PUBLIC OPEN HOUSE #1
Seward Hwy & Alyeska Hwy Intersection Improvement Project
Project No. Z546190000
DECEMBER 10, 2020 @ 6:00 PM via ZOOM
PROJECT TEAM
DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES:• Christina Huber, PE, Project Manager• Scott Thomas, PE, Regional Traffic & Safety Engineer• Orion LeCroy, PE, Highway Safety Improvement Program• Danika Simpson, ROW Property Management• David Post, Surface Transportation Planning Manager• Shawn Gardner, Anchorage Area Planner• James Sowerwine, ROW Project Coordinator
R&M CONSULTANTS, INC:• Tim Grier, PE, Project Manager• Marc Frutiger, PE, PTOE, Engineer Lead• Van Le, AICP, Stakeholder Coordinator/CSS Process Lead• Taryn Oleson Yelle, AICP, Stakeholder Coordinator
KINNEY ENGINEERING• Jeanne Bowie, PE, PhD, PTOE,
Traffic Engineering Analyst
PROJECT OVERVIEWSCOPE
The Alaska Department of Transportation and Public Facilities (DOT&PF) isstarting the Seward Hwy & Alyeska Hwy Intersection Improvement project whichseeks to improve the capacity, operation and safety of the intersection.
Scope: DOT&PF has funded the project for engineering, environmental andpublic involvement activities through the selection of an alternative anddevelopment of the design to the 30% level, including compliance with theMunicipality of Anchorage’s Context Sensitive Solutions (CSS) Policy and theNational Environmental Policy Act (NEPA).
SEWARD HIGHWAY
TESOROSTATION
MALL
TURNAGAIN ARM
GLA
CIE
R C
REE
K
ALASKA RAILROAD
TOA
DST
OO
L D
R
ALY
ESKA
HIG
HW
AY
MA
IN S
T
GOLD AVE
CHUGACHNATIONAL
FORESTRANGERSTATION
TO ANCHORAGE TO SEWARD
TO G
IRD
WO
OD
B IRD TO GIRD PATHWAY
TID
EWA
TER
SLO
UG
H
PROJECT LIMITSSEWARD HWY MP 75-90PROJECT LIMITS
STUDY AREA
Seward Hwy & Alyeska HwyIntersection Improvements November 18, 2020
Project OverviewAERIAL IMAGE DATES: 2015 & 2020
WHAT WE KNOWEXISTING CONDITIONS & DATA COLLECTED
• Traffic data• Crashes• Speeds• Volume• Turning movements• Non motorized
• Environmental Constraints• Wetlands
• Topography• Field survey• Aerial data acquisition
6%
28%
64%
2%
0
2
4
6
8
10
12
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Cras
hFr
eque
ncy
Year
Seward Highway and Alyeska Highway Crash Severity by Year(1980 to 2017)
Unknown
Property Damage Only (PDO)
Minor Injury
Major Injury
SEWARD HIGHWAY
TESOROSTATION
MALL
GLA
CIE
R C
REE
K
ALASKA RAILROAD
TOA
DST
OO
L D
R
ALY
ESKA
HIG
HW
AY
MA
IN S
T
GOLD AVE
TO SEWARD
TO G
IRD
WO
OD
PROJECT LIMITS
STUDY AREA
BIRD TO GIRD PATHWAY
ROWROW
ROW
RO
WRO
W
ROW
SEWARD HWY MP 75-90PROJECT LIMITS
I
I
SPEED AND TRAFFIC VOLUMESTUDY (TYPICAL)
TURNING MOVEMENT COUNT(AM, PM, WEEKEND) AND
SIGHT DISTANCE MEASUREMENT(TYPICAL)
TID
EWA
TER
SLO
UG
H
TURNAGAIN ARM
TO ANCHORAGE
WELCOME TO GIRDWOOD SIGN
Seward Hwy & Alyeska HwyIntersection Improvements December 10, 2020
Traffic StudyAERIAL IMAGE DATES: 2015 & 2020
WHAT WE KNOWWETLANDS
Based on delineation performed in2020, subject to US Army Corps ofEngineers review and approval.
High Value
Low Value
ISSUESToadstool Drive
• Girdwood Sign at Toadstool is an attraction,increases stopping/turning movements
• Traffic stopping at Toadstool, pedestrians runningacross highway to photograph Turnagain Arm
• Used as a bypass for intersection, creating moretraffic for local residents
Main Street• Used as a bypass for intersection by locals• Local street, not improved
Gold Avenue• Issue with accessing Alyeska Highway from Gold
Ave.• Old Girdwood townsite has to use the gas station
parking lot for through access
WHAT WE HEARDSTAKEHOLDER ENGAGEMENT SO FAR
Girdwood Station & Commercial Mall• Pedestrian/Bicycle traffic – kids, dogs, people,
especially at Alyeska/Gold Avenue pathway connection• 3 Driveways at Tesoro can cause conflicts• Mall access can be difficult• ROW is being used by vendors to sell seafood, other
itemsSafe ingress/egress for Trucks at Tesoro
• Creates situation where they park along the shouldersof the Seward Highway
• No dedicated parking for big rigsViewsheds to Turnagain Arm
• Do not block or change viewsheds for any alternative• Concerns about the area south of the highway• Desire for scenic view pullouts on Arm side of Seward
Hwy to address parking along shoulders
ISSUES (continued)Speeding along Alyeska Highway after turningoff of Seward HighwayJuly and December are the most congestedmonthsStrong opposition to gravel sourcing fromGirdwood Valley
OPPORTUNITIESRecreation use and need for safe parking orpullouts
• Tide lands for skating in winter• Fishing under Glacier Creek Bridge• Would like a boardwalk in the tidal flats
Non Motorized facilities• Consider a bike path connection (continue Bird to
Gird trail)• Coordination with National Historic Iditarod Trail
WHAT WE HEARDSTAKEHOLDER ENGAGEMENT
SEWARD HIGHWAY
TESOROSTATION
MALL
GLA
CIE
R C
REE
K
ALASKA RAILROAD
TOA
DST
OO
L D
R
ALY
ESKA
HIG
HW
AY
MA
IN S
T
GOLD AVE
TO ANCHORAGE TO SEWARD
TO G
IRD
WO
OD
PROJECT LIMITS
STUDY AREA
BIRD TO GIRD PATHWAY
ROWROW
ROW
RO
WRO
W
ROW
SEWARD HWY MP 75-90PROJECT LIMITS
LEGEND
SPEEDING
PEDESTRIAN/VEHICLE CONFLICT
USE OF ROW BY VENDORS
LOCAL ROAD USED AS DETOURFOR CUT-THROUGH TRAFFIC
MULTIPLE DRIVEWAYSCONFUSION/CONFLICTS
LACK OF OFF-STREET PARKING
PRESERVE VIEWSHED
FISHING ACCESS
RECREATION/TRESPASSING ACCESSTHROUGHPRIVATEPROPERTY
ACCESSTHROUGHPRIVATEPROPERTY
WELCOME TO GIRDWOOD SIGN
Seward Hwy & Alyeska HwyIntersection Improvements December 10, 2020
Identified IssuesAERIAL IMAGE DATES: 2015 & 2020
WHAT WE HAVE SEENCONDITIONS AT THE INTERSECTION
WHAT WE HAVE SEENCONDITIONS AT THE INTERSECTION
WHERE WE ARE GOINGPROJECT SCHEDULE
WE AREHERE
WE WANT TO HEAR FROM YOUQUESTIONS AND COMMENTS WELCOME
PROJECT WEBSITE:www.sewardalyeskahwyintersection.com
CONTACT:Van Le, AICP, Stakeholder [email protected]
Christina Huber, PE, Project [email protected]