30
DATE OF SENDING TO GOVT. DATE OF APPROVAL OF GOVT. (1)(2)(3). (4). (5). (6)(7)(8)(8A)(9)(10)(11)(12). (13)(14)(15)(16)(17)(18). 1 CONT 2689/2006 2006 Munni Devi Dependen t Reg. Appointment HCL 23-09-08 CD-1,(TT), Agra AGR 7 C Pending 2 CONT 1044/2007 2007 Chandra Bhan W/C Rag. Pay fixation HCL 17-01-07 CD-1,(TT), Agra AGR 7 C Pending 3 CONT 1524/2008 2008 Radha Kishan Contractor HCL 03-07-08 CD-1,(TT), Agra AGR 7 Pending 4 CONT 1475/2008 2008 Rishika Maheshwari Contractor HCL 03-07-08 CD-1,(TT), Agra AGR 7 Pending 5 CONT 818/2009 2009 Somesh Chandra Mate For appointment of Mate HCA 29-04-09 PD, Agra AGR 7 Pending 6 CONT 880/2009 2009 Gaurav Kumar Mate For appointment of Mate HCA 04-05-09 PD, Agra AGR 7 Pending 7 CONT 57/2010 2010 Gaurav Kumar Mate For appointment of Mate HCA 23-12-09 PD, Agra AGR 7 Pending 8 Cont 4396/2011 2011 Tara Chandra Compensation HCA 17-10-2011 17-10-11 CD-2, Agra AGR 2 - Pending 9 CONT 241/2011 2011 Mohd. Zuber Alam V/s Ravindra Singh, P.Sec EE(Retd) Reg. Increment of arrear PST 12-06-12 PD, Firozabad AGR 13 A Pending 10 CONT 3093/2011 2011 Fazal Dad Khan V/s T.Ram, ENC Amin For Salary of D/Man HCA 16-08-11 PD, Firozabad AGR 7 D Section Pending 11 CONT 2210/2013 2013 Prabhakar Sharma AE Against order 8.05.13 HCL 12.11.13 19.02.14 26-02-14 PD, Mathura * AGR 13 AE Sectio n Pending 12 CONT 5919/2013 2013 Dr. Narayan Singh Contractor Payment HCA 11.11.13 03.02.14 06-02-14 PD, Mathura AGR 7 Gen Sectio n Pending 13 CONT 144/2014 2014 Madan Mohan Sharma AE Service matter HCA 15.07.14 22.07.12 14-02-14 17.02.14 PD, Mathura AGR 13 AE Sectio n Pending 14 Cont 4824/2014 2014 Vipin Kumar Mirtak Asrit For appointment HCA 27-10-14 PD, Etah * AGR 7 Vad Sectio n Pending ENC OFFICE SECTIO N REMARK DATE OF CA FILING DATE OF ORDER BY COURT (INTERIM/ FINAL) DATE OF SUBMITTING compliance REPORT TO THE GOVT. AGAINST THE ORDER DIVISION ZONE GOVT. SECTION PETITIONER NAME POST SUBJECT OF WRIT COURT DATE OF RECEIVING WRIT BY DIVISION PARAWISE NARRATIVE PUBLIC WORKS DEPARTMENT ENC OFFICE, LUCKNOW CONTEMPT PETITION REPORT ZONE : DATE : 01.04.2017 S.No NOTICE NO. WRIT NO YEAR Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 1

PUBLIC WORKS DEPARTMENT ENC OFFICE, LUCKNOW …

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

1CONT

2689/20062006 Munni Devi Dependen

tReg.

AppointmentHCL 23-09-08

CD-1,(TT), Agra

AGR 7 CPending

2CONT

1044/20072007 Chandra Bhan W/C Rag. Pay

fixationHCL 17-01-07 CD-1,(TT),

AgraAGR 7 C

Pending

3CONT

1524/20082008 Radha Kishan Contractor HCL 03-07-08 CD-1,(TT),

AgraAGR 7

Pending

4CONT

1475/20082008 Rishika

MaheshwariContractor HCL 03-07-08 CD-1,(TT),

AgraAGR 7

Pending

5 CONT 818/2009 2009 Somesh

Chandra MateFor

appointment of Mate

HCA 29-04-09 PD, AgraAGR

7 Pending

6 CONT 880/2009 2009 Gaurav Kumar Mate

For appointment

of MateHCA 04-05-09 PD, Agra

AGR7 Pending

7 CONT 57/2010 2010 Gaurav Kumar Mate

For appointment

of MateHCA 23-12-09 PD, Agra

AGR7 Pending

8 Cont 4396/2011 2011 Tara Chandra Compensation HCA 17-10-2011 17-10-11 CD-2, Agra AGR 2 - Pending

9 CONT 241/2011 2011

Mohd. Zuber Alam V/s

Ravindra Singh, P.Sec

EE(Retd)Reg.

Increment of arrear

PST 12-06-12 PD, Firozabad AGR 13 A Pending

10 CONT 3093/2011 2011

Fazal Dad Khan V/s T.Ram,

ENCAmin For Salary of

D/Man HCA 16-08-11 PD, Firozabad AGR 7 D

Section Pending

11 CONT 2210/2013 2013 Prabhakar

Sharma AEAgainst order

8.05.13HCL 12.11.13 19.02.14 26-02-14 PD, Mathura

* AGR 13AE

Section

Pending

12 CONT 5919/2013 2013 Dr. Narayan

Singh Contractor Payment HCA 11.11.13 03.02.14 06-02-14 PD, Mathura AGR 7Gen

Section

Pending

13 CONT 144/2014 2014 Madan Mohan

Sharma AEService matter

HCA 15.07.14 22.07.12 14-02-14 17.02.14 PD, Mathura AGR 13AE

Section

Pending

14 Cont 4824/2014 2014 Vipin Kumar

Mirtak Asrit

For appointment

HCA 27-10-14 PD, Etah * AGR 7Vad

Section

Pending

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 1

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

15 CONT 428/2014 2014

Ramesh Chandra V/s Sri

Kishan Singh Atoria

SE Service matter PST Not Required 21.07.15 CD-3,

Mainpuri AGR Pending

16 CONT 238/2014 2014 Kaushalendra

Pratap Singh AE Reg. Promotion PST 23.08.14 29-08-14 CD-1,

Mathura AGR

Writ SESB 1220/2014

filed judgement reserved

17CONT 621/2014 2014

Purshottam Lal V/s Smt. Chitra Swaroop & Oth

W/Munshi4000-6000 pay scale

HCL 14.03.16 29.03.16 04-04-16 CD-1, mathura AGR 7 Vad Pending

18 CONT 7413/2015 2015

Chandrabhan V/s Kishan

Singh AtoriaAE(Retd) For Pension HCA 18-02-16 PD, Agra AGR 4

AE Sectio

nPending

19CONT 584/2016 2016

Vivekanand Sharma V/s Aradhana

Shukla & Oth

EEAgainst

SuspensionHCL 20.05.16 24.05.16 24.05.16 26-05-16 CD-1,

Mathura AGR 13B

Section

Pending

20 CONT 2351/2016 2016 Brij Pal Gupta AE GPF Payment HCA 04.07.16 08.07.16 13-07-16 PD, Mainpuri AGR 4

AE Sectio

nPending

21 CONT 564/2016 2016

Vivekanand Sharma V/s

Smt. Aradhana Shukla & oth

EE Againt Suspention PST 20.05.16 24.05.16 24.05.16 26-05-16 CD-1, Agra AGR 13 B Pending

22 CONT 122/2016 2016

Bal Mukund Agarwal V/s Anuradha

Shukla, P.Sec

AE(Retd)

to compliance PST order in 1488/13 dt 27.11.15

PST CD, Mainpuri AGR 13 B Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 2

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 1082/2010 2010 Dinesh

Chandra DependentFor service of

dependentHCL 19.05.10 20.05.10 21.05.10 24-05-10 CD-1,

Pratapgarh ALD 7C

Section

Pending

2 CONT 1220/2010 2010 Lalti Devi Beldar

From appointment

date to regular and all consequental

benefits

HCL 05.07.10 05.07.10 15.07.10 26-07-10 CD-1, Pratapgarh ALD 7

C Sectio

nPending

3 CONT 1228/2010 2010 Rakesh Kumar

Maurya & Oth Mate

From appointment

date to regular and all consequental

benefits

HCL 05.07.10 05.07.10 14.07.10 26-07-10 CD-1, Pratapgarh ALD 7

C Sectio

nPending

4 CONT 1219/2010 2010 Chintamani

Pandey Chaukidar

From appointment

date to regular and all consequental

benefits

HCL 05.07.10 05.07.10 14.07.10 26-07-10 CD-1, Pratapgarh ALD 7

C Sectio

nPending

5 CONT 1172/2010 2010 Dasharath Lal &

Oth Beldar

Ignoring of ceiling limit to

payment of arrears

HCL 05.07.10 05.07.10 14.07.10 26-07-10 CD-1, Pratapgarh ALD 7

C Sectio

nPending

6 CONT 1406/2010 2010 Heera Lal Beldar

From appointment

date to regular and all consequental

benefits

HCL 02.08.10 02.08.10 05.08.10 12-08-10 CD-1, Pratapgarh ALD 7

C Sectio

nPending

7 CONT 1371/2010 2010 Ram Das Beldar

Retiral benefits &

pensionHCL 02.08.10 03.08.10 04.08.10 08-06-10 CD-1,

Pratapgarh ALD 7C

Section

Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 3

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

8 340/2011 2011 Chottan & OthPrivate Person

Reg. Construction

of bridge throgh

petitioner's land

HCA 07-03-11 CD-1, Allahabad ALD 7 SALO Pending

9 CONT 2486/2012 2012 Sanjeev kumar Beldar Adjustment HCA 25-07-12 PD,

Allahabad ALD 7C

Section

Pending

10CONT

2904/20122012

SIPAHI LAL V/s ANIL KUMAR

D.M.HCA

N.H. DIV-1 ALD

ALD Pending

11 CONT 2880/2013 2013 Raj Dulare

DubeyChaukidar

(Retd)

Retiral benefits &

pensionHCA 31.01.14 03.02.14 03.02.14 05-02-14 CD-1,

Pratapgarh ALD 7SSO(E-

3)Pending

12CONT/32013011318/2013

CONT 311/2013 2013 Samar Bahadur

Singh & 8 Oth MateGPF

deductionHCL 02.03.13 04.03.13 08.03.13 08-03-13 CD-1,

Pratapgah ALD 7C

Section

Last Listed 12.11.14

1332013111185/2013

CONT 86/2013 2013

Rameshwar Prasad Patel

BeldarGPF

deductionHCL 12.02.13 20.02.13 21.02.13 21-02-13 CD-1,

Pratapgah ALD 7C

Section

Last Listed 12.11.14

14 CONT 3083/2013 2013

Rijwan Ahmad Khan V/s Rajneesh

Dubey & Smt. Chitra

Swaroop(HOD)

ClerkDiploma Holder

PromptionHCA 22-09-13 CD-1,

Allahabad ALD 7 Pending

15 184/2013 CONT 67/2013 2013 Bharat Singh Mate

GPF deduction

HCL 16.02.13 18.02.13 19.02.13 19-02-13 CD-1, Pratapgah ALD 7

C Sectio

nPending

16 CONT 1798/2014 2014 Sant Lal Contractor

Payment of K.M 2001-02

HCA 26-04-14CD-

4(Kumbh), Allahabad

ALD 7Gen

Section

Payment 18.01.15

173201411595/2014

CONT 1596/2014 2014

Ram Sewak Patel S/o Lt. Kashi Prasad

Beldar

From appointment

date to regular and all consequental

benefits

HCL 12.08.14 30.08.14 15.09.14 03-09-14 CD-1 Pratapgarh ALD 7

C Sectio

n

Last Listed 05.09.14

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 4

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

183201411692/2014

CONT 1732/2014 2014

Komal V/s Chitra Swaroop,

ENCBeldar

From appointment

date to regular and all consequental

benefits

HCL 17.09.14 18.09.14 20.10.14 18-09-14 CD-1 Pratapgarh ALD 7

C Sectio

n

Last Listed 09.10.14

193201411411/2014

CONT-1004/2014 2014

Ram Pal S/o Teja Waheed

Bux Beldar HCL 16.06.14 21.07.14 21-08-14 PD Fathepur ALD 7

C Sectio

n

Last Listed 18.09.14

20CONT

214/2014 2014

Awadesh Kumar Tripathi V/s Dr. Rajnish Dubey, P.Sec

PST PD, Fatehpur ALD Pending

21 CONT 381/2015 2015

D.K. Verma V/s Kishan Singh

AtoriaAE Vacate of stay

on increment PST 13.04.15 03.06.15 30.07.15 03-08-15CD-4,

(Kumbh), Allahanad

ALD 13 AE Pending

22CONT

3146/20152015 M/s Pratiksha

Construction ContractorReg Payment

of interestHCA 17.06.15 03-08-15 20.05.15

CD-4, (Kumbh)

AllahabadALD 7

Gen Sectio

nPending

23CONT

3148/20152015 Arvind Kumar

Pandey ContractorReg Payment

of interestHCA 17.06.15 03-08-15 20.05.15

CD-4, (Kumbh)

AllahabadALD 7

Gen Sectio

nPending

243201511942/2015

CONT 1368/2015 2015 Ram Saran HCL CD-1,

Pratapgarah ALD Pending

25CONT 7193/2015

2015Mohd. Shamim

SiddiquiW/Agent Reg. Arrear HCL 25-01-16 CD-1,

Allahabad ALD 7 Pending

26CONT 80/2015 2015

Rahul Upadhayay

Contractor reg. Payment HCL 29.09.15 20-11-15 NH-1, Allahabad ALD 7 Pending

27 CONT 3146/2015 2015 M/s Pratiksha

Construction ContractorReg.Payment of intererst

HCA 17.06.15 03-08-15 20.05.15CD-

4(Kumbh) Allahabad

ALD 7Gen

Section

Pending

28 CONT 3148/2015 2015 Arvind Kumar

Pandey ContractorReg.Payment of intererst

HCA 17.06.15 03-08-15 20.05.15CD-

4(Kumbh) Allahabad

ALD 7 Pending

29 CONT 262/2016 2016

Geeta Srivastava

Retired & Deceasesd Employee

Reg. Payment & arrear

HCA 20.02.16 09-03-16CD-4,

(Kumbh) Allahabad

ALD 7C

Section

Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 5

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

303201611609/2016

CONT 1296/2016 2016 Shiv Shankar S/o

Ram Saran YadavReg.

RepostingHCL 05.08.16 10-08-16 PD

Pratapgarh ALD 7 Vad Pending

31 CONT 2960/2016 2016 Shailendra

Tripathi AEReg.

PromotionHCA 06-08-16

CD-4, (Kumbh)

AllahabadALD 12 A Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 6

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 4617/2012 2012 RAJENDRA

PRASAD UDC Transfer HCL 23.11.11 23.11.11 29-08-12 CD-5, Azamgarh AZM 7 SSO(E-

3)Pending

2 Cont 3568/2012 2012

M/s Kapleshwari Construction

Contractor From Tender HCA 26.09.12 26.09.12 10-01-12 PD, Ballia AZM 7 Pending

3 Cont 137/2012 2012

Suresh Chandra Jaiswal

JEPayment of

ACPPST 07.08.12 14-08-12 11-10-12 PD,

Azamgarh * AZM 7compliance

report filed in PST

4 Cont 2311/2012 2012 Sushila Devi

Private Person

Information RTI

HCA 19.07.12 22.07.12 23-07-12 PD, Azamgarh AZM COMP

LAINTPending

5 CONT 2022/2014 2014

Deendyal V/sSurendra Verma EE

Bridge on Hathiya nala pahuch marg

HCA 06-05-14 CD-5, Azamgarh AZM Compansatio

n paid

6 CONT 7220/2015 2015

Manmohan Pandey V/s Kishn Singh Atoria P.Sec

W/Super (Retd)

HCA 05-02-16 02.05.16 PD Ballia AZM 7order

14.08.15 in 10287/2014

7 CONT 2064/2016 2016

Harikesh V/s V.K. Singh &

OthMate

For Regularisaatio

nHCL 03.12.16 06.12.16 06-12-16 CD,

Azamgarh AZM 8 A Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 7

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 247/2010 2010 Ramlal Singh JE Reg.

promotion PST 10.08.10 19.08.10 27.08.10 09-09-10 01.11.2010 15.04.11CD-1,

Shahjahanpur

BLY 4D

Section

Pending

2 CONT 2367/2010 2010

Chandra Prakash

Srivastava

Amin (Retd) Reg.Pay HCL 13-01-11

Cd-1, Shahjahanp

urBLY 7

C Sectio

n

Last Listed 15.03.11

3CONT

292/20122012

V.K. ARORA V/s KUMAR

ARVIND SINGH DEO & SMT CHTRA

SWROOP E-IN-C

PST PD BLY BLY 6 Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 8

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 761/2009 2009 Rajesh Kumar

& Oths.

Computer Operator (Contract)

For Appointment HCL 26-05-09 PD, Rae

Bareli CZ 7 Last Listed 06.03.13

2 CONT 1211/2010 2010

Chandhas Shukla & 7 Oth

V/s Sri Ravindra Singh

& 5 oth

Chukidar Regualrisation HCL21/07/2010

¼fj0½ 05-01-11

CD-1, Lucknow CZ 7 C

SectionLast Listed 29.05.13

3 CONT 410/2010 2010 Mahendra Kr.

TiwariExecutive Engineer

Against recovery PST 17-01-11 PD, Rae

Bareli CZ Pending

4 Cont 156/2010 2010 Mahaveer

Prasad EE (Retd)Against

reversionPST Stay order

31.10.12TDCU(E/Main), Lucknow CZ Pending

5 CONT 168/2010 2010 K.C.Hajela AE

For adjusted TI

PST CD-1, Unnao CZ 6 Pending

6 Cont 3181/2011 2011 S.C. Tripathi JE Promotion HCL 31.08.12 NA CD-2,

Lucknow CZ 4D

Section

Last Listed 12.12.11

7 CONT 2598/2011 2011 Jai Prakash

SinghLand

Owner Land dispute HCL 06-01-11 PD, Rae Bareli CZ Pending

8CONT

1311/20112011

SYED HASAN AKHATAR &

OTHJE 14-09-12 HCL

SSO(E-2)/ E.Maint-1, Lucknow

CZ4 Last Listed

11.09.14

9 CONT 599/2011 2011 Shiv Bahadur Mate Regularaigat

ion HCL 09-05-11 PD, Rae Bareli CZ 7 Last Listed

31.05.11

10 CONT 2862/2011 2011

Indra Dev Singh V/s Ravindra Singh, P.Sec

JEReg.

Promotion of AE

HCL 5.13 04-01-12 CD-1, Sitapur CZ 4 D

Section Pending

1132012111137/2012

CONT 2746/2012 2012

Abid Husain V/s Sri Arvind Singh

Dev. P.SecHCL Not

RequiredENC Office,

Lucknow CZ 4 SE EST. Pending

12 CONT 16/2015 2012 Pushplata

Pandey LO (Retd)Reg.

Retirement benefits

PST 17.01.201308.11.2013

CD-4 lucknow CZ 4 B Pending

13 Cont 1825/2012 2012 Babu Ram V/s

G.K. Singh, EE Beldar Pension HCL 21.08.12 29.08.12 03-09-12 22.02.13 06.03.13 CD, Sitapur CZ 7C

Section

Last Listed 13.03.13

14CONT

29051/2012

2012 Salik Ram & oth HCL 08-01-13 PD,

Lucknow * CZ Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 9

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

15 CONT 76/2012 2012 Shanti Saran

Shukla UGC For A.C.P. PST 06-06-12PD,

Lakhimpur Kheri

CZ 7 Pending

16CONT

179/20122012

ARUN KUMAR JAYANT V/S KUMAR A.S.

DEV

PST PD UNNAO CZ Pending

17CONT

115/20122012

C.P.S. GAHARWAR V/s KUMAR

ARVIND SINGH

PSTCD-2

LUCKNOWCZ Pending

18 CONT 160/2012 2012 Devendra Singh AE (Retd)

Reg. Retirenmental

benefitsPST 27-06-13 CD-1,

Lucknow CZ 4 AE Pending

19CONT

2905/20122012

HARI HAR PANDEY V/s

Chitra Swaroop ENC

HCL CD-2, Lucknow CZ Pending

20 CONT 1618/2013 2013 Suresh Kumar

Tiwari L.O(Retd) HCL 19-09-13 CD-2, Lucknow CZ 4

B Sectio

n

Last Listed 02.02.15

2132013111065/2013

CONT 2085/2013 2013

Mool Chand Goyal & 8 Oth V/s Dr. Rajnish

Dubey

AEAgainst order 18.09.12 of

HCLHCL 08.10.13 08.10.13 12-12-13 CD-2,

Lucknow * CZ 4AE

Section

Last Listed 18.09.14

22 CONT 341/2013 2013 Jyoti Bhushan

Agrawal

Reg. Retirenmental

benefitsPST 15-04-15 CD-1,

Lucknow CZ 8 A Pending

2332013111205/2013

CONT 2175/2013 2013 Ram Newal

Prasad Yadav HCL 28-01-14 CD-2, Lucknow * CZ Last Listed

19.03.13

24CONT

441/20142014

P.N. SINGH V/s SV/s SRI KISHAN CHAND

AATORIYA

PSTCD-1

LUCKNOWCZ 3

A SECTI

ONPending

25CONT

394/20142014

HARBHAJAN SINGH V/s SRI KISHAN SINGH

AATORIYA

PSTCD-1

LUCKNOWCZ 4

A SECTI

ONPending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 10

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

26CONT

167/20142014 K.P.S.

KUSHWAHA AE(RET)Pay scale

3000-4500PST 07-08-14

TEP ELE. DIV-1 LUCKNOW

CZ 4 Pending

27 CONT 417/2014 2014

Virendra Pal V/s Mannilal EE, CD-1,

Hardoi

Beldar Reg. Recovery HCL 22.02.14 07.03.14 14.03.14 15-03-14 20.02.14 07.03.14 CD-1, Hardoi CZ 7

C Sectio

n

Last Listed 20.02.14

28CONT

416/20142014

V.K. SINGHAL V/s SRI KISHAN CHAND

AATORIYA

Reg. Retirenmental

benefitsPST

CD-1 LUCKNOW

CZ 8A

SECTION

Pending

293201411582/2014

CONT 1536/2014 2014

Dinesh Chandra

Agarwal S/o Lt. D.D. Agarwal

HCL 29.08.2014 CD-2 Lucknow * CZ 3

A Sectio

n

Last Listed 23.01.15

303201411670/2014

CONT 1249/2014 2014

Vandana Jain W/o Lt. Kuldeep

Jain V/s Hari Bansh Singh,

CE HQ-2, Upppwd

Appoinment HCLCD-2

LUCKNOWCZ 7

C Sectio

n

Last Listed 15.04.15

31 3201411936/2014

CONT 2270/2014 2014

SRI NATH MAURYA V/s A.K. GUPTA

(H.O.D.)

HCLCD-2

LUCKNOWCZ Pending

323201411183/2014

Cont 153/2014 2014

Ravi Prakash Shukla V/s ENC Chitra

swaroop

HelperReg. Scale of

electricianHCL 04.03.14 Not

Required 05.03.2014 CD-2, Lucknow * CZ 7 Last Listed

05.03.14

33CONT

373/20142014

JITENDRA SINGH V/s

KISHAN SINGH AATORIYA

SE PROMOTION PSTCD-1

LUCKNOWCZ Pending

34CONT

374/20142014

JITENDRA SINGH V/s

KISHAN SINGH AATORIYA

SE PROMOTION PSTCD-1

LUCKNOWCZ Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 11

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

35CONT

375/20142014

JITENDRA SINGH V/s

KISHAN SINGH AATORIYA

SE PROMOTION PSTCD-1

LUCKNOWCZ Pending

36CONT

376/20142014

JITENDRA SINGH V/s

KISHAN SINGH AATORIYA

SE PROMOTION PSTCD-1

LUCKNOWCZ Pending

37CONT

377/20142014

JITENDRA SINGH V/s V/s SRI KISHAN

CHAND AATORIYA

SE PROMOTION PSTCD-1

LUCKNOWCZ Pending

38CONT

338/20142014

RAMESH CHANDRA V/s

DR. RAJNEESH

DUBE

SE PROMOTION PST Stay oder 07.04.15

CD-1 LUCKNOW

CZ Pending

39CONT

447/20142014

Kulbhushan Kumar Kapoor

V/s Kishan Singh Atoria,

P.Sec

EE(Retd)Reitral

benefitsPST 12-05-15

CD-1 LUCKNOW

CZ 3 A Pending

40CONT

650/20152015 Abdul Qawi

Khan EE(Retd)Higher pay

scaleHCL 19-05-15

Nh-3, Lucknow

CZ 8 A Section Pending

41 3201511233/2015

CONT 124/2015 2015

Devendra Kumar Jain

SEReg.

retirementHCL 11-05-15 CD-2,

Lucknow CZ 6A

Section

Pending

42 3201511244/2015

CONT 213/2015 2015

Awadhesh Kumar

ChaudharyHCL CD-2,

Lucknow CZ Last listed 03.04.15

43 3201511313/2015

CONT 354/2015 2015

Farooq Ahmad S/o Late Noor Mohammad

Private Person

Construction of road

HCL 01.04.15 01.04.15 10.04.15 10-04-15 CD-2, Lucknow CZ 11 Last listed

13.04.15

44 3201511395/2015

CONT 589/2015 2015

Keshav Lal V/s Kishan Singh Atoria P.Sec.

HCL CD-2, Lucknow CZ Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 12

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

45 CONT 12/2015 2015

Kashi Ram V/s Kishan Singh Atoria , P.Sec

EE ACP Benefit PST 20-05-15 CD-1, Lucknow CZ 8 A Pending

46 CONT 61/2015 2015

Suraj Bhan Shukla

Heavey Machine Operator

Challenge of order

02.07.14 of PST

HCL 30.09.14TY, DCU

(E/M), PWD, Lucknow

CZ 7 Pending

473201511881/2015

CONT 942/2015

2015 Mohan Singh HCL PD, Hardoi CZ Pending

48 32015111339/2015

CONT 2194/2015 2015

Mahima Dayal Singh S/o Late

Indra Dev SinghHCL CD-2,

Lucknow CZ Pending

49 32016116/2016

CONT 2380/2015 2015

Ramesh Chandra S/o

Late Prvat Singh

HCL CD-2, Lucknow CZ Pending

50 CONT 2519/2015 2015

Lal Mohammad V/s A.K. Gupta

HCL 21-01-16 PD, Kheri CZ Pending

513201611318/2016

CONT 260/2016 2016

Narendra Singh S/o Aniruddha

SinghHCL 04-04-16 CD-2 Hardoi CZ Pending

523201611248/2016

CONT 197/2016 2016 Durga Prasad

AgarwalJE(T) HCL 31-03-16 CD-2,

Lucknow CZ4

Pending

533201611261/2016

CONT 208/2016 2016 Anil Kumar HCL CD-2,

Lucknow CZ Pending

54 320161199/2016

CONT 2513/2016

2016 Eklavya Kumar S/o Mohan Lal

EE HCL 03-04-16 CD-2 Lucknow * CZ 6

A Sectio

nPending

553201611460/2016

CONT 564/2016 2016 Vivekanand

SharmaHCL CD-2,

Lucknow CZ Pending

563201611527/2016

CONT 1273/2016 2016 Pramod Kumar

Sharma HCL CD-2, Lucknow CZ 7

C Sectio

nPending

573201611529/2016

CONT 1000/2016 2016 Avinash Bajpai HCL 27.06.16 05-07-16 PD, hardoi CZ 7 Vad Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 13

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

583201611679/2016

CONT 856/2016 2016

Shamshuddin S/o Safat

MohammadHCL CD-2

Lucknow* CZ Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 14

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 1892/2010 2010 Bajrangi & Oth W/agent

HCL06-01-11 PD,

Sultanpur FZD 7C

Section

Last Listed 02.12.11

2 CONT 10/2010 2010 N.K. Srivastava EE For Promotion PST 06.03.10 01.05.10 03.05.10 03-05-10 05.05.10 PD,

Barabanki FZD 6 A Pending

3 CONT 1237/2010 2010 Nawal Kishor

Srivastava EE (Retd) For Promotion PST 25.08.10 26.09.10 28.09.10 28-09-10 PD, Barabanki FZD 6 A Pending

4 CONT 1655/2010 2010

VIKAS CHANDRA

SRIVASTAVA V/s R.K.GARG

AND ANOTHER

JE(Retd) Reg. Pension HCL 06-09-14 CD-2 Faizabad FZD 7

C Sectio

nPending

5 CONT 930/2011 2011 Sant Bahadur

SinghTractor Driver

Service matter

HCL13.07.11 13-07-11

PD, Ambedkar

NagarFZD 7 Vad Pending

6 CONT 205/2011 2011 Krishan Dev

Upadhyay Mate Compansation service HCL 13.02.11 11.03.11 16.03.11 25-03-11 CD-3,

Siltanpur FZD 7 C Pending

7 CONT 1572/2012 2012 Jitendra Pratap

singh EERecal of

judgment 21.9.12

HCL Not Required

CD-2, Faizabad FZD 3

A Sectio

nPending

8 CONT 2172/2012 2012 Bhagwat Saran JE(Retd)

Time bond scale/Arrear,

Inquiry of Irregularity

HCA 18.07.12 21.07.12 25-07-12CD,

Ambedkar Nagar

FZD 4 D Section Pending

9 CONT 1915/2012 2012

DAYA SHANKAR

SINGHContractor

Payment of Bill

HCL 28.09.12 10-09-12PD,

Sultanpur/ PD, Amethi

FZD 7 Gen. Section

CA filed payment release

10 CONT 2045/2012 2012 Ganpalt S/o

Ram Das AppointmentHCL

06.10.12 09-10-12 CD-1, Bahraich

FZD7

C Sectio

n

Lst Listed 11.10.12

11 CONT 324/2013 2013 Walli Ur

RahmanPrivate Person

Encrochment HCL 16.02.13 23.02.13 05.03.13 11-03-13 CD-2, Gonda FZD 2 SALO Pending

12 CONT 346/2013 2013

Suresh Chandra Jaiswal

JEMedical

reimbursement

PST 18-11-13 PD, Sultanpur FZD 6

D Sectio

n

Ca Filed 18.11.13

1332013111236/2013

CONT 2065/2013 2013 Ram Singar HCL 22-10-13 PD,

Sultanpur FZD Last Listed 07.11.14

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 15

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1432013111030/2013

CONT 732/2013 2013 Babu Ram Dependent

Reg. Appointment

HCL 16.10.13 02.11.13 10-07-14 CD-3, Sultanpur * FZD 7

C Sectio

nPending

15 CONT 99/2013 2013

Jagdish Narayan Yadav

V/s Rajnish Dubey & Chitra

swaroop

JEAgainst

PunishmentPST Not

RequiredPD,

Balrampur FZD

4

Pending

16CONT

268/20142014

NARENDRA PRASAD

SINGH V/s STATE

AE(RET)Against

PunishmentPST 26.08.14 20.05.15 20-05-15 02.01.14 19.05.15

CD-2 GONDA

FZD 6A

SECTION

Pending

17CONT

247/20142014

TAHIR HUSAIN ABDI V/s Dr.

Rajnesh Dubey P. Sec.

EEReg.

PromotionPST 22-08-16 17.08.15

PD, Ambedkar

NagarFZD 8 A Pending

183201411761/2014

CONT 91/2014 2014

Bhagwati Prasad

SrivastavaJE(T)

Against Judg. 25.09.13 WP 6423/ss/06

HCL 27-10-14Complianc

ePD, Gonda FZD

4

Pending

193201411568/2014

CONT 1108/2014 2014

Sunil Kumar Singh S/o Vinay

Pratap Singh

Related to Inspection

HouseHCL 01-08-14 PD

Barabanki FZD 7 C Pending

203201411440/2014

CONT 1242/2014 2014

Shyam Prakash Singh S/o Brij Nath Singh

Mate HCL 02-08-14 PD Sultanpur FZD 7 Pending

21 CONT 2646/2014 2014 Bhagwan

Prasad SharmaPrivate Person

HCL 19-01-15 PD, Sultanpur FZD Pending

22320141155/2014

CONT 72/2014 2014 Panchu Beldar(Retd)

For pention benefits after

retirementHCL 03-10-14 PD, Amethi FZD 7

Gen Sectio

nPending

233201411372/2014

CONT 900/2014 2014 Rama Shankar

Lal Sharma HCL 02-08-14 PD, Sultanour FZD Pending

24 CONT 406/2014 2014 Ram Naresh

Gupta JE(Retd) Pay Fixation PST 30.02.15 05.01.2015 CD Ambedkar FZD 4 D Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 16

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

25 CONT 93/2014 2014 Srinath Yadav AE

Reg Promotion of

EEPST 16-12-14 Ty, NH,

Sultanpur FZD 8 AEagainst order 14.10.13 in

CP 163/2011

263201511699/2015

CONT 1058/2015 2015

Siya Ram V/s Rajeev Swami

SEMate HCL 20.07.15 22.07.15 27-07-15 CD-3,

Sultanpur FZD 7 C Pending

27 CONT 1742/2015 2015

Mumtaz Ahmad

W/Agent HCL 20.07.15 22.07.15 25-07-15 27.07.15 CD-3, Sultanpur FZD 7 Pending

28 CONT 2573/2015 2015 Kalyan Singh

Private Person

Reg. Jamuria Pul

HCL 09-02-16 CD-3, Barabanki FZD 2

C Sectio

nPending

29 CONT 378/2016 2016 Kalyan Singh

Private Person

Related to Jamuriaya Pul

HCL 30-04-16 CD-3, Barabanki FZD 2

C Sectio

nPending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 17

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 2768/2005 2005 B/L/ Srivastava JE(Retd)

Retiring benefits Non

Compliance of order dt 30.11.04

HCA 03.12.05 05.12.05 06-12-05PD, Sant Kabeer Nagar

GKP 13 CNot listed

after 21.03.07

2 CONT 359/2007 2007 C.D. Ray AE Miscellaneous PST 30-04-08

PD Siddharth

NagarGKP 13 Pending

3 CONT 2778/2008 2008 Mahangu

Punrikshit vetanman

HCA 25-05-10 CD(Build), Gorakhpur GKP 7 HQ-2 Pending

4 CONT 321/2008 2008

Mewa Lal v/s (kapil dev or R

dubeyPST PD, Deoriya GKP 13 A Pending

5 CONT 118/2008 2008 Divakar Dwivedi Contractor Reg.Order dt

19.09.07 HCA 28-02-08 PD, Deoriya GKP 7 C Pending

6 CONT 4481/2009 2009 M/s Aadi Shakti

Trading Co. Contractor Reg.Order dt 12.12.06 HCA 07-01-10 PD, Deoriya GKP 7 Gen Pending

7 CONT 4482/2009 2009 Raj Kumar

Pandey Contractor Reg.Order dt 1.02.08 HCA 07-01-10 PD, Deoriya GKP 7 Gen Pending

8 CONT 3786/2010 2010 V.M. Verma JE(Retd)

Retiring benefits Non

Compliance of order dt 06.04.10

HCA 03.09.11 05.09.11 06-09-00PD, Sant Kabeer Nagar

GKP 13 C Pending

9CONT

5623/20112011 Phool Chand Farmer Pratikar ke

Bhugtan HCAComplianc

eCD(Build), Gorakhpur GKP 4 HQ-2 Pending

10 CONT 136/2011 2011 Santosh Kumar

Saran EE Reg. order 10.01.11 PST 20.07.12 11.09.12 PD, Deoriya GKP 13 A Pending

11CONT

1542/20112011 Yudishdar Mani

Tiwari JE Reg. order 24.05.10 HCL 08/911 14.07.11 PD, Deoriya GKP 4 D Pending

12CONT

5544/20112011 Ram Karan

SinghPravadhik sahayak

Reg. order 24.05.10 HCL 13-12-11 09.07.12 PD, Deoriya GKP 7 C Pending

13CONT

763/20112011 Saleem

Store keeper

Reg. order 23.11.07 HCL 19-04-12 20.04.12 PD, Deoriya GKP 7 C Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 18

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1432012111019/2012

CONT 2380/2012 2012

Karam Dev V/s Chitra Swaroop,

ENCCleaner

For Appointment

HCL 21-11-12 09.11.12 PD, Basti * GKP 7 C Section Pending

15CONT

1944/20122012

HARI RAM GUPTA V/S KUMAR A.S.

DEV

HCACD

MAHARAJ GANJ

GKP Pending

16CONT

78/20122012

HARIHAR PRASAD V/s RAVINDRA

SINGH

PSTPD,

GorakhpurGKP Pending

17 CONT 3061/2012 2012 Salim

Store keeper (Retd)

Against order dt 23.11.07 HCL 24-01-13 12.12.12 24.01.13 PD, Deoria GKP 7 C

Section Pending

18 CONT 414/2013 2013 Jagdesh Roller

Driver PST 28.07.2014 12.07.13 PD Sant Kabir Nagar GKP 7 C Pending

19CONT

305/20132013

G.C. UPADHYAY

V/s DR. RAJNEESH DUBE, SMT.

CHITRA SWAROOP

EE(Ret) PST E/M GKP GKP Pending

20CONT

258/20132013 C.D. Ray EE(Retd)

Service Matter

PST 23-09-13PD,

Siddarth Nagar

GKP 13 Pending

21CW/1517/2014

CONT 253/2014

2014 Ram Karan Singh Retd. Emp.

Arrear of Intrest

HCA 25-04-14 PD, Deoria GKP Pending

223201411410/2014

CONT 1002/2014

2014Ram Naresh & 38 Oth V/s Dr. Rajnish Dubey

Mirtak Asrit

HCLPD, Sant Kabeer Nagar

GKP Last Listed 14.05.14

23 CONT 922/2014 2014

M/S MAA AMBEY

TRADERS V/s DR.

RAJNEESH DUBE P.SEC.

PWD

Contractor HCL 07-07-14 17.07.14 CD(Build), Gorakhpur GKP 7 HQ-2 Last Listed

24.07.14

24 CONT 384/2014 2014 A. K. Sharma SE Promotion PST Not

RequiredCD(Build), Gorakhpur GKP 13 A Pending

25 CONT 891/2014 2014 Manish Kumar AE

Reg. Suspention

HCA 25-03-14 PD, Siddarth Nagar GKP 7 Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 19

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

26CONT

47/20142014 Umesh

Chandra Jadiya AE(Retd)Against

PunishmentPST 04.04.14 05.05.14 01-08-14

CD, Bansi SDR

GKP 13 A Pending

27 CONT 675/2014 2014 Balinder Rai

Driver (Retd)

GPF payment HCA 04-03-14 PD, Deoria GKP 7C

Section

Pending

28CONT

02/20152015 Shashi Prakash

Roller Driver

PSTPD,

Siddarth Nagar

GKP 7 Pending

29CONT 374/2016 2016

Sumitra (AE, Expired) V/s Sri

Kishan Singh Atoria & Oth

AE Reg. Payment HCA 12.02.16 CD-2(PP) Gorakhpur GKP Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 20

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 29/2011 2011 Shiv shankar

Lal EE For Promotion PST 17.01.12 22.02.12 22-02-12 16.03.11 31.12.12 PD Banda JHS 3 A

2 Cont 1398/2012 2012 Mool Chand

Dubey Farmer Compansation HCA 02-05-12 Disposed PD, Banda JHS 2Gen

Section

07.07.2015

3 CONT 192/2012 2012 Pradeep

Rastogi AE PST PD, Jhansi * JHS 6 Pending

4 48/2012Cont

4216/2012 2012 Suraj Singh Bhadauria

Store keeper (Retd)

Recovery HCL 06.11.12 08.11.12 08-11-12 16.01.12 19.03.12 CD-3, Orai JHS 7C

Section

Pending

5 Cont 5540/2012 2012

Rajdhar Singh V/s Ramesh

Chandra Pateria

EEReitral

benefitsHCA 17-01-13 PD, Lalitpur JHS 7

C Sectio

n15.07.2015

6 CONT 2217/2013 2013 Shanti Nandan

Sharma JE Salary HCA 15-07-13 15.07.13 PD, Hamirpur JHS 6 Compl

aint15.07.2015

7 CONT 274/2013 2013 Emamanul

Singh M.Driver

Misprint of retirenment

date in service book

PST Stay order CD-3, Jhansi JHS 6 Pending

8CONT

290/20132013

SHIV SHANKAR LAL

V/s P.SEC.PST 26.04.13 21.06.13 12.06.13 21-06-13 27.4.15 CD-2 BANDA JHS Last Listed

26.12.2014

9 CONT 166/2014 2014 Satya Dev

Gupta JE(Retd) Retiremental claim PST 28.05.14 05-08-14 CD-2(PP),

Orai JHS4

D 31.07.2015

10 CONT 315/2014 2014 Ravi Das Rahi EE Reg.order

05.09.14 PST 21.11.14 26.05.15 27-05-15 05.10.15 25.05.15 CD-1, Banda JHS 6 A

11 CONT 175/2014 2014 Ajay Kumar EE ACR PST 17.07.14 24.07.14 29.07.14 PD Orai JHS 8 A

12 CONT 218/2015 2015 Rajiv Kumar

Saxena JE PST 13.07.15 04.08.15 10-08-15 26.11.15 CD-1, Banda JHS 6 A 16.03.2016

133201611532/2016

CONT 865/2016 2016 Mani Ram HCL PD, Gonda JHS Pending

14 CONT 2234/2016 2016

Ram Prakash V/s Pratap Narayan

SrivastavaMate

For non compiance of

order HCA 21.08.16 14-07-16 PD, Orai JHS 7

C Sectio

nPending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 21

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1CONT

6071/20102010

RAJENDRA KR.TRIPATHI

& OTHHCA PD, Kanpur

N * KNP Pending

2Cont

170/20102010 Rajendra Singh

Saini AE(Retd) Reg. Recovery PST 10.09.13 26-09-13 27.02.09 PD, Kanpur KNP 13 A Pending

3CONT

41/20102010 Mahesh Chand

Gupta JE Reg. Recovery PST 15-07-13 15.07.13 NH, Kanpur KNP 13Compl

aintPending

4 CONT 3375/2012 2012

Mrigrndra Kumar Anil V/s

SRI A.K. BARANWAL, SEC, PWD

AEAgainst

recoveryHCA 08.06.12 18.07.12 21-09-12 13.08.12

PD, Knapur N/ CD-1(PP), Kanpur

KNP 13 PMGSY Pending

5Cont

996/2012, 966/2012

2012 Ram Chandra FarmerNon

compliance of order

HCA 04.04.12 04.04.12 05-04-12 CD, Aurraiya KNP 6Gen

section

Pending

6 Cont 912/2012 2012 Satish Chandra Beldar Regularisation HCL Not

RequiredFinal

16.05.12CD-3,

Etawah KNP 7C

Section

Pending

7 Cont 193/2012 2012 Satya Prakash D/W Regularisation HCA 14.03.12 15.03.12 15-03-12 16.08.12 27.11.12 CD-3,

Etawah KNP 7D

Section

Pending

8 Cont 2962/2012 2012 Om Prakash

Yadav Contractor Payment HCA 25.08.12 27.08.12 30-08-12 PD, Fatehgarh KNP 7

Gen Sectio

nPending

9 Cont 2842/2012 2012 Usha Awasthi mate

Service matter

HCA 28-08-12 27.08.09CD-1,

Ramabai Nagar

KNP 7C

Section

Pending

10 CONT 2319/2012 2012

Ram Swaroop V/s Kunwar Arvind Singh

Beldar Regularisation HCL 06.11.12 06.11.12 06-11-12 08.11.12Not

RequiredCD-3,

Etawah KNP 7C

Section

Lst Listed 21.01.13

11CONT 5213/2012

2012Ashok Kumar

SrivastavaMate

Service Matter

HCA 31.12.12 22-04-13 23.07.12

CD-1, Ramabai Nagar/ Kanpur

KNP 7C

Section

Pending

12CONT

354/20132013

EKLAVYA KUMAR V/s DR

RAJNEESH DUBE

EEService Matter

PST 18-07-14 PD, Fatehgarh KNP 13 Pending

13 CONT 138/2013 2013 F.K. Rao EE Pay Fixation PST 14-06-13 PD, Kanpur

Nagar KNP 13 A Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 22

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

14 CONT 131/2013 2013 Fateh Chandra JE Pay Fixation PST 24.04.13 20.05.13 15-09-15 15.09.15 PD, Kanpur

Nagar KNP 4 DSERB

1099/2013 filed

15 CP 500/2013 2013 Jagdish

Narayan Yadav JE IInd ACP PST 07.08.13 29.08.13 24-09-13 25.04.14 PD, Kannauj KNP 6 Vad3 Pending

16 CONT 2601/2014 2014 Pushpa Devi Peon

For Salary & other benefits

HCA 12-02-15Complianc

eE/M, Kanpur KNP 7

17 CONT 927/2014 2014 Jabir Ali Mate

Against order 22591/08

HCA 29-04-14 PD, Kanpur (N) KNP 7

18 3201511410/2015

CONT 597/2015 2015 Jai Singh & Oth Mate

Minimum Pay Scale

HCL 26-02-15 PD, Kannauj KNP 7 VADS.Appeal 193/2015

filed

19 3201511334/2015

CONT 342/2015 2015 Pradeep Kumar W/Agent HCL PD, Etawah KNP 7 Pending

20CONT

369/20152015 Jagdish

Narayan Yadav JE(Retd) Reg. ACP PST 23-12-15 PD, Kannauj KNP 6 VAD Pending

21 CONT 249/2015 2015 Rajendra

Prasad Sharma EE(Retd) PST 20-11-15 PD, Etawah KNP 4 A Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 23

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 1860/2010 2010 Bhudev Mate Higher pay

scale PST 03.10.10 06.10.10 08-10-10 PD, Moradabad MBD 7 Pending

2CONT 2911/2012

2012Sitaram

VishwakarmaSr.Clerk For Claim HCA 01-08-13 PD, Bijnor MBD 7

Complaint

Pending

3 CONT 23/2012 2012 Abid Husain AE

Against Recovery

PST 12.06.12 08.07.12 09.07.12 09-07-12 PD, Rampur MBD 6A

Section

Pending

4CONT

2911/20132013

SITA RAM VISWAKARMA

V/s DR. RAJNEESH

DUBE

HCA 01-08-13 PD Bijnor MBD Pending

5 CONT 627/2014 2014 Nawab Kazim

Ali Khan MLA Encrochment HCA 22.02.14 26-02-14 PD, Rampur MBD 5 Gen section Pending

6 CONT 869/2014 2014 Nikhat Aara Ex-Steno

Against recovery

HCA 25.03.14 29-03-14 PD, Rampur MBD 5B

Section

Pending

7 CONT 2600/2014 2014 Ameeran

Begam FarmerNon Z-A Land compansation

HCA 12.05.14 22-05-15 PD, Rampur MBD 5 Gen section Pending

8 CONT 2553/2015 2015

Gulam Umar Khan

FarmerFor re-stay on

contruction on land

HCA 02.06.15 14-07-15 PD Rampur MBD 5Gen

Section

Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 24

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1CONT

2494/20092009

Manoj Kumar V/s Kapil Dev,

P.Sec

Pay scale 4000-6000

HCL 11-02-11 PD, Meerut MRT 7C

Section

Pending

2 CONT 1574/2010 2010 Navneet Yadav Contractor Collection of

Toll Tax HCA 30..04.10 14.05.10 17.05.10 21-05-10PD,

Bulandshahar

MRT 7Gen

sectionPending

3CONT

2263/20112011

HARIMOHAN SAXENA &

OTH

Steno (Retd)

Reg. Salary & pension arrear

HCA 13.05.11 22.06.11 27.06.11 06-07-11 15.03.13Complianc

ePD, Meerut MRT 7

B Sectio

nPending

4CONT

5380/20112011 Mahesh Chand

Saxena JE(Retd)Reg. Payment

of GPF GIM HCA 16.12.11 30.12.11 06-01-12 18.11.11 PD, Meerut MRT 4

D Sectio

n

order 19.07.11 in

396/11

5CONT

2546/20112011 Rishipal Singh W/agent

Pay scale 4000-6000

HCL 26.11.11 28.11.11 08-12-11 28.02.12 PD, Meerut MRT 7C

Section

Pending

6 CONT 63/2012 2012 Champat Singh Mate (Retd) Reg. payment PST 25.04.12 02.05.12 08.05.12 27-07-12 04.05.11 27.07.12

PD, Bulandshah

arMRT 7

C Sectio

nPending

7Cont

1521/20122012 Mohd. Khalid Cleaner

Service benefit

HCA 28.04.12 04.05.12 05//8/2012 08.05.12CD-2, Buland Shahar

MRT 7C

Section

Pending

8 CONT 287/2012 2012 Jagdish Prasad AE(Retd) Reg. Payment PST 20.02.13 25.02.13 30.05.13 07-08-13 10.05.12

CD-2, Bulandshah

arMRT AE Pending

9 CONT 202/2014 2014

CHAMPAT SINGH V/s

STATE OF UPMate(Ret)

Reg. pension but 10 yr

service not complete

PST 14.07.14 28.07.14 03-09-14 17.12.13 03.9.14 CD-2 , Bulandshahar MRT 7

C Sectio

nPending

10 CONT 18/2015 2015 Jai Gopal Singh AE Complaint PST 10.04.15 10.05.15 Not

Required 19.07.16 PD Baghpat MRT 6 Compl Pending

11 CONT 6719/2015 2015 Horam Singh

Pradhan Sahayak (Retd)

Pay scale 4000-6000

HCA 17.12.15 29.12.15 30.12.15 06-01-16 30.10.15 06.01.16 PMGSY, Meerut MRT 7

order 26.05.15 in 31434/2015

is compianced on 30.09.15

12 CONT 177/2015 2015

Mohd. Shamim Siddiqui V/s Rameshwar singh, EE

Sr.Assist. Reg. Pension PST 06-07-15PD,

Muzaffer Nagar

MRT 6 Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 25

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

13CONT 636/2016 2016 Ram Kishan Farmer HCA 07.04.16 12.04.16 18.04.16 22-04-16

PD, Bulandshah

arMRT Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 26

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 10000/2006 CONT 2603/2006 2006 Nanhe Singh &

Oth W/agentReg. Pay

scale 4000-6000

HCL 03.06.07 03.07.07 03-07-07 NH, Gaziabad NH 7 C

Section Pending

2 CONT 2997/2006 2006 Maya Devi Dependent For

Appointment HCA 10.12.07 02.01.08 03-01-08 NH, Gaziabad NH 7 C

Section Pending

3 CONT 2842/2009 2009 Nanhe Singh &

Oth W/agentReg. Pay

scale 4000-6000

HCL 07.01.10 14.01.10 29-01-10 NH, Gaziabad NH 7 C

Section Pending

4 CONT 592/2014 2014 Uma shankar Contractor Lambit deyak HCL 28.04.14

01.05.2014

NH kanpur NH 7A

Section

Last Listed 01.05.14

5 CONT 353/2015 2015 Mohsin Nisar EE Reg. order of

PSt 14.12.12 PST 01.10.15 01.10.15 01.10.15 NH, Gaziabad NH 6 A Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 27

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

1 CONT 550/2005 2005

Surya Kant Pathak V/s

Umesh Kumar Mittal, IAS

FarmerLand

compansationHCA 25.03.05 13.04.05 15-04-05 CD(PP),

Mirzapur VNS Pending

2 CONT 3408/2009 2009 Nand Lal Farmer

Reg. Construction

of roadHCA 19-11-09 CD,

Chandauli VNS 7 Gen Pending

3 ONT 2603/2010 2010

M/s A.K. Construction Co. V/s A.K. Sinha, SE

Contractor Reg. Contract HCA 26.06.10 26-07-10 CD(PP), Mirzapur VNS 7 Pending

4CONT

2058/20102010 Gyan Chand

PathakSelection

gradeHCA 08-07-10 PD,

Varanasi VNS 7C

Section

Pending

5CONT

2705/20102010

Ram Govind Uppadyay V/s R.C. Bhardwaj EE 18 Cir, ALD

Truck Driver

Grade-1 Pay Scale

HCA 04-08-10 NH, Gazipur VNS 7 Pending

6CONT

994/20102010

VANDANA OIL CARRIER &

OTHContractor Tender HCA PD,

Varanasi VNS 7 Pending

7CONT

2542/20102010 Brijendra Singh Farmer

Non Compliance

HCA 24.07.10 26.07.10 29-07-10 PD, Gazipur VNS 2 C Pending

8CONT

2264/20112011 GHANSHYAM

SINGH & OTH StenoSelection

gradeHCA 06-07-11 PD,

Varanasi * VNS 7B

Section

Pending

9 CONT 125/2011 2011

Tileshwar Nath V/s Ravindra

Singh

Against punishment PST 20.08.15 PD, Bhadohi VNS 2 Pending

10 CONT 4085/2011 2011

LaLLAN PRASAD V/S Hemraj Singh

Reg. Pay sclae HCA 14-10-11 PD, Bhadohi VNS Pending

11 CONT 1281/2011 2011 Kalicharan &

Oth W/agentSelection

gradeHCA 30-08-11 PD,

Varanasi VNS 7C

Section

Last listed 14.02.12

12CONT

1702/20112011 Keshawa Singh

Yadav & Oth Cleaner

Non Compliance of

order 18.01.11

HCA 13.05.11 13.05.11 30-05-11 18.01.11 PD, Gazipur VNS 7 C Pending

13 CONT 307/2012 2012

Satendra Narayan Singh

StenoSelection

gradeHCA 13-03-12 PD,

Varanasi * VNS 7C

Section

Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 28

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

14CONT

4563/20122012

RAMESH CHANDRA V/s

KUMAR ARVIND

SINGH DEO

HCAPD MIRZA

PURVNS 13 Pending

15CONT

772/20122012

LALLAN PRASAD

JAISWAL V/S SRI BHARAT SINGH(CE)

ContractorPayment of

billsHCA 23-03-12

PD SANT R NAGAR

VNS 7 Pending

16CONT

3813/20122012

MUNNA RAM V/s CHITRA SWAROOP

ENGINEER IN CHIEF PUBLIC

WORKS DEPTT

HCA PD GAZIPUR VNS Pending

17 CONT 5140/2012 2012 Naim Farmer Reg. road

construction HCA 02-01-13 CD, Chandauli VNS 7 Gen Pending

18 CONT 192/2012 2012 Yogendra Lal Mate GPF

Deduction HCL 18-10-12 CD, Chandauli VNS 7 Gen Pending

19CONT

186/20132013

RAJENDRA KUMAR

DWIVEDI V/S R.M.

SRIVASTAVA

HCLPD SANT R

NAGARVNS Last listed

06.02.13

20CONT

1879/20132013

Lallan Prasad Dubey V/s P.K.

PandeyReg. Pay Scale HCA 16-04-13 PD, Bhadohi VNS 2 Pending

21CONT

3416/20132013 Deo Nath Singh JE

Non Compliance of

order 07.03.23

HCA 06-09-13 PD, Gazipur VNS 13 C Pending

22 CONT 2710/2014 2014

M/S DEEPAK CONSTRUCTI

ONContractor

Interest on bill

HCA 02-02-15 25.04.14 PD, Varanasi VNS 7 Vad 2 Pending

23 CONT 882/2015 2014 Dilip Kumar

Upadhayay MateTo add

services of mate

HCA 15-04-15 PD, Varanasi VNS 7 C Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 29

DATE OF SENDING TO GOVT.

DATE OF APPROVAL OF GOVT.

(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).

ENC OFFICE SECTIO

N

REMARKDATE OF CA FILING

DATE OF ORDER BY

COURT (INTERIM/

FINAL)

DATE OF SUBMITTING compliance REPORT TO THE GOVT.

AGAINST THE ORDER

DIVISION ZONE GOVT. SECTION

PETITIONER NAME POST SUBJECT OF

WRITCOURT

DATE OF RECEIVING

WRIT BY DIVISION

PARAWISE NARRATIVE

PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW

CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017

S.No NOTICE NO. WRIT NO YEAR

24CONT 2457/2014

2014Ramji Lal V/s Kishan Singh Atoria P.Sec

AE(Retd)Retiremental

duesHCL 12-01-15 CD,

Chandauli VNS 4B

Section

Pending

25CONT 830/2014 2014

Jairam V/s Ram Kewal Prasad

EE, PD

GPF deduction

HCL 27-05-14 CD, Chandauli VNS 7

B Sectio

nPending

26 CONT 6870/2015 2015

Prabha Devi Santosh Kumar

ShuklaReg. Pension HCA 12-01-16 PD, Bhadohi VNS Pending

27 CONT 459/2015 2015

Kashiram V/s kishan Singh

Atoria

Review 33/2015 &

Claim 700/2008

PST 21-12-15 PD, Varanasi VNS 13 C 03.02.2017

28 CONT 6567/2015 2015

Subhas Rai V/s Arvind Kumar

GuptaHCA 18-01-16 PD,

Varanasi VNS 7 C Pending

29 CONT 7197/2015 2015

Sankatha Sharma

Farmer Cost of Nali HCA 11-02-16 PD, Varanasi VNS 7

C Sectio

nPending

30CONT 2673/2015

2015 Vimal Kumar Mishra

Reg. Promotion

HCA 08-01-16 PD, Varanasi VNS 2 Pending

31 CONT 882/2015 2015 Dilip Upadhyay Mate

For Including Mate service

HCA 15-04-14 PD, Varanasi VNS 7

C Sectio

nPending

32 CONT 4252/2016 2016 Shayam Sunder

PandeyPrivate Person

Encrochment HCA 03-10-16 PD, Varanasi VNS Pending

Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 30