Punch Points Checklist of BTS siteSite Name-Mumbai Site ID-145MUM783
Sr.no Particulars Status Remark
Outdoor Unit
1 Connection of outdoor jumper cables & GSM antenna ports
should be properly tighten.2 Weather proofing of connection between outdoor jumper
with antenna port should be properly done.
3 Weather proofing should be done from bottom to top of
antenna port and jumper connection.
4 before installing GSM antenna,proper labelling of GSM
antenna should be done.
5 While pulling GSM antenna through ropway at resp.
height,care should be taken that face of antenna(front)
should be in opposite direction of tower.
6 Connections of outdoor jumper cables & Feeder cables
should be properly tighten.
7 While removing outer insulation of Feeder cables,care
should be taken that inner core of cables should not be
damaged.
8 While removing outer insulation of Feeder cables,care
should be taken that direction of knife should be away from
the body.
9 Connectors of Feeder cables should be properly assembled.
10 RF cable,connector & RF connector tool should be fromsame manufacturer.
11 Weather proofing of connection between outdoor jumper
with RF cables should be properly done.
12 Weather proofing should be done from bottom to top of RF
cables and jumper connection.
13 While assembling earthing kits on each cables,care should
be taken that all the earthing kits should be on same point
of contact on all cables.
14 All cu cables of earthing kits should be routed alongwith the
respective RF cable in downward direction i.e. there should
not be any loop.
15 All cu lugs from earthing kits should be routed & grounded
separately on EGB.
16 Weather proofing of earthing kits should be done properly.
17 While installing C-clamp on the tower body,care should be
taken that paint should be removed from tower body where
C-clamp is going to be installed.
8/22/2019 Punch Point List-VIJAY
2/22
18 While bending the RF cables care should be taken that
bending radius should be greater than 300mm.
19 RF clamps should be assembled properly on cable tray.
20 Routing of RF cables through Six-way clamp should be
proper in such way that cables from 1st sector should be
routed through top or bottom section of six-way clamp,2ndsector should be routed through middle section of six-way
clamp,3rd sector should be routed through bottom or top
section of six-way clamp.
21 Cable tie should provided on eac h & every strip of cable
tray.
22 Cable tie should be cutted properly.
23 Direction of knot of cable tie should be same for all.
24 Tie should be provided in double cross with single cable tie
only.
25 While routing cables through Roxtec from outside to inside
of shelter,care should be taken that it should take S-shaped
structure to avoid any entrance of water.
26 As for 4 rubber boot Roxtec,routing of cables should be
proper such that cables from each sector should be inserted
through separate rubber boot and through the holes which
are horizontal to each other on separate rubber boot.
27 All the remaining holes on the boots which are not used
should be properly filled by weather proofing tape.
28 The gap between Roxtec and shelter's wall should be
properly filled by Silicon gel.
Indoor
29 We should wear ESD band while taking entry inside the
shelter.
Connection of Surge arrestors.
30 Connection between Surge arrestor and feeder cable should
be properly tighten.
31 Connection between Surge arrestor and jumper cable
should be properly tighten.
32 Surge arrestors should be properly grounded to IGB.
33 All the grounding connections of surge arrestors should be
separately routed & grounded on IGB.
34 Grounding connections of surge arrestors at the IGB should
be properly tightened.
35 lugs should be properly crimped by crimping tool at IGB
end.
8/22/2019 Punch Point List-VIJAY
3/22
36 While removing outer insulation of grounding cable at IGB
end,care should be taken that inner core of cable should not
be damaged.
37 While removing outer insulation of grounding cable at IGB
end,care should be taken that direction of knife should be
away from the body.
38 PVC tape should be properly wrapped around lugs and cableconnections at IGB end.
39 There should not be any gap in between connection of cu
lug and cables at IGB end.
40 While routing cables from IGB to Surge arrestors there
should not be any cross routing.
41 Cable tie should provided on eac h & every strip of cable
tray.
42 Cable tie should be cutted properly.
43 Direction of knot of cable tie should be same for all.
44 Tie should be provided in double cross with single cable tie
only.
45 While routing cables on the cable tray,it should be routed in
straight way.
46 There should not be any vertical bending or loop.
47 lugs should be properly crimped by crimping tool at Surge
arrestor end.
48 While removing outer insulation of grounding cable at Surge
arrestor end,care should be taken that inner core of cable
should not be damaged.
49 While removing outer insulation of grounding cable at Surge
arrestor end,care should be taken that direction of knifeshould be away from the body.
50 PVC tape should be properly wrapped around lugs and cable
connections at Surge arrestor end.
51 There should not be any gap in between connection of cu
lug and cables at Surge arrestor end.
52 Connection between indoor jumper and BTS ports should
be properly tightened.
Installation of BTS-
53 There should not be any continuity in between the fastner
and BTS.
54 BTS should be properly levelled.
55 BTS should not be moved while applying any force from its
original position.
56 Fastners should be tight in random diagonal manner.
57 BTS should be placed at accurate position as mentioned in
floor plan.
58 Bit of drill machine used to make a holes should be aligned
with the centre of marked position.
8/22/2019 Punch Point List-VIJAY
4/22
59 All the fastners should be tightened simaltaneously i.e. 2 to
3 rounds of drive to each fastner simaltaneously.
60 All the fastners should be properly tightened.
Installation of TR-
61 There should not be any continuity in between the fastner
and TR.62 TR should be properly levelled.
63 TR should not be moved while applying any force from its
original position.
64 Fastners should be tight in random diagonal manner.
65 TR should be placed at accurate position as mentioned in
floor plan.
66 Bit of drill machine used to make a holes should be aligned
with the centre of marked position.
67 All the fastners should be tightened simaltaneously i.e. 2 to
3 rounds of drive to each fastner simaltaneously.
68 All the fastners should be properly tightened.
Installation of B.B.&P.P. cabinet-
69 There should not be any continuity in between the fastner
and Cabinet.
70 Cabinet should be properly levelled.
71 Cabinet should not be moved while applying any force from
its original position.
72 Fastners should be tight in random diagonal manner.
73 Cabinet should be placed at accurate position as mentioned
in floor plan.74 Bit of drill machine used to make a holes should be aligned
with the centre of marked position.
75 All the fastners should be tightened simaltaneously i.e. 2 to
3 rounds of drive to each fastner simaltaneously.
76 All the fastners should be properly tightened.
77 P.P. should be properly placed on the base above the B.B.
Installation of DDF-
78 All the screws should be properly tighten.
79 DDF block should be properly aligned on the wall of shelter.
80 Bit of drill machine used to make a holes should be aligned
with the centre of marked position.
Grounding connections of Equipments-
Grounding connection of BTS-
81 Grounding connections of BTS at the IGB should be properly
tightened.
8/22/2019 Punch Point List-VIJAY
5/22
82 lugs should be properly crimped by crimping tool at IGB
end.
83 While removing outer insulation of grounding cable at IGB
end,care should be taken that inner core of cable should not
be damaged.
84 While removing outer insulation of grounding cable at IGB
end,care should be taken that direction of knife should beaway from the body.
85 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
86 There should not be any gap in between connection of cu
lug and cables at IGB end.
87 While routing cable from IGB to BTS there should not be any
cross routing.
88 Cable tie should be provided on eac h & every strip of cable
tray.
89 Cable tie should be cutted properly.
90 Direction of knot of cable tie should be same for all.
91 Tie should be provided in double cross with single cable tie
only.
92 While routing cables on the cable tray,it should be routed in
straight way.
93 There should not be any vertical bending or loop.
94 lugs should be properly crimped by crimping tool at BTS
end.
95 While removing outer insulation of grounding cable at BTS
end,care should be taken that inner core of cable should not
be damaged.96 While removing outer insulation of grounding cable at BTS
end,care should be taken that direction of knife should be
away from the body.
97 PVC tape should be properly wrapped around lugs and cable
connections at BTS end.
98 There should not be any gap in between connection of cu
lug and cables at BTS end.
Grounding connection of TR-
99 Grounding connections of TR at the IGB should be properly
tightened.
100 lugs should be properly crimped by crimping tool at IGB
end.
101 While removing outer insulation of grounding cable at IGB
end,care should be taken that inner core of cable should not
be damaged.
102 While removing outer insulation of grounding cable at IGB
end,care should be taken that direction of knife should be
away from the body.
8/22/2019 Punch Point List-VIJAY
6/22
103 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
104 There should not be any gap in between connection of cu
lug and cables at IGB end.
105 While routing cable from IGB to TR there should not be any
cross routing.
106 Cable tie should be provided on eac h & every strip of cabletray.
107 Cable tie should be cutted properly.
108 Direction of knot of cable tie should be same for all.
109 Tie should be provided in double cross with single cable tie
only.
110 While routing cables on the cable tray,it should be routed in
straight way.
111 There should not be any vertical bending or loop.
112 lugs should be properly crimped by crimping tool at TR end.
113 While removing outer insulation of grounding cable at TR
end,care should be taken that inner core of cable should not
be damaged.
114 While removing outer insulation of grounding cable at TR
end,care should be taken that direction of knife should be
away from the body.
115 PVC tape should be properly wrapped around lugs and cable
connections at TR end.
116 There should not be any gap in between connection of cu
lug and cables at TR end.
Grounding connection of B.B.-117 Grounding connections of B.B. at the IGB should be properly
tightened.
118 lugs should be properly crimped by crimping tool at IGB
end.
119 While removing outer insulation of grounding cable at IGB
end,care should be taken that inner core of cable should not
be damaged.
120 While removing outer insulation of grounding cable at IGB
end,care should be taken that direction of knife should be
away from the body.
121 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
122 There should not be any gap in between connection of cu
lug and cables at IGB end.
123 While routing cable from IGB to B.B. there should not be
any cross routing.
124 Cable tie should be provided on eac h & every strip of cable
tray.
125 Cable tie should be cutted properly.
8/22/2019 Punch Point List-VIJAY
7/22
126 Direction of knot of cable tie should be same for all.
127 Tie should be provided in double cross with single cable tie
only.
128 While routing cables on the cable tray,it should be routed in
straight way.
129 There should not be any vertical bending or loop.
130 lugs should be properly crimped by crimping tool at B.B.end.
131 While removing outer insulation of grounding cable at B.B.
end,care should be taken that inner core of cable should not
be damaged.
132 While removing outer insulation of grounding cable at B.B.
end,care should be taken that direction of knife should be
away from the body.
133 PVC tape should be properly wrapped around lugs and cable
connections at B.B. end.
134 There should not be any gap in between connection of cu
lug and cables at B.B. end.
Grounding connection of P.P.-
135 Grounding connections of P.P. at the IGB should be properly
tightened.
136 lugs should be properly crimped by crimping tool at IGB
end.
137 While removing outer insulation of grounding cable at IGB
end,care should be taken that inner core of cable should not
be damaged.
138 While removing outer insulation of grounding cable at IGB
end,care should be taken that direction of knife should beaway from the body.
139 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
140 There should not be any gap in between connection of cu
lug and cables at IGB end.
141 While routing cable from IGB to B.B. there should not be
any cross routing.
142 Cable tie should be provided on eac h & every strip of cable
tray.
143 Cable tie should be cutted properly.
144 Direction of knot of cable tie should be same for all.
145 Tie should be provided in double cross with single cable tie
only.
146 While routing cables on the cable tray,it should be routed in
straight way.
147 There should not be any vertical bending or loop.
148 lugs should be properly crimped by crimping tool at P.P.
end.
8/22/2019 Punch Point List-VIJAY
8/22
149 While removing outer insulation of grounding cable at P.P.
end,care should be taken that inner core of cable should not
be damaged.
150 While removing outer insulation of grounding cable at P.P.
end,care should be taken that direction of knife should be
away from the body.
151 PVC tape should be properly wrapped around lugs and cableconnections at P.P. end.
152 There should not be any gap in between connection of cu
lug and cables at P.P. end.
Grounding connection of DDF block-
153 Grounding connections of DDF block at the IGB should be
properly tightened.
154 lugs should be properly crimped by crimping tool at IGB
end.
155 While removing outer insulation of grounding cable at IGB
end,care should be taken that inner core of cable should not
be damaged.
156 While removing outer insulation of grounding cable at IGB
end,care should be taken that direction of knife should be
away from the body.
157 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
158 There should not be any gap in between connection of cu
lug and cables at IGB end.
159 While routing cable from IGB to DDF block there should not
be any cross routing.
160 Cable tie should be provided on eac h & every strip of cabletray.
161 Cable tie should be cutted properly.
162 Direction of knot of cable tie should be same for all.
163 Tie should be provided in double cross with single cable tie
only.
164 While routing cables on the cable tray,it should be routed in
straight way.
165 There should not be any vertical bending or loop.
166 lugs should be properly crimped by crimping tool at DDF
block end.
167 While removing outer insulation of grounding cable at DDF
block end,care should be taken that inner core of cable
should not be damaged.
168 While removing outer insulation of grounding cable at DDF
block end,care should be taken that direction of knife
should be away from the body.
169 PVC tape should be properly wrapped around lugs and cable
connections at DDF block end.
8/22/2019 Punch Point List-VIJAY
9/22
170 There should not be any gap in between connection of cu
lug and cables at DDF block end.
DC connections from P.P.-
DC connection between P.P. & PIU-
171 lugs should be properly crimped by crimping tool at both
ends.
172 While removing outer insulation of grounding cable at bothends,care should be taken that inner core of cable should
not be damaged.
173 While removing outer insulation of grounding cable at both
ends,care should be taken that direction of knife should be
away from the body.
174 PVC tape should be properly wrapped around lugs and cable
connections at both ends.
175 There should not be any gap in between connection of cu
lug and cables at both ends.
Connection of Busbar to B.B.-
176 lugs should be properly crimped by crimping tool at both
ends.
177 While removing outer insulation of grounding cable at both
ends,care should be taken that inner core of cable should
not be damaged.
178 While removing outer insulation of grounding cable at both
ends,care should be taken that direction of knife should be
away from the body.
179 PVC tape should be properly wrapped around lugs and cable
connections at both ends.
180 There should not be any gap in between connection of culug and cables at both ends.
181 Connections at the both ends should be properly tightened.
Connection of fuse to B.B.-
182 lugs should be properly crimped by crimping tool at both
ends.
183 While removing outer insulation of grounding cable at both
ends,care should be taken that inner core of cable should
not be damaged.
184 While removing outer insulation of grounding cable at both
ends,care should be taken that direction of knife should be
away from the body.
185 PVC tape should be properly wrapped around lugs and cable
connections at both ends.
186 There should not be any gap in between connection of cu
lug and cables at both ends.
187 Connections at the both ends should be properly tightened.
DDF,P.P. alarm connections-
8/22/2019 Punch Point List-VIJAY
10/22
188 At alarm panel,all pcm cables should be properly screwed.
189 At DDF end, all pcm cables should be properly punched by
krone tool.
Connection to -ve of BTS-
190 lugs should be properly crimped by crimping tool at both
ends.191 While removing outer insulation of grounding cable at both
ends,care should be taken that inner core of cable should
not be damaged.
192 While removing outer insulation of grounding cable at both
ends,care should be taken that direction of knife should be
away from the body.
193 PVC tape should be properly wrapped around lugs and cable
connections at both ends.
194 There should not be any gap in between connection of cu
lug and cables at both ends.
195 Connections at the both ends should be properly tightened.
Connection to +ve of BTS-
196 lugs should be properly crimped by crimping tool at both
ends.
197 While removing outer insulation of grounding cable at both
ends,care should be taken that inner core of cable should
not be damaged.
198 While removing outer insulation of grounding cable at both
ends,care should be taken that direction of knife should be
away from the body.199 PVC tape should be properly wrapped around lugs and cable
connections at both ends.
200 There should not be any gap in between connection of cu
lug and cables at both ends.
201 Connections at the both ends should be properly tightened.
Power connections to DCDB-
202 lugs should be properly crimped by crimping tool at both
ends.
203 While removing outer insulation of grounding cable at both
ends,care should be taken that inner core of cable should
not be damaged.
204 While removing outer insulation of grounding cable at both
ends,care should be taken that direction of knife should be
away from the body.
205 PVC tape should be properly wrapped around lugs and cable
connections at both ends.
206 There should not be any gap in between connection of cu
lug and cables at both ends.
8/22/2019 Punch Point List-VIJAY
11/22
SITE NAME:-KADI SITE ADDRESS:-PATIA
SITE ID:-KD1234 OPERAYOR:-IDEA
Punch Points Checklist of BTS site
Sr.no Particulars Status Remark
Outdoor Unit
1 Connection of outdoor jumper cables & GSM antenna ports should
be properly tighten.
2 Weather proofing of connection between outdoor jumper with
antenna port should be properly done.
3 Weather proofing should be done from bottom to top of antenna
port and jumper connection.
4 before installing GSM antenna,proper labelling of GSM antenna
should be done.
5 While pulling GSM antenna through ropway at resp. height,care
should be taken that face of antenna(front) should be in oppositedirection of tower.
6 Connections of outdoor jumper cables & Feeder cables should be
properly tighten.
7 While removing outer insulation of Feeder cables,care should be
taken that inner core of cables should not be damaged.
8 While removing outer insulation of Feeder cables,care should be
taken that direction of knife should be away from the body.
9 Connectors of Feeder cables should be properly assembled.
10 RF cable,connector & RF connector tool should be from same
manufacturer.
11 Weather proofing of connection between outdoor jumper with RF
cables should be properly done.
12 Weather proofing should be done from bottom to top of RF cables
and jumper connection.
13 While assembling earthing kits on each cables,care should be taken
that all the earthing kits should be on same point of contact on allcables.
14 All cu cables of earthing kits should be routed alongwith the
respective RF cable in downward direction i.e. there should not be
any loop.
15 All cu lugs from earthing kits should be routed & grounded
separately on EGB.
8/22/2019 Punch Point List-VIJAY
12/22
16 Weather proofing of earthing kits should be done properly.
17 While installing C-clamp on the tower body,care should be taken
that paint should be removed from tower body where C-clamp is
going to be installed.
18 While bending the RF cables care should be taken that bending
radius should be greater than 300mm.
19 RF clamps should be assembled properly on cable tray.
20 Routing of RF cables through Six-way clamp should be proper in
such way that cables from 1st sector should be routed through top
or bottom section of six-way clamp,2nd sector should be routed
through middle section of six-way clamp,3rd sector should be
routed through bottom or top section of six-way clamp.
21 Cable tie should provided on each & every strip of cable tray.
22 Cable tie should be cutted properly.
23 Direction of knot of cable tie should be same for all.
24 Tie should be provided in double cross with single cable tie only.
25 While routing cables through Roxtec from outside to inside of
shelter,care should be taken that it should take S-shaped structure
to avoid any entrance of water.
26 As for 4 rubber boot Roxtec,routing of cables should be proper such
that cables from each sector should be inserted through separaterubber boot and through the holes which are horizontal to each
other on separate rubber boot.
27 All the remaining holes on the boots which are not used should be
properly filled by weather proofing tape.
28 The gap between Roxtec and shelter's wall should be properly filled
by Silicon gel.
Indoor
29 We should wear ESD band while taking entry inside the shelter.
Connection of Surge arrestors.
30 Connection between Surge arrestor and feeder cable should be
properly tighten.
31 Connection between Surge arrestor and jumper cable should be
properly tighten.
8/22/2019 Punch Point List-VIJAY
13/22
32 Surge arrestors should be properly grounded to IGB.
33 All the grounding connections of surge arrestors should be
separately routed & grounded on IGB.
34 Grounding connections of surge arrestors at the IGB should be
properly tightened.
35 lugs should be properly crimped by crimping tool at IGB end.
36 While removing outer insulation of grounding cable at IGB end,care
should be taken that inner core of cable should not be damaged.
37 While removing outer insulation of grounding cable at IGB end,care
should be taken that direction of knife should be away from the
body.
38 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
39 There should not be any gap in between connection of cu lug and
cables at IGB end.
40 While routing cables from IGB to Surge arrestors there should not
be any cross routing.
41 Cable tie should provided on each & every strip of cable tray.
42 Cable tie should be cutted properly.
43 Direction of knot of cable tie should be same for all.
44 Tie should be provided in double cross with single cable tie only.
45 While routing cables on the cable tray,it should be routed in
straight way.
46 There should not be any vertical bending or loop.
47 lugs should be properly crimped by crimping tool at Surge arrestor
end.
48 While removing outer insulation of grounding cable at Surge
arrestor end,care should be taken that inner core of cable should
not be damaged.
49 While removing outer insulation of grounding cable at Surge
arrestor end,care should be taken that direction of knife should be
away from the body.
50 PVC tape should be properly wrapped around lugs and cable
connections at Surge arrestor end.
8/22/2019 Punch Point List-VIJAY
14/22
51 There should not be any gap in between connection of cu lug and
cables at Surge arrestor end.
52 Connection between indoor jumper and BTS ports should be
properly tightened.
Installation of BTS
53 There should not be any continuity in between the fastner and BTS.
54 BTS should be properly levelled.
55 BTS should not be moved while applying any force from its original
position.
56 Fastners should be tight in random diagonal manner.
57 BTS should be placed at accurate position as mentioned in floor
plan.
58 Bit of drill machine used to make a holes should be aligned with thecentre of marked position.
59 All the fastners should be tightened simaltaneously i.e. 2 to 3
rounds of drive to each fastner simaltaneously.
60 All the fastners should be properly tightened.
61 Grounding connections of BTS at the IGB should be properly
tightened.
62 lugs should be properly crimped by crimping tool at IGB end.
63 While removing outer insulation of grounding cable at IGB end,care
should be taken that inner core of cable should not be damaged.
64 While removing outer insulation of grounding cable at IGB end,care
should be taken that direction of knife should be away from the
body.
65 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
66 There should not be any gap in between connection of cu lug and
cables at IGB end.
67 While routing cable from IGB to BTS there should not be any cross
routing.
68 Cable tie should be provided on eac h & every strip of cable tray.
69 Cable tie should be cutted properly.
70 Direction of knot of cable tie should be same for all.
8/22/2019 Punch Point List-VIJAY
15/22
71 Tie should be provided in double cross with single cable tie only.
72 While routing cables on the cable tray,it should be routed in
straight way.
73 There should not be any vertical bending or loop.
74 lugs should be properly crimped by crimping tool at BTS end.
75 While removing outer insulation of grounding cable at BTS end,care
should be taken that inner core of cable should not be damaged.
76 While removing outer insulation of grounding cable at BTS end,care
should be taken that direction of knife should be away from the
body.
77 PVC tape should be properly wrapped around lugs and cable
connections at BTS end.
78 There should not be any gap in between connection of cu lug andcables at BTS end.
79 lugs should be properly crimped by crimping tool at +ve port of BTS
and Busbar end.
80 While removing outer insulation of grounding cable at +ve port of
BTS and Busbar end,care should be taken that inner core of cable
should not be damaged.
81 While removing outer insulation of grounding cable at +ve port of
BTS and Busbar end,care should be taken that direction of knife
should be away from the body.
82 PVC tape should be properly wrapped around lugs and cable
connections at +ve port pf BTS and Busbar end.
83 There should not be any gap in between connection of cu lug and
cables at +ve port BTS and Busbar end.
84 Connections at +ve port of BTS and Busbar end should be properly
tightened.
85 lugs should be properly crimped by crimping tool at -ve port of BTS
and MCB's end.
85 While removing outer insulation of grounding cable at -ve port of
BTS and MCB's end,care should be taken that inner core of cable
should not be damaged.
86 While removing outer insulation of grounding cable at -ve port of
BTS and MCB's end,care should be taken that direction of knife
should be away from the body.
8/22/2019 Punch Point List-VIJAY
16/22
87 PVC tape should be properly wrapped around lugs and cable
connections at -ve port pf BTS and MCB's end.
88 There should not be any gap in between connection of cu lug and
cables at -ve port BTS and MCB's end.
89 Connections at -ve port of BTS and MCB's end should be properly
tightened.
Installation of TR
90 There should not be any continuity in between the fastner and TR.
91 TR should be properly levelled.
92 TR should not be moved while applying any force from its original
position.
93 Fastners should be tight in random diagonal manner.
94 TR should be placed at accurate position as mentioned in floor plan.
95 Bit of drill machine used to make a holes should be aligned with the
centre of marked position.
96 All the fastners should be tightened simaltaneously i.e. 2 to 3
rounds of drive to each fastner simaltaneously.
97 All the fastners should be properly tightened.
98 Grounding connections of TR at the IGB should be properly
tightened.
99 lugs should be properly crimped by crimping tool at IGB end.
100 While removing outer insulation of grounding cable at IGB end,care
should be taken that inner core of cable should not be damaged.
101 While removing outer insulation of grounding cable at IGB end,care
should be taken that direction of knife should be away from the
body.
102 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
103 There should not be any gap in between connection of cu lug and
cables at IGB end.
104 While routing cable from IGB to TR there should not be any cross
routing.
105 Cable tie should be provided on eac h & every strip of cable tray.
106 Cable tie should be cutted properly.
107 Direction of knot of cable tie should be same for all.
8/22/2019 Punch Point List-VIJAY
17/22
108 Tie should be provided in double cross with single cable tie only.
109 While routing cables on the cable tray,it should be routed in
straight way.
110 There should not be any vertical bending or loop.
111 lugs should be properly crimped by crimping tool at TR end.
112 While removing outer insulation of grounding cable at TR end,care
should be taken that inner core of cable should not be damaged.
113 While removing outer insulation of grounding cable at TR end,care
should be taken that direction of knife should be away from the
body.
114 PVC tape should be properly wrapped around lugs and cable
connections at TR end.
115 There should not be any gap in between connection of cu lug and
cables at TR end.
116 lugs should be properly crimped by crimping tool at +ve port of
DCDB and Busbar end.
117 While removing outer insulation of grounding cable at +ve port of
DCDB and Busbar end,care should be taken that inner core of cable
should not be damaged.
118 While removing outer insulation of grounding cable at +ve port of
DCDB and Busbar end,care should be taken that direction of knife
should be away from the body.
119 PVC tape should be properly wrapped around lugs and cable
connections at +ve port of DCDB and Busbar end.
120 There should not be any gap in between connection of cu lug and
cables at +ve port of DCDB and Busbar end.
121 lugs should be properly crimped by crimping tool at -ve port of
DCDB and MCB's end.
122 While removing outer insulation of grounding cable at -ve port of
DCDB and MCB's end,care should be taken that inner core of cable
should not be damaged.
123 While removing outer insulation of grounding cable at -ve port of
DCDB and MCB's end,care should be taken that direction of knife
should be away from the body.
124 PVC tape should be properly wrapped around lugs and cable
connections at -ve port of DCDB and MCB's end.
8/22/2019 Punch Point List-VIJAY
18/22
125 There should not be any gap in between connection of cu lug and
cables at -ve port of DCDB and MCB's end.
Installation of B.B.&P.P. cabinet
126 There should not be any continuity in between the fastner and
Cabinet.
127 Cabinet should be properly levelled.
128 Cabinet should not be moved while applying any force from its
original position.
129 Fastners should be tight in random diagonal manner.
130 Cabinet should be placed at accurate position as mentioned in floor
plan.
131 Bit of drill machine used to make a holes should be aligned with the
centre of marked position.
132 All the fastners should be tightened simaltaneously i.e. 2 to 3
rounds of drive to each fastner simaltaneously.
133 All the fastners should be properly tightened.
134 P.P. should be properly placed on the base above the B.B.
135 Grounding connections of B.B. at the IGB should be properly
tightened.
136 lugs should be properly crimped by crimping tool at IGB end.
137 While removing outer insulation of grounding cable at IGB end,care
should be taken that inner core of cable should not be damaged.
138 While removing outer insulation of grounding cable at IGB end,care
should be taken that direction of knife should be away from the
body.
139 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
140 There should not be any gap in between connection of cu lug and
cables at IGB end.
141 While routing cable from IGB to B.B. there should not be any cross
routing.
142 Cable tie should be provided on eac h & every strip of cable tray.
143 Cable tie should be cutted properly.
144 Direction of knot of cable tie should be same for all.
8/22/2019 Punch Point List-VIJAY
19/22
145 Tie should be provided in double cross with single cable tie only.
146 While routing cables on the cable tray,it should be routed in
straight way.
147 There should not be any vertical bending or loop.
148 lugs should be properly crimped by crimping tool at B.B. end.
149 While removing outer insulation of grounding cable at B.B. end,care
should be taken that inner core of cable should not be damaged.
150 While removing outer insulation of grounding cable at B.B. end,care
should be taken that direction of knife should be away from the
body.
151 PVC tape should be properly wrapped around lugs and cable
connections at B.B. end.
152 There should not be any gap in between connection of cu lug and
cables at B.B. end.
153 Grounding connections of P.P. at the IGB should be properly
tightened.
154 lugs should be properly crimped by crimping tool at IGB end.
155 While removing outer insulation of grounding cable at IGB end,care
should be taken that inner core of cable should not be damaged.
156 While removing outer insulation of grounding cable at IGB end,care
should be taken that direction of knife should be away from the
body.
157 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
158 There should not be any gap in between connection of cu lug and
cables at IGB end.
159 While routing cable from IGB to B.B. there should not be any cross
routing.
160 Cable tie should be provided on eac h & every strip of cable tray.
161 Cable tie should be cutted properly.
162 Direction of knot of cable tie should be same for all.
163 Tie should be provided in double cross with single cable tie only.
8/22/2019 Punch Point List-VIJAY
20/22
164 While routing cables on the cable tray,it should be routed in
straight way.
165 There should not be any vertical bending or loop.
166 lugs should be properly crimped by crimping tool at P.P. end.
167 While removing outer insulation of grounding cable at P.P. end,care
should be taken that inner core of cable should not be damaged.
168 While removing outer insulation of grounding cable at P.P. end,care
should be taken that direction of knife should be away from the
body.
169 PVC tape should be properly wrapped around lugs and cable
connections at P.P. end.
170 There should not be any gap in between connection of cu lug and
cables at P.P. end.
171 lugs should be properly crimped by crimping tool at both P.P. and
PIU ends.
172 While removing outer insulation of grounding cable at P.P. and PIU
ends,care should be taken that inner core of cable should not be
damaged.
173 While removing outer insulation of grounding cable at P.P. and PIU
ends,care should be taken that direction of knife should be away
from the body.
174 PVC tape should be properly wrapped around lugs and cable
connections at both P.P. and PIU ends.
175 There should not be any gap in between connection of cu lug and
cables at P.P. and PIU ends.
176 lugs should be properly crimped by crimping tool at both B.B. and
Busbar end.
177 While removing outer insulation of grounding cable at both B.B.
and Busbar end,care should be taken that inner core of cable
should not be damaged.
178 While removing outer insulation of grounding cable at both B.B.
and Busbar end,care should be taken that direction of knife should
be away from the body.
179 PVC tape should be properly wrapped around lugs and cable
connections at both B.B. and Busbar end.
180 There should not be any gap in between connection of cu lug and
cables at both B.B. and Busbar end.
8/22/2019 Punch Point List-VIJAY
21/22
181 Connections at the both B.B. and Busbar end should be properly
tightened.
182 lugs should be properly crimped by crimping tool at both B.B. and
Fuse end.
183 While removing outer insulation of grounding cable at both B.B.
and Fuse end,care should be taken that inner core of cable shouldnot be damaged.
184 While removing outer insulation of grounding cable at both B.B.
and Fuse end,care should be taken that direction of knife should be
away from the body.
185 PVC tape should be properly wrapped around lugs and cable
connections at both B.B. and Fuse end.
186 There should not be any gap in between connection of cu lug and
cables at both B.B. and Fuse end.
187 Connections at the both B.B. and Fuse end should be properlytightened.
Installation of DDF
188 All the screws should be properly tighten.
189 DDF block should be properly aligned on the wall of shelter.
190 Bit of drill machine used to make a holes should be aligned with the
centre of marked position.
191 Grounding connections of DDF block at the IGB should be properly
tightened.
192 lugs should be properly crimped by crimping tool at IGB end.
193 While removing outer insulation of grounding cable at IGB end,care
should be taken that inner core of cable should not be damaged.
194 While removing outer insulation of grounding cable at IGB end,care
should be taken that direction of knife should be away from the
body.
195 PVC tape should be properly wrapped around lugs and cable
connections at IGB end.
196 There should not be any gap in between connection of cu lug and
cables at IGB end.
197 While routing cable from IGB to DDF block there should not be any
cross routing.
198 Cable tie should be provided on each & every strip of cable tray.
8/22/2019 Punch Point List-VIJAY
22/22
199 Cable tie should be cutted properly.
200 Direction of knot of cable tie should be same for all.
201 Tie should be provided in double cross with single cable tie only.
202 While routing cables on the cable tray,it should be routed in
straight way.
203 There should not be any vertical bending or loop.
204 lugs should be properly crimped by crimping tool at DDF block end.
205 While removing outer insulation of grounding cable at DDF block
end,care should be taken that inner core of cable should not be
damaged.
206 While removing outer insulation of grounding cable at DDF block
end,care should be taken that direction of knife should be away
from the body.
207 PVC tape should be properly wrapped around lugs and cable
connections at DDF block end.
208 There should not be any gap in between connection of cu lug and
cables at DDF block end.
209 At alarm panel,all pcm cables should be properly screwed.
210 At DDF end, all pcm cables should be properly punched by krone
tool.