PURON® HOLLOW FIBER MODULES Hollow Fiber Submerged Membrane Modules for MBR Applications
PRODUCT DESCRIPTION
Membrane Chemistry: Membrane Type: Fiber Support Chemistry: Nominal Pore Size: Outside Fiber Diameter: Potting Material: Module Frame Material: Permeate Collection Tube Material: Storage Solution:
Proprietary PVDF PVDF-1 braided hollow fiber for outside-in operation Polyester 0.03 µm 0.1 inch (2.6 mm) Proprietary epoxy compound 316 Stainless Steel PVC, PN 10 and PE manifolds Glycerin
PRODUCT SPECIFICATIONS
Model PSH 300 PSH 600 PSH 1800
Part Number PUR-PSH37-8 PUR-PSH37-16 PUR-PSH41-44
Membrane Area ft2 (m2) 3,230 (300) 6,460 (600) 19,375 (1800)
OPERATING & DESIGN INFORMATION*
Temperature Range: 41 - 104°F (5 - 40°C) Maximum Filtration Transmembrane Pressure: 9 psi (0.6 bar) Maximum Backflush Transmembrane Pressure: 9 psi (0.6 bar) Allowed Instantaneous Air Flow Rates: PSH 300 and PSH 600 models: 0.016 – 0.034 scfm/ft2 (0.30 - 0.63 Nm3/hr.m2) PSH 1800 model: 0.015 – 0.030 scfm/ft2 (0.27 - 0.55 Nm3/hr.m2) Allowable pH Range for Cleaning 2.0 – 10.5 Maximum Allowed Total Chlorine @ 95°F (35°C) or Lower: 1,000 ppm @ pH 9 or higher during backflush Maximum Allowed Total Chlorine @ 95°F (35°C) or Lower: 2,000 ppm @ pH 9 or higher during recovery cleaning Maximum Allowed Total Chlorine Contact: 500,000 ppm-hrs cumulative * Consult Process Technology Group for specific applications.
NOMINAL DIMENSIONS & WEIGHT*
Model
PSH 300 PSH 600 PSH 1800
L Inches (mm)
35.67 (906) 65.43 (1,662) 88.35 (2,244)
W Inches (mm)
35.16 (893) 35.16 (893) 69.10 (1,755)
H Inches (mm)
93.82 (2,384) 95.35 (2,422) 99.61 (2,530)
Dry Weight Pounds (kg)
700 (320) 1,300 (590) 3,090 (1,400)
* See schematic diagrams next page.
CONNECTIONS Model
PSH 300 PSH 600 PSH 1800
Permeate Type Outside Diameter (mm)
Flange DN 50 (2”) Flange DN 80 (3”) Pipe Ø 200
Air Type Outside Diameter (mm)
Flange DN 50 (2”) Flange DN 80 (3”) Pipe Ø 110
[email protected] Tel. +31-152-610-900www.lenntech.com Fax. +31-152-616-289
P
MSS(4aoTTteWmteaDOaos•
••
PURON® HOLL
Module TranspStorage of PURONStorage of PURON41 to 77°F / 5
avoided. The PURon site. Transport of PUROTransport of PUemperature (23 toWhen the PURONmodule should beemperature, proviand 45°C). Dry-up Protection Once the PURON aqueous medium, itoperated for 7 daysubmerged in the bi The biomass is
over the membra The module is fu The module aer
minute to assure
LOW FIBER M
PSH 1800
port and StoragN Modules N modules shouldto 25°C). ExtendON modules mus
ON Modules URON modules o 113°F / -5 to 45°N modules are bee placed in seawoded that such tem
hollow fiber modt should never be sys or less, the moiomass, provided thhealthy and is ae
ane chamber is funclly submerged in thration is switched e mixing of sludge in
ODULES
ge Conditions:
d be carried out ated exposure to t not be stored for
should be carrC).
eing transported borthy packaging amperature is betw
dule has been comstored dry. If the module may be kephe following conditirated and the recictioning properly. he biomass.
on every 30 minunside the module.
t ambient temperaUV source mus
r longer than 3 mo
ried out at am
by ship , the PURand stored at ameen 23 and 113°F
mmissioned with aembrane plant is n
pt wet by keeping ons are met: rculation of bioma
utes for a period
P
ature st be onths
bient
RON bient F (-5
an not it
ss
of 1
Storage ofIf the idlerequired. • Subme
3 to 4 • Add s
total c• Check
chlorinneces
Long-termIf a dry-uthan 21 ddetails. Proper HUtmost cCollisionsmodules PrecautioKeep theexposuregrinding)
PSH 600
f Used Modules e period is longer th Proceed as followserge the module fu hours, drain the taodium hypochloritehlorine at pH betwe
k the chlorine conne drops below 5 msary.
m Storage up cannot be avoiddays, the module h
andling care at any times, impact or hittinor connections.
ons When Working e hollow fiber moe to heat sources should be strictly p
han 7 days, immers:
ully in potable watenk and finally refill we to form a solutioeen 5.5 and 7.5. ncentration daily. mg/l additional dos
ded due to transpoas to be conditione
e should be takeng the ground in
Near the Hollow Fodules free from . Actions that ma
prohibited.
PSH
rsion in a storage s
r. Start the aerationwith fresh water agon of concentration
If the concentratsage of sodium hy
ort or if the idle peed. Please consult
n when handling a rough manner
iber Module contact with sha
ay cause sparks
H 300
solution is
n for at least gain. n of 10 mg/l
tion of total pochlorite is
eriod is longer KMS for more
the module. may damage
rp objects or(e.g. welding,
The information contained in this publication is believed to be accurate and reliable, but is not to be construed as implying any warranty or guarantee of performance. We assume no responsibility, obligation or liability for results obtained or damages incurred through the application of the information contained herein. Refer to Standard Terms and Conditions of Sale and Performance Warranty documentation for additional information.