Addendum #3 CITY OF ALBANY Public Works Department ADDENDUM #3 SS-18-06, VLR AERATION LINE IMPROVEMENTS In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall be considered part of the contract documents. In order to ensure that all bidders are aware of these provisions, each bidder shall sign this addendum below and attach it to the proposal. CLARIFICATIONS: For the welded pipe, the extensive testing will not be applied. The City will provide a weld inspector to visually inspect the welds. The existing 90-degree bend shown on sheet 4 of the plans that is to be turned upward is an MJ fitting. The new welded steel pipe should be coated like the existing pipe in the blower building. The relevant specifications for the existing pipe coating are attached to this addendum. Contractor’s Signature Date Company Name (please type or print) IMPORTANT: Failure to include a signed Addendum could result in the disqualification of your bid.

Public Works Department VLR AERATION LINE … · NACE International (NACE): RP0188, Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates. NSF International

  • Upload
    buinhi

  • View
    226

  • Download
    0

Embed Size (px)

Citation preview

Addendum #3

CITY OF ALBANY Public Works Department

ADDENDUM #3

SS-18-06, VLR AERATION LINE IMPROVEMENTS In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall be considered part of the contract documents.

In order to ensure that all bidders are aware of these provisions, each bidder shall sign this addendum below and attach it to the proposal.

CLARIFICATIONS:

• For the welded pipe, the extensive testing will not be applied. The City will provide a weld inspector to visually inspect the welds.

• The existing 90-degree bend shown on sheet 4 of the plans that is to be turned upward is an MJ fitting.

• The new welded steel pipe should be coated like the existing pipe in the blower building. The relevant specifications for the existing pipe coating are attached to this addendum.

Contractor’s Signature Date

Company Name (please type or print)

IMPORTANT: Failure to include a signed Addendum could result in the disqualification of your bid.