Electrical Division Copy Right 2012
PT.KPJBTanjung Jati "B" Expansion Project
PLANT NAME SUBJECT
TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document
Work Description Location Start FinishAug-12
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
A GENERATOR16361 1 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF001 21-Aug 25-Aug ELectric 516361 2 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF002A 21-Aug 25-Aug ELectric 516361 3 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF002B 21-Aug 25-Aug ELectric 516361 4 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF005 21-Aug 25-Aug ELectric 5
16348 5 INSPECTION & CLEANING GENERATOR FOR 1ST OUTAGE 21-Aug 9-Sep ELectric 20
16365 6 GIS INSPECTION & CLEANING FOR 1ST OUTAGE 21-Aug 2-Sep ELectric 13
B AVR & SOOT BLOWER
16405 1 SOOT BLOWER INSPECTION FOR 1ST OUTAGE 21-Aug 27-Aug 7
16406 2 SOOT BLOWER INSPECTION FOR 1ST OUTAGE 28-Aug 29-Aug 2
16407 3 SOOT BLOWER INSPECTION FOR 1ST OUTAGE 28-Aug 7-Sep 11
16397 4 BOILER IGNITER INSPECTION FOR 1ST OUTAGE IGNITER 1-Sep 5-Sep 5
16359 5 AVR INSPECTION FOR 1ST OUTAGE 21-Aug 9-Sep 20
16359 6 AVR INSPECTION FOR 1ST OUTAGE 21-Aug 9-Sep 20
16367 7 UPS INSPECTION FOR 1ST OUTAGE 2-Sep 5-Sep 4
16371 8 DC SYSTEM INSPECTION & CLEANING FOR 1ST OUTAGE 4-Sep 7-Sep 4
Work Order
NoWork Group
Duration
(Days)
3GEN-GM001(GENERA
TOR UNIT 3)
GIS/SUBSTATION 500 KV
1L-16L & 1R-16R (LONG
RERTRACTABLE)
17L-22L & 17R-22R (HALF
RERTRACTABLE)
A1-A18, B1-B14 & C1-C18
(WALL DESLAGGER)
AVR GEN-EXC004
AVR GEN-EXC005
UPS UNIT 3 TYPE PEW
1120-220/220-EAN
CHARGER NO.1 SN 5967
Electrical Division Copy Right 2012
PT.KPJBTanjung Jati "B" Expansion Project
PLANT NAME SUBJECT
TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document
Work Description Location Start FinishAug-12
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Work Order
NoWork Group
Duration
(Days)
16371 9 DC SYSTEM INSPECTION & CLEANING FOR 1ST OUTAGE 4-Sep 7-Sep 4
16396 10 INSPECTION FLAME SCANNER FOR 1ST OUTAGE 6-Sep 10-Sep 5
C TURBINE AUX
16388 1 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M010B 22-Aug 24-Aug 3
16388 2 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M020B 22-Aug 24-Aug 3
16388 3 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M050B 22-Aug 24-Aug 3
16388 4 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M080B 22-Aug 24-Aug 3
16388 5 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M120B 22-Aug 24-Aug 3
16388 6 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M010A 21-Aug 23-Aug 3
16388 7 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M020A 21-Aug 23-Aug 3
16388 8 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M050A 21-Aug 23-Aug 3
16388 9 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M080A 21-Aug 23-Aug 3
16388 10 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M120A 21-Aug 23-Aug 3
16388 11 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
CHARGER NO.2 SN 5968
FLAME SCANNER/ DETECTOR
3LOS-M060 (MAIN OIL TANK
TRANS. P. MOTOR)
Electrical Division Copy Right 2012
PT.KPJBTanjung Jati "B" Expansion Project
PLANT NAME SUBJECT
TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document
Work Description Location Start FinishAug-12
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Work Order
NoWork Group
Duration
(Days)
16388 12 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
16388 13 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
16388 14 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
16388 15 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
16388 16 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
16388 17 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
16388 18 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
16388 19 MOTOR INSPECTION FOR 1ST OUTAGE 3COTC-M060A 24-Aug 25-Aug 2
16388 20 MOTOR INSPECTION FOR 1ST OUTAGE 3COTC-M060B 24-Aug 25-Aug 2
16388 21 MOTOR INSPECTION FOR 1ST OUTAGE 3CCCW-M090 24-Aug 25-Aug 2
3LOS-M080 (MAIN OIL
COND. FILTER. P. MOTOR)
3LOS-M010A (MOP A MOTOR)
3LOS-M010B (MOP B MOTOR)
3GSS-M011A (GLAND STEAM
EXHAUSTER MOTOR A)
3GSS-M011B (GLAND STEAM
EXHAUSTER MOTOR B)
3LOS-M020A (MOT VAPOUR XTRACTOR A
MOTOR)
3LOS-M020AB (MOT VAPOUR XTRACTOR B
MOTOR)
ZZZZ
Electrical Division Copy Right 2012
PT.KPJBTanjung Jati "B" Expansion Project
PLANT NAME SUBJECT
TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document
Work Description Location Start FinishAug-12
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Work Order
NoWork Group
Duration
(Days)
16388 22 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M010A 24-Aug 25-Aug 2
16388 23 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M010B 24-Aug 25-Aug 2
16388 24 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M020A 24-Aug 25-Aug 2
16388 25 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M020B 24-Aug 25-Aug 2
16388 26 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M001 25-Aug 26-Aug 2
16388 27 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M002 25-Aug 26-Aug 2
16388 28 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M001A 25-Aug 26-Aug 2
16388 29 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M001B 25-Aug 26-Aug 2
16388 30 MOTOR INSPECTION FOR 1ST OUTAGE 3LOM-M330 23-Aug 24-Aug 2
16388 31 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M010A 23-Aug 24-Aug 2
16388 32 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M010B 23-Aug 24-Aug 2
16388 33 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M015A 23-Aug 24-Aug 2
16388 34 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M015B 23-Aug 24-Aug 2
Electrical Division Copy Right 2012
PT.KPJBTanjung Jati "B" Expansion Project
PLANT NAME SUBJECT
TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document
Work Description Location Start FinishAug-12
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Work Order
NoWork Group
Duration
(Days)
16388 35 MOTOR INSPECTION FOR 1ST OUTAGE 3CAE-M010A 23-Aug 24-Aug 2
16388 36 MOTOR INSPECTION FOR 1ST OUTAGE 3CAE-M010B 23-Aug 24-Aug 2
16388 37 MOTOR INSPECTION FOR 1ST OUTAGE 3CW-MMO11A 23-Aug 24-Aug 2
16388 38 MOTOR INSPECTION FOR 1ST OUTAGE 3CW-MMO11A 23-Aug 24-Aug 2
16388 39 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2
D BOILER AUX
16380 1 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 2 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 3 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 4 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 5 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 6 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 7 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 8 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
3LOS-M050 (EMERGENCY
OP)
3APC-DP901 (IDFAN A DIST
PANEL)3APC-DP902
(IDFAN B DIST PANEL)
3DP-PAN 712A (COAL FEEDER
A LCP)3DP-PAN 712B (COAL FEEDER
B LCP)3DP-PAN 712C (COAL FEEDER
C LCP)3DP-PAN 712D (COAL FEEDER
D LCP)3DP-PAN 712E (COAL FEEDER
E LCP)3DP-PAN 712F (COAL FEEDER
F LCP)
Electrical Division Copy Right 2012
PT.KPJBTanjung Jati "B" Expansion Project
PLANT NAME SUBJECT
TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document
Work Description Location Start FinishAug-12
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Work Order
NoWork Group
Duration
(Days)
16380 9 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16380 10 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2
16377 11 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 28-Aug 29-Aug ELectric 2
16377 12 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 28-Aug 29-Aug ELectric 2
16377 13 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 28-Aug 29-Aug ELectric 2
16377 14 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 27-Aug 28-Aug ELectric 2
00
3BAD-PAN501 (DCC
LOC.CONTROL PANEL)3GG-PAN 862
(LOW PRESS. SEAL AIR FAN
LCP)3APC-TF 810A (380 ESP UNIT
BOARD A)3APC-TF 810B (380 ESP UNIT
BOARD B)3DC-MCC 501 (DC BOILER UNIT MOTOR
STARTER)3APC-TF501B (380V LOW
VOLAGE BOARD)
Electrical Division Copy Right 2012
NOTED BY CHECKED BY
Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
Electrical Division Copy Right 2012
NOTED BY CHECKED BY
Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
Electrical Division Copy Right 2012
NOTED BY CHECKED BY
Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
Electrical Division Copy Right 2012
NOTED BY CHECKED BY
Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
Electrical Division Copy Right 2012
NOTED BY CHECKED BY
Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
Electrical Division Copy Right 2012
NOTED BY CHECKED BY
Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
Outage Schedule