Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time: 6:30 p.m. to 8:30 p.m. Location: Alton Public School 19681 Main Street Alton, Ontario

PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Alton Village StreetscapingMain Street South and Queen Street East

“Phase 2”

PUBLIC INFORMATION CENTRE 

Date: June 6, 2018Time: 6:30 p.m. to 8:30 p.m.Location: Alton Public School

19681 Main StreetAlton, Ontario

Page 2: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Alton Village StreetscapingMain Street South and Queen Street East

“Phase 2”

PUBLIC INFORMATION CENTRE 

Date: June 6, 2018Time: 6:30 p.m. to 8:30 p.m.Location: Alton Public School

19681 Main StreetAlton, Ontario

Page 3: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Project Area – Phase 2

Shaw’s CreekPROJECT

AREA

Main Street South

Page 4: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Summary of the Works

• Implement urban cross section through Alton Village: • 1.8m sidewalks• Coloured impressed concrete splash pads• 4.0m lanes with ‘sharrows’ for bicycle traffic through Village, and 1.5m 

separate bicycle lanes from Beechgrove to start of Village area• Street beautification including:

• Rest areas with benches, waste receptacles and bicycle racks• Landscaping and planting features• Decorative lighting

• Stormwater management improvements including permeable pavers, CB shields, oil‐grit separators and new sewers

• Community parkette at Main and Queen intersection• Traffic calming gateway features north of Beechgrove Sideroad and at 

McClellan Road

Page 5: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Chosen Finishes / Features

Bridge/Culvert Concrete Formliners Bridge/Culvert Railings

Benches and Waste Receptacles Coloured Impressed Concrete Splash Pads

Streetlights

Page 6: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Summary of the Works

Page 7: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Summary of the Works

Page 8: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Summary of the Works

Page 9: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual RenderingMain Street Gateway Feature (Without Monument)

Page 10: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual RenderingMain Street Gateway Feature (With Monument)

Page 11: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual RenderingMain St. at McLellan Road (Looking North)

Page 12: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual RenderingMain St. at McLellan Road (Looking South)

Page 13: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual Rendering – Main St. (North of Station St.)

Page 14: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual Drawing – Retaining Wall

Page 15: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual Rendering – Main / Queen Intersection

Page 16: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Conceptual Rendering ‐ Queen St. Looking West

Page 17: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

Timing – Phase Two

• Main Street South is anticipated to remain open, with lane restrictions 

• Construction start date Spring 2019

• Expected construction completion in late 2019

Page 18: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:

YOUR INPUT IS IMPORTANT

Please complete a Comment Sheet before leaving

By Mail Mr. Serguei Kabanov, C.E.T.Region of PeelTransportation Division10 Peel Centre DriveSuite B, 4th FloorBrampton, ON  L6T 4B9

Mr. David O’Sullivan, P.Eng.R.V. Anderson Associates Limited2001 Sheppard Avenue EastSuite 300Toronto, ON  M2J 4Z8

OR

By Phone 905‐791‐7800, ext. 8754 416‐497‐8600, ext. 1245

By Fax 905‐791‐1442 416‐497‐0342

By E‐mail Serguei. [email protected] [email protected]

THANK YOU FOR ATTENDING

These presentation boards are also available for viewing at http://www.peelregion.ca/news/notices/2017/notice‐171004.htm