Planning Department and Civil Engineering and Development Department Agreement No. CE53/2008 (CE) Planning and Engineering Study on Development of Lok Ma Chau Loop - Investigation Technical Report No. 7 on Stage 1 Implementation Strategy, Cost and Revenue Estimate and Development Programme - Executive Summary Page 1 May 2012 Purpose Technical Report No. 7 provides discussion and recommendation on the implementation mechanism, procurement approach and development programme of the Lok Ma Chau Loop (LMC Loop) development. It also includes the cost and revenue estimates of the project to present the financial implications of the project. The report is based on the Recommended Outline Development Plan (RODP) of the LMC Loop development as presented in Technical Report No. 4 and the supporting infrastructures proposed in the relevant technical assessments under Technical Report No. 5. The Study Area, consisting of Study Area A (Area A) and Study Area B (Area B) on the Hong Kong side, is shown in Figure 1. Implementation Mechanism The report has discussed the general pros and cons of different options of mode of development for the Administration’s reference. Issues discussed include the institutional arrangement, phasing and public and private sector partnership. The mode of development for LMC Loop is subject to further discussion between the Hong Kong and Shenzhen Governments through the Working Group on the Mode of Development for Lok Ma Chau Loop formed under the Hong Kong - Shenzhen Joint Task Force on Boundary District Development. Procurement Approach Contract Packaging Based on the RODP, it is recommended that the LMC Loop development works be divided into 7 construction contracts (1 no. for advance works, 4 nos. for phase 1 works, 2 nos. for phase 2 works), utilising different expertise of the respective contractors. Specialised items like sewage treatment works and district cooling system (DCS) are assigned to individual works contract. Works to be carried out by others, like building work designed and constructed by educational institution, the utility work by utility undertakers, are also identified in the report. Advance Works In order to fast track the programme and achieve earliest beneficial use of the LMC Loop, the report has identified four critical elements on the programme which should be advanced to allow some facilities in the Loop to commence operations in 2020. The advance works include: Land decontamination in Area A; Creation of Ecological Area for reed marsh compensation in Area A; Fishpond compensation for Area A & Area B; Interim minor improvement to Ha Wan Tsuen Road and temporary bridge across meander as temporary haul road to facilitate subsequent construction works. Type of Contract The report has compared the pros and cons of different types of procurement approaches for each of the works contract, in accordance with ETWB Technical Circular No. 32/2004. Procurement approaches include the designer-led; the design & construct (D&C); the design, construct & operate (D,C&O); and the finance, design, construct and operate (F,D,C&O). The report has recommended appropriate procurement category for each works contract for the Administration’s consideration.

Purpose Implementation Mechanism Procurement Approach · network in Kwu Tung North New Development Area which will be available at a later date, , the study has suggested phased implementation

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Purpose Implementation Mechanism Procurement Approach · network in Kwu Tung North New Development Area which will be available at a later date, , the study has suggested phased implementation

Planning Department and

Civil Engineering and Development Department

Agreement No. CE53/2008 (CE)

Planning and Engineering Study on Development of Lok Ma Chau Loop - Investigation

Technical Report No. 7 on Stage 1 Implementation Strategy, Cost and

Revenue Estimate and Development Programme -

Executive Summary

Page 1 May 2012

Purpose

Technical Report No. 7 provides discussion and recommendation on the implementation mechanism,

procurement approach and development programme of the Lok Ma Chau Loop (LMC Loop)

development. It also includes the cost and revenue estimates of the project to present the financial

implications of the project. The report is based on the Recommended Outline Development Plan

(RODP) of the LMC Loop development as presented in Technical Report No. 4 and the supporting

infrastructures proposed in the relevant technical assessments under Technical Report No. 5.

The Study Area, consisting of Study Area A (Area A) and Study Area B (Area B) on the Hong Kong side,

is shown in Figure 1.

Implementation Mechanism

The report has discussed the general pros and cons of different options of mode of development for the

Administration’s reference. Issues discussed include the institutional arrangement, phasing and public

and private sector partnership. The mode of development for LMC Loop is subject to further discussion

between the Hong Kong and Shenzhen Governments through the Working Group on the Mode of

Development for Lok Ma Chau Loop formed under the Hong Kong - Shenzhen Joint Task Force on

Boundary District Development.

Procurement Approach

Contract Packaging

Based on the RODP, it is recommended that the LMC Loop development works be divided into 7

construction contracts (1 no. for advance works, 4 nos. for phase 1 works, 2 nos. for phase 2 works),

utilising different expertise of the respective contractors. Specialised items like sewage treatment

works and district cooling system (DCS) are assigned to individual works contract. Works to be

carried out by others, like building work designed and constructed by educational institution, the utility

work by utility undertakers, are also identified in the report.

Advance Works

In order to fast track the programme and achieve earliest beneficial use of the LMC Loop, the report

has identified four critical elements on the programme which should be advanced to allow some

facilities in the Loop to commence operations in 2020. The advance works include:

Land decontamination in Area A;

Creation of Ecological Area for reed marsh compensation in Area A;

Fishpond compensation for Area A & Area B;

Interim minor improvement to Ha Wan Tsuen Road and temporary bridge across meander as

temporary haul road to facilitate subsequent construction works.

Type of Contract

The report has compared the pros and cons of different types of procurement approaches for each of

the works contract, in accordance with ETWB Technical Circular No. 32/2004. Procurement

approaches include the designer-led; the design & construct (D&C); the design, construct & operate

(D,C&O); and the finance, design, construct and operate (F,D,C&O). The report has recommended

appropriate procurement category for each works contract for the Administration’s consideration.

Page 2: Purpose Implementation Mechanism Procurement Approach · network in Kwu Tung North New Development Area which will be available at a later date, , the study has suggested phased implementation

Planning Department and

Civil Engineering and Development Department

Agreement No. CE53/2008 (CE)

Planning and Engineering Study on Development of Lok Ma Chau Loop - Investigation

Technical Report No. 7 on Stage 1 Implementation Strategy, Cost and

Revenue Estimate and Development Programme -

Executive Summary

Page 2 May 2012

Development Programme

Phasing

In order to enjoy early benefit of part of the LMC Loop while considering the constraint that the road

network in Kwu Tung North New Development Area which will be available at a later date, , the study

has suggested phased implementation of Area A.

Phase 1 development (see Figure 2) covers the buildings in zones 1 & 2 on the western side of Area A,

as well as the necessary infrastructure (sewage treatment works, fire station cum ambulance depot and

power substation) in zone 3 at the east. The Western Connection Road (WCR) and the Direct Link to

the MTR Lok Ma Chau Station area (Direct Link) are also scheduled to support the phase 1

development. It is the current target to allow some facilities in the Loop to commence operations in

2020.

Phase 2 development (see Figure 3) covers the buildings in zones 3 to 5, as well as the Eastern

Connection Road (ECR) linking to Kwu Tung North New Development Area. This phase is scheduled

at a later stage.

Implementation Programme

The report has examined the timeframe for the necessary EIA process, gazettal process, funding

approval process, land clearance & acquisition procedures, as well as the design, tendering and

construction duration. A master development programme has been prepared to outline the activity

arraignment to achieve the targeted initial operation currently scheduled for 2020.

The items on the critical path or with little float time in the programme are identified:

EIA process;

Statutory plan making and gazettal procedures including road works;

LegCo funding application for advance works and site formation works;

Detailed design for advance works;

Creation of ecological area for reed marsh compensation;

Site formation works for Zones 1 to 3

Educational institution building works in zone 2 and sewage treatment works.

Page 3: Purpose Implementation Mechanism Procurement Approach · network in Kwu Tung North New Development Area which will be available at a later date, , the study has suggested phased implementation

1.2

As Shown

研究範圍 Study Area

peter-ly.chan
Typewriter
Page 4: Purpose Implementation Mechanism Procurement Approach · network in Kwu Tung North New Development Area which will be available at a later date, , the study has suggested phased implementation

Closed Area

Boundary

Firing

Range

Lo Wu 300m Range

Closed Area

Boundary

Firing

Range

Lo Wu 300m Range

183

183

108

134

183

183

108

134

Police

Post

Police Post

Police

Post

Police

Post

Police Post

Police

Post

Ser ResSer Res

TAI SHEK MO

Tit Hang

Tse Koo

Hang

Tsung Yuen

Tung Chan

WaiYan Shau

Wai

TAI LAW HAU

Ha Wan

Tsuen

HOO HOK WAI

Lin Barn

Liu Pok

LOK MA CHAU

MA TSO

LUNG

Ma Tso Lung

San Tsuen

MAI PO

Pak Shek Au

PING HANG

SAM PO SHUE

SAN TIN

SEUNG MA

LEI YUE

SHEK MA

Wing Ping

Tsuen

Lok Ma

Chau

On Lung Tsuen

Pun Uk Tsuen

LO WU

Shun Yee

San Tsuen

TA SHA LOK

Chau Tau

(S

HE

NZ

HE

N H

E)

E

SH

AM

C

HU

N

R

VE

R

TAI SHEK MO

Tit Hang

Tse Koo

Hang

Tsung Yuen

Tung Chan

WaiYan Shau

Wai

TAI LAW HAU

Ha Wan

Tsuen

HOO HOK WAI

Lin Barn

Liu Pok

LOK MA CHAU

MA TSO

LUNG

Ma Tso Lung

San Tsuen

MAI PO

Pak Shek Au

PING HANG

SAM PO SHUE

SAN TIN

SEUNG MA

LEI YUE

SHEK MA

Wing Ping

Tsuen

Lok Ma

Chau

On Lung Tsuen

Pun Uk Tsuen

LO WU

Shun Yee

San Tsuen

TA SHA LOK

Chau Tau

(S

HE

NZ

HE

N H

E)

E

SH

AM

C

HU

N

R

VE

R Lok Ma ChauLok Ma Chau

FANLING HIGHWAY

LO

K M

A C

HA

U R

OA

D

SA

N TIN TS

UE

N R

OA

D

SA

N S

HA

M R

OA

D

LookoutLookout

Firing

Range

Lo Wu 300m Range

Firing

Range

Lo Wu 300m Range

183

183

16

183

183

16

Lo Wu

Correctional Institution

Lo Wu

Correctional Institution

TAI SHEK MO

Tong Kok

Tsung Yuen

Tung Fong

Yin Kong

Fung Kong

FUNG KONG SHAN

Ho Sheung

Heung

Kwu Tung

Ma Tso Lung

San TsuenNgam Pin

SHEK MA

Shek Tsai

Leng

NG T

UN

G R

IVE

R

LONG VALLEY

Dills Corner

Garden

Shun Yee

San Tsuen

PAI TAU LO

TAI SHEK MO

Tong Kok

Tsung Yuen

Tung Fong

Yin Kong

Fung Kong

FUNG KONG SHAN

Ho Sheung

Heung

Kwu Tung

Ma Tso Lung

San TsuenNgam Pin

SHEK MA

Shek Tsai

Leng

NG T

UN

G R

IVE

R

LONG VALLEY

Dills Corner

Garden

Shun Yee

San Tsuen

PAI TAU LO

East Rail Extension under construction

East Rail Extension under construction

FANLING HIGHWAYKW U TUNG ROAD

Sewage Treatment

SH

EK S

HE

UN

G RIV

ER

FU

‚¤

°¤

Às⁄Lung Hau Road

⁄U˘

W

ä̂ ‹

Lok M

a C

hau R

oad

Border Roa

d

Ha W

an Tsuen R

oad

A

C

G

O

C

OUSTW

G

OU

C&C

R&D/

OUC&C

R&D/

OU

A

A

E

E

EA

OU

A

A

A

A

A

C&C

R&D/

E

E

E

E

OUOU

O

(Ecological Area)

OU

OU

OU

A

C&C

R&D/

C&C

R&D/

C&C

R&D/

C&C

R&D/

ESS

TI

DCSESS

TI

G DCS

OU

N

C1:15000 ON A3

Legend:

Closed Area Boundary

‚T°ˇ

•s‹É“F¥_•sµo

Study Area Boundary in Hong Kong

›»·ä„Ò⁄”

„ˇ¤

New Development AreaNorth East New TerritoriesStudy Area of

Shenzhen River

LoopLok Ma Chau

‚¤°¤‹w

HKSAR Boundary

4.3Implementation Sequence - Phase 1 Development by Year 2020

2020ƒ~“”µofi

°¤fl

Lo Wu

ˆ„

San Tin

†‘

ƒ

•s

†‘ƒ

Station ConnectionLok Ma Chau

‡s–µ‚¤

RoadConnection Western

Area AInternal Road in

Shenzhen Shi

Ma Tso Lung

841000 N

827000

E

829000

E

825000

E

843000 N

Depot in Zone 3Fire Station cum Ambulance Sewage Treatment Work and

Building in Zone 1 to 2

in Zone 1District Cooling System

in Zone 1132 kV Electrity Sub-station

in Zone 3132 kV Electrity Sub-station

San Tin Highway ConnectionLok Ma Chau Road /

Service ReservoirPart Plan for Fresh Water

›„⁄ô°t⁄ôfiw“

›»·äflS§O

A°ˇ⁄”“”

°ˇ°ì1ƒÜ2⁄

°ˇ°ì1⁄”“”°ˇ

⁄˛fił¤¾§‰

°ˇ°ì3⁄”“”ƒ

¯Ü„

°ˇ°ì3⁄”“”⁄Q⁄

¯Ü„

°ˇ°ì1⁄”“”⁄Q⁄

ƒŁ›–‡s

‚¤°¤‹w‚ô/•s

Scale

Filena

me :

J:\

2098

40\

AR

UP\

CIVIL\

2098

40_

TR

7_

FIG

_4-3

_SIM

SU

N.d

gn

15/5/2

012

Printed by :

Job Title

Rev.

Figure No.Title

DEPARTMENT

AND DEVELOPMENT

CIVIL ENGINEERING

DEPARTMENT

PLANNING

Agreement No. CE 53/2008 (CE)

Development of Lok Ma Chau Loop - Investigation

Planning and Engineering Study on

⁄g⁄ì⁄uµ‡W„

¶ł¶fifl˙⁄

‹ª¤s „ˇ«h „ˇ«h

›×›q

ƒX‹ø

‚¤°¤‹w“efiMƒa°ˇµofii‡W„”⁄

ھ

peter-ly.chan
Typewriter
2
Page 5: Purpose Implementation Mechanism Procurement Approach · network in Kwu Tung North New Development Area which will be available at a later date, , the study has suggested phased implementation

Closed Area

Boundary

Firing

Range

Lo Wu 300m Range

Closed Area

Boundary

Firing

Range

Lo Wu 300m Range

183

183

108

134

183

183

108

134

Police

Post

Police Post

Police

Post

Police

Post

Police Post

Police

Post

Ser ResSer Res

TAI SHEK MO

Tit Hang

Tong Kok

Tse Koo

Hang

Tsung Yuen

Tung Chan

Wai

Tung Fong

Yan Shau

Wai

TAI LAW HAU

Casas Domingo

Fung Kong

FUNG KONG SHANHa Wan

Tsuen

Ho Sheung

Heung

HOO HOK WAI

Kwu Tung

Lin Barn

Liu Pok

LOK MA CHAU

MA TSO

LUNG

Ma Tso Lung

San Tsuen

MAI PO

Pak Shek Au

PING HANG

SAM PO SHUE

SAN TIN

SEUNG MA

LEI YUE

SHEK MA

Shek Tsai

Leng

Wing Ping

Tsuen

Europa Garden

Lok Ma

Chau

On Lung Tsuen

Pun Uk Tsuen

LO WU

Dills Corner

Garden

Shun Yee

San Tsuen

TA SHA LOK

Chau Tau

(S

HE

NZ

HE

N H

E)

EU

NG Y

UE RIV

ER

SH

AM

C

HU

N

R

VE

R

TAI SHEK MO

Tit Hang

Tong Kok

Tse Koo

Hang

Tsung Yuen

Tung Chan

Wai

Tung Fong

Yan Shau

Wai

TAI LAW HAU

Casas Domingo

Fung Kong

FUNG KONG SHANHa Wan

Tsuen

Ho Sheung

Heung

HOO HOK WAI

Kwu Tung

Lin Barn

Liu Pok

LOK MA CHAU

MA TSO

LUNG

Ma Tso Lung

San Tsuen

MAI PO

Pak Shek Au

PING HANG

SAM PO SHUE

SAN TIN

SEUNG MA

LEI YUE

SHEK MA

Shek Tsai

Leng

Wing Ping

Tsuen

Europa Garden

Lok Ma

Chau

On Lung Tsuen

Pun Uk Tsuen

LO WU

Dills Corner

Garden

Shun Yee

San Tsuen

TA SHA LOK

Chau Tau

(S

HE

NZ

HE

N H

E)

EU

NG Y

UE RIV

ER

SH

AM

C

HU

N

R

VE

R

East Rail Extension under construction

Lok Ma Chau

East Rail Extension under construction

Lok Ma Chau

FANLING HIGHWAY

LO

K M

A C

HA

U R

OA

D

KW U TUNG ROAD

SA

N TIN TS

UE

N R

OA

D

SA

N S

HA

M R

OA

D

9

LookoutLookout

‚¤

°¤

Às⁄Lung Hau Road

⁄U˘

W

ä̂ ‹

Lok M

a C

hau R

oad

Border Roa

d

Ha W

an Tsuen R

oad

A

C

G

O

C

OUSTW

G

OU

C&C

R&D/

OUC&C

R&D/

OU

A

A

E

E

EA

OU

A

A

A

A

A

C&C

R&D/

E

E

E

E

OUOU

O

(Ecological Area)

OU

OU

OU

A

C&C

R&D/

C&C

R&D/

C&C

R&D/

C&C

R&D/

ESS

TI

DCSESS

TI

G DCS

OU

N

C1:15000 ON A3

Legend:

Closed Area Boundary

Study Area Boundary in Hong Kong

New Development AreaNorth East New TerritoriesStudy Area of

Shenzhen River

LoopLok Ma Chau

‚¤°¤‹w

HKSAR Boundary

4.4Implementation Sequence - Phase 2 Development by Year 2027

2027ƒ~“”µofi

°¤fl

Lo Wu

ˆ„

San Tin

†‘

ƒ

•s

Shenzhen Shi

Ma Tso Lung

RoadConnection Eastern

843000 N

825000

E

827000

E

829000

E

841000 N

Building in Zone 3 to 5

in Zone 3District Cooling System

Service ReservoirFlushing Water

¥Û¥

Shek Tsai Leng

¥j

Kwu Tung

„ˇ¤

›»·äflS§O

‚T°ˇ

•s‹É“F¥_•sµo

›»·ä„Ò⁄”

†‘ƒ

°ˇ°ì3⁄”“”°ˇ

°ˇ°ì3ƒÜ5⁄

“F›–‡s

¤R·Z¥˛⁄

Scale

Filena

me :

J:\

2098

40\

AR

UP\

CIVIL\

2098

40_

TR

7_

FIG

_4-4

_SIM

SU

N.d

gn

15/5/2

012

Printed by :

Job Title

Rev.

Figure No.Title

DEPARTMENT

AND DEVELOPMENT

CIVIL ENGINEERING

DEPARTMENT

PLANNING

Agreement No. CE 53/2008 (CE)

Development of Lok Ma Chau Loop - Investigation

Planning and Engineering Study on

⁄g⁄ì⁄uµ‡W„

¶ł¶fifl˙⁄

‹ª¤s „ˇ«h „ˇ«h

›×›q

ƒX‹ø

‚¤°¤‹w“efiMƒa°ˇµofii‡W„”⁄

ھ

peter-ly.chan
Typewriter
3