35

PTAS Presentation 2015

Embed Size (px)

Citation preview

Page 1: PTAS Presentation 2015
Page 2: PTAS Presentation 2015

Customers

Rio TintoABB Australia

Rockwell AutomationAdani

Schneider ElectricQGC

Origin EnergyAnglo Coal

John HollandsMonadelphous

Thiess ColesBMA

Gold Coast City CouncilBechtel

SanitariumArnott’s BiscuitsCargill Beef

Projects

‐ Treatment Plant Upgrades‐ Pump Station Upgrades‐Water Gathering Ponds‐ De‐Watering Systems‐ RTU Changeovers

‐ Remote Communication Systems

‐Water Monitoring Systems‐ Diesel Driven Regional Ponds

Spiral SystemsSafety Systems

HV KiosksShiploader Upgrades

Dam UpgradesFully Packaged SwitchroomsAutomated Line upgrades

Solar Systems

PTAS Capabilities

‐ Project Management‐ Packaged Designs

Engineering Design Software & Studies

‐ Quality/Document Control‐ Complete 

Integration/Software     Development

‐ SCADA/HMI Interface‐Manufacturing & Assembly 

‐ Factory Testing Crew‐ Installation Crew

‐ Site Commissioning Crew‐ Operational onsite Training

Page 3: PTAS Presentation 2015

– Engineering– Single Line Diagrams, Schematics– General Arrangements, Termination 

Diagrams, Block Diagrams– Cable Schedules– Project Management– System Integration– SCADA Packages

Company Capabilities

–Manufacturing– Switchboard & Motor Control Centre – DB’s, LCS’s, JB’s, PLC’s, VSD’s, UPS Systems– Custom Busbar Fabrication– Internal/External Labelling – Complete Installations– Switchroom Supply/Fit out & Delivery to Site

Page 4: PTAS Presentation 2015

PTAS can provide upto 7000A 100kA Form 4b type tested, arc fault containment switchboards‐ Cubic Modular System (Fixed, Demountable & 

Withdrawable) in mild steel‐ B&R Signature (Fixed & Demountable) in mild steel‐ Custom type tested switchboards (Fixed & 

Demountable) in mild steel, aluminium & stainless steel

Switchboard/MCC Capabilities 

Page 5: PTAS Presentation 2015

LV, MV, HV CapabilitiesPTAS Can Supply LV, MV & HV Solutions 

Transformer – Schneider / ABB / Tyree / NHPHV Switchgear ‐ Rockwell / ABB / Schneider / Toshiba / NHPMV Switchgear– Rockwell / ABB / Schneider / Toshiba / NHP

6.6kV, 11kV & 33kV Solutions

Page 6: PTAS Presentation 2015

Manufacturing Capabilities 

‐1100m2 Undercover Workshop Area‐Storage Area/Job Shelves‐ Busbar fabrication machinery ‐ Identification labelling machinery‐ Cable/wire labelling machinery‐ Automatic strip/crimp machinery‐ Automatic duct/din cutting machinery‐Welding Machinery‐Milling Machine‐Testing Equipment

Page 7: PTAS Presentation 2015

Project Management/Engineering Capabilities 

‐ Fully Packaged Electrical Design Packages ‐ SLD’s, GA’s, Schematics, Termination Diagrams, Block Diagrams, Bill of materials

‐ Power systems analysis ‐ Load flow calculations, Harmonic Studies, Arc Flash, Short Circuit, Earthing Studies, Motor Protection, Curve diagrams, Energy Management, System Optimization

‐ In house REPQ sign‐off/verification

‐ Experienced Project Management‐ Quality Assurance Manager‐ Programming/SCADA Packages – RSLogix, Siemens, Modicon, 

RS View, Citec WinCC, IFix, Mitsubishi, Digital

Page 8: PTAS Presentation 2015

Installation Capabilities PT Automation Solutions have specially trained & certified installation team that are certified to work on open cut mining & coal seam gas projects as well as building sites throughout Australia and around the globe

‐ X2 20 foot containers fully kitted out work benches and storage‐ X2 Customised Trailers fully kitted out with work benches and storage‐ Cable pulling systems ‐ Jacks/Lifting equipment‐ Cable labelling machinery 

Recently completed installation projects

‐ Coal Seam Gas – X18 sites including Ruby Jo, David, Orana 1

‐ Mining ‐ Acland Coal Mine, Mount Isa Mine, Middlemount Mine,  Whitehaven Coal

‐ Food & Beverage ‐ Smith snack foods, Arnott’s Biscuits, Cargill Beef, Castlemaine XXXX, Top‐cuts, 

‐ Infrastructure – Gold Coast Council, Logan Council, Seq Water, Wet N Wild, Seaworld, Visy, Hinze Dam, 

Page 9: PTAS Presentation 2015

In House Bus Bar Fabrication

PT Automation Solutions have experienced bus bar fabricators in house for all cutting/bending/punching all copper bars upto a capacity of 7000Amps in house.‐MCC’s, Feeder Panels‐Metering, MCCB Tags, Earthing‐ACB section’s

Page 10: PTAS Presentation 2015

PTAS provided Fully Packaged Modular Switchrooms

Adani Abbot Point SL1LV Switchroom

Boyne Smelters CBF4 LV&HV Switchroom

Page 11: PTAS Presentation 2015

GD Pipeline (QGC) – Water Monitoring System 

‐ X15 Remote DC Operated (Solar) System

‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning 

Custom Outdoor Enclosure IP66PLC SectionSolar SystemBattery Back‐up (5 days)Distribution SectionHMI

Page 12: PTAS Presentation 2015

Rockwell Automation (WICETS  Stage 1 Upgrade)

‐ 400+ Communication Panels, LCS’s, PLC Panels, Console Panels IP66

‐PTAS Scope ‐ Design, Manufacture, Factory Acceptance Test, Deliver to site

PLC PanelsLocal Control StationsConsole PanelsJunction BoxesDistribution PanelsCommunication Panels

Page 13: PTAS Presentation 2015

Rio Tinto – Boyne Smelter CBF4 Project– 26m Transportable Modular Switchroom

• Separate LV & HV Switchrooms• 3500A Unlimited Arc Containment SWB • 160 Fully Withdrawable Motor Starters• 40 Feeders• 3 Incoming ACB’s with Bus Tie• Vamp Arc Flash Detection System• 22 Wall Mounted VSD’s• PLC & Safety Panels• UPS System• 3 x 2000KVA 11KV/415V Transformers• 50m of VASS Weather Proof Bus Duct• Fault Study & Protection Scheme Design• All Engineering by PTAS

Page 14: PTAS Presentation 2015

Rio Tinto – Boyne Smelter CBF4 Project

Page 15: PTAS Presentation 2015

Wier Minerals (QGC) – Water Gathering Ponds; Orana 1, Ruby Jo & David

‐ PTAS Scope ‐ Design, Manufacture, Integrate, Factory Acceptance Test, Deliver to site, Installation & Commissioning

‐ Fully Packaged Switchroom‐ Type Tested Form 3b Motor Control Centre IP54‐ Packaged Kiosk 6.6kV‐ 350kW VSD Cabinets‐ Communication Enclosures/Distribution Enclosure

Cassette Enclosure per pump‐ PLC Enclosure/Marshalling Enclosure‐ UPS System‐ Marashel Pluggable Systems

Page 16: PTAS Presentation 2015

Wier Minerals (QGC) – Water Gathering Ponds; Orana 1, Ruby Jo & David

Page 17: PTAS Presentation 2015

Gold Coast Council – Merrimac Treatment Plant & Various other sites

‐ X2 Type Tested Form 3b Motor Control Centre IP54‐ 70+ Motor power/control cubicles supplied

‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning

Incoming SectionMeteringVariable Speed DrivesSoft StartersDOLsUPS System PLC SectionDistribution Section

Page 18: PTAS Presentation 2015

Gold Coast Council – Merrimac Treatment Plant & Various other sites

‐ X12 Pump Station Switchboards IP66

‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning

Incoming SectionMeteringVariable Speed DrivesSoft StartersDOLsDistribution SectionRTU System

Page 19: PTAS Presentation 2015

Xstrata Technologies (Mipac)

‐ X25 DCS Cabinets (Siemens PLC) 

‐PTAS Scope ‐ Design, Manufacture, Factory Acceptance Test, Crate & deliver to Brisbane Port, 

DCS Cabinets (X3 combinations)PLC SectionDistribution SectionCommunication SectionControl SectionMarshalling Section

Page 20: PTAS Presentation 2015

SEQ Water – Stones Road Pump Station

‐ Type Tested Form 3b Motor Control Centre IP54

‐PTAS Scope ‐ Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning

Incoming SectionMeteringSoft StartersDOLsUPS System Marshalling SectionDistribution Section

Page 21: PTAS Presentation 2015

Hirsch – Pallet Manufacturing Machine

• Motor Control Centre• Control Panels• HMI Operator Panel• PLC Section• 21 Servo Drives• Complete Turn Key Solution• Installation/Programming done by PTAS 

in Austria

Page 22: PTAS Presentation 2015

Hirsch – Pallet Manufacturing Machine

Page 23: PTAS Presentation 2015

John Holland – Abbott Point SL2X40 ‐ IP66 Stainless Steel Panels• Shiploader• Marine Works• Distribution Panels, Control Panels, Junction Box’s

Page 24: PTAS Presentation 2015

John Holland – Abbott Point SL2

Page 25: PTAS Presentation 2015

Gladstone Ports – Stockpile 22X35 ‐ Stainless Steel IP66 Rated Boards• Type Tested Limited Arc Containment MCC’s• PLC Panels• Control Panels• Distribution Boards• Local Control Stations

Page 26: PTAS Presentation 2015

Gladstone Ports – Stockpile 22

Page 27: PTAS Presentation 2015

Anglo American Coal – German Creek Mine MCC

16 metre Back to Back Type Tested Cubic MCC• 2000A BusBar• 2 Incomers & Bus Tie Section• 70 Intelligent Motor Starters & Feeders on Device Net.

• ABB Arc Flash Detection System• ABB Control Gear, MCCB’s & ACB’s.• Dead Easy Safety System• Full Design & Software by PTAS• Completed in 8 Weeks from Order (including design)

Page 28: PTAS Presentation 2015

Anglo American Coal – German Creek Mine MCC

Page 29: PTAS Presentation 2015

Origin Energy/APLNG Spring Gully De‐Watering MCC

• IP 66 Solution –external shell mounted over the Switchboard with Ventilation 

• Complete Platform and Switchboard fitted out at PTAS Workshop

• Demountable and Withdrawable Switchboard• PLC Section, UPS System, 6 off DOL’s 

(Withdrawable)• Distribution Section, Metering & 3 off 22kW VSD’s

Page 30: PTAS Presentation 2015

Origin Energy/APLNG Spring Gully De‐Watering MCC

Page 31: PTAS Presentation 2015

Xstrata Zinc (Glencore) Mount Isa Mines

• Various VSD Panels (5.5kW – 630kW), Communication Panels, Local Control Stations & Control Panels

• PT Automation Solutions have built 150+ Enclosures for Xstrata Zinc Mount Isa & George Fisher Mines

Page 32: PTAS Presentation 2015

Xstrata Zinc (Glencore) Mount Isa Mines

Page 33: PTAS Presentation 2015

Adani Abbott Point SL1 • 10.5 Metre Transportable Modular Switchroom• Motor Control Centre• Distribution Boards, PLC Panel, UPS System• Inter‐Connections of Switchroom• 50 + PLC Cabinets• FAT Testing & Delivery to Abbot Point

Page 34: PTAS Presentation 2015

Adani Abbott Point SL1 

Page 35: PTAS Presentation 2015

Sage Automation (Origin Energy) Re‐Injection Skid• Form 3b Type Tested (External Shell IP66)• IP 66 Solution ‐ Achieved by custom external shell bolted 

onto the Cubic System• 800A  Interlock • Pluggable Feeder System• Distribution Section• Feeder Section’s• Marechal Plug System • PTAS completed two Re‐Injection Skid’s for separate 

Projects