS (DOE) FUNDAMENTALCONCEPT AND APPLICATION 4 16-19 13-16 13-16 17-20 15-18 05-08 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000
37 Electrical Test Instrumentation dan SistemPengukuran (Measurements) 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000
38 Instrumentation Systems 4 02-05 30-02 27-30 03-06 02-05 06-09 03-06 31-03 04-07 02-05 27-30 11-14 8.500.00039 Measurements Systems 4 09-12 06-09 27-02 10-13 08-11 13-16 10-13 07-10 11-14 09-12 30-02 19-22 8.500.00040 Energy Audit and Application 4 23-26 20-23 13-16 24-27 29-01 12-15 24-27 28-31 25-28 23-26 13-16 11-14 8.500.00041 STATISTIK INDUSTRI 4 02-05 30-02 20-23 03-06 29-01 05-08 03-06 28-31 04-07 02-05 20-23 11-14 7.950.000
42CATHODIC PROTECTION FOR MINE STEELSTRUCTURE AND MINING SUPORTINGFACILITIES
4 23-26 20-23 13-16 24-27 15-18 05-08 24-27 21-24 25-28 23-26 13-16 04-07 8.750.000
43 Cathodic Protection for Onshore and OffshoreStructure 4 02-05 30-02 20-23 03-06 29-01 12-15 03-06 28-31 04-07 02-05 20-23 11-14 8.750.000
44 CORROSION AND SCALING PREVENTION 4 16-19 13-16 27-02 17-20 08-11 13-16 17-20 07-10 18-21 16-19 30-02 05-08 8.750.000
45 Corrosion Engineering for Non CorrosionEngineers 4 24-27 21-24 06-09 25-28 16-19 05-08 25-28 22-25 26-29 24-27 06-09 12-15 8.750.000
46INTERNAL AND EXTERNAL CORROSIONCONTROL AND MONITORING FOR PIPELINEAND SURFACE FACILITY
4 23-26 20-23 28-03 24-27 15-18 05-08 24-27 21-24 25-28 23-26 31-03 18-21 8.750.000
47 CCTV INSTALASI, PEMROGRAMAN DANPERAWATAN 3 02-04 30-01 13-15 03-05 22-24 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000
3
48 ADVANCED CCTV Perencanaan, Desain danImplementasi 3 09-11 06-08 06-08 10-12 10-12 19-21 10-12 09-11 11-13 09-11 06-08 13-15 5.950.000
49 INSTRUMENTATION AND CONTROL SYSTEM 4 24-27 21-24 27-30 25-28 02-05 12-15 25-28 01-04 26-29 24-27 27-30 12-15 7.950.00050 Scale In Oilfield Water 4 02-05 30-02 28-31 03-06 08-11 05-08 03-06 07-10 04-07 02-05 28-01 05-08 7.950.000
51 SIMULASI PROSES TEKNIK KIMIAMENGGUNAKAN HYSYS 4 09-12 06-09 27-02 10-13 15-18 13-16 10-13 21-24 11-14 09-12 30-02 12-15 7.950.000
52 PERHITUNGAN KETIDAKPASTIAN HASILPENGUKURAN DAN PENGUJIAN 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 18-20 5.950.000
53 BASIC FUZZY LOGIC CONTROL AND ITS SIMULATIONWITH SPREADSHEET APPLICATION PROGRAM 4 02-05 30-02 06-09 03-06 15-18 12-15 03-06 07-10 04-07 02-05 06-09 04-07 8.500.000
54 APPLICATION STATISTIC IN ENGINEERINGINDUSTRY 4 02-05 30-02 20-23 03-06 08-11 06-09 03-06 31-03 04-07 02-05 20-23 05-08 7.950.000
55 CALLIBRATION OF MEASURING TOOL 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 28-31 26-29 24-27 07-10 04-07 7.950.000
56 CONTROL VALVE OPERATION, MAINTENANCE,AND TROUBLESHOOTING 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 21-24 18-21 16-19 28-01 05-08 7.950.000
57 FINITE ELEMENT METHODS (FEM) 4 03-06 31-03 28-03 04-07 09-12 06-09 04-07 01-04 05-08 03-06 31-03 05-08 7.950.00058 Flow Measurement and Control Element 4 09-12 06-09 07-10 10-13 15-18 12-15 10-13 07-10 11-14 09-12 07-10 12-15 7.950.00059 INDUSTRIAL METROLOGY 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 08-11 12-15 10-13 30-02 18-21 7.950.00060 Inspeksi dan Korosi 4 17-20 14-17 06-09 18-21 30-02 05-08 18-21 22-25 19-22 17-20 06-09 05-08 7.950.00061 MEASUREMENT SYSTEM ANALYSIS 4 03-06 31-03 06-09 04-07 09-12 06-09 04-07 01-04 05-08 03-06 06-09 11-14 7.950.000
62 ADVANCE PROCESS CONTROL,INSTRUMENTATION AND METERING 4 23-26 20-23 27-02 24-27 08-11 05-08 24-27 31-03 25-28 23-26 30-02 11-14 8.500.000
63 OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTEDCOMPONENT OBJECT MODEL (DCOM) 4 02-05 30-02 06-09 03-06 15-18 12-15 03-06 07-10 04-07 02-05 06-09 18-21 8.500.000
64 PROCESS CONTROL AND INSTRUMENTATION 4 09-12 06-09 13-16 10-13 29-01 06-09 10-13 21-24 11-14 09-12 13-16 04-07 8.500.000
65 SAFETY INSTRUMENTED SYSTEM (SIS) ANDCONTROL 4 16-19 13-16 20-23 17-20 02-05 13-16 17-20 28-31 18-21 16-19 20-23 12-15 8.500.000
66 SAFETY RELIEF VALVE FUNDAMENTALCONCEPTS, SIZING AND SELECTION 4 24-27 21-24 27-30 25-28 09-12 05-08 25-28 01-04 26-29 24-27 27-30 19-22 8.500.000
67 FLUID FLOW MEASUREMENT AND METERPROVING IN OIL AND GAS INDUSTRY 4 24-27 21-24 14-17 25-28 09-12 06-09 25-28 01-04 26-29 24-27 14-17 11-14 7.950.000
68 GPS(Global Positioning System) for mining andPetroleum 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 18-21 8.500.000
69 INDUSTRIAL COMBUSTION AND BURNER 4 16-19 13-16 27-02 17-20 02-05 12-15 17-20 28-31 18-21 16-19 30-02 04-07 8.500.00070 WATER TREATMENT 4 16-19 13-16 20-23 17-20 08-11 13-16 17-20 07-10 18-21 16-19 20-23 19-22 8.750.00071 LIFE CYCLE COSTING 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 6.500.000
4
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MECHANICAL1 Gas, Oil and Water Pipeline Design and
Maintenance 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 11-14 8.750.000
2 WELDING SAFETY 2 02-03 30-31 02-03 03-04 02-03 12-13 03-04 28-29 04-05 02-03 02-03 27-28 3.950.000
3 Electric motor Operation, Maintenance &Troubleshooting 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 04-07 7.950.000
4 BOILER CONTROL SYSTEMS ENGINEERING 4 23-26 20-23 27-30 24-27 02-05 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.0005 PLUMBING SYSTEM AND MAINTENANCE 3 16-18 13-15 13-15 17-19 22-24 19-21 17-19 14-16 18-20 16-18 13-15 27-29 6.500.000
6SISTEM KONTROL RHVAC (REFRIGERATIONHEATING VENTILATING AND AIRCONDITIONING)
5 23-27 20-24 20-24 24-28 29-02 12-16 24-28 21-25 25-29 23-27 20-24 04-08 9.500.000
7 REFRIGERATION RETROFIT 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 28-31 04-07 02-05 27-30 11-14 8.500.0008 Pipeline Risk & Integrity Management 3 23-25 20-22 13-15 24-26 15-17 12-14 24-26 14-16 25-27 23-25 13-15 27-29 6.950.000
9 Piping & Pipeline System Design, Specification,Installation & Maintenance 4 02-05 30-02 20-23 03-06 29-01 05-08 03-06 21-24 04-07 02-05 20-23 04-07 8500000
10 PLANT LIFE MANAGEMENT THROUGHRELIABILITY BASED INSPECTION 5 09-13 06-10 27-31 17-21 08-12 12-16 10-14 31-04 11-15 09-13 27-01 11-15 9.500.000
11 QC for Water Network (Pipeline) Construction 3 18-20 15-17 01-03 11-13 22-24 19-21 19-21 28-30 20-22 18-20 01-03 20-22 6.950.00012 Risk Based Inspection 3 04-06 01-03 15-17 05-07 17-19 07-09 05-07 14-16 06-08 04-06 15-17 06-08 6.950.00013 Basic CNC 3 02-04 30-01 06-08 03-05 08-10 05-07 03-05 07-09 04-06 02-04 06-08 04-06 7.250.000
14COMPRESSOR OPERATION, MAINTENANCE,TROUBLESHOOTING AND DIAGNOSTIC OFFAILURE ANALYSIS
4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 21-24 11-14 09-12 13-16 11-14 7.950.000
15 MACHINERY FLUID MECHANICS 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 18-21 7.950.00016 PELUMAS DAN SISTEM PELUMASAN 4 23-26 20-23 27-30 24-27 02-05 13-16 24-27 31-03 25-28 23-26 27-30 04-07 7.950.000
17 ELECTRIC CHARGING SYSTEM AND STARTINGSYSTEM OF HEAVY DUTY EQUIPMENT 4 09-12 06-09 06-09 10-13 15-18 12-15 10-13 21-24 11-14 09-12 06-09 18-21 7.950.000
18 ELECTRO-PNEUMATICS SYSTEM PRINCIPLESAND APPLICATION 4 16-19 13-16 13-16 17-20 29-01 05-08 17-20 28-31 18-21 16-19 13-16 04-07 7.950.000
19 INSTRUMENTATION AND CONTROL SYSTEM 4 23-26 20-23 20-23 24-27 02-05 13-16 24-27 31-03 25-28 23-26 20-23 11-14 7.950.00020 KONTROL ELEKTRIK 4 02-05 30-02 27-30 03-06 08-11 06-09 03-06 07-10 04-07 02-05 27-30 19-22 7.950.00021 MECHATRONICS APPLICATION IN INDUSTRY 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 22-25 12-15 10-13 30-02 05-08 7.950.00022 Mekatronika 4 17-20 14-17 07-10 18-21 30-02 05-08 18-21 28-31 19-22 17-20 07-10 12-15 7.950.00023 PNEUMATIC SYSTEM AND APPLICATION 4 24-27 21-24 14-17 25-28 02-05 13-16 25-28 01-04 26-29 24-27 14-17 18-21 7.950.00024 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 03-06 31-03 21-24 04-07 09-12 06-09 04-07 08-11 05-08 03-06 21-24 04-07 7.950.00025 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 09-12 06-09 28-31 10-13 15-18 12-15 10-13 21-24 11-14 09-12 28-01 11-14 7.950.00026 REKAYASA HIDROLIK AND APLIKASI 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 28-31 18-21 16-19 31-03 19-22 7.950.00027 INSTRUMENTATION AND BASIC CONTROL 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.000
5
SYSTEM28 BELT CONVEYOR OPERATION & MAINTENANCE 4 02-05 30-02 27-30 03-06 29-01 12-15 03-06 28-31 04-07 02-05 27-30 04-07 7.950.00029 MANAJEMEN MATERIAL 4 16-19 13-16 06-09 17-20 08-11 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.00030 Manajemen Perbengkelan 4 23-26 20-23 13-16 24-27 15-18 06-09 24-27 21-24 25-28 23-26 13-16 05-08 7.950.000
31 PENGETAHUAN MATERIAL HANDLING &APLIKASI 4 03-06 31-03 20-23 04-07 30-02 12-15 04-07 28-31 05-08 03-06 20-23 12-15 7.950.000
32 AC & REFRIGERATION PRINCIPLES, OPERATIONAND TROUBLESHOOTING 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 31-03 04-07 02-05 27-30 11-14 7.950.000
33 ADVANCED VIBRATION MONITORINGTECHNIQUE 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 21-24 18-21 16-19 06-09 04-07 7.950.000
34 BEARING TECHNOLOGY AND LUBRICATIONSYSTEM 4 24-27 21-24 07-10 25-28 30-02 13-16 25-28 28-31 26-29 24-27 07-10 18-21 7.950.000
35 CENTRIFUGAL GAS COMPRESSOR Anti SurgeControl 4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 19-22 7.950.000
36 CENTRIFUGAL GAS COMPRESSOR OPERATION &MAINTENANCE 4 23-26 20-23 27-02 24-27 29-01 13-16 24-27 28-31 25-28 23-26 30-02 05-08 7.950.000
37 CENTRIFUGAL PUMP OPERATION ANDMAINTENANCE 4 03-06 31-03 06-09 04-07 02-05 05-08 04-07 01-04 05-08 03-06 06-09 11-14 7.950.000
38 COLD STORAGE PRINCIPLE, OPERATION &TROUBLESHOOTING 4 24-27 21-24 28-31 25-28 30-02 13-16 25-28 28-31 26-29 24-27 28-01 12-15 7.950.000
39 DIESEL ENGINES OPERATION ANDMAINTENANCE 4 16-19 13-16 14-17 17-20 15-18 06-09 17-20 21-24 18-21 16-19 14-17 11-14 7.950.000
40 GAS TURBINE OPERATION, PERFORMANCE &TROUBLESHOOTING 4 09-12 06-09 28-31 10-13 08-11 12-15 10-13 07-10 11-14 09-12 28-01 18-21 7.950.000
41 HYDRAULICS SYSTEMS Engineering Applications 4 03-06 31-03 14-17 04-07 02-05 05-08 04-07 01-04 05-08 03-06 14-17 19-22 7.950.000
42 HYDRAULICS SYSTEMS MAINTENANCE &TROUBLESHOOTING 4 10-13 07-10 21-24 10-13 09-12 12-15 11-14 08-11 12-15 10-13 21-24 05-08 7.950.000
43 MATERIAL ATTITUDE USES AND PROBLEMS 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 01-04 05-08 03-06 31-03 11-14 7.950.00044 MATERIAL IDENTIFICATION 4 10-13 07-10 07-10 10-13 09-12 12-15 11-14 08-11 12-15 10-13 07-10 18-21 7.950.00045 METALLURGY FOR NON METALLURGIST 4 24-27 21-24 21-24 25-28 30-02 13-16 25-28 28-31 26-29 24-27 21-24 12-15 7.950.000
46 MOTOR CONTROL CENTER OPERATION &MAINTENANCE 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 31-03 04-07 02-05 27-30 19-22 7.950.000
47 OPERATING AND MAINTENANCE OF HEAVYDUTY EQUIPMENTS 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 21-24 18-21 16-19 06-09 11-14 7.950.000
48 PIPING SYSTEM MATERIAL DESIGN ANDMAINTENANCE 4 10-13 07-10 28-31 10-13 09-12 12-15 11-14 08-11 12-15 10-13 28-01 12-15 7.950.000
49 PRACTICAL WELDING 4 09-12 06-09 21-24 10-13 08-11 12-15 10-13 07-10 11-14 09-12 21-24 18-21 7.950.00050 PRACTICE CONSIDERATIONS OF ARC WELDING 4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 04-07 7.950.00051 ROTOR BALANCING AND SHAFT ALIGNMENT 4 10-13 07-10 13-16 10-13 09-12 12-15 11-14 08-11 12-15 10-13 13-16 05-08 7.950.00052 Welding 4 17-20 14-17 06-09 18-21 16-19 06-09 18-21 22-25 19-22 17-20 06-09 04-07 7.950.000
6
53 Welding Joint Inspection 4 24-27 21-24 13-16 25-28 30-02 13-16 25-28 28-31 26-29 24-27 13-16 12-15 7.950.00054 Welding Metallurgy 4 02-05 30-02 20-23 03-06 02-05 05-08 03-06 31-03 04-07 02-05 20-23 19-22 7.950.00055 Welding Oxy Acetylene 4 09-12 06-09 28-31 10-13 08-11 12-15 10-13 07-10 11-14 09-12 28-01 05-08 7.950.00056 MANAJEMEN BENGKEL 4 02-05 30-02 13-16 03-06 02-05 05-08 03-06 31-03 04-07 02-05 13-16 04-07 7.950.00057 THERMAL SPRAY COATING 4 09-12 06-09 13-16 10-13 02-05 05-08 10-13 31-03 11-14 09-12 13-16 11-14 8.500.00058 MATERIAL HANDLING & PACKAGING 4 23-26 20-23 20-23 24-27 02-05 05-08 24-27 31-03 25-28 23-26 20-23 18-21 7.950.00059 AEROENGINE BEARING INSPECTION 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 6.500.00060 AIR COMPRESSOR 3 23-25 20-22 13-15 24-26 22-24 19-21 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000
61 ALIGNMENT AND BALANCING IN ROTATINGEQUIPMENT 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000
62 BEARING LUBRICATION TECHNOLOGY 4 09-12 06-09 27-30 10-13 08-11 12-15 10-13 07-10 11-14 09-12 27-30 04-07 7.950.000
63 Compressor and Prime Mover Operation &Maintenance 3 25-27 22-24 08-10 26-28 22-24 19-21 26-28 14-16 27-29 25-27 08-10 27-29 6.500.000
64 GAS TURBINE OPERATION & MAINTENANCE 4 10-13 07-10 21-24 10-13 29-01 13-16 11-14 28-31 12-15 10-13 21-24 18-21 7.950.00065 Machinery Diagnostic 4 16-19 13-16 28-31 17-20 02-05 06-09 17-20 31-03 18-21 16-19 28-01 05-08 7.950.000
66 MANAGING THE INTEGRITY OF GAS PIPELINESYSTEM 3 23-25 20-22 01-03 24-26 22-24 19-21 24-26 14-16 25-27 23-25 01-03 27-29 6.500.000
67 PIPELINE PIGGING OPERATIONS ANDEQUIPMENT 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.000
68 Vibration Monitoring & Control System 3 11-13 08-10 08-10 11-13 22-24 19-21 12-14 14-16 13-15 11-13 08-10 27-29 6.500.000
69 MANAJEMEN POST WELD HEAT TREATMENTTEORI, STANDARD PROSEDUR DAN APLIKASI 3 09-11 06-08 27-01 10-12 02-04 19-21 10-12 31-02 11-13 09-11 30-01 11-13 6.500.000
70 MATERIAL CERTIFICATION REQUIREMENT FOROIL AND GAS INDUSTRY 3 23-25 20-22 13-15 24-26 15-17 12-14 24-26 14-16 25-27 23-25 13-15 27-29 6.500.000
71 PROTECTIVE COATING TECHNOLOGY FORCORROSION CONTROL 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 21-23 06-08 04-06 20-22 04-06 6.500.000
72 ROTATING EQUIPMENTS 3 18-20 15-17 29-31 19-21 31-02 19-21 19-21 29-31 20-22 18-20 29-01 20-22 6.500.00073 ANALISIS VIBRASI 4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 21-24 11-14 09-12 13-16 11-14 8.500.00074 PIPING SYSTEM 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 18-21 8.500.000
75 MOTOR DIESEL PRINSIP DASAR, OPERASI DANPERAWATAN 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 7.950.000
76 PELUMASAN MESIN 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 7.950.00077 PEMBANGKIT UAP (BOILER) 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 7.950.00078 PENGGERAK MULA (PRIME MOVER) 4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 7.950.00079 TURBIN GAS 4 10-13 07-10 27-02 10-13 09-12 05-08 11-14 08-11 12-15 10-13 30-02 19-22 7.950.00080 TURBIN UAP 4 17-20 14-17 07-10 18-21 16-19 12-15 18-21 22-25 19-22 17-20 07-10 05-08 7.950.000
81 PIPELINE INTERNAL CORROSION CONTROL ANDMONITORING 4 09-12 06-09 13-16 10-13 02-05 06-09 10-13 31-03 11-14 09-12 13-16 12-15 8.750.000
82 Chiller and Cooling Tower Design and Operation 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6.500.000
7
83 DESIGN OF HEATING, VENTILATION AND AIRCONDITIONING SYSTEM 5 02-06 30-03 27-03 03-07 15-19 05-09 03-07 21-25 04-08 02-06 30-03 04-08 9.500.000
84 HVAC SYSTEM Operation & Maintenance 4 09-12 06-09 06-09 10-13 29-01 12-15 10-13 28-31 11-14 09-12 06-09 11-14 8.500.000
85 PETROLEUM INDUSTRIAL REFRIGERATIONOPERATION AND MAINTENANCE 4 16-19 13-16 13-16 17-20 02-05 05-08 17-20 31-03 18-21 16-19 13-16 18-21 8.500.000
86 Practical and Advanced Course on HVAC Systems 4 24-27 21-24 20-23 25-28 08-11 13-16 25-28 07-10 26-29 24-27 20-23 04-07 8.500.000
87 CENTRIFUGAL PUMP Selection, Operation, andMaintenance 5 02-06 30-03 27-31 03-07 15-19 05-09 03-07 21-25 04-08 02-06 27-01 11-15 9.500.000
88 Gas Compressor Operation, Maintenance &Troubleshooting 4 09-12 06-09 27-02 10-13 29-01 12-15 10-13 28-31 11-14 09-12 30-02 18-21 8.500.000
89 Hydraulics Power System 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 31-04 18-22 16-20 06-10 04-08 9.500.000
90 KOMPRESOR SENTRIFUGAL OPERASI,PEMELIHARAAN, DAN TROUBLESHOOTING 4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 07-10 25-28 23-26 13-16 11-14 8.500.000
91 PUMP AND COMPRESSOR OPERATION,MAINTENANCE & TROUBLESHOOTING 5 02-06 30-03 20-24 03-07 15-19 05-09 03-07 21-25 04-08 02-06 20-24 18-22 9.500.000
92 SISTEM HIDROLIK DAN PNEUMATIK 4 10-13 07-10 27-30 10-13 30-02 12-15 11-14 28-31 12-15 10-13 27-30 04-07 8.500.00093 NON DESTRUCTIVE TEST(NDT) 4 09-12 06-09 13-16 10-13 15-18 05-08 10-13 21-24 11-14 09-12 13-16 11-14 7.950.00094 ASME PTC 4 – 1 4 23-26 20-23 27-30 24-27 29-01 12-15 24-27 28-31 25-28 23-26 27-30 04-07 7.950.00095 BASIC GAS ENGINE 4 02-05 30-02 27-02 03-06 02-05 05-08 03-06 31-03 04-07 02-05 30-02 11-14 7.950.000
96 Belt Conveyor Technology, Design Cacilationand Troubleshooting 4 09-12 06-09 06-09 10-13 08-11 13-16 10-13 07-10 11-14 09-12 06-09 18-21 7.950.000
97 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 16-19 13-16 13-16 17-20 15-18 06-09 17-20 21-24 18-21 16-19 13-16 05-08 7.950.000
98 COAL FIRED POWER PLANT COMBUSTIONOPERATION & MAINTENANCE 4 24-27 21-24 20-23 25-28 30-02 12-15 25-28 28-31 26-29 24-27 20-23 12-15 7.950.000
99 DIESEL ENGINE OPERATION AND MAINTENANCE 4 03-06 31-03 28-31 04-07 02-05 05-08 04-07 01-04 05-08 03-06 28-01 19-22 7.950.000100 DIESEL GUNSET OPERATION AND MAINTENANCE 4 10-13 07-10 28-03 10-13 09-12 13-16 11-14 08-11 12-15 10-13 31-03 04-07 7.950.000
101 GAS TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 17-20 14-17 07-10 18-21 16-19 06-09 18-21 22-25 19-22 17-20 07-10 11-14 7.950.000
102 OPERATION & MAINTENANCE OF BOILER 4 23-26 20-23 14-17 24-27 29-01 12-15 24-27 28-31 25-28 23-26 14-17 18-21 7.950.000
103 OPERATION, MAINTENANCE ANDTROUBLESHOOTING OF GAS TURBINE 4 02-05 30-02 21-24 03-06 02-05 05-08 03-06 31-03 04-07 02-05 21-24 05-08 7950000
104 Perawatan Belt Conveyor 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 14-16 11-13 09-11 27-29 27-29 5.950.000
105 STEAM GENERATOR AND TURBINE OPERATION ANDMAINTENANCE 4 16-19 13-16 27-02 17-20 08-11 13-16 17-20 07-10 18-21 16-19 30-02 12-15 7.950.000
106 TRANSMISI DAYA MEKANIK (MECHANICALPOWER TRANSMISSION) 4 03-06 31-03 13-16 04-07 30-02 12-15 04-07 28-31 05-08 03-06 13-16 04-07 7.950.000
107 VALVE 4 10-13 07-10 20-23 10-13 02-05 05-08 11-14 01-04 12-15 10-13 20-23 11-14 7.950.000
108 Turbomachinery Operation, Maintenance andTroubleshooting 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 18-21 7.950.000
8
109 PRESSURE VESSEL DESIGN, OPERATION &MAINTENANCE 4 23-26 20-23 28-03 24-27 16-19 06-09 24-27 22-25 25-28 23-26 31-03 05-08 7.950.000
110 ALIGNMENT AND VIBRATION INSPECTIONSYSTEM 4 16-19 13-16 20-23 17-20 29-01 12-15 17-20 21-24 18-21 16-19 20-23 18-21 7.950.000
111 AUTOMOTIVE (CARS) AIR CONDITIONING (AC)SYSTEM 4 23-26 20-23 27-30 24-27 02-05 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.000
112 BOILER (KETEL UAP) DAN TURBIN UAP OPERASI,PERAWATAN DAN TROUBLESHOOTING 4 02-05 30-02 27-02 03-06 08-11 13-16 03-06 31-03 04-07 02-05 30-02 11-14 7.950.000
113 POMPA DAN KOMPRESOR OPERASI,PERAWATAN DAN TROUBLESHOOTING 4 24-27 21-24 21-24 25-28 02-05 05-08 25-28 28-31 26-29 24-27 21-24 12-15 7.950.000
114 Pump Operation, Maintenance &Troubleshooting 4 10-13 07-10 28-03 10-13 16-19 06-09 11-14 08-11 12-15 10-13 31-03 04-07 7.950.000
115 OPERATION AND MAINTENANCE OF HEAVYDUTY EQUIPMENT 4 16-19 13-16 27-02 17-20 29-01 12-15 17-20 21-24 18-21 16-19 30-02 18-21 7.950.000
116 ALIGNMENT, LEVELLING AND ROTORBALANCING 3 09-11 06-08 13-15 10-12 15-17 05-07 10-12 14-16 11-13 09-11 13-15 11-13 5950000
117 BEARING AND OIL LUBRICATION FORMACHINERY 3 16-18 13-15 20-22 17-19 22-24 12-14 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000
118 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 02-05 30-02 27-02 03-06 02-05 12-15 03-06 31-03 04-07 02-05 30-02 11-14 8.500.000
119 COMPRESSOR Operation, Maintenance andTroubleshooting 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 27-29 6.750.000
120 GAS AND STEAM TURBINE Operation,Maintenance And Troubleshooting 4 16-19 13-16 13-16 17-20 15-18 05-08 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000
121GAS TURBINE PRINCIPLES, INSPECTION,OPERATION, MAINTENANCE ANDTROUBLESHOOTING
4 23-26 20-23 20-23 24-27 29-01 13-16 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000
122 HEAT EXCHANGERS Operation, maintenanceand troubleshooting 4 03-06 31-03 27-30 04-07 02-05 06-09 04-07 01-04 05-08 03-06 27-30 12-15 8.500.000
123 HIGH PRESSURE PUMP (HPP) OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 10-13 07-10 28-03 10-13 09-12 12-15 11-14 08-11 12-15 10-13 31-03 19-22 8.500.000
124 Lubrication and Bearing Technology 4 17-20 14-17 07-10 18-21 16-19 05-08 18-21 22-25 19-22 17-20 07-10 05-08 8.500.000125 LUBRIKASI Prinsip Dasar dan Aplikasi 3 25-27 22-24 15-17 26-28 22-24 19-21 26-28 14-16 27-29 25-27 15-17 27-29 6.500.000
126 OIL FILM BEARING (JOURNAL DAN THRUSTBEARING HYDRODYNAMIC BEARINGS) 4 02-05 30-02 21-24 03-06 30-02 13-16 03-06 28-31 04-07 02-05 21-24 11-14 8.500.000
127 PIPELINE Design, Testing, Inspection AndMaintenance 4 09-12 06-09 28-31 10-13 02-05 06-09 10-13 31-03 11-14 09-12 28-01 18-21 8.500.000
128 Pressure Vessel Calculation, Codes, Production,Operation, Control & Safeties 4 16-19 13-16 27-02 17-20 08-11 12-15 17-20 07-10 18-21 16-19 30-02 04-07 8.500.000
9
129 PUMP OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 23-26 20-23 06-09 24-27 15-18 05-08 24-27 21-24 25-28 23-26 06-09 12-15 8.500.000
130 PUMP AND COMPRESSOR OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 03-06 31-03 13-16 04-07 29-01 13-16 04-07 28-31 05-08 03-06 13-16 19-22 8.500.000
131 Refractory and Heat Insulation 4 10-13 07-10 20-23 10-13 02-05 06-09 11-14 01-04 12-15 10-13 20-23 05-08 8.500.000
132 REFRIGERATION OPERATION, MAINTENANCEAND TROUBLESHOOTING 4 17-20 14-17 27-30 18-21 09-12 12-15 18-21 08-11 19-22 17-20 27-30 11-14 8.500.000
133 ROTATING EQUIPMENT 4 24-27 21-24 28-03 25-28 16-19 05-08 25-28 22-25 26-29 24-27 31-03 18-21 8.500.000
134 STEAM TURBINE OPERATION, MAINTENANCEAND TROUBLESHOOTING 4 02-05 30-02 07-10 03-06 30-02 13-16 03-06 28-31 04-07 02-05 07-10 04-07 8.500.000
135 ELECTROPLATING 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 9.250.000136 FAILURE ANALYSIS METHODS AND CASES 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 11-14 7.950.000
137 PROSES PENGERJAAN AKHIR DENGAN PELAPISLOGAM (ELECTROPLATING) 4 09-12 06-09 27-02 10-13 08-11 06-09 10-13 31-03 11-14 09-12 30-02 18-21 9.250.000
138 ALAT PENUKAR KALOR (HEAT EXCHANGER)OPERASI DAN PERAWATAN 4 16-19 13-16 06-09 17-20 29-01 05-08 17-20 21-24 18-21 16-19 06-09 11-14 7.950.000
139ANALISIS DAN PENGUKURAN GETARANMEKANIK (ANALYSIS AND MEASURING OFVIBRATION MACHINERY)
4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000
140 BEARING AND OIL LUBRICATION FORMACHINERY 4 10-13 07-10 27-30 10-13 16-19 12-15 11-14 08-11 12-15 10-13 27-30 12-15 7.950.000
141 COATING SYSTEM AND PROTECTIONCORROSION 4 03-06 31-03 14-17 04-07 09-12 06-09 04-07 01-04 05-08 03-06 14-17 11-14 7.950.000
142 CONVEYOR OPERASI DAN PERAWATAN 4 23-26 20-23 27-02 24-27 02-05 13-16 24-27 28-31 25-28 23-26 30-02 12-15 7.950.000
143 DISAIN ALAT BANTU CEKAM DAN PEGANG(DESIGN OF JIGS AND FIXTURES) 4 02-05 30-02 06-09 03-06 08-11 06-09 03-06 31-03 04-07 02-05 06-09 19-22 7.950.000
144 DISAIN ALAT PENEKAN DAN PEMBENTUK 4 10-13 07-10 13-16 10-13 16-19 12-15 11-14 08-11 12-15 10-13 13-16 04-07 7.950.000
145 DISAIN KONSTRUKSI MESIN DAN PERALATANINDUSTRI 4 17-20 14-17 20-23 18-21 30-02 05-08 18-21 22-25 19-22 17-20 20-23 11-14 7.950.000
146 DYNAMIC OF MACHINE TOOLS 4 24-27 21-24 27-30 25-28 02-05 13-16 25-28 28-31 26-29 24-27 27-30 18-21 7.950.000147 HAND TOOL UTILIZATION 4 16-19 13-16 14-17 17-20 29-01 05-08 17-20 21-24 18-21 16-19 14-17 19-22 7.950.000148 HEAVY DUTY EQUIPMENT 4 23-26 20-23 21-24 24-27 02-05 13-16 24-27 28-31 25-28 23-26 21-24 04-07 7.950.000149 HYDRAULIC CONTROL SYSTEM 4 02-05 30-02 28-31 03-06 08-11 06-09 03-06 31-03 04-07 02-05 28-01 11-14 7.950.000
150 KINEMATIKA DAN DINAMIKA MESIN (KINEMATICSAND DYNAMICS OF MACHINERIES) 4 03-06 31-03 20-23 04-07 09-12 06-09 04-07 01-04 05-08 03-06 20-23 19-22 7.950.000
151 MACHINERY NOISE AND PROBLEM SOLVING 4 09-12 06-09 27-30 10-13 15-18 12-15 10-13 07-10 11-14 09-12 27-30 04-07 7.950.000
152 MANUFACTURING PROCESS TO USE CNC MACHINING 4 10-13 07-10 21-24 10-13 16-19 12-15 11-14 08-11 12-15 10-13 21-24 12-15 7.950.000
153 MANUFACTURING PROCESSES TO USE CASTING 4 17-20 14-17 28-31 18-21 30-02 05-08 18-21 22-25 19-22 17-20 28-01 19-22 7.950.000
10
154 MANUFACTURING PROCESSES TO USE METALFORMING 4 24-27 21-24 27-02 25-28 02-05 13-16 25-28 28-31 26-29 24-27 30-02 04-07 7.950.000
155 MEASUREMENT TECHNIQUE FOR MAINTENANCEAND OPERATION LATHE MACHINE 4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 07-10 11-14 09-12 13-16 18-21 7.950.000
156 NON DESTRUCTIVE TEST 4 23-26 20-23 27-30 24-27 02-05 13-16 24-27 28-31 25-28 23-26 27-30 12-15 7.950.000157 OXY ACETYLENE WELDING 4 17-20 14-17 14-17 18-21 30-02 05-08 18-21 22-25 19-22 17-20 14-17 11-14 8.500.000
158 PEMILIHAN MATERIAL KOMPONEN MESIN(MATERIAL SELECTION) 4 24-27 21-24 21-24 25-28 02-05 13-16 25-28 28-31 26-29 24-27 21-24 18-21 7.950.000
159 PENGEMBANGAN TEKNOLOGI DAN STANDARMATERIAL 4 03-06 31-03 28-31 04-07 09-12 06-09 04-07 01-04 05-08 03-06 28-01 05-08 7.950.000
160 PENGUJIAN MATERIAL BERSIFAT MERUSAK(DESTRUCTIVE TEST) 4 09-12 06-09 27-02 10-13 15-18 12-15 10-13 07-10 11-14 09-12 30-02 12-15 7.950.000
161 PERLAKUAN PANAS LOGAM (HEAT TREATMENTFOR METAL) 4 02-05 30-02 20-23 03-06 08-11 06-09 03-06 31-03 04-07 02-05 20-23 11-14 7.950.000
162 PNEUMATIC CONTROL SYSTEM 4 10-13 07-10 27-30 10-13 16-19 12-15 11-14 08-11 12-15 10-13 27-30 18-21 7.950.000163 PRODUCTION OF HELICAL GEAR 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 21-24 18-21 16-19 28-01 11-14 7.950.000164 PROSES PEMESINAN (MACHINING) 4 10-13 07-10 13-16 10-13 16-19 12-15 11-14 08-11 12-15 10-13 13-16 12-15 7.950.000165 PUMP OPERATION AND MAINTENANCE 4 17-20 14-17 20-23 18-21 30-02 05-08 18-21 22-25 19-22 17-20 20-23 19-22 7.950.000166 SISTEM PEMIPAAN (PIPING) 4 16-19 13-16 14-17 17-20 29-01 05-08 17-20 21-24 18-21 16-19 14-17 05-08 7.950.000167 TESTING OF MACHINE TOOLS 4 17-20 14-17 06-09 18-21 30-02 05-08 18-21 22-25 19-22 17-20 06-09 11-14 7.950.000
168 Transmisi Daya Mekanik (Mechanical PowerTransmission) 4 03-06 31-03 20-23 04-07 09-12 06-09 04-07 01-04 05-08 03-06 20-23 05-08 7.950.000
169 TROUBLE SHOOTING, INSPECTION, ANDMONITORING OF MACHINERY 4 09-12 06-09 27-30 10-13 15-18 12-15 10-13 07-10 11-14 09-12 27-30 12-15 7.950.000
170 BASIC WELDING 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 21-24 25-28 23-26 20-23 04-07 8.950.000171 GAS METAL ARC WELDING (LAS MIGMAG) 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 28-31 04-07 02-05 27-30 11-14 8.950.000172 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 09-12 06-09 27-02 10-13 08-11 13-16 10-13 31-03 11-14 09-12 30-02 18-21 8.950.000173 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 07-10 18-21 16-19 06-09 05-08 8.950.000174 OXY ACETYLENE WELDING (LAS ASETILIN) 4 24-27 21-24 13-16 25-28 30-02 12-15 25-28 22-25 26-29 24-27 13-16 12-15 8.950.000175 WELDING INSPECTION 4 03-06 31-03 21-24 04-07 02-05 05-08 04-07 28-31 05-08 03-06 21-24 19-22 9.500.000176 WELDING METALLURGY 4 10-13 07-10 28-31 10-13 09-12 13-16 11-14 01-04 12-15 10-13 28-01 04-07 8.950.000177 WELDING SAFETY 3 18-20 15-17 01-03 19-21 22-24 19-21 19-21 14-16 20-22 18-20 01-03 27-29 6.950.000178 WELDING TECHNOLOGY 4 23-26 20-23 07-10 24-27 16-19 06-09 24-27 08-11 25-28 23-26 07-10 11-14 8.950.000
179 ANALISIS GETARAN DALAM PERAWATANROTARY EQUIPMENT 4 02-05 30-02 27-02 03-06 15-18 12-15 03-06 07-10 04-07 02-05 30-02 04-07 7.950.000
180 BENGKEL ALAT BERAT 4 09-12 06-09 06-09 10-13 29-01 05-08 10-13 21-24 11-14 09-12 06-09 11-14 7.950.000181 BOILER WATER TREATMENT 4 16-19 13-16 13-16 17-20 02-05 13-16 17-20 28-31 18-21 16-19 13-16 18-21 7.950.000182 CENTRIFUGAL COMPRESSOR 4 23-26 20-23 20-23 24-27 08-11 06-09 24-27 31-03 25-28 23-26 20-23 05-08 7.950.000
11
183 CENTRIFUGAL COMPRESSOR & STEAM TURBINEPERFORMANCE 4 03-06 31-03 27-30 04-07 16-19 12-15 04-07 08-11 05-08 03-06 27-30 12-15 7.950.000
184 CENTRIFUGAL PUMP AND SEAL 4 10-13 07-10 28-03 10-13 30-02 05-08 11-14 22-25 12-15 10-13 31-03 19-22 7.950.000185 CORROSION AND CATHODIC PROTECTION 4 17-20 14-17 07-10 18-21 02-05 13-16 18-21 28-31 19-22 17-20 07-10 04-07 7.950.000186 HEAVY EQUIPMENT MANAGEMENT 4 02-05 30-02 21-24 03-06 15-18 12-15 03-06 07-10 04-07 02-05 21-24 18-21 7.950.000
187 HYDRAULIC PNEUMATIC & ELECTRIC CONTROLSYSTEM 4 09-12 06-09 28-31 10-13 29-01 05-08 10-13 21-24 11-14 09-12 28-01 05-08 7.950.000
188 NON DESTRUCTIVE TESTING (NDT) 4 16-19 13-16 27-02 17-20 02-05 13-16 17-20 28-31 18-21 16-19 30-02 12-15 7.950.000
189 OPERASI DAN PEMELIHARAAN TURBIN GASDAN GENERATOR 4 23-26 20-23 06-09 24-27 08-11 06-09 24-27 31-03 25-28 23-26 06-09 19-22 7.950.000
190 POMPA OPERASI DAN PERAWATAN 4 03-06 31-03 13-16 04-07 16-19 12-15 04-07 08-11 05-08 03-06 13-16 04-07 7.950.000191 ROTATING EQUIPMENTS 4 24-27 21-24 28-03 25-28 09-12 06-09 25-28 01-04 26-29 24-27 31-03 05-08 7.950.000192 TURBIN & GENERATOR OPERATION 4 16-19 13-16 21-24 17-20 02-05 13-16 17-20 28-31 18-21 16-19 21-24 04-07 7.950.000193 VALVE (CHOKE & CONTROL VALVE) 4 23-26 20-23 28-31 24-27 08-11 06-09 24-27 31-03 25-28 23-26 28-01 11-14 7.950.000194 WELDING INSPECTION 4 03-06 31-03 27-02 04-07 16-19 12-15 04-07 08-11 05-08 03-06 30-02 18-21 7.950.000195 LIQUID PENETRANT TESTING 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 31-04 18-22 16-20 06-10 04-08 11.500.000196 MAGNETIC PARTICLE TESTING 5 23-27 20-24 13-17 24-28 15-19 12-16 24-28 07-11 25-29 23-27 13-17 11-15 11.500.000
197 PENGENDALIAN MOTOR LISTRIK SECARAELEKTRONIK 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000
198 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000199 SISTEM KONTROL MOTOR LISTRIK 4 02-05 30-02 07-10 03-06 15-18 12-15 03-06 07-10 04-07 02-05 07-10 12-15 7.950.000
200 TRAFO PRINCIPLES, APPLICATION ANDMAINTENANCE 4 09-12 06-09 14-17 10-13 29-01 05-08 10-13 21-24 11-14 09-12 14-17 19-22 7.950.000
201 ENGINEERING MATERIAL KNOWLEDGE FORWAREHOUSE PEOPLE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 6.500.000
202 PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.950.000
203PEMBANGKITAN ALIRAN PERMUKAAN UNTUKOIL SPILL (OIL FENCE) SEBAGAI PENGUMPULTUMPAHAN MINYAK
4 17-20 14-17 13-16 18-21 30-02 12-15 18-21 22-25 19-22 17-20 13-16 05-08 7.950.000
204 Oil Transportation Piping 4 02-05 30-02 28-03 03-06 08-11 06-09 03-06 31-03 04-07 02-05 31-03 19-22 7.950.000205 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MAINTENANCE
1 RELIABILITY, AVAILABILITY & MAINTAINABILITYANALYSIS 3 25-27 22-24 08-10 26-28 02-04 19-21 26-28 09-11 27-29 25-27 08-10 27-29 6.950.000
2 RELIABILITY ENGINEERING (TEKNIKKEANDALAN) 2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000
12
3 ADVANCED MAINTENANCE MANAGEMENT 4 09-12 06-09 27-02 10-13 08-11 12-15 10-13 07-10 11-14 09-12 30-02 18-21 7.950.000
4 MACHINERY CONDITION MONITORING FORPREDICTIVE AND PREVENTIVE MAINTENANCE 4 16-19 13-16 20-23 17-20 15-18 06-09 17-20 21-24 18-21 16-19 20-23 19-22 7.950.000
5 MAINTENANCE PLANNING SCHEDULING ANDCOORDINATING 4 23-26 20-23 28-31 24-27 29-01 13-16 24-27 28-31 25-28 23-26 28-01 05-08 7.950.000
6 MAINTENANCE MANAGEMENT SYSTEM FORSUPERVISOR 4 23-26 20-23 06-09 24-27 29-01 12-15 24-27 28-31 25-28 23-26 06-09 18-21 7.950.000
7 MAINTENANCE AND SPARE PARTMANAGEMENT 4 09-12 06-09 06-09 10-13 15-18 05-08 10-13 21-24 11-14 09-12 06-09 04-07 7.950.000
8 FAULT FINDING SKILLS TECHNICALTROUBLESHOOTING 3 04-06 01-03 15-17 05-07 22-24 19-21 05-07 14-16 06-08 04-06 15-17 27-29 6.500.000
9 Production Optimization and Minimize DownTime 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6.500.000
10 RELIABILITY CENTERED MAINTENANCE (RCM) 3 25-27 22-24 27-29 26-28 22-24 19-21 26-28 14-16 27-29 25-27 27-29 27-29 6.500.000
11RELIABILITY CENTERED MAINTENANCE (RCM)Increasing Safety & Reliability in Gas PipelineSystem
3 04-06 01-03 27-01 05-07 22-24 19-21 05-07 14-16 06-08 04-06 30-01 27-29 6.500.000
12 MAINTENANCE MANAGEMENT 3 16-18 13-15 15-17 17-19 22-24 19-21 17-19 14-16 18-20 16-18 15-17 27-29 6.500.000
13 EFFECTIVENESS DESIGN OF MAINTENANCEORGANIZATION AND ADMINISTRATION 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 21-23 06-08 04-06 22-24 27-29 5.950.000
14 MAINTENANCE CONTROL AND MONITORING 3 02-04 30-01 15-17 03-05 17-19 19-21 03-05 14-16 04-06 02-04 15-17 27-29 6.500.000
15 THE ECONOMICS OF MAINTENANCEMANAGEMENT 3 02-04 30-01 01-03 03-05 02-04 19-21 03-05 31-02 04-06 02-04 01-03 06-08 5.950.000
16 MAINTENANCE PLANNING AND SCHEDULING 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 6.500.000
17 PREVENTIVE & PREDICTIVE MAINTENANCE(PPM) 4 02-05 30-02 13-16 03-06 15-18 06-09 03-06 21-24 04-07 02-05 13-16 04-07 8.500.000
18 RELIABILITY CENTERED MAINTENANCE 3 11-13 08-10 20-22 11-13 22-24 14-16 12-14 14-16 13-15 11-13 20-22 13-15 6.500.00019 Integrated Maintenance Management 4 10-13 07-10 21-24 10-13 29-01 06-09 11-14 22-25 12-15 10-13 21-24 12-15 7.950.000
20 Effective and Efficient of MaintenanceManagement 3 18-20 15-17 29-31 19-21 22-24 19-21 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000
21 Total Productive Maintenance (TPM) 4 24-27 21-24 06-09 25-28 15-18 06-09 25-28 21-24 26-29 24-27 06-09 19-22 7.950.000
22 PREVENTIVE MAINTENANCE (SCHEDULE &PREDICTIVE MAINTENANCE) 4 03-06 31-03 28-31 04-07 09-12 13-16 04-07 01-04 05-08 03-06 28-01 18-21 7.950.000
23TEKNIK PEMELIHARAAN KENDARAAN(PREVENTIVE MAINTENANCE UNTUKKENDARAAN)
4 23-26 20-23 14-17 24-27 02-05 05-08 24-27 28-31 25-28 23-26 14-17 19-22 7.950.000
24 TEKNIK PERAWATAN MEKANIK 4 02-05 30-02 20-23 03-06 08-11 13-16 03-06 31-03 04-07 02-05 20-23 05-08 7.950.00025 MAINTENANCE OF MACHINE TOOLS 4 23-26 20-23 27-30 24-27 29-01 06-09 24-27 28-31 25-28 23-26 27-30 04-07 7950000
26 COMPETITIVE MAINTENANCE & SPARE PARTSMANAGEMENT 4 09-12 06-09 27-02 10-13 08-11 05-08 10-13 07-10 11-14 09-12 30-02 18-21 7.950.000
13
27 Maintenance Strategic Planning 4 24-27 21-24 07-10 25-28 09-12 06-09 25-28 08-11 26-29 24-27 07-10 05-08 7.950.00028 MAINTENANCE SYSTEM AND DOCUMENTATION 4 03-06 31-03 14-17 04-07 16-19 13-16 04-07 22-25 05-08 03-06 14-17 12-15 7.950.00029 MANAGING MAINTENANCE RESOURCES 4 09-12 06-09 21-24 10-13 30-02 05-08 10-13 28-31 11-14 09-12 21-24 18-21 7.950.000
30 RELIABILITY CENTERED MAINTENANCE & RISKBASED INSPECTION 5 02-06 30-03 06-10 03-07 08-12 05-09 03-07 07-11 04-08 02-06 06-10 04-08 8.950.000
31 ROOT CAUSE ANALYSIS 4 10-13 07-10 13-16 10-13 15-18 13-16 11-14 21-24 12-15 10-13 13-16 11-14 7.950.00032 Spare Part Management 4 17-20 14-17 20-23 18-21 29-01 05-08 18-21 28-31 19-22 17-20 20-23 19-22 7.950.00033 ADVANCED MAINTENANCE MANAGEMENT 4 09-12 06-09 27-02 10-13 15-18 12-15 10-13 07-10 11-14 09-12 30-02 04-07 7.950.000
34 CONDITIONS BASE INSPECTION ANDMAINTENANCE 4 09-12 06-09 21-24 10-13 15-18 12-15 10-13 07-10 11-14 09-12 21-24 18-21 7.950.000
35 MAINTENANCE MANAGEMENT 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 21-24 18-21 16-19 31-03 11-14 7.950.00036 MAINTENANCE OF MACHINE COMPONENTS 4 23-26 20-23 07-10 24-27 02-05 13-16 24-27 28-31 25-28 23-26 07-10 18-21 7.950.00037 MAINTENANCE SYSTEM AND COST 4 02-05 30-02 14-17 03-06 08-11 06-09 03-06 31-03 04-07 02-05 14-17 05-08 7.950.00038 MODERN MAINTENANCE MANAGEMENT 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 21-24 18-21 16-19 20-23 05-08 7.950.000
39PERENCANAAN DAN PENJADWALANPERAWATAN (MAINTENANCE PLANNING ANDSCHEDULING)
4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 28-31 25-28 23-26 13-16 04-07 7.950.000
40 PREDICTIVE MAINTENANCE 4 17-20 14-17 28-03 18-21 30-02 05-08 18-21 22-25 19-22 17-20 31-03 05-08 7.950.00041 RELIABILITY CENTERED MAINTENANCE (RCM) 4 09-12 06-09 07-10 10-13 15-18 12-15 10-13 07-10 11-14 09-12 07-10 18-21 7.950.00042 TEKNOLOGI PERAWATAN MESIN 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 08-11 12-15 10-13 30-02 04-07 7.950.00043 Total Productive Maintenance (TPM) 4 24-27 21-24 13-16 25-28 02-05 13-16 25-28 28-31 26-29 24-27 13-16 18-21 7.950.00044 PREVENTIVE MAINTENANCE 4 10-13 07-10 20-23 10-13 30-02 05-08 11-14 22-25 12-15 10-13 20-23 11-14 7.950.00045 PREVENTIVE MAINTENANCE GENERATOR 4 17-20 14-17 27-30 18-21 02-05 13-16 18-21 28-31 19-22 17-20 27-30 18-21 7.950.000
46 CULTURE CHANGE FOR MAINTENANCE ANDRELIABILITY IMPROVEMENT 3 09-11 06-08 27-29 10-12 29-31 05-07 10-12 28-30 11-13 09-11 27-29 11-13 6.500.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - ELECTRICAL1 PENGENDALIAN MOTOR LISTRIK SECARA
ELEKTRONIK 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000
2 GENSET TEKNOLOGI, PERAWATAN DANOPERASI 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000
3 SISTEM KONTROL MOTOR LISTRIK 4 02-05 30-02 07-10 03-06 15-18 12-15 03-06 07-10 04-07 02-05 07-10 12-15 7.950.000
4 TRAFO PRINCIPLES, APPLICATION ANDMAINTENANCE 4 09-12 06-09 14-17 10-13 29-01 05-08 10-13 21-24 11-14 09-12 14-17 19-22 7.950.000
5 ADVANCED CONTROL FOUNDATION 4 16-19 13-16 20-23 17-20 29-01 12-15 17-20 21-24 18-21 16-19 20-23 18-21 7.950.0006 FLOWMETERING AND CUSTODY TRANSFER 4 02-05 30-02 27-02 03-06 08-11 13-16 03-06 31-03 04-07 02-05 30-02 11-14 7.950.0007 PRACTICAL PROCESS CONTROL 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000
14
8 Implementasi DSP (digital signal processing)Dalam Sistem Komunikasi 4 02-05 30-02 13-16 03-06 02-05 12-15 03-06 31-03 04-07 02-05 13-16 04-07 7.950.000
9 INDUSTRIAL ROBOTICS SENSING, PLANNING,AND CONTROL 4 16-19 13-16 27-02 17-20 08-11 12-15 17-20 07-10 18-21 16-19 30-02 04-07 7.950.000
10 AUTOMATIC VOLTAGE REGULATOR(AVR)OPERATION AND MAINTENANCE 4 03-06 31-03 20-23 04-07 02-05 05-08 04-07 01-04 05-08 03-06 20-23 19-22 7.950.000
11 GENERATOR OPERATION, MAINTENANCE &TROUBLESHOOTING 4 16-19 13-16 28-03 17-20 15-18 06-09 17-20 21-24 18-21 16-19 31-03 04-07 7.950.000
12 PLC ( Tingkat dasar ) 4 17-20 14-17 28-03 18-21 16-19 06-09 18-21 22-25 19-22 17-20 31-03 19-22 7.950.00013 PLC (TINGKAT MAHIR) 4 24-27 21-24 07-10 25-28 30-02 13-16 25-28 28-31 26-29 24-27 07-10 05-08 7.950.00014 POWER FACTOR IMPROVEMENT 4 02-05 30-02 14-17 03-06 02-05 05-08 03-06 31-03 04-07 02-05 14-17 11-14 7.950.000
15 PROTEKSI TERHADAP GANGGUAN SAMBARANPETIR 4 03-06 31-03 06-09 04-07 02-05 05-08 04-07 01-04 05-08 03-06 06-09 19-22 7.950.000
16 SISTEM INSTALASI DAN PROTEKSI JARINGANTENAGA LISTRIK 4 17-20 14-17 20-23 18-21 16-19 06-09 18-21 22-25 19-22 17-20 20-23 11-14 7.950.000
17 SISTEM INSTALASI TENAGA LISTRIK 4 24-27 21-24 28-31 25-28 30-02 13-16 25-28 28-31 26-29 24-27 28-01 18-21 7.950.00018 TRANFORMER OPERATION & MAINTENANCE 4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 05-08 7.950.00019 Uninterupted Power Suply 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 11-14 7.950.000
20PERFORMANCE ANALISYS AND MAINTENANCEOF ELECTRICAL DISTRIBUTION NETWORKS FORSUPERVISOR
4 09-12 06-09 20-23 10-13 08-11 13-16 10-13 07-10 11-14 09-12 20-23 11-14 8.500.000
21PERFORMANCE ANALISYS AND OPERATING OFGENERATOR SET FOR SENIOR OPERATOR ANDENGINEER
4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 19-22 8.500.000
22PERFORMANCE ANALISYS AND OPERATING OFINDUCTION MOTOR FOR SENIOR OPERATORAND JUNIOR SUPERVISOR
4 24-27 21-24 27-02 25-28 30-02 12-15 25-28 28-31 26-29 24-27 30-02 05-08 8.500.000
23DISTRIBUTED CONTROL SYSTEM (DCS)PRINCIPLES, MAINTENANCE, OPERATION,PROGRAMMING & TROUBLESHOOTING
5 09-13 06-10 27-03 17-21 08-12 05-09 10-14 07-11 11-15 09-13 30-03 18-22 9.500.000
24 DISTRIBUTED CONTROL SYSTEMS (DCS)FUNDAMENTAL 4 17-20 14-17 07-10 10-13 16-19 12-15 18-21 22-25 19-22 17-20 07-10 05-08 8.500.000
25 Electrical Control Wiring 4 24-27 21-24 14-17 25-28 30-02 05-08 25-28 28-31 26-29 24-27 14-17 11-14 8.500.00026 PLC COMMUNICATION AND LAN 4 17-20 14-17 27-30 18-21 16-19 12-15 18-21 22-25 19-22 17-20 27-30 18-21 8.500.000
27 PLC OPERATION, PROGRAMMING,TROUBLESHOOTING AND MAINTENANCE 4 23-26 20-23 28-03 24-27 29-01 06-09 24-27 28-31 25-28 23-26 31-03 04-07 8.500.000
28 ACDC ELECTRICAL MOTOR CONTROL 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 7.950.00029 BASIC ELECTRICAL 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 5.950.00030 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 09-12 06-09 27-02 10-13 02-05 12-15 10-13 31-03 11-14 09-12 30-02 11-14 7.950.000
15
31 DISTRIBUTION SYSTEM PROTECTION 4 16-19 13-16 06-09 17-20 08-11 06-09 17-20 07-10 18-21 16-19 06-09 18-21 7.950.00032 Electric Installation In Hazardous Area 4 24-27 21-24 13-16 25-28 15-18 13-16 25-28 22-25 26-29 24-27 13-16 05-08 7.950.00033 ELECTRICAL CALIBRATION 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 14-16 06-08 04-06 22-24 27-29 5.950.000
34 ELECTRICAL EQUIPMENT SYSTEM ANDMAINTENANCE 4 10-13 07-10 28-31 10-13 30-02 05-08 11-14 28-31 12-15 10-13 28-01 12-15 7.950.000
35 ELECTRICAL POWER GENERATOR OPERATION,PROTECTION AND MAINTANANCE 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 31-04 18-22 16-20 30-03 18-22 8.950.000
36 ELECTRICAL POWER SYSTEM ANALYSIS 4 23-26 20-23 07-10 24-27 02-05 06-09 24-27 08-11 25-28 23-26 07-10 04-07 7.950.000
37 ELECTRICAL POWER SYSTEM ANALYSIS USINGSOFTWARE APPLICATION 4 02-05 30-02 14-17 03-06 16-19 12-15 03-06 21-24 04-07 02-05 14-17 11-14 7.950.000
38 ELECTRICAL POWER SYSTEM PROTECTION 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 28-31 11-14 09-12 20-23 18-21 7.950.00039 ELECTRICAL SYSTEM GENERATORSET 4 16-19 13-16 27-30 17-20 02-05 13-16 17-20 31-03 18-21 16-19 27-30 05-08 7.950.00040 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 24-27 21-24 27-02 25-28 08-11 06-09 25-28 07-10 26-29 24-27 30-02 12-15 7.950.00041 GENERATOR EXCITATION SYSTEM 4 03-06 31-03 06-09 04-07 15-18 12-15 04-07 22-25 05-08 03-06 06-09 19-22 7.950.000
42 GROUNDING SYSTEM AND LIGHTNINGPROTECTION 4 10-13 07-10 13-16 10-13 30-02 05-08 11-14 28-31 12-15 10-13 13-16 04-07 7.950.000
43 High Voltage Electrical Equipmment Operation,Maintenance and Repair 5 16-20 13-17 20-24 17-21 08-12 12-16 17-21 31-04 18-22 16-20 20-24 11-15 8.950.000
44 INSTRUMENTATION ELECTRIC Operation andMaintenance 4 23-26 20-23 28-31 24-27 02-05 06-09 24-27 08-11 25-28 23-26 28-01 18-21 7.950.000
45 LV AND MV GENERATOR 4 02-05 30-02 28-03 03-06 16-19 12-15 03-06 21-24 04-07 02-05 31-03 05-08 7.950.00046 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 09-12 06-09 07-10 10-13 29-01 05-08 10-13 28-31 11-14 09-12 07-10 11-14 7.950.000
47 LV SWITCHGEAR MAINTENANCE ANDCOORDINATION 4 16-19 13-16 14-17 17-20 02-05 13-16 17-20 31-03 18-21 16-19 14-17 19-22 7.950.000
48 POWER ELECTRICAL INSTALLATION SYSTEM 4 24-27 21-24 20-23 25-28 08-11 06-09 25-28 07-10 26-29 24-27 20-23 04-07 7.950.00049 POWER ELECTRONICS 4 03-06 31-03 27-30 04-07 15-18 12-15 04-07 22-25 05-08 03-06 27-30 12-15 7.950.00050 POWER PROTECTION RELAY SYSTEM 4 10-13 07-10 27-02 10-13 30-02 05-08 11-14 28-31 12-15 10-13 30-02 18-21 7.950.00051 POWER TRANSFORMER 4 17-20 14-17 06-09 18-21 02-05 13-16 18-21 01-04 19-22 17-20 06-09 05-08 7.950.00052 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 23-26 20-23 13-16 24-27 09-12 06-09 24-27 08-11 25-28 23-26 13-16 11-14 7.950.000
53 Soft Starter (Operation, Protection andMaintanance) 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 14-16 04-06 02-04 22-24 27-29 5.950.000
54 TRANSMISSION AND DISTRIBUTION OPERATIONAND MAINTENANCE 4 09-12 06-09 28-31 10-13 16-19 12-15 10-13 21-24 11-14 09-12 28-01 19-22 7.950.000
55 Uninterruptible Power Suply Operation andMaintenance 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 28-31 18-21 16-19 31-03 04-07 7.950.000
56 VARIABLE FREQUENCY DRIVES 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 31-03 26-29 24-27 07-10 12-15 7.950.00057 VARIABLE SPEED DRIVES 4 03-06 31-03 14-17 04-07 08-11 06-09 04-07 07-10 05-08 03-06 14-17 18-21 7.950.00058 POWER DISTRIBUTION TRANSFORMER 4 10-13 07-10 20-23 10-13 15-18 12-15 11-14 22-25 12-15 10-13 20-23 05-08 7.950.00059 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 17-20 14-17 27-30 18-21 30-02 05-08 18-21 28-31 19-22 17-20 27-30 11-14 7.950.000
16
60 TRANSFORMATOR DAYA OPERASI DANPEMELIHARAAN 3 23-25 20-22 27-01 24-26 22-24 19-21 24-26 14-16 25-27 23-25 30-01 27-29 5.950.000
61 ELECTRONIC SWITCHBOARD RESCUE 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.00062 GARDU INDUK 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 5.950.000
63 TEKNIK KONSERVASI ENERGI MELALUI AUDITENERGI PADA BANGUNAN GEDUNG 4 16-19 13-16 07-10 17-20 29-01 12-15 17-20 21-24 18-21 16-19 07-10 11-14 7.950.000
64 Data Akuisisi, Interfacing, dan SistemMonitoring 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 21-23 25-27 23-25 20-22 27-29 6.750.000
65 Pemrograman Mikrokontroler AVR denganCodeVisionAVR 3 02-04 30-01 27-29 03-05 29-31 05-07 03-05 28-30 04-06 02-04 27-29 04-06 6.750.000
66 Pemrograman Mikrokontroler untuk Robotika 3 09-11 06-08 27-01 10-12 02-04 12-14 10-12 31-02 11-13 09-11 30-01 11-13 6.750.000
67 ADVANCE COURSE ON LIGHTNING PROTECTIONAND GROUNDING SYSTEM 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 31-04 18-22 16-20 30-03 18-22 9.500.000
68Lightning Protection and Grounding System forOil & Gas Refinery and PetrochemicalInstallation
3 23-25 20-22 06-08 24-26 02-04 19-21 24-26 07-09 25-27 23-25 06-08 27-29 6.950.000
69LIGHTNING PROTECTION AND GROUNDINGSYSTEM FOR POWER PLANT, TRANSMISSION,DISTRIBUTION AND LARGE INDUSTRY
3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 04-06 6.950.000
70 ADVANCED PLC PROGRAMMING ANDIMPLEMENTATION 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 8.500.000
71 PLC INTEGRATION TO LOCAL AREA NETWORK(LAN) 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000
72 PLC (ROGRAMMABLE LOGIC CONTROLLER)PRINCIPLES, OPERATION AND PROGRAMMING 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000
73SCADA (SUPERVISORY CONTROL AND DATAACQUISITION) PRINCIPLES, HARDWARESYSTEM, OPERATION & PROGRAMMING
4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 8.500.000
74 NUMERICAL CONTROL AND ROBOTIC 4 16-19 13-16 06-09 17-20 15-18 12-15 17-20 07-10 18-21 16-19 06-09 04-07 7.950.00075 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 02-05 30-02 06-09 03-06 08-11 06-09 03-06 31-03 04-07 02-05 06-09 05-08 7.950.000
76 Electric motor Operation, Maintenance &Troubleshooting 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 04-07 7.950.000
77Electrical Panel Design 3 02-04 30-01 13-15 03-05 15-17 05-07 03-05 14-16 04-06 02-04 13-15 04-06 5.950.000
78Electrical Safety For Electrical TechnicianTrainer
4 09-12 06-09 20-23 10-13 29-01 12-15 10-13 21-24 11-14 09-12 20-23 11-14 7.950.000
79 Motor Rewinding 3 16-18 13-15 27-29 17-19 22-24 19-21 17-19 28-30 18-20 16-18 27-29 18-20 5.950.000
80 Perhitungan Perkiraan Biaya Proyek Mekanikal 2 23-24 20-21 27-28 24-25 02-03 08-09 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000
17
Elektrikal Untuk Bangunan Gedung
81Power Transformer (Operation, Testing,Asessment And Maintenance)
4 03-06 31-03 06-09 04-07 08-11 13-16 04-07 07-10 05-08 03-06 06-09 05-08 7.950.000
ENGINEERING - IT
1PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWERPOINT)
2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.000
2 IT AUDIT PRACTICES 3 11-13 08-10 27-29 10-12 29-31 19-21 12-14 28-30 13-15 11-13 27-29 11-13 5.950.0003 IT HELPDESK 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.0004 AUTOCAD COSTUMIZATION 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 12-15 7.950.000
5 INFORMATION TECHNOLOGY &TELECOMUNICATION 4 24-27 21-24 27-02 25-28 30-02 13-16 25-28 28-31 26-29 24-27 30-02 18-21 7.950.000
6 Holistic Information Security 3 23-25 20-22 27-01 24-26 02-04 05-07 24-26 31-02 25-27 23-25 30-01 27-29 5.950.0007 Information Security System 3 02-04 30-01 06-08 03-05 08-10 12-14 03-05 07-09 04-06 02-04 06-08 04-06 5.950.0008 OPTIMALISASI CYBER PUBLIC RELATION 3 09-11 06-08 13-15 10-12 15-17 19-21 10-12 14-16 11-13 09-11 13-15 11-13 5.950.000
9 PENGEMBANGAN KONTEN SITUS WEBPERUSAHAAN 3 16-18 13-15 20-22 17-19 22-24 07-09 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000
10 TEKNIK DESAIN GRAFIS PADA WEB 3 25-27 22-24 27-29 26-28 29-31 14-16 26-28 28-30 27-29 25-27 27-29 27-29 5.950.00011 TEKNIK DESAIN WEB 3 04-06 01-03 01-03 05-07 03-05 19-21 05-07 02-04 06-08 04-06 01-03 06-08 5.950.00012 ADVANCE MICROSOFT EXCEL 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.00013 ADVANCE MICROSOFT POWERPOINT 3 11-13 08-10 06-08 11-13 08-10 07-09 12-14 07-09 13-15 11-13 06-08 11-13 5.950.00014 ADVANCE MICROSOFT WORD 3 18-20 15-17 13-15 19-21 15-17 14-16 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000
15 BASIC AUTOCAD 2D (2D TECHNICAL DRAWINGWITH AUTOCAD) 5 23-27 20-24 27-03 24-28 08-12 05-09 24-28 31-04 25-29 23-27 30-03 04-08 8.950.000
16 BASIC AUTOCAD 3D (3D TECHNICAL DRAWINGWITH AUTOCAD) 2 02-03 30-31 06-07 03-04 02-03 12-13 03-04 07-08 04-05 02-03 06-07 27-28 3.950.000
17 BASIC TELECOMMUNICATION PABX 3 16-18 13-15 27-01 17-19 22-24 19-21 17-19 14-16 18-20 16-18 30-01 27-29 5.950.00018 BASIC VSAT SYSTEM 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.00019 FIBER OPTIC SYSTEM 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 14-16 11-13 09-11 20-22 27-29 6.500.000
20 Fraud Management in telecommunication business 3 18-20 15-17 27-29 19-21 22-24 19-21 19-21 14-16 20-22 18-20 27-29 27-29 5.950.000
21 INTERNETWORKING DENGAN TCP IP 3 25-27 22-24 01-03 26-28 02-04 19-21 26-28 31-02 27-29 25-27 01-03 27-29 5.950.000
22 IPTV - TEKNOLOGI, PELUANG BISNIS DANREGULASI 3 04-06 01-03 08-10 05-07 08-10 19-21 05-07 07-09 06-08 04-06 08-10 27-29 5.950.000
23 NETWORK MANAGEMENT AND OPERATIONSSUPPORT SYSTEM 3 11-13 08-10 15-17 11-13 15-17 19-21 12-14 14-16 13-15 11-13 15-17 11-13 5.950.000
24 POWER LINE CARRIER 3 16-18 13-15 22-24 17-19 22-24 19-21 17-19 21-23 18-20 16-18 22-24 18-20 5.950.000
18
25 Teknologi dan Bisnis di WiMAX dan Sub WiMAX 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000
26 MANAJEMEN KABEL PADA JARINGANTELEKOMUNIKASI 4 02-05 30-02 27-02 03-06 02-05 05-08 03-06 01-04 04-07 02-05 30-02 04-07 8.500.000
27 MIKROTIK FUNDAMENTAL 3 18-20 15-17 13-15 19-21 17-19 12-14 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00028 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 25-27 22-24 20-22 26-28 22-24 19-21 26-28 23-25 27-29 25-27 20-22 27-29 6.500.000
29 INFORMATION TECHNOLOGY INFRASTRUCTURELIBRARY (I T I L) VERSION 3.1 4 17-20 14-17 27-02 18-21 02-05 06-09 18-21 31-03 19-22 17-20 30-02 19-22 7.950.000
30 MASTERING MICROSOFT EXCEL 2007 2 16-17 13-14 30-31 17-18 01-02 12-13 17-18 30-31 18-19 16-17 30-01 18-19 3.950.000
31 CAD BIDANG TEKNIK MESIN (CAD FORMECHANICAL AUTOCAD OR CATIA) 4 17-20 14-17 28-03 18-21 30-02 05-08 18-21 22-25 19-22 17-20 31-03 19-22 7.950.000
32 Teknologi CAD CAM 4 02-05 30-02 28-31 03-06 08-11 06-09 03-06 31-03 04-07 02-05 28-01 19-22 7.950.00033 PENGEMBANGAN SITUS WEB 3 23-25 20-22 27-01 24-26 22-24 19-21 24-26 14-16 25-27 23-25 30-01 27-29 5.950.000
34 COLLABORATION MS Office AND EFFECTIVEPRESENTATION 3 04-06 01-03 27-01 05-07 02-04 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000
ENGINEERING - MINING1 BATUBARA 3 02-04 30-01 27-01 03-05 02-04 05-07 03-05 31-02 04-06 02-04 30-01 04-06 6.500.0002 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 09-12 06-09 06-09 10-13 08-11 12-15 10-13 07-10 11-14 09-12 06-09 11-14 7.950.0003 GEOLOGY FOR NON GEOLOGIST 4 16-19 13-16 13-16 17-20 15-18 06-09 17-20 21-24 18-21 16-19 13-16 18-21 7.950.000
4 PEMBORAN DAN PELEDAKAN UNTUKPERTAMBANGAN 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.000
5 PEMINDAHAN TANAH MEKANIS 3 04-06 01-03 27-29 05-07 29-31 14-16 05-07 28-30 06-08 04-06 27-29 06-08 5.950.0006 VENTILASI TAMBANG 3 11-13 08-10 01-03 10-12 03-05 19-21 12-14 02-04 13-15 11-13 01-03 13-15 6.500.000
7 EVALUASI STUDI KELAYAKAN DALAM USAHAPERTAMBANGAN 3 18-20 15-17 08-10 19-21 10-12 05-07 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000
8 PERENCANAAN TAMBANG TERBUKA 3 25-27 22-24 15-17 26-28 17-19 12-14 26-28 14-16 27-29 25-27 15-17 27-29 5.950.0009 PEMBORAN EKSPLORASI BATUBARA 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 23-25 04-06 02-04 22-24 04-06 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MIGAS1 PETROLEUM PLANT & PIPELINE SECURITY
MANAGEMENT 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.950.000
2PEMBANGKITAN ALIRAN PERMUKAAN UNTUKOIL SPILL (OIL FENCE) SEBAGAI PENGUMPULTUMPAHAN MINYAK
4 17-20 14-17 13-16 18-21 30-02 12-15 18-21 22-25 19-22 17-20 13-16 05-08 7.950.000
3 Oil Transportation Piping 4 02-05 30-02 28-03 03-06 08-11 06-09 03-06 31-03 04-07 02-05 31-03 19-22 7.950.0004 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.0005 H2S AWARENESS 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 14-16 06-08 04-06 20-22 27-29 5.950.000
19
6 GAS PROCESSING AND EQUIPMENT 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 31-03 11-14 09-12 30-02 11-14 8.500.000
7 BASIC OF SURFACE OPERATION ANDMAINTENANCE FOR OIL AND GAS INDUSTRIES 4 17-20 14-17 28-03 18-21 16-19 06-09 18-21 22-25 19-22 17-20 31-03 11-14 7.950.000
8 PENGETAHUAN TEKNIK PERMINYAKAN UNTUKMANAJERIAL 4 03-06 31-03 20-23 04-07 02-05 05-08 04-07 01-04 05-08 03-06 20-23 04-07 7.950.000
9 Oil and Gas Measurements 4 17-20 14-17 06-09 18-21 16-19 05-08 18-21 22-25 19-22 17-20 06-09 05-08 8.500.000
10 GAS DEHYDRATION AND GLYCOLREGENERATION 4 03-06 31-03 14-17 04-07 30-02 12-15 04-07 28-31 05-08 03-06 14-17 19-22 8.750.000
11 GAS SWEETENING H2S AND CO2 REMOVAL INCHEMICAL, OIL AND GAS 4 10-13 07-10 21-24 10-13 02-05 06-09 11-14 01-04 12-15 10-13 21-24 04-07 8.750.000
12 GAS HANDLING, CONDITIONING, ANDPROCESSING FACILITIES 4 23-26 20-23 27-02 24-27 02-05 12-15 24-27 31-03 25-28 23-26 30-02 04-07 7.950.000
13 OIL AND GAS HANDLING FACILITIES 4 03-06 31-03 28-03 04-07 09-12 05-08 04-07 08-11 05-08 03-06 31-03 19-22 7.950.000
14 OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATION 4 10-13 07-10 07-10 10-13 16-19 13-16 11-14 22-25 12-15 10-13 07-10 04-07 7.950.000
15 Drilling operations for operator in oil and gasindustries 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 11-14 8.500.000
16 NATURAL GAS PROCESSING - FRACTINATIONAND REFREGERATION 4 09-12 06-09 27-30 10-13 08-11 06-09 10-13 31-03 11-14 09-12 27-30 04-07 8.500.000
17 PETROLEUM ENGINEERING FOR NONPETROLEUM EMPLOYEE 4 16-19 13-16 27-02 17-20 15-18 13-16 17-20 07-10 18-21 16-19 30-02 12-15 8.500.000
18 PRACTICAL ASPECT OF ARTIFIAL LIFT METHODSFOR PETROLEUM PRODUCTION SYSTEM 4 03-06 31-03 14-17 04-07 02-05 12-15 04-07 28-31 05-08 03-06 14-17 05-08 8.500.000
19 PRODUCTION LOGGING 4 10-13 07-10 21-24 10-13 09-12 06-09 11-14 01-04 12-15 10-13 21-24 11-14 8.500.000
20 SUPPLY CHAIN MANAGEMENT IN THEUPSTREAM OIL & GAS INDUSTRY 3 18-20 15-17 29-31 19-21 22-24 19-21 19-21 14-16 20-22 18-20 29-01 27-29 6.500.000
21 WATER FLOODING 4 23-26 20-23 28-03 24-27 16-19 13-16 24-27 08-11 25-28 23-26 31-03 18-21 8.500.00022 WP&B, AFE and POD 4 02-05 30-02 07-10 03-06 29-01 05-08 03-06 21-24 04-07 02-05 07-10 04-07 8.500.00023 ARTIFICIAL LIFT 4 09-12 06-09 13-16 10-13 02-05 12-15 10-13 28-31 11-14 09-12 13-16 12-15 8.500.000
24 OFFSHORE WELLHEAD FUNCTION ANDTROUBLESHOOTING 4 16-19 13-16 20-23 17-20 08-11 06-09 17-20 31-03 18-21 16-19 20-23 19-22 8.500.000
25 Advanced Oil and Gas Production System 4 16-19 13-16 13-16 17-20 02-05 12-15 17-20 28-31 18-21 16-19 13-16 18-21 8.950.000
26 BASIC DRILLING ENGINEERING AND HEALTH,SAFETY & ENVIRONMENTAL CONSIDERATION 4 23-26 20-23 20-23 24-27 08-11 05-08 24-27 31-03 25-28 23-26 20-23 04-07 8.950.000
27 Basic Petroleum Engineering 4 02-05 30-02 27-30 03-06 15-18 13-16 03-06 07-10 04-07 02-05 27-30 11-14 8.950.000
28 Basic Reservoir Engineering for Non PetroleumEngineer 4 09-12 06-09 27-02 10-13 29-01 06-09 10-13 21-24 11-14 09-12 30-02 19-22 8.950.000
29ELECTRIC SUBMERSIBLE PUMP PRINCIPLES,INSTALLATION, OPERATION, MAINTENANCEAND TROUBLESHOOTING
4 24-27 21-24 14-17 25-28 09-12 05-08 25-28 01-04 26-29 24-27 14-17 12-15 8.950.000
20
30 FORMATION DAMAGE AND WELLSTIMULATION 4 03-06 31-03 21-24 04-07 16-19 13-16 04-07 08-11 05-08 03-06 21-24 18-21 8.950.000
31 NATURAL GAS RESERVOIR, PROCESSING ANDECONOMICS ASPECTS 4 10-13 07-10 28-31 10-13 30-02 06-09 11-14 22-25 12-15 10-13 28-01 04-07 8.950.000
32 Oil & Gas Production System 4 16-19 13-16 28-03 17-20 02-05 12-15 17-20 28-31 18-21 16-19 31-03 11-14 8.950.00033 OIL & GAS MEASUREMENT AND CALCULATION 4 23-26 20-23 07-10 24-27 08-11 05-08 24-27 31-03 25-28 23-26 07-10 19-22 8.950.00034 OIL AND GAS HANDLING FACILITIES 4 02-05 30-02 13-16 03-06 15-18 13-16 03-06 07-10 04-07 02-05 13-16 05-08 8.950.000
35 OIL AND GAS WELLS STIMULATION BYACIDIZING AND HYDRAULIC FRACTURING 4 09-12 06-09 20-23 10-13 29-01 06-09 10-13 21-24 11-14 09-12 20-23 12-15 8.950.000
36 Oil Field, and 100 Methods to Maintain andIncrease Production 4 17-20 14-17 27-30 18-21 02-05 12-15 18-21 28-31 19-22 17-20 27-30 18-21 8.950.000
37 PETROLEUM ENGINEERING FOR NONPETROLEUM ENGINEERS 4 24-27 21-24 27-02 25-28 09-12 05-08 25-28 01-04 26-29 24-27 30-02 04-07 8.950.000
38 PRODUCTION DOWNHOLE AND SUBSURFACEEQUIPMENTS 4 03-06 31-03 06-09 04-07 16-19 13-16 04-07 08-11 05-08 03-06 06-09 11-14 8.950.000
39 PRODUCTION OPERATION MANAGEMENT FORMANAGERS 4 10-13 07-10 14-17 10-13 30-02 06-09 11-14 22-25 12-15 10-13 14-17 19-22 8.950.000
40 Pump Selection, Design and Operation for Oiland Gas Surface Production Facilities 4 16-19 13-16 21-24 17-20 02-05 12-15 17-20 28-31 18-21 16-19 21-24 05-08 8.950.000
41 SUCKER ROD PUMP DESIGN, OPERATION ANDTROUBLESHOOTING 4 23-26 20-23 28-31 24-27 08-11 05-08 24-27 31-03 25-28 23-26 28-01 12-15 8.950.000
42 Surface Production Operation and Equipments 4 02-05 30-02 28-03 03-06 15-18 13-16 03-06 07-10 04-07 02-05 31-03 18-21 8.950.00043 WELL COMPLETION AND WORK OVER 4 09-12 06-09 07-10 10-13 29-01 06-09 10-13 21-24 11-14 09-12 07-10 04-07 8.950.00044 BLOWOUT PREVENTION AND WELL CONTROL 4 17-20 14-17 13-16 18-21 02-05 12-15 18-21 28-31 19-22 17-20 13-16 11-14 8.950.00045 ARUS MINYAK KORPORATE 3 25-27 22-24 20-22 26-28 22-24 19-21 26-28 14-16 27-29 25-27 20-22 27-29 7.950.000
46MODERN HYDROCARBON WELL PRODUCTIONLOGGING DATA ANALYSIS ANDINTERPRETATION
4 03-06 31-03 27-30 04-07 09-12 05-08 04-07 01-04 05-08 03-06 27-30 19-22 8.950.000
47 OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT 4 02-05 30-02 07-10 03-06 29-01 12-15 03-06 28-31 04-07 02-05 07-10 05-08 8.750.000
48 BASIC SURFACE SAFETY SYSTEM 4 17-20 14-17 06-09 18-21 02-05 12-15 18-21 28-31 19-22 17-20 06-09 05-08 8.950.000
49PETROLEUM FINANCE, COST CONTROL &RESERVOIR MANAJEMEN (PetroleumEconomics)
4 24-27 21-24 06-09 25-28 30-02 05-08 25-28 22-25 26-29 24-27 06-09 19-22 8.500.000
50 Gas, Oil and Water Pipeline Design andMaintenance 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 11-14 8.750.000
HSE1 OIL SPILL - OIL BOOM AND ENVIRONMENTAL
MANAGEMENT 4 02-05 30-02 07-10 03-06 29-01 12-15 03-06 28-31 04-07 02-05 07-10 05-08 8.750.000
21
2 BASIC SURFACE SAFETY SYSTEM 4 17-20 14-17 06-09 18-21 02-05 12-15 18-21 28-31 19-22 17-20 06-09 05-08 8.950.0003 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.0004 WATER TREATMENT 4 16-19 13-16 20-23 17-20 08-11 13-16 17-20 07-10 18-21 16-19 20-23 19-22 8.750.0005 MANAJEMEN LINGKUNGAN 4 02-05 30-02 27-02 03-06 08-11 05-08 03-06 07-10 04-07 02-05 30-02 11-14 7.950.0006 AHLI HIGIENE INDUSTRI MADYA (HIMA) 5 16-20 13-17 06-10 17-21 08-12 12-16 17-21 07-11 18-22 16-20 06-10 18-22 8.950.000
7 AMDAL ( ENVIRONMENTAL AND SOCIALIMPACT ASSESSMENT) FOR EXECUTIVE 4 23-26 20-23 13-16 24-27 15-18 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000
8 APPLIED ERGONOMICS AT WORKPLACE 4 02-05 30-02 20-23 03-06 29-01 12-15 03-06 28-31 04-07 02-05 20-23 11-14 7.950.0009 AUTHORISED GAS TESTING 4 09-12 06-09 27-30 10-13 02-05 06-09 10-13 31-03 11-14 09-12 27-30 18-21 8.500.000
10 BASIC SAFETY ORIENTATION FORCONTRACTORS 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 07-11 18-22 16-20 30-03 04-08 9.250.000
11 CANTEEN HYGIENE 2 26-27 23-24 06-07 27-28 22-23 19-20 27-28 14-15 28-29 26-27 06-07 27-28 3.950.000
12 CONTRACTOR SAFETY MANAGEMENT SYSTEM(CSMS) 4 03-06 31-03 14-17 04-07 16-19 05-08 04-07 22-25 05-08 03-06 14-17 12-15 7.950.000
13 ELECTRICAL SAFETY 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 14-16 13-15 11-13 22-24 27-29 6.500.00014 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 16-18 13-15 29-31 17-19 31-02 19-21 17-19 28-30 18-20 16-18 29-01 20-22 5.950.00015 HEALTH IMPACT ASSESSMENT (HIA) 4 23-26 20-23 27-02 24-27 02-05 12-15 24-27 01-04 25-28 23-26 30-02 04-07 7.950.000
16 INCIDENT INVESTIGATION, PREVENTION ANDPROACTIVE IMPROVEMENT 3 02-04 30-01 08-10 03-05 08-10 19-21 03-05 07-09 04-06 02-04 08-10 27-29 6.500.000
17 JOB SAFETY ANALYSIS (JSA) 2 09-10 06-07 13-14 12-13 15-16 19-20 10-11 14-15 11-12 09-10 13-14 11-12 3.950.00018 K3 RUMAH SAKIT 2 19-20 16-17 20-21 20-21 22-23 08-09 20-21 21-22 21-22 19-20 20-21 18-19 3.950.00019 LOCKOUT TAGOUT (LOTO) 2 26-27 23-24 27-28 27-28 29-30 15-16 27-28 30-31 28-29 26-27 27-28 27-28 3.950.00020 MANAGING SAFE WORK 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 31-03 05-08 03-06 31-03 05-08 7.950.00021 MATERIAL SAFETY DATA SHEETS (MSDS) 2 11-12 08-09 06-07 10-11 11-12 20-21 12-13 10-11 13-14 11-12 06-07 13-14 3.950.00022 MODERN SAFETY MANAGEMENT (MSM) 4 16-19 13-16 14-17 17-20 16-19 12-15 17-20 22-25 18-21 16-19 14-17 19-22 7.950.00023 OHSAS 180012007 AUDITOR 5 23-27 20-24 20-24 24-28 29-02 05-09 24-28 31-04 25-29 23-27 20-24 04-08 9.250.00024 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 30-31 29-30 03-04 23-24 19-20 03-04 15-16 04-05 02-03 29-30 28-29 3.950.000
25 PANITIA PEMBINA KESELAMATAN DANKESEHATAN KERJA (P2K3) 4 10-13 07-10 27-02 10-13 02-05 13-16 11-14 28-31 12-15 10-13 30-02 12-15 7.950.000
26 PENERAPAN PENGENDALIAN BISING TERPADUDITEMPAT KERJA 3 18-20 15-17 08-10 19-21 08-10 19-21 19-21 07-09 20-22 18-20 08-10 18-20 6.500.000
27 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 23-25 20-22 13-15 24-26 15-17 05-07 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000
28 PERLINDUNGAN LINGKUNGAN DANPENGELOLAAN LIMBAH B3 4 03-06 31-03 20-23 04-07 29-01 12-15 04-07 21-24 05-08 03-06 20-23 04-07 7.950.000
29 PERMIT TO WORK (PTW) 2 09-10 06-07 30-31 10-11 22-23 19-20 10-11 28-29 11-12 09-10 30-01 11-12 3.950.00030 Process Hazard Analysis (PHA) 3 16-18 13-15 01-03 17-19 02-04 07-09 17-19 31-02 18-20 16-18 01-03 20-22 5.950.00031 Process Hazard Analysis (PHA) for Facilitator 4 24-27 21-24 06-09 25-28 09-12 13-16 25-28 08-11 26-29 24-27 06-09 05-08 7.950.00032 Process Safety Management 3 02-04 30-01 15-17 03-05 17-19 19-21 03-05 14-16 04-06 02-04 15-17 27-29 5.950.00033 PROJECT HSE MANAGEMENT 3 11-13 08-10 22-24 11-13 22-24 05-07 12-14 23-25 13-15 11-13 22-24 13-15 6.500.000
22
34 RISK ASSESSMENT AND OPTIMAL RISKMANAGEMENT BASED ON ISO 31000 2 19-20 16-17 27-28 20-21 01-02 12-13 20-21 30-31 21-22 19-20 27-28 18-19 3.950.000
35 SAFETY AUDITS AND SITE INSPECTION 3 23-25 20-22 27-01 24-26 03-05 19-21 24-26 02-04 25-27 23-25 30-01 27-29 5.950.00036 SAFETY OfficeR DEVELOPMENT PROGRAM 5 02-06 30-03 06-10 03-07 08-12 05-09 03-07 07-11 04-08 02-06 06-10 04-08 9.250.00037 SAFETY TRAINING FOR THE LABORATORY 3 09-11 06-08 13-15 10-12 15-17 14-16 10-12 14-16 11-13 09-11 13-15 11-13 6.500.000
38 SELF CONTAINED BREATHINGAPPARATUS(SCBA) 1 16-16 13-13 20-20 17-17 22-22 19-19 17-17 21-21 18-18 16-16 20-20 20-20 2.950.000
39 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 23-27 20-24 27-31 24-28 29-02 05-09 24-28 31-04 25-29 23-27 27-01 04-08 9.250.00040 WORKING AT HEIGHT 2 12-13 09-10 06-07 12-13 08-09 20-21 13-14 07-08 14-15 12-13 06-07 14-15 3.950.00041 PENERAPAN HACCP 4 17-20 14-17 14-17 18-21 16-19 05-08 18-21 22-25 19-22 17-20 14-17 19-22 7.950.000
42IDENTIFICASI BAHAYA, PENILAIAN,PENGENDALIAN RESIKO (HIRAC) DAN ANALISABAHAYA DIPEKERJAAN (JSA)
4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 04-07 7.950.000
43 FIRE ALARMS & PROTECTION 4 17-20 14-17 06-09 18-21 16-19 06-09 18-21 22-25 19-22 17-20 06-09 19-22 7.950.00044 HAZARDOUS MATERIAL HANDLING 4 23-26 20-23 07-10 24-27 29-01 13-16 24-27 28-31 25-28 23-26 07-10 12-15 7.950.00045 INDUSTRIAL POLLUTION CONTROL 4 17-20 14-17 27-30 18-21 16-19 06-09 18-21 22-25 19-22 17-20 27-30 11-14 7.950.00046 JOB SAFETY ANALYSIS TRAINING 4 02-05 30-02 06-09 03-06 02-05 05-08 03-06 31-03 04-07 02-05 06-09 04-07 7.950.000
47 LINGKUNGAN KERJA YANG BERSIH DAN AMANPADA INDUSTRI KIMIA 4 09-12 06-09 13-16 10-13 08-11 12-15 10-13 07-10 11-14 09-12 13-16 12-15 7.950.000
48 Water Treatment 4 10-13 07-10 27-02 10-13 09-12 12-15 11-14 08-11 12-15 10-13 30-02 18-21 7.950.000
49 AMDAL ( ENVIRONMENTAL AND SOCIALIMPACT ASSESSMENT) FOR EXECUTIVE 4 16-19 13-16 27-02 17-20 15-18 05-08 17-20 21-24 18-21 16-19 30-02 11-14 7.950.000
50 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 02-05 30-02 27-02 03-06 08-11 12-15 03-06 07-10 04-07 02-05 30-02 18-21 7.950.000
51 SYSTEM SAFETY ENGINEERING ANDMANAGEMENT 4 16-19 13-16 13-16 17-20 29-01 13-16 17-20 28-31 18-21 16-19 13-16 11-14 7.950.000
52 BEHAVIOR BASED SAFETY (BBS) 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 18-20 6.500.00053 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 8.500.00054 HAZARDOUS MATERIALS SAFE HANDLING 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 11-14 8.500.000
55 HEALTH, SAFETY & ENVIRONMENT (HSE)ASPECTS IN LOGISTICS ACTIVITIES 4 09-12 06-09 27-02 10-13 08-11 06-09 10-13 31-03 11-14 09-12 30-02 19-22 8.500.000
56 Hot Works 3 18-20 15-17 06-08 19-21 22-24 19-21 19-21 07-09 20-22 18-20 06-08 27-29 6.500.00057 HSE MANAGEMENT SYSTEM 4 24-27 21-24 14-17 25-28 16-19 13-16 25-28 22-25 26-29 24-27 14-17 05-08 8.500.00058 HSE WORK PRACTICES AT CONFINED SPACE 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 14-16 06-08 04-06 22-24 27-29 6.500.000
59 JOB SAFETY ANALYSIS (JSA) ANALISAKESELAMATAN PEKERJAAN 3 11-13 08-10 29-31 10-12 31-02 19-21 12-14 28-30 13-15 11-13 29-01 13-15 6.500.000
60 MANAGING CONTRACTOR SAFETY 3 16-18 13-15 01-03 17-19 02-04 19-21 17-19 02-04 18-20 16-18 01-03 18-20 6.500.000
61 MODERN SAFETY AND LOSS CONTROLMANAGEMENT 4 23-26 20-23 07-10 24-27 09-12 05-08 24-27 08-11 25-28 23-26 07-10 04-07 8.500.000
62 OCCUPATIONAL HEALTH, SAFETY ANDENVIRONMENT (HSE) AUDITING 5 02-06 30-03 13-17 03-07 15-19 12-16 03-07 21-25 04-08 02-06 13-17 11-15 9.250.000
23
63 Occupational Health, Safety and Environment(HSE) on Paper and Pulp Industry 4 09-12 06-09 20-23 10-13 29-01 06-09 10-13 28-31 11-14 09-12 20-23 19-22 8.500.000
64 ONSHORE DRILLING SAFETY OPERATIONS HSEASPECTS IN ONSHORE DRILLING OPERATIONS 4 17-20 14-17 27-30 18-21 02-05 12-15 18-21 31-03 19-22 17-20 27-30 05-08 8.500.000
65ONSHORE DRILLING SAFETY OPERATIONS HSEASPECTS IN ONSHORE DRILLING OPERATIONSFOR MANAGERS AND SUPERINTENDENTS
3 25-27 22-24 27-01 26-28 22-24 19-21 26-28 14-16 27-29 25-27 30-01 27-29 6.500.000
66 PENCEGAHAN DAN PENANGGULANGANKEBAKARAN (FIRE PREVENTION & PROTECTION) 3 02-04 30-01 06-08 03-05 08-10 19-21 03-05 07-09 04-06 02-04 06-08 27-29 6.500.000
67 PRODUCTION SAFETY SYSTEM 5 09-13 06-10 13-17 17-21 15-19 05-09 10-14 21-25 11-15 09-13 13-17 11-15 8.500.000
68 PROFESSIONAL ACCIDENT INCIDENTINVESTIGATION 3 16-18 13-15 22-24 10-12 22-24 19-21 17-19 14-16 18-20 16-18 22-24 18-20 6.500.000
69 SAFETY MANAGEMENT FOR SUPERVISORS ANDMANAGERS 4 23-26 20-23 28-31 24-27 30-02 13-16 24-27 28-31 25-28 23-26 28-01 04-07 8.500.000
70 TRANSPORTATION SAFETY MANAGEMENTSYSTEM 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 01-04 05-08 03-06 31-03 11-14 8.500.000
71 WAREHOUSE SAFETY MANAGEMENT 4 09-12 06-09 07-10 10-13 09-12 12-15 10-13 08-11 11-14 09-12 07-10 19-22 8.500.00072 HIRADC 3 18-20 15-17 13-15 17-19 15-17 19-21 19-21 14-16 20-22 18-20 13-15 27-29 6.500.00073 PROCESS SAFETY MANAGEMENT 4 24-27 21-24 20-23 25-28 29-01 06-09 25-28 21-24 26-29 24-27 20-23 05-08 8.500.000
74 Chemical Hazard Safety in Mining andWorkplace 4 09-12 06-09 27-30 10-13 02-05 06-09 10-13 31-03 11-14 09-12 27-30 18-21 8.750.000
75 HAZARDOUS MATERIAL HANDLING 4 02-05 30-02 06-09 03-06 08-11 05-08 03-06 07-10 04-07 02-05 06-09 11-14 7.950.00076 HAZID (HAZARD IDENTIFICATON) 4 09-12 06-09 13-16 10-13 15-18 13-16 10-13 21-24 11-14 09-12 13-16 18-21 7.950.00077 HAZOPS(HAZARD AND OPERABILITY STUDIES) 4 16-19 13-16 20-23 17-20 29-01 06-09 17-20 28-31 18-21 16-19 20-23 05-08 7.950.00078 WASTE WATER TREATMENT & MANAGEMENT 4 16-19 13-16 06-09 17-20 29-01 06-09 17-20 28-31 18-21 16-19 06-09 19-22 7.950.00079 Water Treating and Chemicals 4 24-27 21-24 13-16 25-28 02-05 12-15 25-28 01-04 26-29 24-27 13-16 04-07 7.950.00080 PENGENDALIAN PENCEMARAN AIR 3 11-13 08-10 27-29 10-12 22-24 19-21 12-14 14-16 13-15 11-13 27-29 27-29 6.500.00081 PENGENDALIAN PENCEMARAN UDARA 3 18-20 15-17 01-03 19-21 22-24 19-21 19-21 14-16 20-22 18-20 01-03 27-29 6.500.00082 DUKUNGAN TEKNOLOGI BARU DAN MODERN 4 02-05 30-02 13-16 03-06 15-18 12-15 03-06 07-10 04-07 02-05 13-16 18-21 7.950.000
83 ISU PEMENUHAN KUALITAS DAN KEAMANANPANGAN 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 21-24 11-14 09-12 20-23 04-07 7.950.000
84 PEMENUHAN PERSYARATAN PERIZINAN 4 16-19 13-16 27-30 17-20 02-05 13-16 17-20 28-31 18-21 16-19 27-30 11-14 7.950.000
85 POTENSI DAN PERKEMBANGAN INDUSTRIPANGAN 4 23-26 20-23 27-02 24-27 08-11 06-09 24-27 31-03 25-28 23-26 30-02 19-22 7.950.000
86 HSE MANAGEMENT SYSTEM INTERNALAUDITOR 4 02-05 30-02 20-23 03-06 02-05 12-15 03-06 28-31 04-07 02-05 20-23 18-21 8.500.000
87 PRODUCTION SYSTEM SAFETY 4 23-26 20-23 27-02 24-27 02-05 13-16 24-27 28-31 25-28 23-26 30-02 18-21 7.950.00088 FIT FOR DUTY 2 09-10 06-07 06-07 10-11 22-23 19-20 10-11 14-15 11-12 09-10 06-07 27-28 3.950.00089 SURVEILANS KESEHATAN PEKERJA 2 16-17 13-14 13-14 17-18 23-24 20-21 17-18 15-16 18-19 16-17 13-14 28-29 3.950.00090 APLIKASI PROGRAM PERLINDUNGAN 2 23-24 20-21 20-21 24-25 22-23 19-20 24-25 14-15 25-26 23-24 20-21 27-28 4.500.000
24
PERNAFASAN91 FOOD HYGIENE SANITATION AND MONITORING 2 02-03 30-31 27-28 03-04 23-24 20-21 03-04 15-16 04-05 02-03 27-28 28-29 4.500.00092 HEARING CONSERVATION PROGRAM 2 11-12 08-09 27-28 12-13 22-23 19-20 12-13 14-15 13-14 11-12 30-31 27-28 4.500.00093 MENGELOLA KESEHATAN DI TEMPAT KERJA 2 18-19 15-16 08-09 19-20 23-24 20-21 19-20 15-16 20-21 18-19 08-09 28-29 4.500.000
94 CATERING SERVICE, HYGIENE & SANITATION(INCLUDING PERSONAL HYGIENE) 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 6.500.000
95 Penerapan Hazard Analysis Critical ControlPoint (HACCP) pada Pengelolaan Makanan 3 04-06 01-03 15-17 05-07 22-24 19-21 05-07 14-16 06-08 04-06 15-17 27-29 5.950.000
96 BEHAVIOR BASED SAFETY 2 23-24 20-21 27-28 24-25 22-23 19-20 24-25 14-15 25-26 23-24 27-28 27-28 4.500.00097 CSMS AWARENESS 2 02-03 30-31 27-28 03-04 02-03 20-21 03-04 31-01 04-05 02-03 30-31 28-29 4.500.00098 HSE LEADERSHIP 2 09-10 06-07 06-07 10-11 08-09 19-20 10-11 07-08 11-12 09-10 06-07 27-28 4.500.00099 INCIDENT INVESTIGATION 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 27-29 6.500.000
100 AMDAL (ENVIRONMENTAL IMPACTASSESMENT) FOR EXECUTIVES 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 6.500.000
101 EMERGENCY PREPAREDNESS 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6.500.000
102 ENVIRONMENTAL LEGISLATION (ANTICIPATINGCONFLICS) 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 27-29 6.500.000
103 ENVIRONMENTAL MONITORING KEY TOPOLUTION FREE 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6.500.000
104 HSE AUDIT TECHNIQUES 3 04-06 01-03 27-01 05-07 22-24 19-21 05-07 14-16 06-08 04-06 30-01 27-29 6.500.000
105 OCCUPATIONAL HEALTH, SAFETY ANDENVIRONMENTAL IN THE OIL & GAS INDUSTRY 3 11-13 08-10 08-10 11-13 22-24 19-21 12-14 14-16 13-15 11-13 08-10 27-29 6.500.000
106 WASTE HANDLING & TREATMENT IN THE OIL &GAS INDUSTRIES 3 18-20 15-17 15-17 19-21 22-24 19-21 19-21 14-16 20-22 18-20 15-17 27-29 6.500.000
107 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 6.950.000
108 HANDLING OF DANGEROUS GOODS IN AIRTRANSPORT 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000
109 PRODUCTION SAFETY SYSTEM 4 17-20 14-17 14-17 18-21 30-02 06-09 18-21 28-31 19-22 17-20 14-17 11-14 7.950.000
110 SAFETY INSTRUMENTED SYSTEM (SIS) ANDCONTROL 4 23-26 20-23 21-24 24-27 02-05 12-15 24-27 31-03 25-28 23-26 21-24 18-21 7.950.000
111 CATERING & ACCOMMODATIONMANAGEMENT (INCLUDING TABLE MANNER) 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000
112 WELDING SAFETY 2 02-03 30-31 02-03 03-04 02-03 12-13 03-04 28-29 04-05 02-03 02-03 27-28 3.950.000113 H2S AWARENESS 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 14-16 06-08 04-06 20-22 27-29 5.950.000
114Higiene Sanitasi Makanan Berbasis HACCP 2 09-10 06-07 27-28 10-11 29-30 05-06 10-11 28-29 11-12 09-10 27-28 11-12 4.500.000
MANAJEMEN1 STRESS & CONFLICT MANAGEMENT 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000
25
2 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 02-06 30-03 27-31 03-07 08-12 05-09 03-07 31-04 04-08 02-06 27-01 11-15 8.950.000
3 CORPORATE BUILIDNG DALAM MEMBANGUNKULTUR DAN ETIKA INTERNAL ORGANISASI 4 16-19 13-16 06-09 17-20 02-05 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.000
4 MODEL PEMBINAAN ANGGOTA YANGEXCELLENT DALAM DUNIA KERJA PERUSAHAAN 3 16-18 13-15 27-29 17-19 31-02 19-21 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000
5 Office COMMUNICATION AND BEHAVIOR ETHIC 3 04-06 01-03 06-08 05-07 08-10 19-21 05-07 07-09 06-08 04-06 06-08 04-06 5.950.000
6 CHANGE & CONFLICT MANAGEMENT ANDDEALING WITH DIFFICULT PEOPLE 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000
7 SPEED AND INNOVATION 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000
8 HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP 2 09-10 06-07 27-28 10-11 23-24 20-21 10-11 15-16 11-12 09-10 30-31 28-29 3.950.000
9 CONTEMPORARY COMMUNICATION &LEADERSHIP 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000
10 TALENT MANAGEMENT 4 03-06 31-03 28-31 04-07 29-01 05-08 04-07 28-31 05-08 03-06 28-01 05-08 7.950.000
11 COMMUNICATION, ASSERTIVENESS ANDCONFLICT MANAGEMENT 2 12-13 09-10 29-30 12-13 22-23 19-20 13-14 30-31 14-15 12-13 29-30 14-15 3.950.000
12 INNER SUCCESS TRAINING 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000
13PETROLEUM FINANCE, COST CONTROL &RESERVOIR MANAJEMEN (PetroleumEconomics)
4 24-27 21-24 06-09 25-28 30-02 05-08 25-28 22-25 26-29 24-27 06-09 19-22 8.500.000
14 ENGINEERING MATERIAL KNOWLEDGE FORWAREHOUSE PEOPLE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 6.500.000
15 CULTURE CHANGE FOR MAINTENANCE ANDRELIABILITY IMPROVEMENT 3 09-11 06-08 27-29 10-12 29-31 05-07 10-12 28-30 11-13 09-11 27-29 11-13 6.500.000
16 CATERING & ACCOMMODATIONMANAGEMENT (INCLUDING TABLE MANNER) 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000
17 LIFE CYCLE COSTING 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 6.500.00018 ACCOUNT RECEIVABLE MANAGEMENT 2 09-10 06-07 27-28 10-11 29-30 05-06 10-11 28-29 11-12 09-10 27-28 11-12 3.950.00019 Accounting Information Systems 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 5.950.00020 Asset Management 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000
21 BALANCED SCORECARD (BSC) CONCEPT ANDIMPLEMENTATION 2 02-03 30-31 13-14 03-04 15-16 07-08 03-04 14-15 04-05 02-03 13-14 04-05 3.950.000
22 BASIC ACCOUNTING 3 11-13 08-10 20-22 11-13 22-24 14-16 12-14 21-23 13-15 11-13 20-22 13-15 5.950.00023 BASIC AUDIT FINANCE 3 18-20 15-17 29-31 19-21 31-02 19-21 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000
24 BASIC KNOWLEDGE ABOUT FINANCIALMANAGEMENT 3 25-27 22-24 01-03 26-28 03-05 07-09 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000
25 BUDGET PLANNING, CONTROLLING &ANALYSING 3 04-06 01-03 08-10 05-07 10-12 12-14 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000
26 BUDGETING AND PROJECT COST CONTROL 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 11-13 5.950.00027 BUDGETING AND REPORTING 3 16-18 13-15 22-24 17-19 22-24 05-07 17-19 23-25 18-20 16-18 22-24 18-20 5.950.000
26
28 CASH MANAGEMENT 2 23-24 20-21 27-28 24-25 29-30 15-16 24-25 28-29 25-26 23-24 27-28 27-28 3.950.00029 CUSTOMER RELATION MANAGEMENT(CRM) 3 18-20 15-17 13-15 19-21 15-17 12-14 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00030 Export import 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 18-20 5.950.000
31 FINANCE FOR NON FINANCE FOR OIL & GASINDUSTRY 3 25-27 22-24 15-17 26-28 17-19 07-09 26-28 14-16 27-29 25-27 15-17 27-29 5.950.000
32 FINANCE FOR NON FINANCE MANAGER 3 04-06 01-03 22-24 05-07 22-24 12-14 05-07 23-25 06-08 04-06 22-24 06-08 5.950.00033 Financial Planning and Budgeting for Banking 3 11-13 08-10 29-31 11-13 31-02 19-21 12-14 28-30 13-15 11-13 29-01 13-15 5.950.000
34 Holistic CSR and Sustainable CommunityDevelopment 2 19-20 16-17 02-03 20-21 02-03 05-06 20-21 03-04 21-22 19-20 02-03 21-22 3.950.000
35 HR Based On Competency for Recruitment 2 02-03 30-31 13-14 03-04 15-16 19-20 03-04 14-15 04-05 02-03 13-14 04-05 3.950.00036 INTERMEDIATE ACCOUNTING 3 09-11 06-08 20-22 10-12 22-24 07-09 10-12 21-23 11-13 09-11 20-22 11-13 5.950.00037 Key Account Management 2 16-17 13-14 27-28 17-18 29-30 12-13 17-18 30-31 18-19 16-17 27-28 18-19 3.950.000
38 LAPORAN KEUANGAN PEMAHAMAN DANPENGGUNAANNYA 3 25-27 22-24 27-01 26-28 03-05 19-21 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000
39 Managing Training Function 3 04-06 01-03 08-10 05-07 10-12 05-07 05-07 09-11 06-08 04-06 08-10 06-08 5.950.00040 OUTSOURCING MANAGEMENT 3 11-13 08-10 15-17 11-13 17-19 14-16 12-14 14-16 13-15 11-13 15-17 13-15 5.950.000
41 PETTY CASH MANAGEMENT &ADMINISTRATION 2 18-19 15-16 23-24 19-20 22-23 19-20 19-20 24-25 20-21 18-19 23-24 20-21 3.950.000
42 PROBLEM SOLVING AND DECISION MAKING 4 02-05 30-02 28-03 03-06 02-05 12-15 03-06 01-04 04-07 02-05 31-03 04-07 7.950.000
43 PROFIT PLANNING COST - VOLUME - PROFITRELATIONSHIP ANALYSIS 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 11-13 5.950.000
44 Project Cost Estimation & Cost Control 3 18-20 15-17 13-15 19-21 15-17 05-07 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000
45 Standard Operational Procedure, Accounting &Finance 3 25-27 22-24 20-22 26-28 22-24 14-16 26-28 21-23 27-29 25-27 20-22 27-29 5.950.000
46 Total Quality Management 3 16-18 13-15 08-10 17-19 10-12 12-14 17-19 09-11 18-20 16-18 08-10 18-20 5.950.000
47 TRAINING EVALUATION AND MEASUREMENTMETHOD 2 23-24 20-21 16-17 24-25 18-19 20-21 24-25 14-15 25-26 23-24 16-17 27-28 3.950.000
48 TRAINING NEED ANALYSIS 2 02-03 30-31 23-24 03-04 22-23 05-06 03-04 24-25 04-05 02-03 23-24 04-05 3.950.000
49 Training untuk pegawai persiapan masapensiun (training pra-purnabakti) 5 09-13 06-10 27-31 17-21 29-02 12-16 10-14 31-04 11-15 09-13 27-01 11-15 8.950.000
50 ACCOUNT PAYABLE MANAGEMENT 2 19-20 16-17 01-02 10-11 04-05 19-20 20-21 28-29 21-22 19-20 01-02 21-22 3.950.00051 COST ACCOUNTING 3 25-27 22-24 06-08 26-28 08-10 07-09 26-28 07-09 27-29 25-27 06-08 27-29 5.950.00052 FIXED ASSET 3 04-06 01-03 13-15 05-07 15-17 12-14 05-07 14-16 06-08 04-06 13-15 06-08 5.950.00053 ANALISIS KEEKONOMISAN PROYEK 3 09-11 06-08 20-22 11-13 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.000
54 SISTEM INFORMASI MANAJEMEN DANAKUNTANSI 3 16-18 13-15 27-29 17-19 29-31 05-07 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000
55 COST VOLUME PROFIT ANALYSIS 3 23-25 20-22 01-03 24-26 02-04 14-16 24-26 31-02 25-27 23-25 01-03 27-29 5.950.000
56 INTERNATIONAL FINANCIAL REPORTINGSTANDARD (IFRS) 2 02-03 30-31 09-10 03-04 11-12 19-20 03-04 10-11 04-05 02-03 09-10 04-05 4.500.000
57 TREASURY AND CASH FLOW MANAGEMENT 2 12-13 09-10 16-17 10-11 18-19 08-09 13-14 14-15 14-15 12-13 16-17 14-15 4.500.000
27
58 ADVANCE SECURITY MANAGEMENT 4 09-12 06-09 13-16 10-13 29-01 05-08 10-13 21-24 11-14 09-12 13-16 11-14 7.950.00059 ANALISIS BEBAN KERJA 2 09-10 06-07 20-21 10-11 22-23 12-13 10-11 21-22 11-12 09-10 20-21 11-12 3.950.00060 ANALITYCAL HIERARCHY PROCESS 2 16-17 13-14 27-28 17-18 29-30 19-20 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000
61IMPLEMENTASI BALANCED SCORE CARD (BSC)SEBAGAI ALAT UKUR PERFORMANSIKARYAWAN
3 02-04 30-01 06-08 03-05 08-10 14-16 03-05 07-09 04-06 02-04 06-08 04-06 5.950.000
62 KESEIMBANGAN LINTAS PRODUKSI (LINEBALANCING) 2 11-12 08-09 13-14 12-13 15-16 20-21 12-13 14-15 13-14 11-12 13-14 13-14 3.950.000
63 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 18-19 15-16 22-23 19-20 23-24 07-08 19-20 23-24 20-21 18-19 22-23 20-21 3.950.00064 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 25-26 22-23 29-30 26-27 31-01 12-13 26-27 30-31 27-28 25-26 29-30 28-29 3.950.00065 MANAJEMEN LOGISTIK 3 04-06 01-03 01-03 05-07 03-05 19-21 05-07 02-04 06-08 04-06 01-03 06-08 5.950.00066 MANAJEMEN PENGEMBANGAN PRODUK 3 11-13 08-10 08-10 10-12 10-12 07-09 12-14 09-11 13-15 11-13 08-10 13-15 5.950.000
67 MANAJEMEN PERGUDANGAN DANPERSEDIAAN 2 19-20 16-17 15-16 20-21 17-18 14-15 20-21 15-16 21-22 19-20 15-16 21-22 3.950.000
68 MANAJEMEN PROYEK 3 25-27 22-24 22-24 26-28 22-24 19-21 26-28 23-25 27-29 25-27 22-24 27-29 5.950.00069 OPERATION MANAGEMENT 2 02-03 30-31 30-31 03-04 01-02 05-06 03-04 28-29 04-05 02-03 30-01 04-05 3.950.00070 PEMILIHAN PEMASOK (VENDOR) 2 09-10 06-07 27-28 12-13 02-03 15-16 10-11 31-01 11-12 09-10 30-31 11-12 3.950.00071 STANDARD OPERATING PROCEDURE 2 23-24 20-21 16-17 24-25 18-19 07-08 24-25 14-15 25-26 23-24 16-17 27-28 3.950.00072 STUDI KELAYAKAN PROYEK 2 04-05 01-02 20-21 05-06 22-23 12-13 05-06 21-22 06-07 04-05 20-21 06-07 3.950.000
73 TANGGUNG JAWAB SOSIAL PERUSAHAAN(CORPORATE SOCIAL RESPONSIBILITY) 2 11-12 08-09 27-28 10-11 29-30 20-21 12-13 30-31 13-14 11-12 27-28 13-14 3.950.000
74 VALUE ENGINEERING (REKAYASA NILAI) 2 18-19 15-16 01-02 19-20 04-05 08-09 19-20 02-03 20-21 18-19 01-02 20-21 3.950.00075 Sistem Informasi manajemen Pergudangan 2 25-26 22-23 08-09 26-27 10-11 14-15 26-27 09-10 27-28 25-26 08-09 28-29 395000076 Sistem Life Cycle Costing 2 05-06 02-03 13-14 06-07 15-16 19-20 06-07 15-16 07-08 05-06 13-14 07-08 395000077 ANALISIS KEPUTUSAN 2 12-13 09-10 22-23 12-13 23-24 05-06 13-14 23-24 14-15 12-13 22-23 14-15 3.950.00078 MANAJEMEN PRODUKSI 2 19-20 16-17 29-30 20-21 31-01 15-16 20-21 28-29 21-22 19-20 29-30 21-22 3.950.00079 METODE PENGAMBILAN KEPUTUSAN 2 26-27 23-24 02-03 27-28 02-03 20-21 27-28 03-04 28-29 26-27 02-03 27-28 3.950.00080 BUSINESS PROCESS REENGINEERING 2 16-17 13-14 27-28 17-18 23-24 20-21 17-18 15-16 18-19 16-17 27-28 28-29 3.950.000
81 LOGISTICS AND SUPPLY CHAIN MANAGEMENTCONCEPT, STRATEGY AND IMPLEMENTATION 4 02-05 30-02 06-09 03-06 08-11 05-08 03-06 07-10 04-07 02-05 06-09 11-14 7.950.000
82 MANAJEMEN STRATEGI 3 11-13 08-10 13-15 11-13 15-17 19-21 12-14 14-16 13-15 11-13 13-15 27-29 5.950.000
83 PRACTICAL PROJECT EVALUATION ANDFINANCING 2 18-19 15-16 22-23 19-20 23-24 19-20 19-20 21-22 20-21 18-19 22-23 18-19 3.950.000
84PROJECT MANAGEMENT WITH MICROSOFTPROJECT APPLICATION,Win QSB & MONTECARLO SIMULATION
3 25-27 22-24 29-31 26-28 29-31 19-21 26-28 28-30 27-29 25-27 29-01 27-29 5.950.000
85 RISK-BASED MANAGEMENT 3 04-06 01-03 01-03 05-07 02-04 19-21 05-07 31-02 06-08 04-06 01-03 04-06 5.950.00086 STRATEGI PENGEMBANGAN BISNIS 3 09-11 06-08 08-10 10-12 10-12 12-14 10-12 09-11 11-13 09-11 08-10 13-15 5.950.00087 SUPPLY CHAIN MANAGEMENT 3 18-20 15-17 15-17 19-21 17-19 19-21 19-21 14-16 20-22 18-20 15-17 20-22 5.950.00088 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 31-03 11-14 09-12 30-02 11-14 7.950.000
28
89 PROJECT MANAGEMENT 4 10-13 07-10 28-31 10-13 02-05 05-08 11-14 01-04 12-15 10-13 28-01 19-22 7.950.00090 ACCOUNT OfficeR 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.00091 AUDITING SDM 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.00092 BUSINESS STRATEGY FOR MANAGERS 3 25-27 22-24 27-01 26-28 02-04 05-07 26-28 31-02 27-29 25-27 30-01 27-29 5.950.00093 COSTUMER SERVICE(CS) 3 18-20 15-17 22-24 19-21 22-24 07-09 19-21 23-25 20-22 18-20 22-24 20-22 5.950.000
94 KEPEMIMPINAN (LEADERSHIP HIGH LEVELMANAGER) 5 09-13 06-10 06-10 17-21 08-12 05-09 10-14 07-11 11-15 09-13 06-10 11-15 8.950.000
95 KEPEMIMPINAN (LEADERSHIP LOWER LEVELMANAGER) 3 16-18 13-15 13-15 10-12 15-17 12-14 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000
96 KEPEMIMPINAN (LEADERSHIP MIDDLE LEVELMANAGER) 4 24-27 21-24 20-23 25-28 29-01 05-08 25-28 21-24 26-29 24-27 20-23 04-07 7.950.000
97 KEWIRANIAGAAN (SALESMANSHIP) 3 04-06 01-03 27-29 05-07 22-24 19-21 05-07 28-30 06-08 04-06 27-29 27-29 5.950.000
98 MANAJEMEN PERUBAHAN (CHANGEMANAGEMENT) 3 09-11 06-08 27-01 11-13 02-04 14-16 10-12 31-02 11-13 09-11 30-01 11-13 5.950.000
99 MANAJEMEN SDM (PERSONALIA ATAUTENAGA KERJA) 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 07-11 18-22 16-20 06-10 18-22 8.950.000
100MANAJEMEN PERILAKU DALAMORGANISASI(MANAGEMENT OFORGANIZATION BEHAVIOR)
4 23-26 20-23 14-17 24-27 16-19 12-15 24-27 22-25 25-28 23-26 14-17 05-08 7.950.000
101 MANAJEMEN STRATEGI 5 02-06 30-03 20-24 03-07 29-02 05-09 03-07 31-04 04-08 02-06 20-24 11-15 8.950.000102 MANUSIA DALAM KERJA (MEN IN WORK) 2 12-13 09-10 30-31 10-11 22-23 19-20 13-14 14-15 14-15 12-13 30-01 27-28 3.950.000
103 MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR(SUPERVISORY MANAGEMENT) 4 16-19 13-16 28-03 17-20 02-05 13-16 17-20 28-31 18-21 16-19 31-03 18-21 7.950.000
104PENGANTAR KONSEPMANAJEMEN(INTRODUCTION TOMANAGEMENT)
4 24-27 21-24 06-09 25-28 08-11 05-08 25-28 07-10 26-29 24-27 06-09 04-07 7.950.000
105 RAPAT YANG PRODUKTIF (PRODUCTIVEMEETING) 2 23-24 20-21 27-28 24-25 02-03 20-21 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000
106 TEAM DEVELOPMENT 3 25-27 22-24 29-31 26-28 29-31 05-07 26-28 29-31 27-29 25-27 29-01 27-29 5.950.000107 TEKNIK NEGOSIASI 3 02-04 30-01 01-03 03-05 03-05 14-16 03-05 02-04 04-06 02-04 01-03 04-06 5.950.000108 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 24-27 21-24 13-16 25-28 15-18 05-08 25-28 22-25 26-29 24-27 13-16 05-08 7.950.000109 GOOD CORPORATE GOVERNANCE 3 23-25 20-22 08-10 24-26 08-10 07-09 24-26 09-11 25-27 23-25 08-10 27-29 5.950.000110 HOW TO IMPROVE BUSINESS PERFORMANCE 3 04-06 01-03 15-17 05-07 17-19 14-16 05-07 14-16 06-08 04-06 15-17 04-06 5.950.000111 KEMADYAAN 5 16-20 13-17 27-31 17-21 29-02 05-09 17-21 31-04 18-22 16-20 27-01 18-22 8.500.000
112 MANAGEMENT PROJECT STRATEGI DANIMPLEMENTASI 4 24-27 21-24 27-02 25-28 02-05 12-15 25-28 28-31 26-29 24-27 30-02 05-08 7.950.000
113 MANAJEMEN OPERASI – PRODUKSI 3 02-04 30-01 06-08 03-05 10-12 19-21 03-05 07-09 04-06 02-04 06-08 27-29 5.950.000114 PERFORMANCE MANAGEMENT 3 11-13 08-10 13-15 11-13 15-17 05-07 12-14 14-16 13-15 11-13 13-15 11-13 5.950.000115 SIX SIGMA CHAMPIONS 4 16-19 13-16 21-24 17-20 29-01 13-16 17-20 22-25 18-21 16-19 21-24 18-21 7.950.000116 HANDLING CUSTOMER COMPLAINT 2 05-06 02-03 02-03 06-07 02-03 08-09 06-07 31-01 07-08 05-06 02-03 04-05 3.950.000
29
117 PELAYANAN PRIMA BAGI APARATURPEMERINTAHAN 3 09-11 06-08 08-10 10-12 08-10 12-14 10-12 09-11 11-13 09-11 08-10 13-15 5.950.000
118 MARKETING MANAGEMENT 4 24-27 21-24 20-23 25-28 30-02 13-16 25-28 28-31 26-29 24-27 20-23 05-08 7.950.000119 MANAJEMEN PERPUSTAKAAN 3 02-04 30-01 29-31 03-05 22-24 19-21 03-05 14-16 04-06 02-04 29-01 27-29 5.950.000120 COST CONTROL AND ESTIMATING 4 09-12 06-09 07-10 10-13 08-11 12-15 10-13 07-10 11-14 09-12 07-10 05-08 7.950.000121 FEASIBILITY STUDY & PROJECT EVALUATION 4 10-13 07-10 27-02 10-13 09-12 12-15 11-14 08-11 12-15 10-13 30-02 12-15 7.950.000122 MATERIAL MANAGEMENT 4 17-20 14-17 14-17 18-21 16-19 06-09 18-21 22-25 19-22 17-20 14-17 04-07 7.950.000123 Office MANAGEMENT AND FILING SYSTEM 4 09-12 06-09 27-02 10-13 08-11 12-15 10-13 07-10 11-14 09-12 30-02 05-08 7.950.000124 QA & QC Inspection Program 3 18-20 15-17 20-22 19-21 22-24 19-21 19-21 14-16 20-22 18-20 20-22 27-29 6.500.000125 CONTEMPORARY LEADERSHIP 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000126 CUSTOMER SERVICE IN CREDIT UNION 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 27-29 5.950.000127 KEWIRAUSAHAAN PRA PURNA BAKTI 4 23-26 20-23 07-10 24-27 09-12 12-15 24-27 08-11 25-28 23-26 07-10 11-14 8.500.000128 MOSSAD STRATEGY ON BUSINESS 3 25-27 22-24 27-01 26-28 03-05 19-21 26-28 02-04 27-29 25-27 30-01 27-29 5.950.000129 PERSUASIVE MARKETING 3 18-20 15-17 22-24 19-21 22-24 19-21 19-21 21-23 20-22 18-20 22-24 20-22 5.950.000130 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000131 MANAJEMEN PERPAJAKAN 3 02-04 30-01 27-01 03-05 22-24 19-21 03-05 14-16 04-06 02-04 30-01 27-29 5.950.000
132 INDONESIA TAX OUTLOOK 2015-2016 DAN TAXAMNESTY 2 09-10 06-07 06-07 10-11 22-23 19-20 10-11 14-15 11-12 09-10 06-07 27-28 4.500.000
133 CUSTOMER LOYALITY STRATEGY 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5950000134 Crisis Management 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.000
135 INTERVIEWING SKILL FOR RECRUITMENTPROMOTION 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000
136 QUALITY MANAGEMENT SYSTEM ISO 90012008 STANDARD (SISTEM MANAJEMEN MUTU) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000
137 SECURITY MANAGEMENT SYSTEM 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 5.950.000138 BASIC LEADERSHIP 3 25-27 22-24 13-15 26-28 22-24 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.000
139DINAMIKA SERIKAT PEKERJA DALAMPERUSAHAAN TERKAIT MENGHADAPI ERAGLOBALISASI
2 05-06 02-03 23-24 06-07 22-23 19-20 06-07 14-15 07-08 05-06 23-24 27-28 3.950.000
140 HOUR OF CHANGE MANAGEMENT 3 11-13 08-10 29-31 11-13 29-31 19-21 12-14 28-30 13-15 11-13 29-01 27-29 5.950.000141 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 18-20 5.950.000
142 HUKUM KEIMIGRASIAN TERKAIT PEMBERIANIJIN MEMPERKERJAKAN TENAGA KERJA ASING 3 23-25 20-22 08-10 24-26 08-10 19-21 24-26 07-09 25-27 23-25 08-10 27-29 5.950.000
143 LOBBYING AND SCHEDULLING 3 02-04 30-01 15-17 03-05 15-17 19-21 03-05 14-16 04-06 02-04 15-17 04-06 5.950.000144 MAN POWER PLANNING 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.000145 PROBLEM SOLVING & DECISION MAKING 3 16-18 13-15 27-29 17-19 31-02 05-07 17-19 29-31 18-20 16-18 27-29 20-22 5.950.000146 STRATEGI MEMBANGUN IMAGE CORPORATE 3 25-27 22-24 27-01 26-28 03-05 12-14 26-28 02-04 27-29 25-27 30-01 27-29 5.950.000147 TRANSFORMATION LEADERSHIP 3 04-06 01-03 06-08 05-07 10-12 19-21 05-07 09-11 06-08 04-06 06-08 06-08 5.950.000148 MANAJEMEN RESIKO 3 11-13 08-10 13-15 11-13 17-19 07-09 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000149 INTELLIGENT AND INVESTIGATION SKILLS 3 18-20 15-17 22-24 19-21 22-24 14-16 19-21 23-25 20-22 18-20 22-24 18-20 5.950.000
30
150 ASSET SECURITY MANAGEMENT 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000151 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 02-04 30-01 01-03 03-05 02-04 05-07 03-05 31-02 04-06 02-04 01-03 04-06 5.950.000152 MEASURING CUSTOMER SATISFACTION 3 09-11 06-08 08-10 10-12 08-10 12-14 10-12 07-09 11-13 09-11 08-10 11-13 5.950.000153 CREATIVE ACCOUNTING DAN DISCLOSURE 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 27-29 5.950.000154 PENCEGAHAN FRAUD DAN INVESTIGATIF 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.000155 ASSET MANAGEMENT 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 14-16 11-13 09-11 27-29 27-29 5.950.000156 ASSET MANAGEMENT BERBASIS ICT 3 16-18 13-15 27-01 17-19 02-04 19-21 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000
157 DOCUMENT CONTROL ( VERIFICATION ANDCLASSIFICATION ) 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000
158 DOCUMENT MANAGEMENT SYSTEM ANDELECTRONIC FILING 3 04-06 01-03 13-15 05-07 15-17 05-07 05-07 14-16 06-08 04-06 13-15 04-06 5.950.000
159 MANAGEMENT INFORMATION SYSTEM 3 11-13 08-10 22-24 11-13 22-24 12-14 12-14 21-23 13-15 11-13 22-24 11-13 5.950.000
160 MANAGEMENT OF DOCUMENT CONTROL &MODERN LIBRARY 3 18-20 15-17 29-31 19-21 29-31 19-21 19-21 28-30 20-22 18-20 29-01 20-22 5.950.000
161 Office MANAGEMENT AND ELECTRONIC FILINGSYSTEM 3 25-27 22-24 01-03 26-28 03-05 07-09 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000
162 Office MODERN FILING MANAGEMENT 3 02-04 30-01 08-10 03-05 10-12 14-16 03-05 09-11 04-06 02-04 08-10 06-08 5.950.000163 EFFECTIVE REPORT WRITING TECHNIQUE 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000164 Office AUTOMATION SKILL 3 16-18 13-15 20-22 17-19 22-24 05-07 17-19 23-25 18-20 16-18 20-22 18-20 5.950.000165 TATACARA PENYUSUNAN SILABUS DIKLAT 3 23-25 20-22 27-29 24-26 31-02 12-14 24-26 29-31 25-27 23-25 27-29 27-29 5.950.000
166 COMERCIAL CONTRACT DRAFTING ANDMANAGEMENT 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.000
167 CONTRACT MANAGEMENT 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 27-29 5.950.000168 Cost control 3 18-20 15-17 13-15 19-21 15-17 19-21 19-21 14-16 20-22 18-20 13-15 27-29 5.950.000169 Creative Problem Solving 4 24-27 21-24 21-24 25-28 29-01 05-08 25-28 21-24 26-29 24-27 21-24 04-07 7.950.000170 Effective Business Letters Writing 3 04-06 01-03 29-31 05-07 22-24 19-21 05-07 28-30 06-08 04-06 29-01 27-29 5.950.000
171 Effective Inventory Management and ModernWarehousing for Support Personal 4 10-13 07-10 28-03 10-13 02-05 13-16 11-14 01-04 12-15 10-13 31-03 11-14 7.950.000
172 Excellent Supervisory 4 02-05 30-02 20-23 03-06 30-02 06-09 03-06 22-25 04-07 02-05 20-23 05-08 7.950.000173 Integrated and Effective Logistic Management 4 17-20 14-17 27-02 18-21 02-05 12-15 18-21 31-03 19-22 17-20 30-02 18-21 7.950.000
174 Leadership Skill How Become a More EffectiveLeader 3 25-27 22-24 06-08 26-28 08-10 19-21 26-28 07-09 27-29 25-27 06-08 27-29 5.950.000
175 Modern Office Administration and FillingSystem 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 28-31 18-21 16-19 28-01 19-22 7.950.000
176 PROJECT MANAGEMENT DARI KONSEPTUALSAMPAI OPERASIONAL 4 02-05 30-02 07-10 03-06 09-12 13-16 03-06 08-11 04-07 02-05 07-10 05-08 7.950.000
177 PRODUCTION PLANNING AND INVENTORYCONTROL (PPIC) 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000
31
178TRAINING NEEDS ANALYSIS(TNA),TRAININGPLAN, TRAINING BUDGET AND TRAININGIMPACT EVALUATION(TIE)
3 04-06 01-03 27-01 05-07 03-05 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000
179 MANAJEMEN ARSIP DINAMIS DANPERPUSTAKAAN BERBASIS TI 2 23-24 20-21 27-28 24-25 02-03 19-20 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000
180 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 02-04 30-01 06-08 03-05 08-10 19-21 03-05 07-09 04-06 02-04 06-08 27-29 5.950.000181 KEWIRAUSAHAAN ENTERPRENEURSHIP 3 23-25 20-22 13-15 24-26 22-24 19-21 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000182 CAREER MANAGEMENT 3 23-25 20-22 06-08 24-26 08-10 12-14 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000
183 COMPREHENSIVE TRAINING MANAGEMENTSYSTEM 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 04-06 5.950.000
184 ESSENTIAL SKILL FOR SECRETARY ANDADMINISTRATION PROFESSIONAL 4 17-20 14-17 28-31 18-21 29-01 13-16 18-21 28-31 19-22 17-20 28-01 19-22 7.950.000
185 INTEGRATED HUMAN RESOURCESMANAGEMENT 3 16-18 13-15 22-24 17-19 22-24 19-21 17-19 23-25 18-20 16-18 22-24 18-20 5.950.000
186 LEADERSHIP AND EFFECTIVE SUPERVISORY 4 23-26 20-23 27-30 24-27 30-02 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.000
187 PELAKSANAAN DAN PERMASALAHANPENGADAAN TANAH PEMBEBASAN LAHAN 3 02-04 30-01 27-01 03-05 02-04 14-16 03-05 31-02 04-06 02-04 30-01 27-29 5.950.000
188 PENERAPAN EKONOMI TEKNIK DALAM PROSESPENGAMBILAN KEPUTUSAN BISNIS 4 10-13 07-10 06-09 10-13 08-11 06-09 11-14 07-10 12-15 10-13 06-09 11-14 7.950.000
189 PLANNING AND ORGANIZE TRAINING 3 18-20 15-17 13-15 19-21 15-17 19-21 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000190 TRAINING DEVELOPMENT MANAGEMENT 3 09-11 06-08 01-03 10-12 03-05 19-21 10-12 02-04 11-13 09-11 01-03 13-15 5.950.000191 Salesmanship Skills 2 16-17 13-14 09-10 17-18 11-12 15-16 17-18 10-11 18-19 16-17 09-10 18-19 4.500.000
192 BASIC RELATIONSHIP MANAGEMENT FORLEADERS 3 23-25 20-22 13-15 24-26 15-17 07-09 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000
193 COMPREHENSIVE MANAGERIAL SKILLS &LEADERSHIP TRAINING 3 18-20 15-17 01-03 19-21 03-05 05-07 19-21 02-04 20-22 18-20 01-03 20-22 5.950.000
194 DEVELOVING HIGH PERFORMANCE TEAMS 2 26-27 23-24 09-10 27-28 11-12 12-13 27-28 10-11 28-29 26-27 09-10 27-28 3.950.000195 EFFECTIVE EXECUTIVE SECRETARY 2 02-03 30-31 16-17 03-04 18-19 20-21 03-04 14-15 04-05 02-03 16-17 04-05 3.950.000196 FILLING SYSTEM FOR SECRETARY 3 16-18 13-15 29-31 17-19 29-31 14-16 17-19 28-30 18-20 16-18 29-01 18-20 5.950.000197 HR MANAGEMENT 2 04-05 01-02 06-07 05-06 08-09 05-06 05-06 07-08 06-07 04-05 06-07 06-07 3.950.000198 HR MANAGEMENT OF CHANGE 3 11-13 08-10 13-15 11-13 15-17 12-14 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000
199 INTEGRATED DOCUMENT & ELECTRONIC FILINGSYSTEM 2 19-20 16-17 20-21 20-21 22-23 19-20 20-21 21-22 21-22 19-20 20-21 21-22 3.950.000
200 INVENTORY MANAGEMENT AND COSTINVESTMENT RECOVERY 4 03-06 31-03 28-03 04-07 02-05 13-16 04-07 01-04 05-08 03-06 31-03 05-08 7.950.000
201 Logistic Management 2 09-10 06-07 08-09 10-11 10-11 20-21 10-11 09-10 11-12 09-10 08-09 11-12 3.950.000
202 LOGISTIC MANAGEMENT & SUPPLY CHAINMANAGEMENT 3 16-18 13-15 15-17 17-19 17-19 07-09 17-19 14-16 18-20 16-18 15-17 18-20 5.950.000
203 MAN POWER PLANNING 3 23-25 20-22 22-24 24-26 22-24 12-14 24-26 23-25 25-27 23-25 22-24 27-29 5.950.000204 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 4 02-05 30-02 28-31 03-06 29-01 05-08 03-06 28-31 04-07 02-05 28-01 04-07 7.950.000
32
205 MATERIAL MANAGEMENT FOR PROJECT 4 10-13 07-10 27-02 10-13 02-05 13-16 11-14 31-03 12-15 10-13 30-02 12-15 7.950.000
206 MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR 2 19-20 16-17 09-10 20-21 11-12 19-20 20-21 10-11 21-22 19-20 09-10 21-22 3.950.000
207 PLAN LAY OUT Office 3 25-27 22-24 13-15 26-28 15-17 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.000208 SERVICE EXCELLENT 3 04-06 01-03 20-22 05-07 22-24 07-09 05-07 21-23 06-08 04-06 20-22 06-08 5.950.000
209 SUPERVISORY LEADERSHIP AND DECISSIONMAKING 3 09-11 06-08 27-29 10-12 31-02 12-14 10-12 28-30 11-13 09-11 27-29 11-13 5.950.000
210 WAREHOUSE MANAGEMENT OPERATION ANDCONTROL 2 23-24 20-21 06-07 24-25 08-09 19-20 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000
211 Warehousing & Distribution Management 3 02-04 30-01 15-17 03-05 17-19 14-16 03-05 14-16 04-06 02-04 15-17 04-06 5.950.000212 TAX ACCOUNTING 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000
213 RESTITUSI PAJAK, PEMERIKSAAN PAJAK,KEBERATAN, BANDING DAN GUGATAN 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000
214 MANAJEMEN MUTU TERPADU 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 21-22 11-12 09-10 20-21 11-12 3.950.000
215 TOTAL QUALITY MANAGEMENT SERIESMANAJEMEN MUTU TERPADU 2 16-17 13-14 27-28 17-18 29-30 20-21 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000
216 BUILDING A TEAM 2 02-03 30-31 06-07 03-04 22-23 19-20 03-04 14-15 04-05 02-03 06-07 27-28 3.950.000217 CAREER PLANNING SYSTEM 2 09-10 06-07 13-14 10-11 23-24 20-21 10-11 15-16 11-12 09-10 13-14 28-29 3.950.000218 COMPENSATION SYSTEM DEVELOPMENT 2 23-24 20-21 27-28 24-25 29-30 20-21 24-25 28-29 25-26 23-24 27-28 28-29 3.950.000
219 COMPETENCY-BASED HUMAN RESOURCESMANAGEMENT 2 04-05 01-02 27-28 05-06 02-03 19-20 05-06 31-01 06-07 04-05 30-31 27-28 3.950.000
220 EFFECTIVE PERFORMANCE APPRAISAL 2 18-19 15-16 15-16 19-20 15-16 19-20 19-20 15-16 20-21 18-19 15-16 18-19 3.950.000221 EFFECTIVE TRAINING MANAGEMENT 3 25-27 22-24 22-24 26-28 22-24 12-14 26-28 21-23 27-29 25-27 22-24 27-29 5.950.000
222 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 2 05-06 02-03 29-30 06-07 31-01 20-21 06-07 30-31 07-08 05-06 29-30 04-05 3.950.000
223 JOB COMPETENCY PROFILING 2 12-13 09-10 01-02 10-11 04-05 05-06 13-14 02-03 14-15 12-13 01-02 13-14 3.950.000224 MEASURING TRAINING IMPACT 2 19-20 16-17 09-10 20-21 10-11 15-16 20-21 09-10 21-22 19-20 09-10 20-21 3.950.000225 PERFORMANCE BASED PAY 2 23-24 20-21 16-17 24-25 17-18 19-20 24-25 14-15 25-26 23-24 16-17 27-28 3.950.000
226STRATEGIC HUMAN RESOURCESMANAGEMENT FOR GLOBAL COMPETITIVEADVANTAGE
2 09-10 06-07 30-31 12-13 01-02 12-13 10-11 28-29 11-12 09-10 30-01 14-15 3.950.000
227 WORKLOAD ANALYSIS 2 16-17 13-14 02-03 17-18 02-03 20-21 17-18 03-04 18-19 16-17 02-03 21-22 3.950.000228 ACTIVITY BASED MANAGEMENT 2 23-24 20-21 06-07 24-25 08-09 05-06 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000
229NEGOTIATION IMPROVE YOUR NEGOTIATINGSKILLS AND MAKE YOU MORE EFFECTIVENEGOTIATOR
2 02-03 30-31 13-14 03-04 15-16 12-13 03-04 14-15 04-05 02-03 13-14 04-05 3.950.000
230 STRATEGIC MANAGEMENT 3 25-27 22-24 27-01 26-28 02-04 14-16 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000231 Supply Chain Management (SCM) 2 04-05 01-02 08-09 05-06 10-11 20-21 05-06 09-10 06-07 04-05 08-09 06-07 3.950.000232 Supplier Management 2 11-12 08-09 15-16 12-13 17-18 08-09 12-13 15-16 13-14 11-12 15-16 13-14 3.950.000233 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 09-12 06-09 27-30 10-13 15-18 05-08 10-13 07-10 11-14 09-12 27-30 11-14 7.950.000
33
234 ASPEK HUKUM DAN PENYELESAIAN KONFLIKPERTANAHAN 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.000
235 ANTI MONOPOLI 3 02-04 30-01 13-15 03-05 22-24 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000236 HUKUM KEPAILITAN 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 14-16 11-13 09-11 20-22 27-29 5.950.000
237 HUKUM KETENAGAKERJAAN & HUBUNGANINDUSTRIAL 3 16-18 13-15 27-29 17-19 22-24 19-21 17-19 28-30 18-20 16-18 27-29 27-29 5.950.000
238 HUKUM PERLINDUNGAN KONSUMEN DANPERSAINGAN BISNIS 3 25-27 22-24 27-01 26-28 02-04 19-21 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000
239 HUKUM TINDAK PIDANA KORUPSI 3 04-06 01-03 08-10 05-07 08-10 19-21 05-07 07-09 06-08 04-06 08-10 04-06 5.950.000
240 STRATEGI MENGANTISIPASI RISIKO TINDAKPIDANA (KORUPSI) 3 11-13 08-10 15-17 11-13 15-17 19-21 12-14 14-16 13-15 11-13 15-17 11-13 5.950.000
241 TINDAK PIDANA PENCUCIAN UANG DANPERANAN BANK UNTUK MENCEGAHNYA 3 18-20 15-17 22-24 19-21 22-24 05-07 19-21 21-23 20-22 18-20 22-24 18-20 5.950.000
242 TIPIKOR DALAM PENGELOLAAN KEUANGANPERUSAHAAN & PERBANKAN 3 23-25 20-22 29-31 24-26 29-31 12-14 24-26 29-31 25-27 23-25 29-01 27-29 5.950.000
243 BERITA ACARA PEMERIKSAAN 3 02-04 30-01 01-03 03-05 03-05 19-21 03-05 02-04 04-06 02-04 01-03 06-08 5.950.000244 MARITIME & SHIPPING LAW IN INDONESIA 3 09-11 06-08 06-08 10-12 10-12 07-09 10-12 09-11 11-13 09-11 06-08 13-15 5.950.000245 HUKUM DAN KONTRAK KONSTRUKSI 3 16-18 13-15 13-15 17-19 17-19 14-16 17-19 14-16 18-20 16-18 13-15 20-22 5.950.000246 BASIC OF SUPPLY CHAIN MANAGEMENT 2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000247 EFFECTIVE LINE BALANCING 2 23-24 20-21 13-14 24-25 15-16 05-06 24-25 14-15 25-26 23-24 13-14 27-28 3.950.000
248 FILLING MANAGEMENT FOR SECRETARY ANDADMINISTRATION STAFF 3 02-04 30-01 20-22 03-05 22-24 12-14 03-05 21-23 04-06 02-04 20-22 04-06 5.950.000
249INFORMATION SYSTEMS AND INFORMATIONTECHNOLOGIES FOR SUPPLY CHAINMANAGEMENT
3 09-11 06-08 27-29 10-12 29-31 19-21 10-12 28-30 11-13 09-11 27-29 11-13 5.950.000
250 ISO WAREHOUSING 2 25-26 22-23 08-09 26-27 10-11 15-16 26-27 09-10 27-28 25-26 08-09 28-29 3.950.000251 KOMPUTERISASI PERGUDANGAN 2 05-06 02-03 15-16 06-07 17-18 19-20 06-07 15-16 07-08 05-06 15-16 07-08 3.950.000
252 MAINTENANCE MANAGEMENT (FORMANUFACTURE AND OIL & GAS COMPANY) 3 11-13 08-10 22-24 11-13 22-24 05-07 12-14 23-25 13-15 11-13 22-24 13-15 6.500.000
253 MEASURING AND MANAGING COSTESCALATION IN PROJECT 2 26-27 23-24 02-03 27-28 02-03 20-21 27-28 03-04 28-29 26-27 02-03 27-28 3.950.000
254 MODERN WAREHOUSE DESIGN 2 02-03 30-31 09-10 03-04 11-12 08-09 03-04 10-11 04-05 02-03 09-10 04-05 3.950.000255 NEGOTIATION SKILL FOR PURCHASING STAFF 3 09-11 06-08 15-17 10-12 17-19 14-16 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000
256 OPERATING SYSTEMS TECHNOLOGIES ANDINSTALLATION PROCEDURES 3 18-20 15-17 20-22 19-21 22-24 19-21 19-21 21-23 20-22 18-20 20-22 20-22 5.950.000
257 PLANNING AND MANAGING INVENTORIES IN ASUPPLY CHAIN 3 23-25 20-22 27-29 24-26 29-31 05-07 24-26 28-30 25-27 23-25 27-29 27-29 5.950.000
258 PLANNING DEMAND AND SUPPLY IN A SUPPLYCHAIN 3 04-06 01-03 27-01 05-07 03-05 12-14 05-07 31-02 06-08 04-06 30-01 06-08 5.950.000
259 PROJECT EVALUATION AND FINANCING 3 16-18 13-15 13-15 17-19 15-17 07-09 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000
34
260 PROJECT MANAGEMENT USING MICROSOFTPROJECT 3 25-27 22-24 22-24 26-28 22-24 14-16 26-28 23-25 27-29 25-27 22-24 27-29 5.950.000
261 PROJECT MANAGEMENT(PM) WITHPRIMAVERA V6 3 02-04 30-01 29-31 03-05 31-02 19-21 03-05 29-31 04-06 02-04 29-01 04-06 5.950.000
262 RFID for WAREHOUSE 2 09-10 06-07 02-03 10-11 02-03 05-06 10-11 03-04 11-12 09-10 02-03 11-12 3.950.000
263 STRATEGI SISTEM INFORMASI KESEHATAN DIRUMAH SAKIT 3 18-20 15-17 08-10 19-21 10-12 12-14 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000
264 STUDI KELAYAKAN INVESTASI MENGGUNAKANAPLIKASI MICROSOFT EXCEL 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000
265 TRANSPORTATION AND FACILITY DECISIONS INA SUPPLY CHAIN 3 04-06 01-03 20-22 05-07 22-24 07-09 05-07 21-23 06-08 04-06 20-22 06-08 5.950.000
266 VENDOR MANAGED INVENTORY 2 11-12 08-09 27-28 12-13 29-30 15-16 12-13 28-29 13-14 11-12 27-28 13-14 3.950.000267 Workload Analysis 2 16-17 13-14 27-28 17-18 04-05 19-20 17-18 31-01 18-19 16-17 30-31 18-19 3.950.000268 ENTERPRISE RESOURCES PLANNING (ERP) 4 24-27 21-24 06-09 25-28 08-11 05-08 25-28 07-10 26-29 24-27 06-09 04-07 7950000269 ANALISA KEBUTUHAN BARANG PERSEDIAAN 3 02-04 30-01 13-15 03-05 15-17 12-14 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000270 PROJECT COST MANAGEMENT 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 23-25 13-15 11-13 22-24 13-15 5.950.000
271 PROJECT MANAGEMENT IN ENGINEERING,PROCUREMENT & CONSTRUCTION 3 18-20 15-17 29-31 19-21 31-02 07-09 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000
272 ADVANCED LAND TRANSPORT 3 23-25 20-22 01-03 24-26 02-04 14-16 24-26 02-04 25-27 23-25 01-03 27-29 5.950.000
273 HUMAN RESOURCE PLANNING ANDPRODUCTIVITY 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6500000
274 JOB DESCRIPTION ANALYSIS, DEVELOPMENT,AND DESIGN 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000
275 Project Management (3 Hr) 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6500000276 PROJECT MANAGEMENT (PM) (5Hr) 5 02-06 30-03 27-03 03-07 08-12 05-09 03-07 31-04 04-08 02-06 30-03 11-15 9500000277 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 11-13 08-10 06-08 11-13 02-04 19-21 12-14 07-09 13-15 11-13 06-08 27-29 6500000
278 STRATEGIC HUMAN RESOURCE MANAGEMENTAND ORGANIZATION DEVELOPMENT 3 18-20 15-17 15-17 19-21 15-17 19-21 19-21 14-16 20-22 18-20 15-17 18-20 6500000
279 Strategic Performance Management 3 25-27 22-24 22-24 26-28 22-24 19-21 26-28 21-23 27-29 25-27 22-24 27-29 6500000280 Strategic Planning 5 02-06 30-03 27-31 03-07 29-02 12-16 03-07 31-04 04-08 02-06 27-01 04-08 9500000281 CRYSTALL BALL 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 28-31 11-14 09-12 30-02 11-14 7.950.000
282DECISION MAKING BY USING STRATEGICTHINKING (PENDEKATAN SISTEMIK DAN NEW 7TOOLS APPROACH)
2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000
283 INOVASI DAN KREATIFITAS MENUJUORGANISASI PEMBELAJARAN 2 02-03 30-31 20-21 03-04 22-23 20-21 03-04 14-15 04-05 02-03 20-21 27-28 3.950.000
284 LEADERSHIP FOR MANAGER 4 10-13 07-10 27-30 10-13 29-01 06-09 11-14 28-31 12-15 10-13 27-30 12-15 7.950.000285 ADMINISTRASI KEPABEANAN 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 21-24 11-14 09-12 20-23 11-14 7.950.000
286 Custom facility, Shipping Documents & ExportImport Procedure 2 16-17 13-14 27-28 17-18 22-23 12-13 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000
35
287 EFFECTIVE PUBLIC RELATIONS SKILL 3 23-25 20-22 27-01 24-26 02-04 19-21 24-26 31-02 25-27 23-25 30-01 27-29 5.950.000288 Export-Import 3 02-04 30-01 06-08 03-05 08-10 07-09 03-05 07-09 04-06 02-04 06-08 04-06 5.950.000289 Export-Import and Incoterm 3 11-13 08-10 13-15 10-12 15-17 14-16 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000290 FREIGHT FORWARDING 2 18-19 15-16 23-24 19-20 23-24 19-20 19-20 24-25 20-21 18-19 23-24 20-21 3.950.000291 Incoterm 2010 2 26-27 23-24 29-30 27-28 01-02 05-06 27-28 30-31 28-29 26-27 29-30 27-28 3.950.000
292 PEMAHAMAN SHIPPING DOCUMENT &PROSEDUR KEPABEANAN 3 04-06 01-03 01-03 05-07 03-05 12-14 05-07 02-04 06-08 04-06 01-03 06-08 5.950.000
293 INFORMATION TECHNOLOGY PROJECTMANAGEMENT 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000
294 INVENTORY MANAGEMENT FOR RAWMATERIAL 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000
295 Office Automation 2 16-17 13-14 30-31 17-18 22-23 19-20 17-18 14-15 18-19 16-17 30-01 27-28 3.950.000296 PROBLEM SOLVING & DECISION MAKING 3 23-25 20-22 27-01 24-26 03-05 12-14 24-26 02-04 25-27 23-25 30-01 27-29 5.950.000
297 STRATEGIC PLANNING FOR INFORMATIONSYSTEMS 3 25-27 22-24 27-29 26-28 22-24 19-21 26-28 14-16 27-29 25-27 27-29 27-29 5.950.000
298 SUPPLY MARKET ANALYSIS 4 02-05 30-02 28-03 03-06 02-05 12-15 03-06 31-03 04-07 02-05 31-03 04-07 7.950.000299 TOTAL COST OF OWNERSHIP ANALYSIS 3 16-18 13-15 15-17 17-19 17-19 19-21 17-19 14-16 18-20 16-18 15-17 18-20 5.950.000300 CONTRACT MANAGEMENT 4 23-26 20-23 27-30 24-27 15-18 12-15 24-27 07-10 25-28 23-26 27-30 04-07 7.950.000301 PAJAK DAN PROSEDUR IMPLEMENTASI 4 02-05 30-02 27-02 03-06 29-01 05-08 03-06 21-24 04-07 02-05 30-02 11-14 7.950.000302 TAX AND FINANCIAL CONTROL 3 09-11 06-08 06-08 10-12 22-24 19-21 10-12 14-16 11-13 09-11 06-08 27-29 5.950.000303 Inventory Management Manufacturing Industry 4 24-27 21-24 13-16 25-28 02-05 13-16 25-28 28-31 26-29 24-27 13-16 12-15 7.950.000304 OPTIMIZATION FOR PRODUCTION SYSTEM 4 10-13 07-10 07-10 10-13 16-19 12-15 11-14 08-11 12-15 10-13 07-10 04-07 7.950.000305 Perancangan Tata Letak Pabrik 4 16-19 13-16 06-09 17-20 29-01 05-08 17-20 21-24 18-21 16-19 06-09 19-22 7.950.000306 PRODUCTION AND OPERATION MANAGEMENT 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 28-31 26-29 24-27 07-10 12-15 7.950.000307 PRODUCTION AND PLANNING CONTROL 4 03-06 31-03 14-17 04-07 09-12 06-09 04-07 01-04 05-08 03-06 14-17 19-22 7.950.000
308 Production Handling Separation andMeasurement 4 09-12 06-09 21-24 10-13 15-18 12-15 10-13 07-10 11-14 09-12 21-24 04-07 7.950.000
309 QUALITY CONTROL OF PRODUCT 4 24-27 21-24 27-30 25-28 02-05 13-16 25-28 28-31 26-29 24-27 27-30 04-07 7.950.000310 QUALITY SYSTEM ENGINEERING 4 03-06 31-03 28-03 04-07 09-12 06-09 04-07 01-04 05-08 03-06 31-03 11-14 7.950.000311 SYSTEM AND COST PRODUCTION 4 23-26 20-23 21-24 24-27 02-05 13-16 24-27 28-31 25-28 23-26 21-24 12-15 7.950.000312 ANALISA KEUANGAN 2 09-10 06-07 27-28 10-11 22-23 19-20 10-11 14-15 11-12 09-10 30-31 27-28 4.500.000
313 ANALISA KREDIT MODAL KERJA KONTRAKTORDAN STANDBY KREDIT 2 16-17 13-14 06-07 17-18 23-24 20-21 17-18 15-16 18-19 16-17 06-07 28-29 4.500.000
314 ANALISA PERKREDITAN 4 23-26 20-23 13-16 24-27 02-05 12-15 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000315 BASIC ACCOUNTING 4 02-05 30-02 20-23 03-06 08-11 05-08 03-06 31-03 04-07 02-05 20-23 04-07 7.950.000
316 PEMBERIAN KREDIT DENGAN PENDEKATANLAPORAN ARUS KAS_CASH FLOW 2 11-12 08-09 27-28 12-13 22-23 19-20 12-13 14-15 13-14 11-12 27-28 27-28 4.500.000
317 PENILAIAN KELAYAKAN PROYEK (FEASIBILITYSTUDY) 2 18-19 15-16 01-02 19-20 23-24 20-21 19-20 15-16 20-21 18-19 01-02 28-29 4.500.000
36
318 PENYELESAIAN KREDIT BERMASALAH 2 26-27 23-24 08-09 27-28 22-23 19-20 27-28 07-08 28-29 26-27 08-09 27-28 4.500.000319 PENYUSUNAN DAN ANALISA SCORING RATING 2 05-06 02-03 16-17 06-07 15-16 20-21 06-07 14-15 07-08 05-06 16-17 28-29 4.500.000
320 PENYUSUNAN PERATURAN INTERNALPERKREDITAN BANK 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 21-23 13-15 11-13 22-24 27-29 5.950.000
321 GOOD CORPORATE GOVERNANCE 3 18-20 15-17 29-31 19-21 29-31 19-21 19-21 28-30 20-22 18-20 29-01 27-29 5.950.000322 COST MANAGEMENT 3 16-18 13-15 27-01 17-19 22-24 19-21 17-19 14-16 18-20 16-18 30-01 27-29 5.950.000323 DASAR-DASAR PERBENDAHARAAN 4 23-26 20-23 06-09 24-27 29-01 05-08 24-27 21-24 25-28 23-26 06-09 18-21 7.950.000324 MANAJEMEN RISIKO INVESTASI 4 02-05 30-02 13-16 03-06 02-05 12-15 03-06 28-31 04-07 02-05 13-16 04-07 7.950.000
325 MANAJEMEN KEUANGAN UNTUK NONMANAJER KEUANGAN 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 14-15 11-12 09-10 20-21 27-28 3.950.000
326 STUDY KELAYAKAN BISNIS 2 16-17 13-14 27-28 17-18 23-24 20-21 17-18 15-16 18-19 16-17 27-28 28-29 3.950.000
327 CUSTOMER RELATIONSHIP MANAGEMENT(CRM) 4 09-12 06-09 27-30 10-13 02-05 12-15 10-13 28-31 11-14 09-12 27-30 11-14 7.950.000
328 FINANCING CONDOTEL HOTEL OPERATION 4 16-19 13-16 27-02 17-20 08-11 06-09 17-20 31-03 18-21 16-19 30-02 18-21 7.950.000
329 MANAGEMENT OF OUTSOURCE STAFFHOUSING AND CATERING SERVICES 4 24-27 21-24 06-09 25-28 15-18 13-16 25-28 07-10 26-29 24-27 06-09 05-08 7.950.000
330 Service Recovery Create Loyal Customers forLife 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 14-16 13-15 11-13 22-24 27-29 5.950.000
331 MEMBEDAH PROFESI SEKRETARISPROFESSIONAL 4 09-12 06-09 27-30 10-13 29-01 05-08 10-13 21-24 11-14 09-12 27-30 18-21 7.950.000
332PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWERPOINT)
2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.000
333 IT AUDIT PRACTICES 3 11-13 08-10 27-29 10-12 29-31 19-21 12-14 28-30 13-15 11-13 27-29 11-13 5.950.000334 IT HELPDESK 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.000
335 Change & conflict management and dealingwith difficult people 2 02-03 30-31 27-28 03-04 02-03 19-20 03-04 31-01 04-05 02-03 30-31 04-05 3.950.000
336 Strategic and Systematic Thinking 2 05-06 02-03 27-28 06-07 29-30 19-20 06-07 30-31 07-08 05-06 27-28 07-08 3.950.000337 THE LEADERSHIP CHALLENGE 2 12-13 09-10 27-28 12-13 02-03 08-09 13-14 31-01 14-15 12-13 30-31 14-15 3.950.000338 COACHING & CONSELING DI PERUSAHAAN 3 11-13 08-10 15-17 11-13 17-19 19-21 12-14 14-16 13-15 11-13 15-17 13-15 5.950.000339 COACHING AND COUNSELING ( MONITORING) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 28-30 11-13 09-11 30-01 27-29 5.950.000340 PERFORMANCE COACHING FOR MANAGER 2 02-03 30-31 27-28 03-04 22-23 19-20 03-04 14-15 04-05 02-03 27-28 27-28 3.950.000
341 EFFECTIVE PRESENTATION AND REPORTWRITING 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 20-22 5.950.000
342 Effective Time Management 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000
343 HANDLING CONFLICT AND COMPLAINTEFFECTIVELY 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 29-31 11-13 09-11 27-29 13-15 5.950.000
344 Strategic Time Management 3 18-20 15-17 20-22 19-21 22-24 07-09 19-21 23-25 20-22 18-20 20-22 18-20 5.950.000345 TIME MANAGEMENT 4 16-19 13-16 28-03 17-20 02-05 05-08 17-20 01-04 18-21 16-19 31-03 18-21 7.950.000346 HOW TO HANDLE CRITICISM AND COMPLAIN 2 23-24 20-21 06-07 24-25 08-09 15-16 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000
37
347 Pengendalian Dokumen ISO 9001 20154 02-05 30-02 27-02 03-06 02-05 05-08 03-06 31-03 04-07 02-05 30-02 04-07 7.950.000
348Akuntansi Perpajakan pada Badan Usaha MilikNegara (BUMN)
3 02-04 30-01 27-01 03-05 02-04 05-07 03-05 31-02 04-06 02-04 30-01 04-06 5.950.000
349Fraud Prevention, Detection And InvestigationAudit
3 09-11 06-08 06-08 10-12 08-10 12-14 10-12 07-09 11-13 09-11 06-08 11-13 5.950.000
350General Affairs Management 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000
351Hubungan Industrial Dan Tenaga Kerja 3 23-25 20-22 20-22 24-26 22-24 07-09 24-26 21-23 25-27 23-25 20-22 27-29 5.950.000
352ISO 26000 UNDERSTANDING ANDIMPLEMENTING CSR
3 04-06 01-03 27-29 05-07 29-31 14-16 05-07 28-30 06-08 04-06 27-29 06-08 5.950.000
353Legal Due Diligence (LC Perdagangan) 3 11-13 08-10 01-03 11-13 03-05 19-21 12-14 02-04 13-15 11-13 01-03 13-15 5.950.000
354Keterampilan Pengelolaan Hubungan IndustrialSampai Dengan Penyelesaian Perselisihan
3 18-20 15-17 08-10 19-21 10-12 05-07 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000
355Merger Dan Akuisisi 2 26-27 23-24 16-17 27-28 18-19 12-13 27-28 14-15 28-29 26-27 16-17 27-28 3.950.000
356Pengendalian Kinerja Bisnis Dan Aliran Kas 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 23-25 04-06 02-04 22-24 04-06 5.950.000
357Rekonsiliasi Fiskal & Penyusunan SPT TahunanPPH Badan
3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000
358Training Analysis Program 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN - PROCUREMENT
1 Prinsip dasar dan prosedur pengadaan barang& jasa 3 23-25 20-22 29-31 24-26 31-02 07-09 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000
2 HARGA PERKIRAAN SENDIRI (HPS) 2 23-24 20-21 27-28 24-25 02-03 05-06 24-25 31-01 25-26 23-24 30-31 27-28 3.950.0003 ASPEK TKDN 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 14-15 11-12 09-10 20-21 27-28 3.950.0004 INTEGRATED PROCUREMENT MANAGEMENT 2 23-24 20-21 27-28 24-25 22-23 19-20 24-25 14-15 25-26 23-24 30-31 27-28 3.950.000
5TEKNIK DAN METODE PENYUSUNAN HPS OE(HARGA PERKIRAAN SENDIRI) ATASPENGADAAN BARANG DAN JASA
3 23-25 20-22 22-24 24-26 22-24 07-09 24-26 23-25 25-27 23-25 22-24 27-29 5.950.000
6 BASIC PROCUREMENT & PURCHASING 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 5.950.0007 PROCUREMENT MANAGEMENT 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 21-22 11-12 09-10 20-21 11-12 3.950.000
38
8 PROCUREMENT STRATEGY 2 16-17 13-14 27-28 17-18 29-30 07-08 17-18 28-29 18-19 16-17 27-28 18-19 3.950.0009 PRINCIPLES OF PROCUREMENT MANAGEMENT 3 04-06 01-03 08-10 05-07 10-12 19-21 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000
10 E-PROCUREMENT (E-Proc) 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 5.950.00011 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 13-15 5.950.000
12 SUSTAINABLE PROCUREMENT IN RELATIONWITH QUALITY ASSURANCE 4 17-20 14-17 28-31 18-21 30-02 05-08 18-21 22-25 19-22 17-20 28-01 12-15 7.950.000
MOTIVASI DAN PERSONALDEVELOPMENT
1 Communication SKILL 2 12-13 09-10 06-07 12-13 08-09 08-09 13-14 07-08 14-15 12-13 06-07 14-15 3.950.0002 Dynamic Interpersonal & Comunication Skills 2 25-26 22-23 20-21 26-27 22-23 20-21 26-27 21-22 27-28 25-26 20-21 28-29 3.950.000
3 EFFECTIVE PRESENTATION & NEGOTIATIONSKILLS 2 04-05 01-02 29-30 05-06 31-01 05-06 05-06 30-31 06-07 04-05 29-30 06-07 3.950.000
4 Effective public speaking and businesspresentation 2 09-10 06-07 01-02 10-11 04-05 15-16 10-11 02-03 11-12 09-10 01-02 11-12 3.950.000
5 CARA MENYENANGKAN MEMBANGUN TIMIMPIAN 4 16-19 13-16 20-23 17-20 02-05 12-15 17-20 31-03 18-21 16-19 20-23 18-21 7.950.000
6 Constructive Anger Management 3 02-04 30-01 27-01 03-05 22-24 19-21 03-05 14-16 04-06 02-04 30-01 27-29 5.950.0007 Menjadi pribadi yang asertif 3 04-06 01-03 13-15 05-07 15-17 19-21 05-07 14-16 06-08 04-06 13-15 04-06 5.950.0008 Menjadi pribadi yang berpengaruh 3 11-13 08-10 22-24 11-13 22-24 19-21 12-14 21-23 13-15 11-13 22-24 11-13 5.950.0009 Motivating staff for excellent performance 3 23-25 20-22 01-03 24-26 02-04 19-21 24-26 02-04 25-27 23-25 01-03 27-29 5.950.000
10 BOOST YOUR CREATIVITY IN THINKING MINDMAP 2 09-10 06-07 27-28 10-11 22-23 19-20 10-11 14-15 11-12 09-10 27-28 27-28 3.950.000
11 BRAIN DEVELOPMENT FOR PERSONALASSISTANT & SECRETARY 3 16-18 13-15 27-01 17-19 02-04 19-21 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000
12 EFFECTIVE MASTER OF CEREMONY (MC) 3 11-13 08-10 20-22 11-13 22-24 05-07 12-14 21-23 13-15 11-13 20-22 11-13 5.950.00013 ACHIEVEMENT MOTIVATION 2 02-03 30-31 27-28 03-04 29-30 05-06 03-04 28-29 04-05 02-03 27-28 04-05 3.950.00014 Advance Negotiation Skill 3 09-11 06-08 27-01 10-12 02-04 12-14 10-12 31-02 11-13 09-11 30-01 11-13 5.950.00015 CHANGE YOUR MINDSET 4 03-06 31-03 20-23 04-07 30-02 13-16 04-07 21-24 05-08 03-06 20-23 05-08 7.950.00016 MC (MASTER OF CEREMONY) 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000
17 COMMUNICATION, ASSERTIVENESS ANDCONFLICT MANAGEMENT 2 12-13 09-10 29-30 12-13 22-23 19-20 13-14 30-31 14-15 12-13 29-30 14-15 3.950.000
18 INNER SUCCESS TRAINING 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.00019 TOTOK AURA MENUJU TOTAL BEAUTY 3 09-11 06-08 08-10 10-12 10-12 19-21 10-12 09-11 11-13 09-11 08-10 11-13 5.950.00020 SPEED AND INNOVATION 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000
21 HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP 2 09-10 06-07 27-28 10-11 23-24 20-21 10-11 15-16 11-12 09-10 30-31 28-29 3.950.000
22 CONTEMPORARY COMMUNICATION &LEADERSHIP 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000
39
23 TALENT MANAGEMENT 4 03-06 31-03 28-31 04-07 29-01 05-08 04-07 28-31 05-08 03-06 28-01 05-08 7.950.00024 WOMENS PRIME POWER, BEAUTY AND BRAIN 2 16-17 13-14 13-14 17-18 22-23 19-20 17-18 14-15 18-19 16-17 13-14 27-28 3.950.00025 ASSERTIVE TRAINING 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.00026 BRAIN POWER 3 16-18 13-15 27-29 17-19 29-31 19-21 17-19 28-30 18-20 16-18 27-29 18-20 5.950.000
27 CAPACITY BUILDING(MEMBANGUN KAPASITASDAN KEMAMPUAN) 3 04-06 01-03 08-10 05-07 08-10 12-14 05-07 07-09 06-08 04-06 08-10 04-06 5.950.000
28 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 23-25 20-22 29-31 24-26 31-02 14-16 24-26 29-31 25-27 23-25 29-01 27-29 5.950.000
29 INDIVIDUAL DEVELOPMENT (SERVICEPRODUCT) 3 02-04 30-01 01-03 03-05 03-05 19-21 03-05 02-04 04-06 02-04 01-03 06-08 5.950.000
30PENINGKATAN MOTIVASIBERPRESTASI(ACHIEVEMENT MOTIVATIONTRAINING)
3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000
31 PEOPLE SKILL 5 09-13 06-10 20-24 17-21 29-02 12-16 10-14 21-25 11-15 09-13 20-24 11-15 8.950.00032 PRIBADI EFEKTIF 2 19-20 16-17 27-28 12-13 23-24 19-20 20-21 28-29 21-22 19-20 27-28 21-22 3.950.000
33 SENSITIVITY TRAINING (TURNING POINT ATAUNEW BORN) 3 04-06 01-03 08-10 05-07 10-12 07-09 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000
34 TEKNIK PRESENTASI 2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.00035 TRAINING OF TRAINER 3 18-20 15-17 13-15 19-21 15-17 07-09 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00036 ACHIEVEMENT MOTIVATION 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 21-24 25-28 23-26 20-23 04-07 7.950.00037 EFFECTIVE COMMUNICATION SKILL 4 02-05 30-02 21-24 03-06 30-02 12-15 03-06 28-31 04-07 02-05 21-24 11-14 7.950.00038 EFFECTIVE PRESENTATION SKILLS 3 11-13 08-10 27-29 11-13 22-24 19-21 12-14 14-16 13-15 11-13 27-29 27-29 5.950.00039 EMOTIONAL QUETIENTS 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.00040 ICE BREAKING AND ENERGIZERS 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 13-15 5.950.00041 TRAINING OF TRAINER (TOT) 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 28-30 25-27 23-25 27-29 27-29 5.950.00042 Train the trainers 4 16-19 13-16 14-17 17-20 15-18 06-09 17-20 21-24 18-21 16-19 14-17 19-22 7.950.00043 ACHIEVEMENT MOTIVATION TRAINING 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.00044 CAPACITY BUILDING SOFT SKILL PROGRAM 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.00045 BREATHING ARTS FOR CREATIVE THINKING 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.00046 EFFECTIVE STRATEGY TO CONTROL STRESS 3 25-27 22-24 13-15 26-28 15-17 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.00047 ESQ FOR PEAK PERFORMANCE 3 11-13 08-10 29-31 11-13 29-31 19-21 12-14 28-30 13-15 11-13 29-01 27-29 5.950.00048 HUMAN PERFORMANCE AND LIMITATION 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 27-29 5.950.000
49 MENGGALI POTENSI DIRI UNTUK MENCAPAIPRIBADI YANG UNGGUL 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 24-25 11-12 09-10 20-21 27-28 3.950.000
50 PERFORMANCE, BEHAVIOR AND STRESSMANAGEMENT 3 11-13 08-10 13-15 11-13 15-17 19-21 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000
51 MANAGING PRESSURE FOR PEAKPERFORMANCE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5950000
52 Stress Management Strategies 3 25-27 22-24 27-29 26-28 31-02 12-14 26-28 28-30 27-29 25-27 27-29 27-29 5.950.000
53 HYPNO-PRESENTATION SKILL UNLOCKINGYOUR POTENTIAL POWER 3 25-27 22-24 01-03 26-28 03-05 19-21 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000
40
54 ICE BREAKER FOR EFFECTIVE TRAININGDELIVERY 3 04-06 01-03 08-10 05-07 10-12 07-09 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000
55 IMPROVING PERSONAL SKILL FOR SECRETARY &ADMINISTRATIVE ASSISTANT 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000
56 SEVEN HABITS WITH NLP APPROACH 3 25-27 22-24 20-22 26-28 22-24 12-14 26-28 21-23 27-29 25-27 20-22 27-29 5.950.000
57 EMOTIONAL INTELLIGENCE FOR MENTALATTITUDE 3 09-11 06-08 22-24 10-12 22-24 07-09 10-12 23-25 11-13 09-11 22-24 11-13 5.950.000
58 FINDING YOUR ESSENTIAL SELF 3 23-25 20-22 27-01 24-26 02-04 19-21 24-26 31-02 25-27 23-25 30-01 27-29 5.950.00059 INTERPERSONAL COMMUNICATION SKILL 2 26-27 23-24 27-28 27-28 01-02 07-08 27-28 30-31 28-29 26-27 27-28 27-28 3.950.000
60 DYNAMIC INTERPERSONAL &COMMUNICATION SKILLS 2 11-12 08-09 08-09 12-13 08-09 20-21 12-13 07-08 13-14 11-12 08-09 11-12 3.950.000
61 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 30-31 20-21 03-04 22-23 07-08 03-04 24-25 04-05 02-03 20-21 06-07 3.950.000
62 PERSONALITY DEVELOPMENT BERBASISEMOTIONAL AND SPRITUAL QUETIENTS 4 23-26 20-23 06-09 24-27 08-11 05-08 24-27 31-03 25-28 23-26 06-09 11-14 7.950.000
63 STRESS & CONFLICT MANAGEMENT 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 21-23 18-20 16-18 20-22 18-20 5.950.00064 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 02-06 30-03 27-31 03-07 08-12 05-09 03-07 31-04 04-08 02-06 27-01 11-15 8.950.000
65 CORPORATE BUILIDNG DALAM MEMBANGUNKULTUR DAN ETIKA INTERNAL ORGANISASI 4 16-19 13-16 06-09 17-20 02-05 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.000
66 MODEL PEMBINAAN ANGGOTA YANGEXCELLENT DALAM DUNIA KERJA PERUSAHAAN 3 16-18 13-15 27-29 17-19 31-02 19-21 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000
67 Office COMMUNICATION AND BEHAVIOR ETHIC 3 04-06 01-03 06-08 05-07 08-10 19-21 05-07 07-09 06-08 04-06 06-08 04-06 5.950.000
68 CHANGE & CONFLICT MANAGEMENT ANDDEALING WITH DIFFICULT PEOPLE 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000
69 COLLABORATION MS Office AND EFFECTIVEPRESENTATION 3 04-06 01-03 27-01 05-07 02-04 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000
70 Change & conflict management and dealingwith difficult people 2 02-03 30-31 27-28 03-04 02-03 19-20 03-04 31-01 04-05 02-03 30-31 04-05 3.950.000
71 Strategic and Systematic Thinking 2 05-06 02-03 27-28 06-07 29-30 19-20 06-07 30-31 07-08 05-06 27-28 07-08 3.950.00072 THE LEADERSHIP CHALLENGE 2 12-13 09-10 27-28 12-13 02-03 08-09 13-14 31-01 14-15 12-13 30-31 14-15 3.950.00073 COACHING & CONSELING DI PERUSAHAAN 3 11-13 08-10 15-17 11-13 17-19 19-21 12-14 14-16 13-15 11-13 15-17 13-15 5.950.00074 COACHING AND COUNSELING ( MONITORING) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 28-30 11-13 09-11 30-01 27-29 5.950.00075 PERFORMANCE COACHING FOR MANAGER 2 02-03 30-31 27-28 03-04 22-23 19-20 03-04 14-15 04-05 02-03 27-28 27-28 3.950.000
76 EFFECTIVE PRESENTATION AND REPORTWRITING 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 20-22 5.950.000
77 Effective Time Management 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000
78 HANDLING CONFLICT AND COMPLAINTEFFECTIVELY 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 29-31 11-13 09-11 27-29 13-15 5.950.000
79 Strategic Time Management 3 18-20 15-17 20-22 19-21 22-24 07-09 19-21 23-25 20-22 18-20 20-22 18-20 5.950.00080 TIME MANAGEMENT 4 16-19 13-16 28-03 17-20 02-05 05-08 17-20 01-04 18-21 16-19 31-03 18-21 7.950.00081 HOW TO HANDLE CRITICISM AND COMPLAIN 2 23-24 20-21 06-07 24-25 08-09 15-16 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000
41
Keterangan :
Seluruh judul training yang ada, apabila ada permintaan dapat kami selenggarakan sebagai Inhouse Training Jadwal terupdate dapat dilihat di website kami di http://www.mairodi-training.com atau di www.pelatihan-indonesia.com atau di www.training-bandung.com Venue Training : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci, dll), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll Untuk korespondensi bisa dikirimkan via email : [email protected] atau [email protected]