Customers
Rio TintoABB Australia
Rockwell AutomationAdani
Schneider ElectricQGC
Origin EnergyAnglo Coal
John HollandsMonadelphous
Thiess ColesBMA
Gold Coast City CouncilBechtel
SanitariumArnott’s BiscuitsCargill Beef
Projects
‐ Treatment Plant Upgrades‐ Pump Station Upgrades‐Water Gathering Ponds‐ De‐Watering Systems‐ RTU Changeovers
‐ Remote Communication Systems
‐Water Monitoring Systems‐ Diesel Driven Regional Ponds
Spiral SystemsSafety Systems
HV KiosksShiploader Upgrades
Dam UpgradesFully Packaged SwitchroomsAutomated Line upgrades
Solar Systems
PTAS Capabilities
‐ Project Management‐ Packaged Designs
Engineering Design Software & Studies
‐ Quality/Document Control‐ Complete
Integration/Software Development
‐ SCADA/HMI Interface‐Manufacturing & Assembly
‐ Factory Testing Crew‐ Installation Crew
‐ Site Commissioning Crew‐ Operational onsite Training
– Engineering– Single Line Diagrams, Schematics– General Arrangements, Termination
Diagrams, Block Diagrams– Cable Schedules– Project Management– System Integration– SCADA Packages
Company Capabilities
–Manufacturing– Switchboard & Motor Control Centre – DB’s, LCS’s, JB’s, PLC’s, VSD’s, UPS Systems– Custom Busbar Fabrication– Internal/External Labelling – Complete Installations– Switchroom Supply/Fit out & Delivery to Site
PTAS can provide upto 7000A 100kA Form 4b type tested, arc fault containment switchboards‐ Cubic Modular System (Fixed, Demountable &
Withdrawable) in mild steel‐ B&R Signature (Fixed & Demountable) in mild steel‐ Custom type tested switchboards (Fixed &
Demountable) in mild steel, aluminium & stainless steel
Switchboard/MCC Capabilities
LV, MV, HV CapabilitiesPTAS Can Supply LV, MV & HV Solutions
Transformer – Schneider / ABB / Tyree / NHPHV Switchgear ‐ Rockwell / ABB / Schneider / Toshiba / NHPMV Switchgear– Rockwell / ABB / Schneider / Toshiba / NHP
6.6kV, 11kV & 33kV Solutions
Manufacturing Capabilities
‐1100m2 Undercover Workshop Area‐Storage Area/Job Shelves‐ Busbar fabrication machinery ‐ Identification labelling machinery‐ Cable/wire labelling machinery‐ Automatic strip/crimp machinery‐ Automatic duct/din cutting machinery‐Welding Machinery‐Milling Machine‐Testing Equipment
Project Management/Engineering Capabilities
‐ Fully Packaged Electrical Design Packages ‐ SLD’s, GA’s, Schematics, Termination Diagrams, Block Diagrams, Bill of materials
‐ Power systems analysis ‐ Load flow calculations, Harmonic Studies, Arc Flash, Short Circuit, Earthing Studies, Motor Protection, Curve diagrams, Energy Management, System Optimization
‐ In house REPQ sign‐off/verification
‐ Experienced Project Management‐ Quality Assurance Manager‐ Programming/SCADA Packages – RSLogix, Siemens, Modicon,
RS View, Citec WinCC, IFix, Mitsubishi, Digital
Installation Capabilities PT Automation Solutions have specially trained & certified installation team that are certified to work on open cut mining & coal seam gas projects as well as building sites throughout Australia and around the globe
‐ X2 20 foot containers fully kitted out work benches and storage‐ X2 Customised Trailers fully kitted out with work benches and storage‐ Cable pulling systems ‐ Jacks/Lifting equipment‐ Cable labelling machinery
Recently completed installation projects
‐ Coal Seam Gas – X18 sites including Ruby Jo, David, Orana 1
‐ Mining ‐ Acland Coal Mine, Mount Isa Mine, Middlemount Mine, Whitehaven Coal
‐ Food & Beverage ‐ Smith snack foods, Arnott’s Biscuits, Cargill Beef, Castlemaine XXXX, Top‐cuts,
‐ Infrastructure – Gold Coast Council, Logan Council, Seq Water, Wet N Wild, Seaworld, Visy, Hinze Dam,
In House Bus Bar Fabrication
PT Automation Solutions have experienced bus bar fabricators in house for all cutting/bending/punching all copper bars upto a capacity of 7000Amps in house.‐MCC’s, Feeder Panels‐Metering, MCCB Tags, Earthing‐ACB section’s
PTAS provided Fully Packaged Modular Switchrooms
Adani Abbot Point SL1LV Switchroom
Boyne Smelters CBF4 LV&HV Switchroom
GD Pipeline (QGC) – Water Monitoring System
‐ X15 Remote DC Operated (Solar) System
‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning
Custom Outdoor Enclosure IP66PLC SectionSolar SystemBattery Back‐up (5 days)Distribution SectionHMI
Rockwell Automation (WICETS Stage 1 Upgrade)
‐ 400+ Communication Panels, LCS’s, PLC Panels, Console Panels IP66
‐PTAS Scope ‐ Design, Manufacture, Factory Acceptance Test, Deliver to site
PLC PanelsLocal Control StationsConsole PanelsJunction BoxesDistribution PanelsCommunication Panels
Rio Tinto – Boyne Smelter CBF4 Project– 26m Transportable Modular Switchroom
• Separate LV & HV Switchrooms• 3500A Unlimited Arc Containment SWB • 160 Fully Withdrawable Motor Starters• 40 Feeders• 3 Incoming ACB’s with Bus Tie• Vamp Arc Flash Detection System• 22 Wall Mounted VSD’s• PLC & Safety Panels• UPS System• 3 x 2000KVA 11KV/415V Transformers• 50m of VASS Weather Proof Bus Duct• Fault Study & Protection Scheme Design• All Engineering by PTAS
Rio Tinto – Boyne Smelter CBF4 Project
Wier Minerals (QGC) – Water Gathering Ponds; Orana 1, Ruby Jo & David
‐ PTAS Scope ‐ Design, Manufacture, Integrate, Factory Acceptance Test, Deliver to site, Installation & Commissioning
‐ Fully Packaged Switchroom‐ Type Tested Form 3b Motor Control Centre IP54‐ Packaged Kiosk 6.6kV‐ 350kW VSD Cabinets‐ Communication Enclosures/Distribution Enclosure
Cassette Enclosure per pump‐ PLC Enclosure/Marshalling Enclosure‐ UPS System‐ Marashel Pluggable Systems
Wier Minerals (QGC) – Water Gathering Ponds; Orana 1, Ruby Jo & David
Gold Coast Council – Merrimac Treatment Plant & Various other sites
‐ X2 Type Tested Form 3b Motor Control Centre IP54‐ 70+ Motor power/control cubicles supplied
‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning
Incoming SectionMeteringVariable Speed DrivesSoft StartersDOLsUPS System PLC SectionDistribution Section
Gold Coast Council – Merrimac Treatment Plant & Various other sites
‐ X12 Pump Station Switchboards IP66
‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning
Incoming SectionMeteringVariable Speed DrivesSoft StartersDOLsDistribution SectionRTU System
Xstrata Technologies (Mipac)
‐ X25 DCS Cabinets (Siemens PLC)
‐PTAS Scope ‐ Design, Manufacture, Factory Acceptance Test, Crate & deliver to Brisbane Port,
DCS Cabinets (X3 combinations)PLC SectionDistribution SectionCommunication SectionControl SectionMarshalling Section
SEQ Water – Stones Road Pump Station
‐ Type Tested Form 3b Motor Control Centre IP54
‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning
Incoming SectionMeteringSoft StartersDOLsUPS System Marshalling SectionDistribution Section
Hirsch – Pallet Manufacturing Machine
• Motor Control Centre• Control Panels• HMI Operator Panel• PLC Section• 21 Servo Drives• Complete Turn Key Solution• Installation/Programming done by PTAS
in Austria
Hirsch – Pallet Manufacturing Machine
John Holland – Abbott Point SL2X40 ‐ IP66 Stainless Steel Panels• Shiploader• Marine Works• Distribution Panels, Control Panels, Junction Box’s
John Holland – Abbott Point SL2
Gladstone Ports – Stockpile 22X35 ‐ Stainless Steel IP66 Rated Boards• Type Tested Limited Arc Containment MCC’s• PLC Panels• Control Panels• Distribution Boards• Local Control Stations
Gladstone Ports – Stockpile 22
Anglo American Coal – German Creek Mine MCC
16 metre Back to Back Type Tested Cubic MCC• 2000A BusBar• 2 Incomers & Bus Tie Section• 70 Intelligent Motor Starters & Feeders on Device Net.
• ABB Arc Flash Detection System• ABB Control Gear, MCCB’s & ACB’s.• Dead Easy Safety System• Full Design & Software by PTAS• Completed in 8 Weeks from Order (including design)
Anglo American Coal – German Creek Mine MCC
Origin Energy/APLNG Spring Gully De‐Watering MCC
• IP 66 Solution –external shell mounted over the Switchboard with Ventilation
• Complete Platform and Switchboard fitted out at PTAS Workshop
• Demountable and Withdrawable Switchboard• PLC Section, UPS System, 6 off DOL’s
(Withdrawable)• Distribution Section, Metering & 3 off 22kW VSD’s
Origin Energy/APLNG Spring Gully De‐Watering MCC
Xstrata Zinc (Glencore) Mount Isa Mines
• Various VSD Panels (5.5kW – 630kW), Communication Panels, Local Control Stations & Control Panels
• PT Automation Solutions have built 150+ Enclosures for Xstrata Zinc Mount Isa & George Fisher Mines
Xstrata Zinc (Glencore) Mount Isa Mines
Adani Abbott Point SL1 • 10.5 Metre Transportable Modular Switchroom• Motor Control Centre• Distribution Boards, PLC Panel, UPS System• Inter‐Connections of Switchroom• 50 + PLC Cabinets• FAT Testing & Delivery to Abbot Point
Adani Abbott Point SL1
Sage Automation (Origin Energy) Re‐Injection Skid• Form 3b Type Tested (External Shell IP66)• IP 66 Solution ‐ Achieved by custom external shell bolted
onto the Cubic System• 800A Interlock • Pluggable Feeder System• Distribution Section• Feeder Section’s• Marechal Plug System • PTAS completed two Re‐Injection Skid’s for separate
Projects