Jindal Steel & Power Limited 1 1 Q3 Performance Highlights – FY 14 Jindal Steel and Power Ltd 28 th January, 2014

Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 1 1

Q3 Performance Highlights – FY 14 Jindal Steel and Power Ltd

28th January, 2014

Page 2: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 2

This presentation contains certain forward looking statements concerning JSPL’s future business prospects and business profitability, which are subject to a number of risks and uncertainties and the actual results could materially differ from those in such forward looking statements. The risks and uncertainties relating to these statements include, but are not limited to, risks and uncertainties regarding fluctuations in earnings, our ability to manage growth, competition (both domestic and international), economic growth in India and the target countries for exports, ability to attract and retain highly skilled professionals, time and cost over runs on contracts, our ability to manage our international operations, government policies and actions with respect to investments, fiscal deficits, regulations, etc., interest and other fiscal costs generally prevailing in the economy. Past performance may not be indicative of future performance. The company does not undertake to make any announcement in case any of these forward looking statements become materially incorrect in future or update any forward looking statements made from time to time by or on behalf of the company.

DISCLAIMER

Page 3: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 3

Presentation Outline

Executive Summary

Industry Developments

Highlights

Operational Performance

Financial Performance

Projects Update

Q3-FY 14

Page 4: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 4

Presentation Outline

Executive Summary

Industry Developments

Highlights

Operational Performance

Financial Performance

Projects Update

Q3-FY 14

Page 5: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 5

Executive Summary : Q3 FY 13-14 Results

JSPL barring the challenge of virtual nil growth in steel industry; sagging power demand & merchant rates and additional burden of depreciation & interest costs caused by major capacity expansion projects undertaken during 2013-14, put up an impressive performance during Q3 FY14.

JSPL Consolidated turnover during Q3FY14 grew by 8% and 12% compared to Q2FY14 and

Q3FY13 respectively. The company’s Profit after Tax (PAT) recorded an increase of 23% over the previous quarter but was lower by 36% compared to the same quarter last year. EBITDA levels in Q3 FY14 increased to 31.6% compared to 29.2% in Q2 FY14.

JSPL (Standalone) saw its volume grow by 4% over Q3 FY13, while in value terms its

turnover marginally dropped by 1% due to a changed product mix. Steel Business’s Net Price Realization increased by 2.5% and 4% over Q3 FY13 and Q2 FY14 respectively. The Q3 FY14 PAT of JSPL (Standalone) increased by 42% compared to the previous quarter this year but it fell short of the same quarter in FY13 by 30% due to increased burden of interest & depreciation of the recently commissioned Angul Steel Plant.

Page 6: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 6

The Company maintained its tempo of growth in both exports and retail business. While exports in Q3 FY14 grew by 9% in volume terms, retail business grew by a whopping 78% compared to the previous quarter. The Company by the end of December 2013 has spread its distributor network to cover the entire country and had appointed 41 distributors & 875 dealers.

During Q3 FY14 JSPL further commissioned new downstream units and introduced several new product lines. The Company intends to take capital upgradation work at its Raigarh facility during Q4 FY14. Production and dispatches from the Steel Melt Shop (SMS) and Plate Mill in Angul also witnessed major growth. The Company’s continued focus on “Capital Efficiency” programme saw impressive reduction in inventories which dropped to all time low and debtors decline by 20% compared to Q2 FY14.

Jindal Power Ltd (JPL), JSPL Group’s subsidiary saw another quarter of high operational

performance with PLF at 95.8% compared to 81% of Q3FY13. JPL’s turnover and PAT increased by 9% and 4% respectively over Q3 FY13. It also completed the second 600 MW unit of Tamnar Phase II and is all set to complete the third unit before March 31, 2014.

Executive Summary : Q3 FY 13-14 Results

Page 7: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 7

JSPL acquired a majority stake in NRE – Gujarat (GNRE), a company based in Australia producing Prime Quality Hard Coking coal, which will further enhance JSPL’s input material security. Integration of GNRE however negatively impacted JSPL’s PAT by Rs 69 Crores

JSPL Global Ventures with the exception of Gujarat NRE, performed well with revenue in Q3

growing by 71% compared to the same quarter in FY13. Company’s Oman unit sold a record quantity of nearly 500,000 MT of HBI which was 48% higher than the volume sold in Q3 FY13. Oman operations’ turnover in Q3 FY14 at US$ 171 million was 45% higher than Q3 FY13. Production volume of Anthracite (ROM) in JSPL’s South African mines increased by 21% on Q3 to Q3 basis.

JSPL’s Angul Steel project remains on track, although small delays were caused due to

external interference with the execution of water supply works. 1st Phase of Angul Project will be fully ready before the end of Feb 2014. New Pelletization plant of 4.5 MPTA is progressing well and will go into commercial production by the end of Feb 2014.

Executive Summary : Q3 FY 13-14 Results

Page 8: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 8

Presentation Outline

Executive Summary

Industry Developments

Highlights

Operational Performance

Financial Performance

Projects Update

Q3-FY 14

Page 9: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 9

1582

1059

779

81

166 109 119

26

1529

999

725

77

169 111 122

24

World Asia China India EU CIS North America Middle East

Global Steel Production (Mt)

Jan-Dec '13 Jan - Dec '12

3.5%

6%

7.5%

5.1% 6.9%

1.8%

1.9% 1.9%

Source: WSA

Global Steel Industry

Page 10: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 10

India’s steel production (Jan-Dec’13) up by 5.1% (y-o-y)

India’s Production in Q3 FY’14 (Oct-

Dec’13) up by 3.3% (vs Q3 12-13)

Rest of the World (other then China & India) Steel Production (Jan – Dec’13) down by 0.7% (y-o-y)

For H1 (Jan-Jun’13), Rest of World’s

production down by 3.3% (vs H1 12), while for H2 (Jul-Dec’13) production up by 2.1% (vs H2 Jul-Dec ‘12)

5,600

5,800

6,000

6,200

6,400

6,600

6,800

7,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

India ('000 MT)

FY 12 FY 13

50,000

52,000

54,000

56,000

58,000

60,000

62,000

64,000

66,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Rest of the World ('000 MT)

FY 12 FY 13

5.8%

2.4%

1.6%

6.2% 3.6%

4.6%

Source: WSA

Global Steel Industry

Page 11: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 11

Crude Production: During April-Dec ‘13, crude steel production was 59.332 million tonnes (mt), a growth of

1.8% year-on-year (y-o-y).

Imports: Import of total finished steel showed a southward trend, declining by 29.2% yoy in April- Dec’13 (y-o-

y)..

Exports: Export of total finished steel was up by 9.5% during April-Dec ‘’13 (y-o-y)

India emerged as a net exporter of total finished steel in December 2013 as well as April- December 2013

Steel Demand: India’s real consumption of total finished steel was up by 0.5% in April-Dec’ 13 (y-o-y), impacted

by the slowdown in the domestic economy (as reflected in the poor performance of the IIP and infrastructure

index, both)

Steel Industry impacted by factors like slowdown in domestic economy, exchange rate volatility, relative prices,

global downswing and bilateral agreements among others Source: BI - JSPL

How the Indian Industry Fared

Indian Steel Scene: April – Dec’13

Qty (MT) % Change*

Crude Steel Production 59.33 1.8

Import 4.09 (29.20)

Export 4.14 9.5

Real Consumption 53.79 0.5 * over same period of last year

Page 12: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 12

• Developer has to tie up 65% of installed capacity through competitive bidding and upto 35% under regulated tariff as per specific host state policy

• It would be one time and limited to 15 projects which are located in the States having mandatory host State power tie up policy of PPAs under regulated tariff

• Max time period is 60 months instead of 36 months from date of import for furnishing the final mega certificates to tax authorities

Amending Mega Power Policy 2009 for provisional mega power projects

• 9 units out of 24 TPPs with Tapering linkages within 78000 MW to get coal supplies for a period of 3 years (Till 30.09.2016) or for the period they were affected by the Go No-go Policy thru FSA

CCEA has approved the supply of coal to 9 out of 24 units for the delay in development of coal blocks due to Go No-Go by MoEF

Power Sector – Recent Developments

Page 13: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 13

• Southern grid connectivity was achieved 3 months ahead of schedule with the commissioning of 765 Kv Raichur-Sholapur Transmission line on 31st December, 2013

• Indian power system becomes one of the largest operating synchronous grids in the world

Southern Grid synchronously connected with the National Power Grid

• 9 applications have been received for Odisha UMPP and 8 for Cheyyur (Tamil Nadu), the bids for which will be opened on 26th February, 2014

• These projects are also being seen as a test case for the new design, build, finance, operate and transfer (DBFOT) model; unlike the earlier build, own, operate (BOO) model. It will create a lot of financing problems.

PFC has started the bidding process for 2 UMPPs in Odisha & Tamil Nadu, ending the 5 year of uncertainty.

Power Sector – Recent Developments

Page 14: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 14

159,794

4,780

39,893 29,463

233,930

-

50,000

100,000

150,000

200,000

250,000

138,213 20,381

1,200

4,780

39,893

29,463

Coal Gas Diesel Nuclear Hydro RES

Power Scenario – Installed Capacity (as on 31st Dec’2013)

(in MW)

(in MW)

Source: CEA

(in GW)

59% 9%

1%

2%

17%

13%

Coal Gas Diesel Nuclear Hydro RES

148 159

174

200

223 234

0

50

100

150

200

250

FY09 FY10 FY11 FY12 FY13 Q3FY14

Page 15: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 15

94 102

112

132

152 160

77.20% 77.50% 75.07%

73.32%

69.95%

64.62%

50.00%

55.00%

60.00%

65.00%

70.00%

75.00%

80.00%

0

20

40

60

80

100

120

140

160

180

FY09 FY10 FY11 FY12 FY13 Dec'13

Inst.Cap (in GW) PLF (in %age)

Growth in Thermal Capacity Vs PLF%

Source: CEA

Page 16: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 16

Presentation Outline

Executive Summary

Industry Developments

Highlights

Operational Performance

Financial Performance

Projects Update

Q3-FY 14

Page 17: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 17

6.5% growth in Production volume of Q3 last year 10.8% growth in Production volume over Q2 FY14 2.5% growth in Sales volume over Q3 last year 2% growth in NSR over Q3 last year 4% growth in NSR over previous quarter

-

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14

Sales (in Lakh, MT)

Production, Sales & NSR - Steel

6.2

6.4

6.6

6.8

7.0

7.2

7.4

7.6

7.8

8.0

8.2

Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14

Production of Crude Steel (in Lakh, MT)

Page 18: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 18

18% increase in Generation (Q3 FY14 Vs Q3 FY13)

4% increase in Realization (Q3 FY14 Vs Q3 FY13)

Generation, Sales & NSR – JPL Power

-

500

1,000

1,500

2,000

2,500

Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14

Generation (MU)

0.0

20.0

40.0

60.0

80.0

100.0

120.0

Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14

PLF in %age

0

0.5

1

1.5

2

2.5

3

3.5

4

Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14

NSR (Rs/Unit)

Page 19: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 19

19

104

140

263

119 138 150

406

0

50

100

150

200

250

300

350

400

450

Q1 Q2 Q3 TOTAL

Export Sales (in MT)

FY - 2012-13 FY - 2013-14

7% growth in Export Sales in Q3 (vs Q3 12-13)

54% growth in Export Sales in Apr - Dec (vs Apr – Dec 12-13)

Export of Steel

Page 20: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 20

Oman Production HBI (MT): 377,468 Sales (MT): 498,749

South Africa Production HBI (MT): 220,634 Sales (MT): 182,199

Overseas Operations – Q3 Update

Gujrat NRE – Coke Production Coal (MT): 217,000 Sales (MT): 187,000

Mozambique Production Coal (MT): 95,334 Sales (MT): 99,411

Page 21: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 21

Presentation Outline

Executive Summary

Industry Developments

Highlights

Operational Performance

Financial Performance

Projects Update

Q3-FY 14

Page 22: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 22

Standalone Financials – Q3 & 9 months

Particulars (Rupees in Cr.) 31.12.2013 30.09.2013 31.12.2012 Y ON Y Q ON Q

Turnover-Total 3,777 3,656 3,821 -1% 3%

-Export 896 930 595 50% -4%

EBITDA 1,210 983 1,278

PBT 546 352 740 -26% 55%

Profit after Tax 366 257 520 -30% 42%

Cash Profit 730 582 814 -10% 25%CAPEX 1,614 1,571 1,411

For the Quarter ending %

Particulars FY %

(Rupees in Cr.) 31.12.2013 31.12.2012 2012-13 Y ON Y

Turnover-Total 10,858 10,741 14,955 1% -Export 2,489 1,260 1,928 98%EBITDA 3,041 3,576 4,613 PBT 1,216 1,601 2,098 -24%Profit after Tax 861 1,115 1,462 -23%Cash Profit 1,867 1,971 2,658 -5%CAPEX 4,413 3,847 4,667

For the 9 Month ending

Page 23: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 23

Consolidated Financials – Q3 & 9 months

Particulars

(Rupees in Cr.) 31.12.2013 30.09.2013 31.12.2012 Y ON Y Q ON Q

Turnover-Total 5,377 4,984 4,802 12% 8%

EBITDA 1,701 1,457 1,790

PBT 819 627 1,147 -29% 31%

Profit after Tax 559 455 870 -36% 23%

Cash Profit 1,093 907 1,285 -15% 20%

CAPEX 2,548 3,571 2,660

For the Quarter ending %

Particulars FY %

(Rupees in Cr.) 31.12.2013 31.12.2012 2012-13 Y ON Y

Turnover 14,901 14,158 19,807 5%

EBITDA 4,463 5,079 6,669

PBT 2,116 2,892 3,833 -27%

Profit after Tax 1,515 2,159 2,912 -30%

Cash Profit 2,929 3,367 4,593 -13%

CAPEX 8,688 7,496 8,983

For the 9 Month ending

Page 24: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 24

Key Ratios

Standalone 2013-14 2013-14 2012-13 2012-13

Ratio (%) Q3 Q2 Q3 Annual

EBITDA to turnover 32.03 26.90 33.45 31.04

Profit before tax to turnover 14.45 9.62 19.37 14.03

Profit after tax to turnover 9.68 7.02 13.62 9.78

Debt Equity Ratio 1.74 1.72 1.65 1.66

Net Debt (Rs. in Cr.) 22,296 21,806 19,562 20,440

Consolidated 2013-14 2013-14 2012-13 2012-13

Ratios (%) Q3 Q2 Q3 Annual

EBITDA to turnover 31.63 29.23 37.27 33.67

Profit before tax to turnover 15.23 12.59 23.89 19.35

Profit after tax to turnover 10.40 9.13 18.12 14.70

Debt Equity Ratio 1.52 1.30 1.15 1.15

Net Debt (Rs. in Cr.) 31,602 29,947 23,435 24,418

*Net Debt as on 31st December, 2013 excludes debt of Rs. 2530 Cr. on the Balance sheet of Gujarat NRE Australia

Page 25: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 25

Presentation Outline

Executive Summary

Industry Developments

Highlights

Operational Performance

Financial Performance

Projects Update

Q3-FY 14

Page 26: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 26

JSPL Consolidated & Standalone

JSPL Consolidated turnover in Q3FY14 grew by 8% and 12% compared to Q2FY14 and Q3FY13

respectively.

Consolidated PAT recorded an increase of 23% over the previous quarter

EBITDA levels in Q3 FY14 increased to 31.6% compared to 29.2% in Q2 FY14.

JSPL Standalone sales volume grow by 4% over Q3 previous year

SMS commissioned in Angul

Improvement in Steel prices (4% growth over previous quarter)

6.5% growth in Production volume of Q3 last year

10.8% growth in Production volume over Q2 FY14

Retail Sales register 78% growth over previous quarter

Performance Highlights

Page 27: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 27

Performance Highlights

Jindal Power Ltd

JPL’s turnover and PAT increased by 9% and 4% respectively over Q3 FY13

PLF at 95.8% compared to 81% of Q3FY13

Station achieved Generation of 2116 Mus in Q3 FY14 as compared to 1790 Mus in Q3 FY13

2 x 600 MW units synchronized

Page 28: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 28

Performance Highlights

Oman

Oman clocked record sales volume in Q3 FY14 – 498,750 MT (36% increase over Q2 13-

14 and 47% increase over Q3 last year)

Mozambique

Allocation for movement of 2,50,000 Tons per quarter obtained on Sena Line

JSPL Mozambique’s First coal loaded train from Moatize to Beira moved on 07/11/2013

95334 MT coking coal production in Q3 FY13-14 compared to 67120 MT in Q2 FY13-14

99400 MT sales achieved in Q3 FY 13-14 (96,900 MT sold in Q2 FY13-14)

Page 29: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 29

Presentation Outline

Executive Summary

Industry Developments

Highlights

Operational Performance

Financial Performance

Projects Update Q3-FY 14

Page 30: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 30

Angul – SMS & Slab Caster

Page 31: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 31

Angul – SMS & Slab Caster

Page 32: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 32

Angul – SMS & Slab Caster

Page 33: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 33

Angul – 6x135 MW CPP

Page 34: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 34

Angul – Coal Gasification

Page 35: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 35

Angul – Coal Gasification, Unit 3

Page 36: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 36

Angul – UNIT 6 – PHENOSOLVAN & STORAGE TANK

Page 37: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 37

Angul – DRI Plant

REDUCTION FURNACE TOWER & HIGH ANGLE CONVEYOR

Page 38: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 38

Angul

REDUCTION FURNACE TOWER & HIGH ANGLE CONVEYOR

RESERVOIR AND POWER PLANT RAILWAY SIDING

KERJANG SIDING – WORK COMPLETED

Page 39: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 39

JPL - Panoramic View of 4x600 MW

Page 40: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 40

Unit 1 – 600 MW

Unit 1 – Boiler Front View Unit 1 – Boiler to EPS

Unit 1 – EPS Inlet Unit 1 – Main oil Tank

Page 41: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 41

Unit 2 – 600 MW

Unit 2 – Boiler Rear view Unit 2 – RHS Mill Bay

Unit 2 - TG Unit 2 - Tipper

Page 42: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 42

Unit 3 – 600 MW

U-3 Transformer Yard U-3 Main Oil Tank

U-3 TG U-3 – Boiler Front View

Page 43: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 43

Unit 4 – 600 MW

U-3 – Boiler Front View U-4 TG Floor U-4 Boiler

U-4 EPS U-4 EPS

Page 44: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 44

Oman – 2 MTPA SMS

EAF Area – 9 Meter Platform Scrap Transfer Car

FTP Area

Page 45: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 45

Oman – 2 MTPA SMS

LRF Material handling External DE dusting System

WTP

Page 46: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 46

SMS Overall Progress Photo

Oman – 2 MTPA SMS

Page 47: Q3 Performance Highlights FY 14 - Jindal Steel and Power · Jindal Steel & Power Limited 5 Executive Summary : Q3 FY 13-14 Results JSPL barring the challenge of virtual nil growth

Jindal Steel & Power Limited 47

THANK YOU

For any information please contact: -

D.Balasubramanyam – Head of Investor Relations

Tel: - 011-26739166

Mobile: - 8130755166

Email: - [email protected]

Ms. Pallavi Kumari – Investor Relations

Tel : - 011-26739165

Mobile:-8800094171

Email: - [email protected]