QUALITY PLAN FOR PRESSURE VESSELMANUFACTURER PROJECT : EQUIPMENTS DRAWING NO. : Sr. NO. 1.0 1.1 COMPONENT / OPERATION UNITED ENGINEERING WORK E:48,49,'D'ROAD, MIDC, SATPUR, NASHIK-7. TOYOTSU RARE EARTH PROJECT VERTICLE AIR RECEIVERS - 10M3 & 20M3 9410868300 & 9410868200 CUSTOMER QAP. NO. : REVISION : DATED : SHEET : M/S.KIRLOSKAR PNEUMATICS CO. LTD. UEW/KPCL-TRE/01 0 08.12.2011 1 of 2
CHARACTERISTICS CHECKED
CLASS TYPE / METHOD OF CHECK
EXTENT OF CHECK
REFERENCE DOCUMETS
ACCEPTANCE NORMS
FORMAT OF RECORD
AGENCY M C N
REMARKS
RAW-MATERIAL PLATES FOR SHELL, DISHED ENDS MADE IN SINGLE PIECE , FLANGES, NOZZLES, PIPES, FITTINGS PHYSICAL PROPERTY CHEMICAL PROPERTY CRITICAL PHYSICAL & CHEMICAL TESTS 1 / HEAT / BATCH APPROVED DRG. DATA SHEET RELEVANT STD. - DO RELEV. STD./SPEC. APPROVED DRG. APPROVED DRAWING DATA SHEET MILL TC OR LAB REPORT P V V
SURFACE DEFECTS DIMENSIONS 2.0 2.1 2.2 2.3 IN-PROCESS WELDING PROCEDURE SPECIFICATION SUITABILITY
MAJOR MAJOR
VISUAL MEASUREMENTS
100 % 100 %
NO RUST,FITTINGS INSPC. REPORT NO SURFACE DEFECTS RELEV. STD./SPEC. INSPC. REPORT APPROVED DRG. & T.C.
P P
V V
V V
MAJOR MAJOR MAJOR
PROCEDURE & WELDER QUALIFIACTION WELD SOUNDNESS DISHED-ENDS PROFILE & DIMENSIONS INCLUNDING THINING AT KNUCKLE PORTION SURFACE DEFECT AT KR & SF AND AROUND DISHED-ENDS HOLE
VISUAL/ RADIOGRAPHY PHYSICAL TESTS TEMPLATE / MEASUREMENTS VISUAL PENETRANT TEST VISUAL
100 % ASME 100 %
ASME IX ASME IX APPROVED DRG. & RELEVANT STD.
ASME IX ASME IX APPROVED DRG. & RELEVANT STD.
ASME FORMAT WPS ASME FORMAT WPS INSPEC. REPORT
P P P
V V V
V V V
MAJOR
100 %
ASTM E 16.5 ASME SEC. VIII. DIV. 1
NO LINEAR INDICATION, NO SURFACE DEFECTS APPROVED DRG. RELEVANT STD.
INSPEC. REPORT
P
V
V
2.4
SHELL, ROLLING, LONG CIRSEAM & NOZZLE TO FLANGES SETUP
DIMENSION INCLUDING MAJOR OVALITY, EDGE PREPRTN. SURFACE DEFECTS ALIGNMENT & DIMENSION DIMENSIONS SURFACE DEFECTS MAJOR
MEASUREMENT VISUAL
100 %
APPROVED DRG. RELEVANT STD.
INSPEC. REPORT
P
V
V
2.5
FIT UP OF ALL WELDS
VISUAL, TEMPLATE
100 %
APPROVED DRG., WPS RELEVENT STAND. APPROVED DRG.,
APPROVED DRG., WPS
INSPEC. REPORT
P
V
V
2.6
FLANGES & NOZZLES
MAJOR
MEASUREMENT VISUAL
100 %
RELEVENT STANDARD INSPEC. REPORT APPROVED DRG.,
P
V
V
QUALITY PLAN FOR PRESSURE VESSELMANUFACTURER PROJECT : EQUIPMENTS DRAWING NO. : COMPONENT / OPERATION UNITED ENGINEERING WORK E:48,49,'D'ROAD, MIDC, SATPUR, NASHIK-7. TOYOTSU RARE EARTH PROJECT VERTICLE AIR RECEIVERS - 10M3 & 20M3 9410868300 & 9410868200 CUSTOMER QAP. NO. : REVISION : DATED : SHEET : M/S.KIRLOSKAR PNEUMATICS CO. LTD. UEW/KPCL-TRE/01 0 08.12.2011 2 of 2
CHARACTERISTICS CHECKED
TYPE / METHOD OF CHECK
EXTENT OF CHECK
REFERENCE DOCUMETS
ACCEPTANCE NORMS
FORMAT OF RECORD
M
AGENCY C N
REMARKS
2.7
WELD QUALITY 1. COMPLETED BUTT-WELDS SEALED RUN AFTER BACKCHIPPING DYE PENETRATION CHECK MAJOR VISUAL MEASUREMENT VISUAL VISUAL AS PER DRG/ STD./ 100% 100% ASME SEC VIII DIV 1 ASTM E 16.5 AS PER CODE ASME SEC VIII DIV 1 ASTM E 16.5 AS PER CODE INSPEC. REPORT P V V
2.8
ALL SUBJOINTS, LONGITUDINAL JOINTS DYE PENETRATION TEST & T JOINTS TO BUTT-WELD
MAJOR
INSPEC. REPORT
P
V
V
2.9 D.P. TESTING ON FINISHED WELDS
D.P. TEST , WELD QUALITY MAJOR AND SOUNDNESS
VISUAL
100%
AS PER ASME SECT. VIII/ ASME SECT. VIII DIV. 1 INSPEC. REPORT ASME SECT. V ASME SECT. VIII DIV.1 ASME SECT. VIII DIV.1 RT FILM
P
V
V
2.10 LONGITUDNAL JOINTS ( ALL BUTT WELDS) OUNDNESS S CIRUMSEAM JOINTS ( ALL BUTT WELDS) 2.11 ALL JOINTS ( T - JOINTS) 3.0 3.1 FINAL INSPECTION COMPLETED VESSEL DIMENSION ORIENTATN. OF NOZZLE SOUNDNESS
CRITICAL VISUAL
10 % AS PER ASME SECT. VIII, RADIOGRAPHY APPROVED DRG. & DESIGN 100% AS PER ASME SECT. VIII
P
V
V
CRITICAL VISUAL
RT FILM
P
V
V
MAJOR
MEASUREMENT* VISUAL/ MEASUREMENT
100 % 100 %
APPROVED DRG/ DATA SHEET APPROVED DRG
APPROVED DRG/ DATA SHEET APPROVED DRG
INSPEC. REPORT INSPEC. REPORT
P P
V V
V W
WORKMANSHIP & FINISH LEAK TIGHTNESS HYDRO TEST INTERNAL & EXTERNAL CLEANLING 3.2 PAINTING & STAMPING STAMPING & MARKING UNIFORMITY,PRIMER THICKNESS
MAJOR CRITICAL
VISUAL HYDRO TEST VISUAL VISUAL
100 % 100 %
ASME VIII 1.5 TIMES OF D.PR FOR 30 MINUTES AS PER APPRD DRG
ASME VIII ASME VIII
INSPEC. REPORT INSPEC. REPORT NO LEAKAGE INSPEC. REPORT
P P
V V
W W
MAJOR
100 %
AS PER APPRD DRG
P
V
V
MAJOR MAJOR
VISUAL VISUAL SHADE , DFT
100 % 100 %
ASME SEC VIII TECHN. SPECIFIC./ APPROVED DRG./SPEC. PROVIDED BY CLIENT Submitted by
ASME SEC VIII
INSPEC. REPORT
P P
V V
V V
TECHNICAL SPECIFIC INSPEC. REPORT APPROVED DRAWING
LEGENDS: M :- MAUUFACTURER C :- KPCL N :- TPI AGENCY P:- PERFORM, V:- VERIFICATION W:- WITNESS
Approved BY
UEW Sign Date Sign Date