3
Debur Heat Treat Job Start Finish Start Finish 1 0 2 2 2 8 6 2 2 5 3 8 13 5 3 5 12 7 13 17 4 4 12 15 3 17 25 8 5 15 16 1 25 30 5 6 16 24 8 30 32 2 a.Select the job with shortest processing time .It is job 5 with a b.Since ,the time is at the Debur,schedule job 5 first.Eliminate j c. Job 1 and Job 6 have the next shortest time. Job 1 is with a t Job 6 is with a time of 2 hrs at the heat treat.Since it is at hea d. Job 2 and Job 4 both have the next shortest time of 3 hrs at th Thus, scheduling Job 4 at 3rd place and job 2 at 4th place after i e. Finally assign Job 3 to remaining 5th position and the result i 1st 2nd 3rd 4th 5 1 4 2 Processing Time Processing Time

Q.4

  • Upload
    sourabh

  • View
    213

  • Download
    0

Embed Size (px)

DESCRIPTION

B

Citation preview

Sheet1DeburHeat TreatJobStartFinishProcessing TimeStartFinishProcessing Time1022286225381353512713174412153172585151612530561624830322

1st2nd3rd4th5th6tha.Select the job with shortest processing time .It is job 5 with a time of one hour.5b.Since ,the time is at the Debur,schedule job 5 first.Eliminate job 5 from further considerationc. Job 1 and Job 6 have the next shortest time. Job 1 is with a time of 2 hrs at the Debur schedule it at the second position and eliminate it from further considerationJob 6 is with a time of 2 hrs at the heat treat.Since it is at heat treat schedule it last at 6 and eliminate it from further consideration.1st2nd3rd4th5th6th511st2nd3rd4th5th6th516d. Job 2 and Job 4 both have the next shortest time of 3 hrs at the Debur .Since both are at Debar we can choose any one of them first to be placed at 3rd postion followed by the other one at the next 4th position.Thus, scheduling Job 4 at 3rd place and job 2 at 4th place after it.1st2nd3rd4th5th6th51426e. Finally assign Job 3 to remaining 5th position and the result is1st2nd3rd4th5th6th514236

Sheet2

Sheet3