Purple Line Extension Section 1 Construction Community Meeting July 16, 2015

Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Purple Line Extension Section 1 Construction Community Meeting July 16, 2015

Page 2: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Tonight’s Agenda

• Construction Update and Look-Ahead • Pile Installation at La Brea Look-Ahead • Eat, Shop, Play Wilshire • Parking Replacement • Landscape Review: Tree Palette • Breakout Session Q&A

2

Page 3: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Section 2 New Starts Engineering phase of the FTA Capital Investment Grant Program

Under Construction Forecasted Schedule Section 1 Section 2 Section 3

Length 3.9 Miles 2.55 Miles 2.48 Miles

New Stations Wilshire/La Brea Wilshire/Fairfax Wilshire/La Cienega

Wilshire/Rodeo Century City/ Constellation

Westwood/UCLA Westwood/VA Hospital

Pre-Construction Activities Current - 2016 2015 - 2018 2025 - 2027

Construction 2015 - 2023 2019 - 2026 2027 - 2035

Operations 2024 2026 2035 3

Page 4: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Purple Line Extension Project Map

4

Page 5: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Tie-in at Western Station

5

Advanced Utility Relocation – Anticipated to begin December 2015 – Wilshire between Manhattan Place and

Western Hours of operation

– Day, 9:30-3:30pm – Night, 8:00pm-6:00am

Example of utility work at Fairfax

Rendering of AUR Work

Page 6: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Crenshaw Yard Staging Site Wilshire/Crenshaw

• Used throughout Section 1 utility relocation and construction • Mitigation efforts and maintenance:

– “Right Turn Only” signs at Lorraine Gate – “No Metro Contractor Parking on City Street” signs – Noise awareness training – Nightly noise readings – Maintenance inside and outside of yard

6 Signage at the Crenshaw Yard

Page 7: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Station

Rendering shows length of the La Brea underground station box on Wilshire Blvd from Orange Dr to Detroit St

7

Page 8: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Station Construction Survey • Design survey of existing streets, sidewalks, landscape and buildings.

Duct bank Work • Currently underway at Orange Drive • Starts Sunday, August 2nd on the northeast corner of Wilshire and La Brea • Night Hours: 8pm-6am

8

Page 9: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Completed • Alley relocation • Art removal at former Metro Customer

Service Center

Summer 2015 Day Work (7am-4pm)

• Demolition of former Metro Customer Service Center, Blockbuster and Lawrence of La Brea buildings

• Undergrounding of overhead utilities in Detroit lot

• Construct sound wall

La Brea Station North La Brea Staging Yard

9

Page 10: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Summer 2015 • Temporary fence installed around

remaining properties. • Temporary alley relocation to exit

west to Detroit at northern end • Demolition of former Metro

Customer Service Center, Blockbuster and Lawrence of La Brea buildings

• Construct sound wall

La Brea Station North La Brea Staging Yard

10

Page 11: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

• Metro acquired former Bank of America property end of May

– Temporary fence installed – Abatement work of non-recyclable materials began

July 1st. – Day Work (7am-4pm)

• Metro acquires additional properties end of summer

• Future South La Brea Staging Yard

La Brea Station South La Brea Staging Yard

11

Photo of Abatement Work

Page 12: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Starting Fall 2015* Day Work (7am-4pm)

• Fence remaining property • Demolition of existing buildings • Build sound wall (after sound study is

completed) • Build slurry plant (only used for 2 years) to

support tunneling *dates subject to change

La Brea Station South La Brea Staging Yard

12

Page 13: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Station Mitigation

• Business and resident advanced communications

• North and South La Brea Staging Yard maintenance

• Sound wall study underway

13

Illustration of La Brea Staging Yards Sound Wall Design

Photo of Crenshaw Yard Sound Wall which will look similar to how La Brea Sound Walls will look

Page 14: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Station Pile Installation

14

Fall 2015 through Summer 2016* • First major construction activity of subway at La Brea. • Length of pile installation will be on Wilshire from Orange Dr.

to Detroit St. • Pile installation includes:

– Rig to construct 95ft (L) deep hole on 7 center to center spacing – Crane lifting 95Ft (L) , 24 Inch H-piles into holes – 1-2 piles per day, 390 piles total – Drilling, pile installation and backfilled concrete completed same

day

• All work occurs behind a k-rail. • Operation anticipated to take approximately 4-6 months on

each side of the street. • Wilshire will be reduced to two lanes each way during

construction. *dates subject to change

Page 15: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Station Pile Installation

15

Page 16: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Station Pile Installation

16

Page 17: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Station

Rendering shows length of the Fairfax underground station box on Wilshire Blvd from west of Fairfax to just west of Ogden Dr.

17

Page 18: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Station Construction

Metro Advanced Utility Relocation (AUR) Work • Electrical, water and gas work continues • Work Hours:

Day work: o Monday thru Friday: 9am-3:30pm o Saturday: 8am-6pm

Night work: o Sunday thru Thursday: 8pm-6am o Friday: 10pm-8am

18

Photos of recent AUR work for Fairfax Station

Photos of recent AUR work at Wilshire/Fairfax

Page 19: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Utility Relocation 2 Years *Schedule is subject to change. Updated as of July 2015.

19

Page 20: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Station Mitigation

• Noisy activities re-scheduled from night to day work or to be completed by 11 p.m. Activities are monitored throughout each shift.

• Torch cutters used in place of traditional plate cutters. • Additional sound blankets placed when needed. • Work activities are adjusted to reduce noise levels. • Battery powered (solar charged) lights are utilized to eliminate noise from

generators.

20 Photos of noise mitigation at Wilshire/Fairfax

Page 21: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Station Staging Yards • Buildings between Ogden and Orange Grove have been acquired by Metro.

• Abatement activity is currently being scheduled. • Parking lot on northwest corner of Fairfax and Wilshire was closed permanently on

July 8 and geotechnical work began July 9.

21 Fenced in parking lot at northwest corner of Fairfax/Wilshire Buildings at 6010-6030 Wilshire

Page 22: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Cienega Station

Rendering shows length of the La Cienega underground station box on Wilshire Blvd from La Cienega to Tower Dr.

22

Page 23: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Cienega Station Construction

Metro Advanced Utility Relocation (AUR) Work • Electrical, sewer and telecommunication work continues from La

Cienega to San Vicente. • Geotechnical work is underway.

Photo of recent AUR work for the La Cienega Station

23

Page 24: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Cienega Utility Relocation 30 Months *Schedule is subject to change. Updated as of July 2015.

24

Page 25: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Cienega Station What’s Next

April through December 2015 • AUR activities occur mostly during

daytime hours. • Days and Hours

o Monday thru Friday: 7am – 4pm o Saturday or Sunday: 8am – 6pm o Night Time Hours:

• 8pm – 6am or • 1am – 9am

25

Vault placement on Gale for La Cienega Station

Page 26: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Noise Mitigation Night time work permit: Ambient +5 Db

Wilshire/La Cienega Wilshire/Fairfax

26

Page 27: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

27

Eat, Shop, Play Wilshire

Eat, Shop, Play Wilshire has officially launched! Make it easier for the public to

• Eat at local restaurants

• Shop at local retail stores

• Play at local destinations

during and after construction of new Metro Purple Line Extension!

Page 28: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

28

Eat, Shop, Play Quarterly Drawing

• Visit metro.net/eatshopplay to take the pledge to Eat, Shop, Play Wilshire!

• Spend $25 to enter Quarterly Drawing

– $1,000 Grand Prize

– $500 2nd Prize

– $250 3rd Prize

• Drawing Date: October 2 • Sponsor for Q3 2015

Page 29: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

29

Eat, Shop, Play Wilshire Lunch Meet-up at Origen

• On July 1, we held our first #espWilshire Lunch Meet-up at Origen Mexican Kitchen, a family-owned restaurant located across the street from the future La Brea Station. 60 people showed their support.

– Address: 5354 Wilshire Blvd. Los Angeles, CA 90036 – For more info visit: www.origenmexicankitchen.com or bit.ly/1IHB1Ji

Page 30: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

30

Eat, Shop, Play Wilshire Ryders Tuxedo

• Ryders Tuxedo is a local shop on Wilshire Blvd. where you can rent or buy tuxedos, suits and more. Ryders Tuxedo offers a variety of tuxedos to accommodate different styles and tastes.

– Address: 5375 Wilshire Blvd. Los Angeles, CA 90036 – For more info visit: www.ryderstuxedo.com or bit.ly/1HN11UU – Check out our #espWilshire Business Spotlight Video on Ryders: bit.ly/1HgOX7U

Page 31: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

31

Eat, Shop, Play Wilshire Muse on 8th Street

• Muse on 8th Street is a neighborhood café that serves organic coffee, tea & espresso drinks, baked-goods from local artisan bakeries and vegetarian/vegan-friendly food and just last month, celebrated its 3-year anniversary!

– Address: 759 S. La Brea Ave. Los Angeles, CA 90036 – For more info visit: museon8th.com or bit.ly/1IHB1Ji

Page 32: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

32

Eat, Shop, Play Wilshire Black Dog Coffee

• Black Dog Coffee has been serving the Miracle Mile since 1998. They offer a full selection of coffee and other beverages, including iced and blended coffee drinks and fruit smoothies. They also have delicious and healthy breakfasts, homemade soups, sandwiches and salads. They serve vegan options too!

– Address: 5657 Wilshire Blvd. Los Angeles, CA 90036 – For more info visit: blackdogcoffee.com or bit.ly/1JUavuV.

Page 33: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Parking Utilization Study

• La Brea Utilization study completed • Station located in Miracle Mile

– High demand for parking on and off-street – Several Preferred Parking Districts

• Examined parking utilization rate of existing parking spaces

• Determined initial additional spaces needed for Parking Management Plan

33

Page 34: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Parking Management Plan

• Parking Management Program (FEIR Mitigation TCON 7) – Minimize parking impacts due to temporary removal of on-street

parking within the construction work zone, if possible

• Parking Monitoring and Community Outreach (Mitigation TCON 8)

– Monitor and identify parking shortages during construction

34

Page 35: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Draft: Parking Relocation Options

• Turn 2 way street into 1 way street – Removes parallel parking on one side – Replaces one side with angled parking

• Current prospects: Cloverdale and Ridgeley • Will remain 2 way street up to public parking lots • After lots, northbound one way street from Wilshire to 6th • Will follow existing parking regulations

35

Page 36: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Draft: Parking Relocation Options

• Replacement parking falls within Permit Parking District (PPD) • New angled parking will follow existing parking regulations

– Time limit or PPD restrictions on existing signs

• Exact replacement count still being approved by DOT • Requires 2/3 approval by building owners/managers of both

sides of each street – Block meetings will be held once exact # and streets are identified

• Anticipated to be implemented in Fall 2015

36

Page 37: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Draft: Cloverdale Replacement Parking

37

Page 38: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Draft: Ridgeley Replacement Parking

38

Page 39: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Tree Removal and Replacement Plan

• Estimate 82 trees need to be removed in public Right-of-Way • Tree Removal and Replacement Plan submitted to Bureau of Street

Services April 2015 • Trees posted for removal May 9, 2015 • Board of Public Works hearing July 22, 2015 • Tree removal schedule

– La Brea summer 2015 – Fairfax summer 2016 – La Cienega late 2016

39

Phoenix dactylifera around Wilshire/Fairfax

Page 40: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Landscape Overview

• Mia Lehrer + Associates Landscape Architecture • Used existing palette as starting point • Updated palette based on Urban Forestry requirements • Will replace removed trees 2:1 • Will focus on medians and sidewalk trees • Overflow trees will go on side streets adjacent to Wilshire

40

Page 41: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Western Existing

41

Page 42: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Existing

42

Page 43: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Existing

43

Page 44: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Western Proposed

44

Page 45: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

La Brea Proposed

45

Page 46: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Proposed: Option A

46

Page 47: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Fairfax Proposed: Option B

47

Page 48: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Future Community Meetings

• Next Section 1 Community Meeting: September 17, 2015 at the Korean Cultural Center.

– Business Focused Meeting – Metro Business Interruption Fund – How to Do Business with Metro

• Community Meetings held on the 3rd Thursday of every other month

– Community Meeting location will rotate along the alignment – Section 1 Advisory Group will meet as needed to discuss station

specific issues. Meetings will be open to the public.

• Sign up for the newsletter to receive project updates!

48

Page 49: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/... · 2015-07-21 · •First major construction activity of subway at La Brea. • Length of pile installation

Stay in Touch

www.metro.net/purplelineext

twitter.com/purplelineext

facebook.com/purplelineext

213.922.6934

[email protected]

49