PUBLIC OPEN HOUSE #1 Seward Hwy & Alyeska Hwy Intersection Improvement Project Project No. Z546190000 DECEMBER 10, 2020 @ 6:00 PM via ZOOM

PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

PUBLIC OPEN HOUSE #1

Seward Hwy & Alyeska Hwy Intersection Improvement Project

Project No. Z546190000

DECEMBER 10, 2020 @ 6:00 PM via ZOOM

Page 2: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

PROJECT TEAM

DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES:• Christina Huber, PE, Project Manager• Scott Thomas, PE, Regional Traffic & Safety Engineer• Orion LeCroy, PE, Highway Safety Improvement Program• Danika Simpson, ROW Property Management• David Post, Surface Transportation Planning Manager• Shawn Gardner, Anchorage Area Planner• James Sowerwine, ROW Project Coordinator

R&M CONSULTANTS, INC:• Tim Grier, PE, Project Manager• Marc Frutiger, PE, PTOE, Engineer Lead• Van Le, AICP, Stakeholder Coordinator/CSS Process Lead• Taryn Oleson Yelle, AICP, Stakeholder Coordinator

KINNEY ENGINEERING• Jeanne Bowie, PE, PhD, PTOE,

Traffic Engineering Analyst

Page 3: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

PROJECT OVERVIEWSCOPE

The Alaska Department of Transportation and Public Facilities (DOT&PF) isstarting the Seward Hwy & Alyeska Hwy Intersection Improvement project whichseeks to improve the capacity, operation and safety of the intersection.

Scope: DOT&PF has funded the project for engineering, environmental andpublic involvement activities through the selection of an alternative anddevelopment of the design to the 30% level, including compliance with theMunicipality of Anchorage’s Context Sensitive Solutions (CSS) Policy and theNational Environmental Policy Act (NEPA).

Page 4: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

SEWARD HIGHWAY

TESOROSTATION

MALL

TURNAGAIN ARM

GLA

CIE

R C

REE

K

ALASKA RAILROAD

TOA

DST

OO

L D

R

ALY

ESKA

HIG

HW

AY

MA

IN S

T

GOLD AVE

CHUGACHNATIONAL

FORESTRANGERSTATION

TO ANCHORAGE TO SEWARD

TO G

IRD

WO

OD

B IRD TO GIRD PATHWAY

TID

EWA

TER

SLO

UG

H

PROJECT LIMITSSEWARD HWY MP 75-90PROJECT LIMITS

STUDY AREA

Seward Hwy & Alyeska HwyIntersection Improvements November 18, 2020

Project OverviewAERIAL IMAGE DATES: 2015 & 2020

Page 5: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

WHAT WE KNOWEXISTING CONDITIONS & DATA COLLECTED

• Traffic data• Crashes• Speeds• Volume• Turning movements• Non motorized

• Environmental Constraints• Wetlands

• Topography• Field survey• Aerial data acquisition

6%

28%

64%

2%

0

2

4

6

8

10

12

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Cras

hFr

eque

ncy

Year

Seward Highway and Alyeska Highway Crash Severity by Year(1980 to 2017)

Unknown

Property Damage Only (PDO)

Minor Injury

Major Injury

Page 6: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

SEWARD HIGHWAY

TESOROSTATION

MALL

GLA

CIE

R C

REE

K

ALASKA RAILROAD

TOA

DST

OO

L D

R

ALY

ESKA

HIG

HW

AY

MA

IN S

T

GOLD AVE

TO SEWARD

TO G

IRD

WO

OD

PROJECT LIMITS

STUDY AREA

BIRD TO GIRD PATHWAY

ROWROW

ROW

RO

WRO

W

ROW

SEWARD HWY MP 75-90PROJECT LIMITS

I

I

SPEED AND TRAFFIC VOLUMESTUDY (TYPICAL)

TURNING MOVEMENT COUNT(AM, PM, WEEKEND) AND

SIGHT DISTANCE MEASUREMENT(TYPICAL)

TID

EWA

TER

SLO

UG

H

TURNAGAIN ARM

TO ANCHORAGE

WELCOME TO GIRDWOOD SIGN

Seward Hwy & Alyeska HwyIntersection Improvements December 10, 2020

Traffic StudyAERIAL IMAGE DATES: 2015 & 2020

Page 7: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

WHAT WE KNOWWETLANDS

Based on delineation performed in2020, subject to US Army Corps ofEngineers review and approval.

High Value

Low Value

Page 8: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

ISSUESToadstool Drive

• Girdwood Sign at Toadstool is an attraction,increases stopping/turning movements

• Traffic stopping at Toadstool, pedestrians runningacross highway to photograph Turnagain Arm

• Used as a bypass for intersection, creating moretraffic for local residents

Main Street• Used as a bypass for intersection by locals• Local street, not improved

Gold Avenue• Issue with accessing Alyeska Highway from Gold

Ave.• Old Girdwood townsite has to use the gas station

parking lot for through access

WHAT WE HEARDSTAKEHOLDER ENGAGEMENT SO FAR

Girdwood Station & Commercial Mall• Pedestrian/Bicycle traffic – kids, dogs, people,

especially at Alyeska/Gold Avenue pathway connection• 3 Driveways at Tesoro can cause conflicts• Mall access can be difficult• ROW is being used by vendors to sell seafood, other

itemsSafe ingress/egress for Trucks at Tesoro

• Creates situation where they park along the shouldersof the Seward Highway

• No dedicated parking for big rigsViewsheds to Turnagain Arm

• Do not block or change viewsheds for any alternative• Concerns about the area south of the highway• Desire for scenic view pullouts on Arm side of Seward

Hwy to address parking along shoulders

Page 9: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

ISSUES (continued)Speeding along Alyeska Highway after turningoff of Seward HighwayJuly and December are the most congestedmonthsStrong opposition to gravel sourcing fromGirdwood Valley

OPPORTUNITIESRecreation use and need for safe parking orpullouts

• Tide lands for skating in winter• Fishing under Glacier Creek Bridge• Would like a boardwalk in the tidal flats

Non Motorized facilities• Consider a bike path connection (continue Bird to

Gird trail)• Coordination with National Historic Iditarod Trail

WHAT WE HEARDSTAKEHOLDER ENGAGEMENT

Page 10: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

SEWARD HIGHWAY

TESOROSTATION

MALL

GLA

CIE

R C

REE

K

ALASKA RAILROAD

TOA

DST

OO

L D

R

ALY

ESKA

HIG

HW

AY

MA

IN S

T

GOLD AVE

TO ANCHORAGE TO SEWARD

TO G

IRD

WO

OD

PROJECT LIMITS

STUDY AREA

BIRD TO GIRD PATHWAY

ROWROW

ROW

RO

WRO

W

ROW

SEWARD HWY MP 75-90PROJECT LIMITS

LEGEND

SPEEDING

PEDESTRIAN/VEHICLE CONFLICT

USE OF ROW BY VENDORS

LOCAL ROAD USED AS DETOURFOR CUT-THROUGH TRAFFIC

MULTIPLE DRIVEWAYSCONFUSION/CONFLICTS

LACK OF OFF-STREET PARKING

PRESERVE VIEWSHED

FISHING ACCESS

RECREATION/TRESPASSING ACCESSTHROUGHPRIVATEPROPERTY

ACCESSTHROUGHPRIVATEPROPERTY

WELCOME TO GIRDWOOD SIGN

Seward Hwy & Alyeska HwyIntersection Improvements December 10, 2020

Identified IssuesAERIAL IMAGE DATES: 2015 & 2020

Page 11: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

WHAT WE HAVE SEENCONDITIONS AT THE INTERSECTION

Page 12: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

WHAT WE HAVE SEENCONDITIONS AT THE INTERSECTION

Page 13: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

WHERE WE ARE GOINGPROJECT SCHEDULE

WE AREHERE

Page 14: PUBLIC OPEN HOUSE #1 · 2020. 12. 11. · tesoro station mall turnagain arm glacier creek alaska railroad toadstool dr alyeska highway main st gold ave chugach national forest ranger

WE WANT TO HEAR FROM YOUQUESTIONS AND COMMENTS WELCOME

PROJECT WEBSITE:www.sewardalyeskahwyintersection.com

CONTACT:Van Le, AICP, Stakeholder [email protected]

Christina Huber, PE, Project [email protected]