815
Saudi Aramco: Public RFI Data of Project 10-00167-0002 S# Date RFI# RFI Description 1 6/30/2012 18:08 3044 2 6/30/2012 18:11 3045 3 6/30/2012 18:13 3046 7 6/30/2012 18:04 3124 6 7/1/2012 9:35 3397 5 7/1/2012 9:39 3398 4 7/1/2012 9:48 3399 8 7/8/2012 5:46 3510 11 7/8/2012 5:49 3513 12 7/8/2012 5:52 3516 13 7/7/2012 18:25 3752 9 7/7/2012 18:31 3755 10 7/7/2012 18:35 3757 14 7/15/2012 10:21 4020 17 7/15/2012 10:25 4021 18 7/15/2012 10:27 4022 15 7/15/2012 10:30 4023 16 7/15/2012 10:33 4024 19 7/15/2012 10:35 4025 33 7/22/2012 4:43 4332 37 7/22/2012 4:48 4333 26 7/22/2012 4:56 4334 30 7/24/2012 10:42 4403 31 7/25/2012 15:45 4508 34 7/27/2012 7:37 4615 35 7/30/2012 17:55 4617 29 7/27/2012 7:59 4618 20 7/28/2012 16:28 4636 21 7/28/2012 16:30 4641 23 7/29/2012 14:37 4690 24 7/29/2012 14:40 4691 27 7/29/2012 14:42 4692 25 7/30/2012 15:03 4752 38 7/30/2012 15:03 4752 22 7/30/2012 15:11 4753 28 7/30/2012 15:11 4753 32 8/1/2012 16:27 4870 39 8/2/2012 12:24 4937 453 8/2/2012 12:25 4938 AM to 6 PM 6 AM to 6 PM 6 AM to 6 PM PM. AM to 6 PM 6 AM to 6 PM 6 AM to 6 PM 6AM to 6PM. at 6AM to 6PM. at 6AM to 6PM. 6AM to 6PM. at 6AM to 6PM. at 6AM to 6PM. 6AM to 6PM. at 6AM to 6PM. 6AM to 6PM. 6AM to 6PM. at 6AM to 6PM. 6AM to 6PM. AT 6AM TO 6PM AT NGL TRAIN 1 B90-302 AT NGL TRAIN 1 B90-302 area. (P.O. # 4500081069) 4500081069-70) 6am to 6pm. to 6pm. to 6pm. LAYDONW YARD FABRICATION AREA NSH AT LAYDOWN YARD NSH FABRICATION YARD NSH FABRICATION LAYDOWN YARD FABRICATION LAYDOWN YARD FABRICATION LAYDOWN YARD FABRICATION LAYDOWN YARD. FABRICATION LAYDOWN YARD. NSH LAYDOWN YARD FABRICATION AREA. NSH LAYDOWN YARD FABRICATION AREA. 0506-B6 R/L and 0506-B7 COLOR CODINGS AT NSH LAYDOWN YARD COLOR CODINGS AT NSH LAYDOWN YARD

QMIS_23-04-2015

Embed Size (px)

Citation preview

RFI Data of Project

report_rfidataRFI Data of Project 10-00167-0002S#DateRFI#RFI Description16/30/12 18:083044Prewelding Inspection of Structural Plate to Precasting Panel Date 24-06-12 to 30-06-12 At 6 AM to 6 PM26/30/12 18:113045Inprocess welding Inspection of Structural Plate to Precasting Panel Date 24-06-12 to 30-06-12 At 6 AM to 6 PM36/30/12 18:133046Post weld visual Inspection of Structural Plate to Precasting Panel Date 24-06-12 to 30-06-12 At 6 AM to 6 PM76/30/12 18:043124Receiving Inspection and Verification of Welding Consumable Controls in Place (Properties, type, source, segregation, storage, Issue, Handling, etc.) Rescheduled to Date 01-07-12 at 7 AM to 7 PM.67/1/12 9:353397Prewelding Inspection of Structural Plate to Precasting Panel Date 02-07-12 to 07-02-12 At 6 AM to 6 PM57/1/12 9:393398Inprocess welding Inspection of Structural Plate to Precasting Panel Date 02-07-12 to 07-07-12 At 6 AM to 6 PM47/1/12 9:483399Post weld visual Inspection of Structural Plate to Precasting Panel Date 02-07-12 to 07-07-12 At 6 AM to 6 PM87/8/12 5:463510Pre-welding Inspection of structural plateto Precasting panel Date 07-07-2012 to 14-07-2012 at 6AM to 6PM.117/8/12 5:493513In-process welding Inspection of structural plate to Precasting panel Date 07-07-2012 to 14-07-2012 at 6AM to 6PM.127/8/12 5:523516Post welding final Inspection of structural plate to Precasting panel Date 07-07-2012 to 14-07-2012 at 6AM to 6PM.137/7/12 18:253752Pre-welding inspection of structural plate to Precasting panel Date 07-07-2012 to 13-07-2012 at 6AM to 6PM.97/7/12 18:313755Inprocess welding inspection of structural plate to Precasting panel Date 07-07-2012 to 13-07-2012 at 6AM to 6PM.107/7/12 18:353757Post weld visual inspection of structural plate to Precasting panel Date 07-07-2012 to 13-07-2012 at 6AM to 6PM.147/15/12 10:214020Pre-welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.177/15/12 10:254021In-process welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.187/15/12 10:274022Post weld final inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.157/15/12 10:304023Pre-welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.167/15/12 10:334024In-process welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.197/15/12 10:354025Post weld final inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.337/22/12 4:434332PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PRE-CASTING PANEL DATE 22-07-2012 TO 28-07-2012 AT 6AM TO 6PM377/22/12 4:484333IN PROCESS WELSING INSPECTION OF STRUCTURAL PLATE TO PRECASTING PANEL DATE 22-07-2012 TO 28-07-12 AT NGL TRAIN 1 B90-302267/22/12 4:564334POST WELD FINAL INSPECTION FO STRUCTURAL PLAT TO PRE-CASTING PANEL DATE 22-07-2012 TO 28-07-2012 AT NGL TRAIN 1 B90-302307/24/12 10:424403Material receiving & visual inspection of bottom sump assembly w/ CBI P/L # 10 & mark # 0519-A,annular plates w/ CBI P/L # 10 & mark #0506-1, bottom rectangular plates w/ CBI P/L # 11 & mark # 0506-12,CBI P/L # 13 & mark # 0506-B2 R/L,0506-B3 R/L,0506-B4 R/L,0506-B6 R/L at B92-D-0007 AB area. (P.O. # 4500081069)317/25/12 15:454508Material receiving and visual inspection of sump assembly w/ CBI P/L # 10 & mark # 0119-A,0219-A,0319-A,CBI P/L # 12 & mark # 0419-A,0818-A,1119-A,bottom plate w/ CBI P/L # 12 & mark # 0106-B1 R/L,0206-B1,0206-B2 R/L,0206-B3,0306-B1,0306-B2,0306-B3 R/L,roof sketch plate w/ CBI P/L # 13 & mark # 0311-R1 R/L,0311-R2 R/L,0311-R3 R/L,0311-R4 at B92-D-0007AB Area (P.O. # 4500081069-70)347/27/12 7:374615In process welding inspection of structural plate to precasting panel date 28-07-12 to 04-08-12 at 6am to 6pm.357/30/12 17:554617Pre welding inspection of structural plate to precasting panel date 28-07-12 to 04-08-12 at 6m to 6pm.297/27/12 7:594618Post weld final inspection of structural plate to precasting panel date 28-07-12 to 04-08-12 at 6am to 6pm.207/28/12 16:284636RECIEVING OF PIPING AND PLANT PIPING MATERIALS AT LAYDONW YARD FABRICATION AREA NSH217/28/12 16:304641RECIEVING INSPECTION OF PIPING AND PLANT PIPING AT LAYDOWN YARD NSH FABRICATION YARD237/29/12 14:374690RECIEVING INSPETION OF PIPE AND PIPE FITTING AT NSH FABRICATION LAYDOWN YARD247/29/12 14:404691RECIEVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD277/29/12 14:424692RECIEVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD257/30/12 15:034752RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD.387/30/12 15:034752RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD.227/30/12 15:114753RECEIVING INSPECTION OF PIPE AND PIPE FITTINGS AT NSH LAYDOWN YARD FABRICATION AREA.287/30/12 15:114753RECEIVING INSPECTION OF PIPE AND PIPE FITTINGS AT NSH LAYDOWN YARD FABRICATION AREA.328/1/12 16:274870Material receiving and visual inspection of bottom sketch plates with CBI P/L # 14 and mark # 0506-B1, 0506-B2 R/L, 0506-B4 R/L, 0506-B5 R/L, 0506-B6 R/L and 0506-B7398/2/12 12:244937MATERIAL INSPECTION OF PIPE AND FITTINGS WITH COLOR CODINGS AT NSH LAYDOWN YARD4538/2/12 12:254938RECEIVING INSPECTION OF PIPE AND FITTINGS WITH COLOR CODINGS AT NSH LAYDOWN YARD408/2/12 12:284953INSPECTION OF MATERIAL STORAGE AND HANDLING AT NSH LAY DOWN YARD FABRICATION AREA368/4/12 16:085038Material receiving and visul inspection of shell plate with P/L # 18 and mark # 0507-1A,1B,1C,2A,7A,8A, P/L # 17 and mark # 0507-3, P/L # 16 and mark # 0507-1,2,bottom rectangular plates P/L # 15 and mark # 0506-6528/4/12 17:065068Pre-welding inspection of structural to pre-casting panel date 04-08-2-2012 to 10-08-2012 at 6 AM to 6PM.588/4/12 17:105069In-process welding inspection of structural to pre-casting panel date 04-08-2-2012 to 10-08-2012 at 6 AM to 6PM.438/4/12 17:145070Post weld visual inspection of structural to pre-casting panel date 04-08-2-2012 to 10-08-2012 at 6 AM to 6PM.538/5/12 15:145071Pre-welding inspection of structural plate to plate date 05-08-2012 to 10-08-2012 at 6AM to 6PM.448/5/12 15:155072Inprocess welding inspection of structural plate to plate date 05-08-2012 to 10-08-2012 at 6AM to 6PM.598/5/12 15:165073Post weld visual inspection of structural plate to plate date 05-08-2012 to 10-08-2012 at 6AM to 6PM.458/6/12 10:455104Pre-welding inspection of structural plate to precasting panel(TOP LEVEL) Date 04-08-2012 to 10-08-2012 at 6AM to 6PM.608/6/12 10:495105In-process welding inspection of structural plate to precasting panel(TOP LEVEL) Date 04-08-2012 to 10-08-2012 at 6AM to 6PM.618/6/12 10:535106Post weld visual inspection of structural plate to precasting panel(TOP LEVEL) Date 04-08-2012 to 10-08-2012 at 6AM to 6PM.428/6/12 16:285126Material receiving and visual inspection of shell plate with P/L # 19 and mark # 0507-1, P/L # 20 and mark # 0507-7418/7/12 17:155173RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD.468/8/12 15:175188Visual inspection of annular plate(FITP :B92-D-0007A,Activity no:2.4).628/8/12 15:235189SFT vacuum box annular plate butt welds (FITP :B92-D-0007A,Activity no:2.5).638/8/12 15:275190Visual inspection of annular plate(FITP :B92-D-0007B,Activity no:2.4).648/8/12 15:335191SFT vacuum box annular plate butt welds (FITP :B92-D-0007B,Activity no:2.5).548/9/12 15:595221Material receiving and visualinspection of shell plates with P/L # 21 and mark # 0307-1,0307-2,0307-3,0307-4, P/L # 22 and mark # 0107-1,0107-2,0107-3,0107-4, P/L # 23 and mark # 0507-5,0507-6, P/L # 24 and mark # 0507-2,0507-5,top angles with P/L # 22 and mark # 0107-5,0207-6,0307-5478/12/12 5:505345Material receiving and visual inspection of shell plates with P/L # 25 and mark # 0507-4 and P/L # 26 mark # 0507-24948/12/12 16:055385RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD518/13/12 14:145402Verify Test Equipment(Safety Assessment) Calibration Test Report-Pressure Test Reliel Valve/ Valve serial No.625485-12, set Pressure 210 PSI, 3/4".558/12/12 18:035404Review of MT examine the back surface of all double sided full penetration butt weld joints.488/12/12 18:055405Review of MT examine the back surface of all double sided full penetration butt weld joints.498/12/12 18:105406Review of verify bottom surface cleanliness /coating prior to being placed in position @ tank bottom & sump.508/12/12 18:125407Review of verify bottom surface cleanliness /coating prior to being placed in position @ tank bottom & sump.1898/12/12 18:175408Pre-welding inspection of sturctural plate to plate date 12-08-2012 to 17-08-2012.2058/12/12 18:195409Inprocess welding inspection of sturctural plate to plate date 12-08-2012 to 17-08-2012.2538/12/12 18:215410Post weld visual inspection of sturctural plate to plate date 12-08-2012 to 17-08-2012.578/13/12 16:315450Material receiving and visual inspection of shell plates with P/L # 27 and mark # 0507-3,P/L # 28 and mark # 0507-8,P/L # 29 and mark # 0507-4,P/L # 30 and mark # 0507-54548/13/12 17:235473RECEIVING INSPECTION OF PIPE AND FITTINGS AT LAY DOWN YARD NSH FABRICATION4958/13/12 17:215474STORAGE AND HANDLING INSPECTION LAYDOWN YARD NSH FABRICATION.658/14/12 15:285492Material receiving and visual inspection of shell plates with P/L # 31 and mark # 0507-3A,0507-4A,0507-5A,0507-6A,0507-7A1509/17/12 10:535513RECEIVING INSPECTION OF MANUAL VALVES (POST INDICATOR VALVE - 16" AND 18" GATE VALVE BODY ONLY)FOR UNDERGROUND PIPING568/14/12 17:575520verify bottom surface cleanlines/coating prior to being placed to position( FITP NO: B92-D-0005A,ACTIVITY NO:2.1).668/14/12 17:595521verify bottom surface cleanlines/coating prior to being placed to position( FITP NO: B92-D-0005B,ACTIVITY NO:2.1).2068/15/12 9:465523Verify flush grinding on annular plate weld (FITP NO : B92-D-0007A,ACTIVITY NO: 2.7).2148/15/12 9:475524Verify flush grinding on annular plate weld (FITP NO : B92-D-0007B,ACTIVITY NO: 2.7).699/7/12 7:385621MASTIC TAPING OF 12 POINTS FOR METAL DOOR GROUNDING & FUEL TANK ROOM GROUNDING BAR & GENERATOR ROOM GROUNDING BAR & ELECTRICAL ROOM GROUNDING BAR AT B56-110, EMERGENCY GENERATOR BUILDING. ( NOTE: LATE QMIS ENTRY DUE TO SYSTEM NOT AVAILABLE )679/9/12 5:435716Pad plate elevation inspection of item B90-E-0103689/9/12 5:475717Pad plate elevation inspection of item B90-E-0104709/9/12 5:505718Pad plate elevation inspection of item B90-E-0105719/9/12 5:545719Pad plate elevation inspection of item B90-E-0106729/9/12 5:565720Pad plate elevation inspection of item B90-E-0113759/9/12 15:485753Pad plate elevation inspection of item B90-E-0108739/9/12 15:525754Pad plate elevation inspection of item B90-E-0107749/9/12 15:565756Pad plate elevation inspection of item B90-E-0109939/9/12 16:095763Material receiving and visual inspection of roof & shell nozzle assembly P/L # 45 and mark #0523-A,C,1123-A,B,0215-9,0222-7,0422-7,0815-9,0816-16,17,18,0523-A,C,1123-A,B,0215-9,0222-7,0815-9,0816-16,17,18,04227-7.889/9/12 16:235765Material receiving and visual inspection of shell plates with P/L # 34 and mark # 0507-6, 0507-7949/9/12 16:315767Material receiving and visual inspection of shell plates with P/L # 35 and mark # 0508-B,C,P/L # 39 and mark # 0507-2, 0507-1A,0507-4,bottom plates with P/L # 39 and mark # 0406-B1,0406-B2,0406-B3 R/L.929/9/12 16:365768Material receiving and visual inspection of shell plates with P/L # 37 and mark # 0407-1,2,3, P/L # 38 and mark # 1107-1,2,3.919/9/12 16:425769Material receiving and visual inspection of shell plates with P/L # 40 and mark # 0207-1,2,3,4,5, & P/L # 42 and mark # 0508-A.1009/9/12 16:525770Material receiving and visual inspection of shell and roof nozzle assembly, pad plate with P/L # 36 and mark # 0116-B,C,D,E,F,G,0123-B,C,D,E,0216-11,12,13,14,0216-A,B,C,D,E,0316-A,B,C,D,E,F,0323-A,B,C,D,0407-5,0416-A,0423-B,C,D,0516-18,19,21,23,0523-B,D,0816-15,19,0816-G,0823-A,C,D,1116-10,1116-A,B,D,E,F,1123-C,D,E,F,G,H,J.859/9/12 16:565771Material receiving and visual inspection of shell plates with P/L # 41 and mark # 0508-E,0508-F.869/9/12 17:015772Material receiving and visual inspection of roof plates with P/L # 43 and mark # 0222-A,0323-B,C,0416-A,B,D,0423-A,B,D,E,0816-C,D,0823-B,0511-3,0511-R3,R4,R5 R/L.819/10/12 11:285788Witness of One PRV Calibration for hydrotest.1019/10/12 11:365789Witness of One PRV Calibration for Hydrotest.999/10/12 17:325843Material receiving and visual inspection of shell plate with P/L # 46 and mark # 0508-D, P/L # 47 and mark # 0807-1,2,3.789/11/12 8:315941Witness of Two PRV Calibration for Hydrotest Purpose.829/11/12 9:535950Witness of one PRV Calibration for Hydrotest Purpose.899/11/12 9:595951Witness of one PRV Calibration for Hydrotest Purpose.799/11/12 10:075952Witness of one PRV Calibration for Hydrotest Purpose.849/11/12 15:255978Material receiving and visual inspection of bottom plates, roof plates, roof manhole assembly with P/L # 48 and mark # 0511-6, 0511-6A, 0511-R1 R/L, 0511-R3 R, 0511-R4 R, 0511-R5 L, 0422-A/B, 0322-A/B, 0822-A/B, 0122-A/B, P/L # 49 and mark # 0806-B1, 0806-B2, 0806-B3 R/L, 0806-B4 R/L, 0511-R6 R/L.2529/11/12 18:526082POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO BEAM2189/11/12 18:576088PRE WELDING INSPECTION OF STRUCTURAL PLATE TO BEAM2199/11/12 19:216090POST WELD VISUAL INSPECTOR OF STRUCTURAL PLATE TO BEAM1789/11/12 19:206093IN PROCESS WELDING OF STRUCTURAL PLATE TO BEAM2509/11/12 19:236097PRE WELDING INSPECTION OF STEEL STRUCTURE PLATE TO BEAM2109/11/12 19:316104IN PROCESS WELDING INSPECTION OF STRUCTURAL STEEL TO PC WALL PANEL2029/11/12 19:346107PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2549/11/12 19:366109POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2279/11/12 19:416112PRE WELDING INSPECTION2039/11/12 19:446114PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2229/11/12 19:466116IN PROCESS WELDING INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL2139/11/12 19:486118POST WELD VISUAL INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL1949/11/12 19:516120IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PLATE2179/11/12 19:556124POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO BEAM1559/11/12 19:586127PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2499/11/12 20:006129IN PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2489/11/12 20:026132POST WELDING VISUAL INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL2479/11/12 20:056133PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2469/11/12 20:076135IN PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2089/11/12 20:106137POST WELD VISUAL INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL2459/11/12 20:156140PRE WELDING INSPECTION OF STRUCTION STEEL PLATE TO THE PC WALL PANEL2449/11/12 20:176142IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2169/11/12 20:196143POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2349/11/12 20:296148VISUAL INSPECTION OF ANNULAR PLATE WELD (REPAIR WELD J-BA4R1539/11/12 20:316149OIL PENETRANT EXAMINE INSIDE FILLET WELD ROOT PASS BEFORE WELDING SECOND PASS AT B92-D-005A1909/11/12 20:336150SOLUTION FILM LEAK TEST BY VACUUM BOX OF ANNULAR PLATE (REPAIR WELD J-BA4R1)1709/11/12 20:336151VISUAL INSPECTION OF INSIDE FILLET WELD ROOT PASS AT STORAGE TANK1549/11/12 20:356152VISUALLY INSPECT COMPLETE WELD OF BOTTOM PLATE FOR POTENTIAL DEFECT & LEAKS1499/11/12 20:356153MT EXAMINED THE BACK GOUGE SURFACE PRIOR TO SECOND SIDE WELD OF RING TANK.2939/11/12 20:376154OIL PENETRANT EXAMINE INSIDE FILLET WELD ROOT PASS BEFORE DEPOSITION PASSES1819/11/12 20:376155SFT VACUUM BOX BOTTOM LAP WELDS1809/11/12 20:396156VISUAL INSPECTION OF SECOND SHELL VERTICAL JOINTS2019/11/12 20:396157VISUALLY INSPECT COMPLETED WELDS OF BOTTOM PLATE1799/11/12 20:406158VISUAL INSPECTION OF SECOND SHELL VERTICAL JOINTS2159/11/12 20:416159MT EXAMINED ARE STRIKE AND TEMPORARY1999/11/12 20:416160SFT VACCUM BOX BOTTOM LAP WELDS2099/11/12 20:426161MT EXAMINED ARC STRIKE AND TEMPORARY ATTACHMENT REMOVAL AREA1639/11/12 20:436162MT EXAMINED (J-BA4R)1719/11/12 20:436163VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENTS AT B92-D-005A.1829/11/12 20:456164VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENTS AT B92-D-005B.1929/11/12 20:456165VISUAL INSPECTION OF ANNULAR PLATE WELD REPAIR JOINT1749/11/12 20:476166VERIFICATION OF BOTTOM SURFACE1879/11/12 20:476167SFT BY VACCUUM BOX OF ANNULAR PLATE WELD REPAIR JOINT2009/11/12 20:486168VISUAL INSPECTION OF BOTTOM PLATE CORNER JOINT FOR FILLET WELD REPAIRED1699/11/12 20:506169MT EXAMINED AT WELD JOINT REPAIR AREA AFTER GAUGING BOTTOM ANNULAR JOINT909/12/12 8:296172VISUAL INSPECTION AT TEST PRESSURE FOR TEST PACKAGE NO. UG-FW-045989/12/12 8:326173VERIFICATION OF TESTING MEDIA FOR HYDROSTATIC TESTING (WATER QUALITY) FOR TEST PACKAGE NO. UG-FW-066979/12/12 8:356174PRE-TEST PUNCHLISTING OF ON-PLOT PIPING PRIOR TO HYDROTEST OF TEST PACKAGE NO. UG-FW-066839/12/12 9:026175Inspection of one PRV Calibration for Hydrotest Purpose.769/12/12 9:116176Inspection of one PRV Calibration for Hydrotest Purpose.809/12/12 10:406183INTERNAL CLEANLINESS AND/OR FLUSHING INSPECTION PRIOR TO HYDROTEST OF TEST PACKAGE NO. UG-FW-066969/12/12 10:416184VERIFICATION OF TESTING EQUIPMENT (INCLUDING SAFETY REQUIREMENTS) INSPECTION FOR TEST PACKAGE NO. UG-FW-066959/12/12 10:536185VERIFICATION OF TEST PREPARATION FOR TEST PACKAGE NO. UG-FW-066879/12/12 10:566186INSPECTION OF FILLING AND PRESSURIZATION FOR TEST PACKAGE NO. UG-FW-06779/12/12 11:006187VISUAL INSPECTION AT TEST PRESSURE FOR TEST PACKAGE NO. UG-FW-066.1029/12/12 11:116190NEOPRENE WRAPPING INSTALLATION INSPECTION FOR 16"-FW-2462-16FE0U1 (TP UG-FW-060)1489/12/12 18:106253MT EXAMINED THE BACK GAUGE SURFACE PRIOR TO WELDING SECOND SIDE OF 1ST RING VERTICAL JOINT1759/12/12 18:126256MT EXAMINED THE BACK OF GAUGE SURFACE PRIOR TO WELDING SECOND SIDE OF THE 1ST RING VERTICAL JOINT1649/12/12 18:156259VISUAL INSPECTION OF VERTICAL JOINT1889/12/12 18:176262VISUAL INSPECTION OF VERTICAL JOINT1689/12/12 18:196264VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENT AFTER SURFACE RESTORATION1669/12/12 18:226267VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENTS AFTER SURFACE RESTORATION1919/12/12 18:256271VERIFY BOTTOM SURFACE CLEANLINESS/COATING PRIOR TO BEING PLACED IN POSITION2429/12/12 18:276274VERIFY BOTTOM SURFACE CLEANLINESS/COATING PRIOR TO BEING PLACED IN POSITION1769/12/12 18:296276VISUAL INSPECTION OF INSIDE FILLET WELD ROOT PASS1779/12/12 18:316280MT EXAMINED OF BACK GAUGED SURFACE PRIOR TO WELDING SECOND SIDE OF 2ND RING VERTICAL JOINT3969/12/12 20:186374Visual inspection of first shell couse vertical butt weld at B92-D-007A( FITP: B92-D-007A Activity no:5.5).4119/12/12 20:266382Visual inspection of shell to annular plate corner joint fillet weld root pass at B92-D-007A( FITP: B92-D-007A Activity no:4.2).3339/12/12 20:306386Visual inspection of second shell vertical butt weld joint at B92-D-007A( FITP: B92-D-007A Activity no:5.5).2869/12/12 20:356391Verify bottom plate cleanliness/coating prior to be placed position at B92-D-0051 (FITP:B92-D-0051,Activity no:2.1).1369/13/12 5:526401Roundness, plumbness and peaking inspection of first course for item B92-D-0007A.1379/13/12 5:586402Roundness, plumbness, peaking and banding inspection of first and second course for item B92-D-0005A/B.2569/13/12 20:136491MT examined arc strike removal area and temporary attachments on GT-1-2 at B92-D-005A ,activity no:8.1).1479/13/12 20:176492Visual inspection of second shell horizontal butt joint at B92-D-005A,activity no:4.5.1519/13/12 20:216493Visual inspection of second shell horizontal joint at B92-D-005B,activity no:4.5.1529/13/12 20:256494Visual inspection of temporary attchments weld removal areas at B92-D-005A,activity no;8.1.1729/13/12 20:296495Visual inspection of temporary attachments weld removal areas (second shell horizontal butt weld joint) at B92-D-005B,activity no:8.1.1739/13/12 20:326496Visual inspection of temporary attachments weld removal areas(first shell vertical butt joint) at B92-D-007A,activity no:9.1.2519/15/12 17:106617Pre-welding inspection of structural plate to beam at NGL pipe rack.2079/15/12 17:116618Inprocess welding inspection of structural plate to beam at NGL pipe rack.1849/15/12 17:126619Post weld visual inspection of structural plate to beam at NGL pipe rack.1039/16/12 14:506637Material receiving inspection of grouting material (Master Flow 524L)at lay down area package # 2.1089/16/12 14:566638Pad plate elevation inspection of item B90-E-0203.1099/16/12 15:016640Pad plate elevation inspection of item B90-E-0213.1049/16/12 15:046643Pad plate elevation inspection of item B90-E-0204.1059/16/12 15:086646Pad plate elevation inspection of item B90-E-0205.1109/16/12 15:156654Pad plate elevation inspection of item B90-E-0207.1129/16/12 15:236659Pad plate elevation inspection of item B90-E-0208.1119/16/12 15:306664Pad plate elevation inspection of item B90-E-0209.1859/17/12 15:076687Pre-welding inspection of structural plate to TT slap at B90-302,date:08-09-2012 to 14-09-2012.2329/17/12 15:106688Inprocess welding inspection of structural plate to TT slap at B90-302,date:08-09-2012 to 14-09-2012.2209/17/12 15:126689Post weld visual inspection of structural plate to TT slap at B90-302,date:08-09-2012 to 14-09-2012.2339/18/12 14:006782Pre-welding inspection of structural plate to PC wall panel at B90-302,Date:08-09-2012 to 14-09-2012.1869/18/12 14:036783Inprocess welding inspection of structural plate to PC wall panel at B90-302,Date:08-09-2012 to 14-09-2012.1679/18/12 14:046784Post weld visual inspection of structural plate to PC wall panel at B90-302,Date:08-09-2012 to 14-09-2012.1069/19/12 15:136861Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0002.1079/19/12 15:196862Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0003.1969/20/12 11:226931MT EXAMINED ARC STRIKE & TEMPORARY ATTACHMENT REMOVAL AREA ON 1ST RING VERTICAL JOIN (FITP ACTIVITY NO. 8.2)2119/20/12 11:246932MT EXAMINED ARC STRIKE AND TEMPORARY ATTACHMENT REMOVAL ARE ON FIRST RING VERTICAL JOINT (ACTIVITY NO. 8.2)2289/21/12 9:556933MT EXAMINED THE BACK GAUGED SURFACE PRIOR TO WELD SECOND SITE OF 1ST RING VERTICAL JOINT (ACTIVITY NO. 5.4)2579/20/12 11:286934MT EXAMINED THE BACK GAUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF GIRTH SEAM (ACTIVITY NO. 4.4)1979/20/12 11:306935MT EXAMINED THE BACK GAUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF GIRTH SEAM (ACTIVITY NO. 4.4)2219/20/12 11:326936VISUAL INSPECTION OF BOTTOM PLATE ANNULAR JOINT REPAIR WELD (BA-12 ACTIVITY NO. 2.4)1959/20/12 11:336937MT EXAMINED AFTER GAUGED REPAIR WELD OF ANNULAR JOINT (BA12 ACTIVITY NO. 2.3)1989/20/12 11:356938SOLUTION FILM LEAK TEST BY VACCUUM BOX ON BOTTOM PLATE ANNULAR JOINT REPAIR WELD (BA-12 ACTIVITY NO. 2.5)2559/20/12 11:386939OIL PENETRANT LEAK TEST ON ROO PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD JOINT (ACTIVITY NO. 4.3)1389/20/12 13:196940MT Examined arc strike removal area & temporary attachment removal area at B92-D-005B2299/20/12 13:246941Visual inspection of repair weld (j-BA 4R1T1,BA 6R1T1 & BA 12R1T1) AT B92-D-007A.2309/20/12 13:286942SFT by vaccum box on bottom plate annular repair weld (BA-4R1T1,BA-6R1T1 & BA-12R1T1) AT B92-D-007A.2319/20/12 13:326943Visual inspection of first shell vertical joints butt weld at B92-D-007B.2369/20/12 13:366946Visual inspection of temporary attachment weld removal area near first vertical joint at B92-D-007B.2049/20/12 13:406948SFT by vaccum box on bottom lap weld at B92-D-005110449/22/12 10:276998Data Base reporting for the period of 13-19 September 2012 @ NSH Fabrication Shop10179/22/12 10:256999PRE WELDING & WELD JOINT FIT-UP INSPECTION FROM SEP. 20-26, 2012 @ NSH FABRICATION SHOP10559/22/12 10:347000IN-PROCESS WELD INSPECTION FROM SEP. 20-26, 2012 @ NSH Fabrication Shop10569/22/12 10:367001POST WELDING VISUAL INSPECTION FROM SEP. 20-26, 2012 @ NSH Fabrication Shop10409/22/12 10:387002WELDING CONSUMABLE CONTROL (STORAGE, HANDLING, ISSUANCE & CONDITIONING) FROM SEP. 20-26, 2012 @ NSH Fabrication Shop9729/22/12 10:407003SELECTION OF WELDS FOR NDT FROM SEP. 20-26, 2012 @ NSH Fabrication Shop1569/22/12 10:447004INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATION OF LIQUID COATING SYSTEM FROM SEPT. 22-27, 2012, 11:00 AM TO 4:30PM @ NSH Fabrication Shop4839/22/12 10:467005IN PROCESS INSPECTION OF PRIMER COAT FROM SEPT. 22-27, 2012, 11:30AM TO 5:00 PM2249/22/12 10:497006INSPECTION OF PRIMER COAT PRIOR TO TOP COAT APPLICATION FROM SEPT. 22-27, 2012 @ NSH Fabrication Shop2399/22/12 16:187054Material receiving and visual inspection of roof plates with P/L # 51 and mark # 0511-R4 L, 0511-R2, 0511-R7, 0111-R1 R/L, 0111-R2 R/L, 0111-R3 R/L, 0111-R4, P/L # 52 and mark # 0122-7, 0216-f, 0422-7, 0511-12, 0511-12A, 0616-B, 0623-A,B,C,D,F,H, 0807-3,4, 0816-A,F, 0823-E, 0516-B2379/22/12 16:227057Roundness, plumbness and peaking inspection of first course shell plates.2359/23/12 11:057098Visual inspection of bottom lab weld breakdown area at B92-D-0004.2129/23/12 11:097099Visual inspection of bottom lab weld breakdown area at B92-D-006A.2599/23/12 11:127100Visual inspection of bottom lab weld breakdown area at B92-D-006B.2389/23/12 11:157101Oil penetrant leak test inside root pass of shell to annular corner joint at B92-D-007B.2589/23/12 11:197102SFT by vaccum box on bottom lab weld breakdown area at B92-D-006B.2439/23/12 11:237103SFT by vaccum box on bottom lab weld brakdown area at B92-D-006A.1839/23/12 11:277104SFT by vaccum box on bottom lab weld break down area at B92-D-004.1179/23/12 14:057137Receiving inspection of equipment item # B90-E-103,104,105 and emergrncy vent manway, breather valve and base plates for item # B90-E-103,203,104,204,105,106.2829/23/12 14:097143Storage, handling and preservation inspection of equipment item # B90-E-103,104,105.1589/24/12 15:287222EQUIPMENT INSPECTION @ NSH FABRICATION SHOP1599/24/12 15:347223VERIFICATOIN AND VISUAL INSPECTION OF PAIN AND ABRASIVE @ NSH FABRICATION SHOP1609/24/12 15:367224STORAGE AND HANDLING OF PAINTS AND ABRASIVE @ NSH FABRICATION SHOP1619/24/12 15:397225INSPECTION OF SURFACE OF PRIMER COAT @ NSH FABRICATION SHOP1629/24/12 15:417226IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP4979/24/12 15:517228INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATOIN OF LIQUID COATING SYSTEM @ NSH FABRICATION SHOP4969/24/12 15:537229IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP4459/24/12 15:557230INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATION OF LIQUID COATING SYSTEM @ NSH FABRICATION SHOP4469/24/12 16:067234IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP5009/24/12 16:097235INSPECTION OF PRIMER COAT PRIOR TO TOP COATING @ NSH FABRICATION SHOP4479/24/12 16:127236INSPECTION OF PRIMER COAT PRIOR TO TOP COATING @ NSH FABRICATION SHOP4489/24/12 16:157237INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATION OF LIQUID COATING SYSTEM @ NSH FABRICATION SHOP4499/24/12 16:197238IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP4789/25/12 16:097316INSPECTION OF TOP COAT APPLICATION 9DRY/CURED COATING)4799/25/12 16:117317VERIFICATION AND VISUAL INSPECTION OF PAINT AND ABRASIVE1159/26/12 14:297337Pad plate elevation inspection of GAS MOLE SIEVE DEHYDRATION VESSELS item # B90-D-0110 A,B,C,D.1169/26/12 14:257344Pad plate elevation inspection of DE-METHANIZER COLUMN item # B90-C-0101.1149/27/12 6:377351Pad plate elevation inspection of REFRIGERANT GAS COMPRESSOR item # B90-K-0103A.1189/26/12 14:487354Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0002.1139/26/12 15:047363Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0003.10389/26/12 17:267386PRODUCTION WELD AND WELDER REPAIR RATE ASSESSMENT FOR ON PLOT PIPING FROM SEP. 27 TO OCT. 3, 2012.10189/26/12 17:297387PRE WELDING AND WELD JOINT FIT-UP INSPECTION FROM SEP. 27 TO OCT. 3, 2012.10439/26/12 17:317388IN PROCESS WELD INSPECTION FROM SEP. 27 TO OCT. 3, 2012.10459/26/12 17:337389POST WELDING VISUAL INSPECTION FROM SEP. 27 TO OCT. 3, 2012.10429/26/12 17:357390WELDING CONSUMABLE CONTROL STORAGE AND HANDLING ISSUANCE AND CONDITIONING FROM SEP. 27 TO OCT. 3, 2012.10399/26/12 17:377391SELECTION OF WELDS FOR NDT FROM SEP. 27 TO OCT. 3, 2012.2639/27/12 15:167409MT Examination at Vertical joint of the backgouged surface at first ring (VT1A,VT1B,VT1C,VT1D,VT1E,VT1G)10289/27/12 15:217410MT Examination at Arcstrike removal area and temporary attachments on girth seam joint GT-1-210299/27/12 15:257411MT Examination at Arcstrike removal area and temporary attachments weld removal area on first ring vertical joint (VT1A,VT1D,VT1E,VT1F,VT1G,VT1H)10309/27/12 15:277412MT Examined on the backgouged surface of the second side of the 3rd ring vertical joint VT3A, VT3B, VT3C2649/27/12 15:317413MT examined arc strike removal area and temporary attachment removal area after surface restoration on 1st ring vertical area of JT# VT1A,VT1B,VT1C,VT1D,VT1E,VT1H2749/27/12 15:347414MT EXAMINED ON THE BACKGOUGEDSURFACE ON 2ND RING OF VERTICAL JOINT VT2A, VT2B, VT2D, VT2E, VT2E, VT2F, VT2G10319/27/12 15:377415MT EXAMINED ON THE BACKGOUGEDSURFACE ON 1ST RING OF VERTICAL JOINT VT1A, VT1B, VT1C2659/27/12 15:427416MT EXAMINED ON THE BACKGOUGED SURFACE OF 1ST RING OF VERTICAL JT VT1A, VT1B, VT1C2669/27/12 15:457417MT EXAMINED THE BACKGOUGE SURFACE ON THE 1ST RING VERTICAL JT VT1A, VT1B, VT1C2679/27/12 15:477418MT EXAMINED ON THE BACKGOUGEDSURFACEOF 1ST RING OF VERTICAL JOINT VT1A, VT1B,VT1C2689/27/12 15:517419MT EXAMINED THE BACKGOUGESURFACE OF 3RD RING VERTICAL JOINT VT3A, VT3B, VT3C2759/27/12 15:537421MT EXAMINED ON THE BACK GOUGE SURFACE ON THE SECOND SIDE OF GIRTH SEAM JOINT GT-2-32699/27/12 15:567423VISUAL INSPECTION ON TEMPORARY ATTACHMENT WELD REMOVAL AREA NEAR FIRST SHELL2769/27/12 15:597424VISUAL INSPECTION ON FIRST COURSE VERTICAL BUTT WELD JOINTS2779/27/12 16:017426MT EXAMINATION ON ARC STRIKE REMOVAL AREA ON 1ST RING VERTICAL JOINT VT1A, VT1B, VT1C24010/2/12 17:147526Material receiving and visual inspection of bottom sketch plate and shell plate ring with P/L # 53 and mark # 0606-B1, 0606-B2 R/L, 0606-B3 R/L, 0606-B4, P/L # 54 and mark # 0607-1, 0607-2, 0607-3, P/L # 55 and mark # 0606-6, 0606-3, 0619-A.36710/4/12 17:457609Material receiving and visual inspection of roof plates with P/L # 56 and mark # 0511-12, 0511-12A, P/L # 55 and mark # 0411-R1 R/L, 0411-R2 R/L, 0411-R3 R/L, 0411-R4, 0321-1, 0421-136810/6/12 17:247674Material receiving and visual inspection of lower column assembly P/L # 02, 03, 04, 08, 12 and mark # 0106-A.48010/7/12 9:487675Inspection of Surface preparation & Prior to Application of liquid Coating System22610/7/12 9:507676In-Process Inspection of Primer Coat19310/7/12 9:527677Verification and visual Inspection of Paint and Abrasive22510/7/12 9:547678Inspection of Primer Coat prior to Top Coat Application24110/7/12 9:557679Inspection of Top coat Application (Dry /Cured coating)13010/7/12 10:207684Visual Inspection on third shell horizontal and vertical butt joints VT3A,VT3B,VT3C,GT2-313110/7/12 10:237685MT Examination onBackgouged surface prior to weld the second side of girth seam GT-2-3 in tank B92-D-0005A14410/7/12 10:267686VISUAL INSPECTION OF ROOT PASS WELDING BEFORE DEPOSITING SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT27010/7/12 10:317688VISUAL INSPECTION OF ROOT PASS WELDING BEFORE SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT J#BCJ112410/7/12 10:347689MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELDING THE SECOND SURFACE OF SECOND RING VERTICAL JOINTS JT # VT2A, VT2B, VT2C, VT2C, VT2D, VT2E, VT2F, VT2G14510/7/12 10:367690OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD13210/7/12 10:377691OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD12610/7/12 10:387692OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD14310/7/12 10:407693VISUAL INSPECTION OF ROOT PASS WELDING BEFORE SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT J#BCJ112910/7/12 10:417694OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD14610/7/12 10:437695MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS ON 3RD RING VERTICAL JOINTS VT31, VT3B, VT3C13310/7/12 10:457696VISUAL INSPECTION OON THIRD SHELL COURSE VERTICAL AND HORIZONTAL BUTT WELD JOINTS VT3A, VT3B, VT3C, GT2-312510/7/12 10:477697MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS ON SURFACE RESTORATION ON GIRTH SEAM JOINT GT-2-313410/7/12 10:487698MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS AFTER SURFACE RESTORATION ON GITH SEAM JT GT-2-313510/7/12 10:507699MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS ON 3RD RING VERTICAL JOINTS VT31, VT3B, VT3C12710/7/12 10:547700VISUAL INSPECTION OF ROOT PASS WELDING BEFORE SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT BCJ198810/7/12 17:147756Inspection of Primer Coat prior to Top Coat Application98110/7/12 18:217758Inspection of Surface preparation & Prior to Application of liquid Coating System104710/7/12 18:267762In-Process Inspection of Primer Coat13910/8/12 17:147830Material receiving and visual inspection of lower column jacking base plates with P/L # 5 and mark # 0106-14 and lower column assembly with P/L # 14 and mark # 0106-A.98710/8/12 16:177890Inspection of Top Coat Application (Dry/Cured coating)27810/9/12 10:447899Pre welding Fit up inspection of Steet structure modification as per site condition27110/9/12 10:477900Inprocess Welding Inspection of Steel Structure modification as per site27210/9/12 10:507901POSTWELDING VISUAL INSPECTION OF STEEL STRUCTURE MODIFICATION AS PER SITE11910/9/12 10:547902VISUAL INSPECTION ON TEMPORARY ATTACHMENT WELD REMOVAL AREAS NEAR 3RD SHELL COURSE VERTICAL AND HORIZONTAL BUTT WELD JOINT VT3A, VT3B, VT3C, GT-2-312010/9/12 10:567903VISUAL INSPECTION ON TEMPORARY ATTACHMENT WELD REMOVAL AREA ON 3RD SHELL COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT3A, VT3B, VT3C, GT2-212310/9/12 10:587904MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C12110/9/12 11:007905MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C12210/9/12 11:027906BOTTOM SURFACE CLEANLINESS/COATING PRIOR TO BE PLACED IN POSITION14010/9/12 11:047907MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C14110/9/12 11:057908MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C14210/9/12 11:107909MT EXAMINATION ON BACKGOUGED SURFACE ON 4TH RING VERTICAL JOINT VT4A, VT4B, VT4C12810/9/12 13:307910MT EXAMINATION ONBACKGOUGED SURFACE ON 4TH RING VERTICAL JOINT VT4A, VT4B, VT4C59610/10/12 10:357975PRODUCTION WELD & REPAIR RATE ASSESSMENT FOR ON-PLOT PIPING97410/10/12 10:377976PRE-WELDING INSPECTION SHOP OF PLANT PIPING FROM 11-OCT-12 TO 17-OCT-201270710/10/12 10:397977IN-PROCESS WELDING INSPECTION FROM 11-OCT-2012 TO 17-OCT-201259210/10/12 10:507978POST WELDING VISUAL INSPECTION FROM 11-OCT-2012 TO 17-OCT-201250310/10/12 10:447979CONTROL OF WELDING CONSUMABLES-PLANT PIPING (SITE STORAGE, HANDLING, CONDITIONING & ISSUANCE) FROM 11-OCT-2012 TO 17-OCT-201250510/10/12 10:467980SELECTION OF WELDS FOR NDE (ON-PLOT PIPING) FROM 11-OCT-2012 TO 17-OCT-201226110/10/12 16:558020Material receiving and visual inspection of reinforcing pad plates for roof fittings with P/L # 57 and mark # 0522-7,0622-6,0622-20 and nozzle assembly with mark # 0323-E,0327-A,0327-2,0416-C,0416-E,0416-F,0416-G,0422-A,0427-A,0427-2,0423-A,0523-D.22310/13/12 16:038165Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:-PRV-P2-0004.15710/13/12 16:068174Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:-PRV-P2-0005.98210/12/12 7:428215Verification and visual Inspection of Paint and Abrasive16510/12/12 8:158216Material receiving and visual inspection of flat bar for diagonal column bracing and horizontal column bracing assembly with P/L # 13 and mark # 0108-1, 0108-A26010/12/12 11:438217Material receiving and visual inspection of reinforcing pad plate for shell nozzle, internal pipe support, roof nozzle, roof manhole assembly, plate for roof manhole hinge and compression bar support with P/L # 50 and mark # 0116-14,0122-6,0123-10,0123-12,0123-17,0222-6,0316-11,0318-11,0318-8,0322-6,0323-12,0323-14,0323-15,0326-6,0416-12,0418-11,0418-14,0422-6,0423-12,0423-14,0422-6,0423-12,0423-14,0423-15,0426-12,0426-6,0510-2,0518-17,0522-6,0522-A,0523-12,0523-13,0623-29,0623-30,0623-31,0822-6,0823-10,0823-11,0823-17,0416-13100410/13/12 16:038271RECEIVING INSPECTION OF PIPE AND FIITINGS (LATE INPUT DUE TO QMIS SHUTDOWN)76210/13/12 16:058272STORAGE AND HANDLING INSPECTION73710/13/12 16:068273RECEIVING INSPECTION OF PIPE AND FIITINGS99210/13/12 16:088274STORAGE AND HANDLING INSPECTION101610/13/12 16:098276RECEIVING INSPECTION OF PIPE AND FIITINGS59710/13/12 16:108278STORAGE AND HANDLING INSPECTION73610/13/12 16:128279RECEIVING INSPECTION OF PIPE AND FIITINGS68610/13/12 16:148280STORAGE AND HANDLING INSPECTION100510/13/12 16:158281RECEIVING INSPECTION OF PIPE AND FIITINGS92010/13/12 16:168282STORAGE AND HANDLING INSPECTION104110/13/12 16:188283RECEIVING INSPECTION OF PIPE AND FIITINGS91910/13/12 16:198284STORAGE AND HANDLING INSPECTION73410/13/12 16:208285RECEIVING INSPECTION OF PIPE AND FIITINGS70810/13/12 16:228286STORAGE AND HANDLING INSPECTION67210/13/12 16:238287RECEIVING INSPECTION OF PIPE AND FIITINGS73510/13/12 16:398288CUTTING AND ASSEMBLY FIT-UP92310/13/12 16:408289CUTTING AND ASSEMBLY FIT-UP92110/13/12 16:418290CUTTING AND ASSEMBLY FIT-UP73310/13/12 16:438291RECEIVING INSPECTION OF PIPE AND FIITINGS99010/13/12 16:448292STORAGE AND HANDLING INSPECTION67110/13/12 16:518293RECEIVING INSPECTION OF PIPE AND FIITINGS91810/13/12 16:538294RECEIVING INSPECTION OF PIPE AND FIITINGS70610/14/12 6:398304RECEIVING INSPECTION OF WELDING CONSUMABLES70510/14/12 6:428305Inprocess verification of solvent-removable color contrast penetrant examination71110/14/12 6:448306Inspection of epair on weld joints or base metal by welding.92210/14/12 15:328324RECEIVING INSPECTION OF PIPE FITTINGS59810/14/12 15:358325CUTTING AND ASSEMBLY FIT-UP97510/14/12 15:378330RECEIVING INSPECTION OF PIPE FITTINGS99410/14/12 15:398332RECEIVING INSPECTION OF PIPE FITTINGS101510/14/12 15:438336CUTTING AND ASSEMBLY FIT-UP69210/14/12 15:458339FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL99110/14/12 15:478341RECEIVING INSPECTION OF PIPE FITTINGS67010/14/12 15:488343RECEIVING INSPECTION OF PIPE FITTINGS93710/14/12 15:508345FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL63510/14/12 15:528347CUTTING AND ASSEMBLY FIT-UP68910/14/12 15:538349RECEIVING INSPECTION OF PIPE FITTINGS68710/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL68810/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL69010/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL69110/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL76310/14/12 15:578353FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL97310/14/12 15:598355FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL67310/14/12 16:008357FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL99310/14/12 16:028359FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL98910/14/12 16:038361CUTTING AND ASSEMBLY FIT-UP98410/14/12 16:208364Inspection of Top coat Application (Dry /Cured coating)32310/14/12 17:188365STEEL STRUCTURE MODIFICATION AS PER SITE CONDITION FOR THE FOLLOWING COLUMN POST, GIRDER FOR 1144128-1054. 1144128-1094, 1144128-202332210/14/12 17:218366STEE STRUCTURE MODIFICATION OF COLUMN POST AND GIRDER AS PER SITE CONDITION FOR THE FOLLOWING DRAWING 1144128-2031,2032,2033,2107.1144025,101B2528510/14/12 17:238368IN PROCESS WELDING OF STEE STRUCTURE MODIFICATION OF COLUMN POST AND GIRDER AS PER SITE CONDITION FOR THE FOLLOWING DRAWING 1144128-2031,2032,2033,2107.1144025,101B2532110/14/12 17:258370PROCESS WELDING OF STEE STRUCTURE MODIFICATION OF COLUMN POST AND GIRDER AS PER SITE CONDITION FOR THE FOLLOWING DRAWING 1144128-2023,1054,109428410/14/12 17:288373PRE WELDING FIT UP INSPECTION32010/14/12 17:318375INPROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL AT B95-31231910/14/12 17:338377POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL39210/14/12 17:388381PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)37110/14/12 17:438384PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)39310/14/12 17:438386PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)39110/14/12 17:468387PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)104610/15/12 15:058408Verification and visual Inspection of Paint and Abrasive (Sigma Cover-410 Ral-Alu gray,7035, Each-1480 lts and 7042-2980 lts)98510/15/12 15:128409Inspection of Surface preparation & Prior to Application of liquid Coating System104910/15/12 15:148410In-Process Inspection of Primer Coat68310/16/12 7:138434Cutting And Assembly Fit-Up81010/16/12 7:158435Recv Inspection of Pipe & Pipe Nipples ( Plant Piping )81110/16/12 7:178436Recv Inspection of Pipe & Pipe Nipples ( Plant Piping )81210/16/12 7:198437Recv Inspection of Pipe & Pipe Nipples ( Plant Piping )/ Material Receiving Inspection Forged Fitting( MRR-P-069 )88710/16/12 7:308440Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0001 #88810/16/12 7:338441Verify Test Equipment (Safety Assessment) # NSH-FD-1016-HDT-0001 #88910/16/12 7:358442Review of Test Package Preparation # NSH-FD-1016-HDT-0001 #89010/16/12 7:378443Inspection of pressure test preparation # NSH-FD-1016-HDT-0001 #89110/16/12 7:408444Inspection Filling Pressurization # NSH-FD-1016-HDT-0001 #88210/16/12 7:428445Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0001 #88410/16/12 7:448446Visual Inspection at test Pressure # NSH-FD-1016-HDT-0001 #88310/16/12 8:028447Material Receiving Inspection Forged Fitting( MRR-P-066 )88510/16/12 7:488448Material Receiving Inspection Forged Fitting ( MRR-P-080 )89210/16/12 7:538449Material Receiving Inspection Flange ( MRR-P-079 )88610/16/12 7:558450Material Receiving Inspection Flange ( MRR-P-079 )81310/16/12 15:198476Inspection of Primer Coat prior to Top Coat Application50710/16/12 16:068481RECEIVING INSPECTION OF WELDING CONSUMABLES30410/16/12 17:018482Material Recieving Inspection of Roof Plate Assembly33210/16/12 17:038483MATERIAL RECIEVING INSPECTION OF COUPLING, PLUG AND PLATES31010/16/12 17:058484MATERIAL RECIVING INSPECTION OF COLUMN STUB87510/17/12 6:558488Review of Test Package Preparation # NSH-FD-1016-HDT-0002 #87610/17/12 6:588489Piping /Equipment Internal Cleaning #NSH-FD-1016-HDT-0002#87710/17/12 6:598490Inspection Filling Pressurization # NSH-FD-1016-HDT-0002 #87810/17/12 7:018491Inspection of pressure test preparation # NSH-FD-1016-HDT-0002 #87910/17/12 7:038492Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002 #88010/17/12 7:048493Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002 #88110/17/12 7:068494Review of Test Package Preparation # NSH-FD-1016-HDT-0003 #73810/17/12 7:088495Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0003 #73910/17/12 7:108496Inspection Filling Pressurization # NSH-FD-1016-HDT-0003 #74010/17/12 7:128497Inspection of pressure test preparation # NSH-FD-1016-HDT-0003 #89310/17/12 7:138498Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0003 #74110/17/12 7:158499Visual Inspection at test Pressure # NSH-FD-1016-HDT-0003 #74210/17/12 18:318541Review of Test Package Preparation # NSH-FD-1016-HDT-0004 #75110/17/12 18:338543Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0004 #75210/17/12 18:348545Inspection Filling Pressurization # NSH-FD-1016-HDT-0004 #75310/17/12 18:358548Inspection of pressure test preparation # NSH-FD-1016-HDT-0004 #75410/17/12 18:388551Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0004 #75510/17/12 18:398553Visual Inspection at test Pressure # NSH-FD-1016-HDT-0004 #75610/17/12 18:408554Material Receiving Inspection Pipe S/S ( MRR-P-066 )74310/17/12 18:428557Cutting And Assembly Fit-Up ( Weekly RFI Oct-11 To Oct-18-2012 )76610/17/12 18:478562Material Receiving Inspection Forged Fitting ( MRR-P-066 )89410/17/12 18:498563Material Receiving Inspection Forged Fitting ( MRR-P-080 )73010/17/12 18:508565Review of Test Package Preparation # NSH-FD-1016-HDT-0006 #59110/17/12 18:528566Data base reporting62110/17/12 18:528567Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0006 #60710/17/12 18:538568Pre-Welding & Weld Joint Fit-up Inspection62210/17/12 18:548569Inspection Filling Pressurization # NSH-FD-1016-HDT-0006 #71210/17/12 19:078570In-Process Weld Inspection62310/17/12 18:568571Inspection of pressure test preparation # NSH-FD-1016-HDT-0006 #60810/17/12 18:568572Post-Welding Visual Inspection62410/17/12 18:578573Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0006 #59310/17/12 18:578574Welding Consumable Control (Storage, Handling, Issuance & Conditioning)50610/17/12 18:588575Selection of welds for NDT62510/17/12 18:598576Visual Inspection at test Pressure # NSH-FD-1016-HDT-0006 #62610/17/12 19:008577Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0004 #62710/17/12 19:028578Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0005 #72210/17/12 19:038579Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0006 #72310/17/12 19:058580Review of Test Package Preparation # NSH-FD-1016-HDT-0005 #72410/17/12 19:078581Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0005 #72510/17/12 19:088582Inspection Filling Pressurization # NSH-FD-1016-HDT-0005 #62810/17/12 19:108583Inspection of pressure test preparation # NSH-FD-1016-HDT-0005 #72610/17/12 19:128584Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0005 #72710/17/12 19:138585Visual Inspection at test Pressure # NSH-FD-1016-HDT-0005 #72810/17/12 19:158586Review of Test Package Preparation # NSH-FD-1016-HDT-0007 #72910/17/12 19:168587Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0007 #89510/17/12 19:188588Inspection Filling Pressurization # NSH-FD-1016-HDT-0007 #81410/17/12 19:198589Inspection of pressure test preparation # NSH-FD-1016-HDT-0007 #81510/17/12 19:218590Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0007 #81610/17/12 19:228591Visual Inspection at test Pressure # NSH-FD-1016-HDT-0007 #81710/17/12 19:248592Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0007 #90610/17/12 19:268593Material Receiving Inspection Fitting ( MRR-P-087 )90710/17/12 19:278594Review of Test Package Preparation # NSH-FD-1016-HDT-0008 #90810/17/12 19:288596Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0008 #90910/17/12 19:308597Inspection Filling Pressurization # NSH-FD-1016-HDT-0008 #91010/18/12 6:268600Inspection of pressure test preparation # NSH-FD-1016-HDT-0008 #91110/18/12 6:278601Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0008 #91310/18/12 6:288602Visual Inspection at test Pressure # NSH-FD-1016-HDT-0008 #91410/18/12 6:378603Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0008 #64610/18/12 6:398604Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0009 #27310/18/12 15:268619Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0004.26210/18/12 15:338620Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0005.62910/19/12 7:148621Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0010 #63010/19/12 7:168622Review of Test Package Preparation # NSH-FD-1016-HDT-0009 #91510/19/12 7:188623Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0009 #91610/19/12 7:208624Inspection Filling Pressurization # NSH-FD-1016-HDT-0009 #69610/19/12 7:218625Inspection of pressure test preparation # NSH-FD-1016-HDT-0009 #69710/19/12 7:238626Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0009 #69810/19/12 7:248627Visual Inspection at test Pressure # NSH-FD-1016-HDT-0009 #69910/19/12 7:268630Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0011 #70010/19/12 7:288633Review of Test Package Preparation # NSH-FD-1016-HDT-0010 #70110/19/12 7:298635Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0010 #91210/19/12 7:318637Inspection Filling Pressurization # NSH-FD-1016-HDT-0010 #66810/19/12 7:328638Inspection of pressure test preparation # NSH-FD-1016-HDT-0010 #66910/19/12 7:348639Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0010 #91710/19/12 7:358640Visual Inspection at test Pressure # NSH-FD-1016-HDT-0010 #106310/19/12 7:358641Inspection of Top coat Application (Dry /Cured coating)68410/19/12 7:418642Inspection of Material ,Storage And Hadling at Fabr ( Weeky RFI 4-Oct -To 11-Oct,2012 )68510/19/12 7:438643Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0012 #78210/19/12 7:448644Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0013 #61710/19/12 7:458645Material Receiving Inspection Flange ( MRR-P-090 )79010/19/12 7:488646Cutting And Assembly Fit-Up ( Weekly RFI Oct-18 To Oct-31-2012 )61910/19/12 7:508647Review of Test Package Preparation # NSH-FD-1016-HDT-0011 #76510/19/12 7:518648Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0011 #78310/19/12 7:538649Inspection Filling Pressurization # NSH-FD-1016-HDT-0011 #61810/19/12 7:558650Inspection of pressure test preparation # NSH-FD-1016-HDT-0011 #62010/19/12 7:578651Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0011 #78410/19/12 8:008652Visual Inspection at test Pressure # NSH-FD-1016-HDT-0011 #45610/19/12 8:028653Review of Test Package Preparation # NSH-FD-1016-HDT-0012 #63110/19/12 8:078654Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0012 #79310/19/12 8:078655Inspection Filling Pressurization # NSH-FD-1016-HDT-0012 #63210/19/12 8:098656Inspection of pressure test preparation # NSH-FD-1016-HDT-0012 #74810/19/12 8:118657Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0012 #78010/19/12 8:128658Visual Inspection at test Pressure # NSH-FD-1016-HDT-0012 #79110/19/12 8:148659Review of Test Package Preparation # NSH-FD-1016-HDT-0013 #79210/19/12 8:168660Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0013 #83510/19/12 8:178661Inspection Filling Pressurization # NSH-FD-1016-HDT-0013 #66210/19/12 8:188662Inspection of pressure test preparation # NSH-FD-1016-HDT-0013 #86010/19/12 8:218663Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0013 #84810/19/12 8:238664Visual Inspection at test Pressure # NSH-FD-1016-HDT-0013 #86110/19/12 8:268665Review of Test Package Preparation # NSH-FD-1016-HDT-0014 #65710/19/12 8:288666Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0014 #86910/19/12 8:298667Inspection Filling Pressurization # NSH-FD-1016-HDT-0014 #85610/19/12 8:318668Inspection of pressure test preparation # NSH-FD-1016-HDT-0014 #87010/19/12 8:328669Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0014 #78910/19/12 8:338670Visual Inspection at test Pressure # NSH-FD-1016-HDT-0014 #98310/20/12 16:168728Verification and visual Inspection of Paint and Abrasive, Indian Garnet 30/6059010/21/12 6:588756Inspection of Repair on Weld Joints or Base Metal by Welding.70910/21/12 6:598757In-process verification of solvent-removable colorcontrast penetrant examination30210/21/12 10:478760POST WELDING VISUAL INSPECTION OF STEEL STRUCTURE MODIFICATION OF STTEL STRUCTURE COLUMN, GIRDER, POST30110/21/12 10:528762FULL WELDING FINAL VISUAL INSPECTION OF EMBEDDED PLATE TO ANGLE BAR WELDING31810/21/12 10:578763PRE WELDING FITUP INSPECTION OF ANGLE BAR TO STRUCTURAL EMBEDDED PLATE31710/21/12 11:038764MT EXAMINATION ON BACKGOUGED SURFACE OF GIRTH 1-2 WHICH DID NOT DONE BY AGW31610/21/12 11:058765MT EXAMINATION ON BACKGOUGED SURFACE OF GIRTH 1-2 WHICH DID NOT DONE BY AGW31510/21/12 11:078766MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-1-230010/21/12 11:088767MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-1-229810/21/12 11:108768MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-3-428110/21/12 11:118769MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-3-429710/21/12 11:148770SFT VACCUM BOX TEST ON BREAK DOWN AREAS ON JT# BLS1, BLS5, BLS6, BLS11, BLS15, BLS16, BLS20, BSS5, BSS6, BSS9, BSS10 AT 3.5 PSIAND REPEAT AT 10 PSI VACCUM28010/21/12 11:208771MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G29910/21/12 11:228772VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G30310/21/12 11:238773VISUAL INSPECTION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS AFTER RESTORING NEAR 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.30510/21/12 11:248774VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G AND GT-1-232410/21/12 11:278775VISUAL INSPECTION OF THE BOTTOM WELLAP WELD LAP BREAKDOWN AREA 12" LONG FROM OUTER JOINTS28710/21/12 11:288776VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G AND GT-1-229010/21/12 11:298777VISUAL INSPECTION OF SHELL TO BOTTOM PLATE JOINT OUTSIDE FILLET ROOT PASS BEFORE SUBSEQUENT PASS.29410/21/12 11:308778VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G ANG GT-1-232710/21/12 11:318779MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G AND GT-1-231410/21/12 11:328780VISUAL INSPECTION OF SHELL TO BOTTOM PLATE JOINT OUTSIDE FILLET ROOT PASS BEFORE SUBSEQUENT PASS. JOINT NO:BCJ132610/21/12 11:338781VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, AND GT-1-230610/21/12 11:358782VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, ANF GT-1-233010/21/12 11:378783MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, AND GT-1-232810/21/12 11:378784VISUAL INSPECTION OF 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.30810/21/12 11:388785MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C,AND GT-1-229510/21/12 11:408786PT EXAMINATION FOR OUTSIDE CORNER FILLET WELD INITIAL PASS BEFORE WELDING SUBSEQUENT PASS.31110/21/12 11:408787SFT VACCUM BOX TEST FOR LAP WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS3 AT 3-5 PSI AND REPEAT AT 10 PSI VACCUM30710/21/12 11:418788SFT VACCUM BOX TEST FOR LAP WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS3 AT 3-5 PSI AND REPEAT AT 10 PSI VACCUM31310/21/12 11:428789VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, AND GT-1-230910/21/12 11:438790MT EXAMINATION FOR BACKGOUGED SURFACE OF GIRTH 1-2 PRIOR TO WELDING.29210/21/12 11:448791VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, AND GT-1-2 ON SECOND SHELL COURSE HORIZONTAL AND VERTICAL JOINTS33110/21/12 11:458792PT EXAMINATION OF OUTSIDE CORNER FILLET WELD INITIAL PASS BEFORE WELDING SUBSEQUENT PASS.29110/21/12 11:468793VISUAL INSPECTION ON BOTTOM PLATE LAP JOINT WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS328810/21/12 11:478794VISUAL INSPECTION OF BOTTOM PLATE LAP JOINTS WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS332510/21/12 11:498795PT EXAMINATION ON OUTSIDE CORNER FILLET WELD INITIAL PASSBEFORE SUBSEQUENT PASSES31210/21/12 11:508796MT EXAMINATION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS & ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 3-4 AND ALONG VERTICAL JOINT: VT4A,VT4B, VT4C.29610/21/12 11:508797MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT4A, VT4B, VT4C, AND GT-3-428910/21/12 11:528798VISUAL INSPECTION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS AFTER RESTORING NEAR 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.32910/21/12 11:548799VISUAL INSPECTION OF 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.33910/21/12 17:068807PADDING INSPECTION104810/21/12 18:578854Inspection of Surface preparation & Prior to Application of liquid Coating System53610/21/12 18:588855In-Process Inspection of Primer Coat53510/22/12 16:208891Inspection of Primer Coat prior to Top Coat Application34710/23/12 15:298933Pre welding Fitup Inspection of Steel Structure Modification34310/23/12 15:308934In process Welding Inspection of Steel Structure Modification40910/23/12 15:318935Post Welding Visual Inspection of Steel Structure Modification33810/24/12 16:029042PRE WELDING FIT UP INSPECTION OF STEEL STRUCTURE MODIFICATION AS PER THE DRAWING/ SITE CONDITIONS34410/24/12 16:059043INPROCESS WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION AS PER SITE CONDITION38110/30/12 6:199044PAD PLATE ELEVATION INSPECTION60910/24/12 16:159045Data base reporting38010/30/12 6:209046PAD PLATE ELEVATION INSPECTION50110/30/12 6:209046PAD PLATE ELEVATION INSPECTION71010/24/12 16:179047Pre-Welding & Weld Joint Fit-up Inspection59510/24/12 16:189049In-Process Weld Inspection70410/24/12 16:209050Post-Welding Visual Inspection70310/24/12 16:219051Welding Consumable Control (Storage, Handling, Issuance & Conditioning)34010/30/12 6:189052PAD PLATE ELEVATION INSPECTION89910/24/12 16:229053Selection of welds for NDT41210/30/12 6:169054PAD PLATE ELEVATION INSPECTION40310/30/12 6:159055PAD PLATE ELEVATION INSPECTION37010/30/12 6:139056PAD PLATE ELEVATION INSPECTION39010/30/12 6:129057PAD PLATE ELEVATION INSPECTION41310/30/12 6:109058PAD PLATE ELEVATION INSPECTION38710/30/12 6:099059PAD PLATE ELEVATION INSPECTION40210/30/12 6:079060PAD PLATE ELEVATION INSPECTION37910/24/12 16:489061MT INSPECTION ON BACKGOUGED AREA OF 3RD RING VERTICAL JOINTS.37710/24/12 16:539063MT ON BACKGOUGED SURFACE OF TOP ANGLE JOINT TOGETHER PRIOR TO WELDING ON SECOND SIDE.35410/24/12 16:579066MT ON WELD REPAIR REMOVAL AREA OF GIRTH 1-2 INTERSECTION 2E, 2F AND EXAMINED AFTER THE COMPLETION OF WELD.38610/25/12 10:019078MT OF BACKGOUGED SURFACE OF VERTICAL JOINTS VT3A, VT3B, VT3C PRIOR TO WELDING40510/25/12 10:069079MT ON 3RD RING VERTICAL JOINTS BACKGOUGED SURFACE FOR THE JOINT NO: VT3A, VT3B, VT3C38411/1/12 10:519083MT ON TEMPORARY ATTACHMENT WELD REMOVAL AREAS AND ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 1-2 AND VERTICAL VT2A, VT2B, VT2C38311/1/12 10:529084MT ON 3RD RING VERTICAL JOINTS BACKGOUGED SURFACE PRIOR TO WELDING JOINT NO: VT3C, VT3D, VT3E, VT3F38511/1/12 10:539085MT ON TEMPORARY ATTACHMENTS WELD REMOVAL AREA AND ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 1-2 AND VERTICAL JOINTS VT2A, VT2B, VT2C.35311/1/12 10:569086VISUAL INSPECTION OF 2ND SHELL COURSE HORIZONTAL AND VERTICAL BUTT JOINTS NO: VT2A, VT2B, VT2C, GT1-235211/1/12 10:559087MT ON BACKGOUGED SURFACE OF VERTICAL JOINTS PRIOR TO WELDING. JOINT NO: VT1A, VT1B, VT1C, VT1D35111/1/12 10:579088VISUAL INSPECTION OF SHELL TO BOTTOM CORNER JOINT OUTSIDE FILLET WELD ROOT PASS. JOINT NO: BCJ135011/1/12 10:589089VISUAL INSPECTION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS AFTER RESTORATION NEAR 2ND COURSE VERTICAL AND HORIZONTAL JOINTS.38211/1/12 10:599090VISUAL INSPECTION OF TEMPORARY ATTACHMENTS WELD REMOVAL AREAS AFTER RESTORATION NEAR HORIZONTAL AND VERTICAL BUTT JOINTS.40411/1/12 10:599091VISUAL INSPECTION OF SECOND SHELL HORIZONTAL AND VERTICAL BUTT JOINTS. JOINT NO: VT2A, VT2B,VT2C, GT1-235511/1/12 11:009092MT ON TOPANGLE TO SHELL BACKGOUGED SURFACE AREA PRIOR TO WELDING.41011/1/12 11:029093MT ON BACKGOUGED SURFACE OF 3RD RING VERTICAL BUTT JOINTS. JOINT NO: VT3A, VT3B, VT3C.28310/25/12 14:439099Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0004.27910/25/12 14:469100Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0005.53410/29/12 6:409197Inspection of Top coat Application (Dry /Cured coating)53310/29/12 6:419198Inspection of Surface preparation & Prior to Application of liquid Coating System53210/29/12 6:429199In-Process Inspection of Primer Coat53110/29/12 6:439200Inspection of Primer Coat prior to Top Coat Application37810/30/12 14:239303VISUAL INSPECTION OF WELD REPAIR REMOVAL AREA GT1-2-INT2E, GT1-2-INT2F AND POST WELDING VISUAL INSPECTION OF GT1-2-INT2ER1, GT1-2-INT2FR139510/30/12 14:289308MT ON REPAIR AREA REMOVAL OF GIRTH 1-2-2D AND THE COMPLETED WELDS39410/30/12 14:309310MT ON BACKGOUGING AREA OF GIRTH 2-3 PRIOR TO WELDING.35810/31/12 13:599311MT ON BACKGOUGING AREA OF GIRTH 2-3 PRIOR TO WELDING.35910/30/12 14:36931435610/30/12 14:469318MT ON BACKGOUGED AREA OF 6TH RING VERTICAL JOINTS VT6A, VT6B, VT6C, VT6D PRIOR TO WELDING.35710/30/12 14:499320PT ON SHELL TO BOTTOM OUTSIDE CORNER FILLET WELD INITIAL PASS BEFORE STARTING SUBSEQUENT PASS.36010/30/12 14:529321MT ON TEMPORARY ATTACHMENT REMOVAL AREAS AND ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 2-3, VERTICAL VT3A, VT3B, VT3C.59410/31/12 6:259341Verify hardness testing50410/31/12 6:269342receiving inspection of welding consumables34510/31/12 11:149349FULL WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.33510/31/12 11:199351IN-PROCESS WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.34610/31/12 11:249352PRE-WELDING FITUP INSPECTION OF STEEL STRUCTURE MODIFICATION.33710/31/12 11:279353MATERIAL RECEIVING INSPECTION39810/31/12 13:449354CENTERING / PLUMBNESS INSPECTION37210/31/12 13:449355CENTERING AND PLUMBNESS INSPECTION40610/31/12 13:459357CENTERING AND PLUMBNESS INSPECTION38910/31/12 13:459358CENTERING AND PLUMBNESS INSPECTION37310/31/12 13:469359CENTERING AND PLUMBNESS INSPECTION36210/31/12 13:199360MATERIAL RECEIVING INSPECTION39710/31/12 13:519364PRE-WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL.39910/31/12 14:079365IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.37510/31/12 14:029366POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.40710/31/12 14:069367POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.33610/31/12 14:109368PRE-WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.33410/31/12 14:139369IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.36310/31/12 14:319370VISUAL INSPECTION OF 3RD RING VERTICAL AND HORIZONTAL JOINTS.37610/31/12 14:359371PLUMBNESS, PEAKING AND BANDING CHECKING IN 3RD RING VERTICAL AND HORIZONTAL JOINTS.40810/31/12 14:409372VISUAL AND PT EXAMINATION OF SHELL TO BOTTOM PLATE CORNER WELD OUTSIDE ROOT PASS BEFORE DEPOSITING SUBSEQUENT PASS.36410/31/12 14:449373FITUP INSPECTION OF SHELL GIRTH JOINT.41510/31/12 14:479374MT ON BACKGOUGING AREA OF SHELL VERTICAL JOINTS.41610/31/12 14:509375MT ON BACKGOUGED AREA OF SHELL GIRTH JOINT.37410/31/12 14:559376IN-PROCESS WELDING INSPECTION OF STEEL STRUCTURE.40010/31/12 14:589379POST WELDING VISUAL INSPECTION OF STEEL STRUCTURE.58110/31/12 16:009414Data base reporting58510/31/12 16:029415Pre-Welding & Weld Joint Fit-up Inspection58910/31/12 16:039416In-Process Weld Inspection70210/31/12 16:049417Post-Welding Visual Inspection84310/31/12 16:069418Welding Consumable Control (Storage, Handling, Issuance & Conditioning)52710/31/12 16:079419Selection of welds for NDT53010/31/12 16:109421Inspection of Top coat Application (Dry /Cured coating)36111/1/12 11:069455MT ON 3RD RING VERTICAL JOINTS BACKGOUGED SURFACE PRIOR TO WELDING JOINT NO: VT3A, VT3B, VT3C.100611/3/12 6:219564COATING FINAL INSPECTION FOR REPAIR/TOUCH UP GALV.COATING FOR ST.STRUCTURES41811/3/12 11:279574VISUAL INSPECTION OF COMPLETED WELD VERTICAL AND HORIZONTAL JOINTS.51411/3/12 11:089575CHECKING OF 3RD RING PLUMBNESS, VERTICAL JOINT PEAKING, GIRTH JOINT BANDING.50911/3/12 11:139576VISUAL AND PT INSPECTION OF SHELL TO BOTTOM CORNER WELD OUTSIDE ROOT PASS BEFORE SUBSEQUENT PASS.36911/3/12 11:169577VISUAL INSPECTION OF SHELL TO BOTTOM COMPLETED WELD INSIDE AND OUTSIDE AND PT FROM INSIDE.42811/3/12 11:189578PRE-WELDING INSPECTION OF SHELL TO BOTTOM CORNER JOINT.42911/3/12 11:219579VISUAL INSPECTION OF COMPLETED WELD OF TOP ANGLE TOGETHER AND TOP ANGLE TO SHELL.40111/3/12 11:249580PRE-WELDING FITUP INSPECTION OF 4TH RING SHELL VERTICAL AND HORIZONTAL JOINTS.42511/3/12 11:329581WELD MATERIAL RECEIVING INSPECTION.43011/3/12 11:359582MT ON BACKGOUGED AREA OF SHELL VERTICAL JOINTS.42211/3/12 11:389583MT ON BACKGOUGED AREA OF BOTTOM BUTT WELD JOINTS PRIOR TO WELDING ON SECOND SIDE.42111/3/12 11:409584MATERIAL RECEIVING INSPECTION42011/3/12 11:429585MATERIAL RECEIVING INSPECTION34211/4/12 9:149640Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0003.34111/3/12 17:039641Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0005.38811/4/12 6:299662Padding Elevation Inspection36611/4/12 11:449664MATERIAL RECEIVING INSPECTION36511/4/12 11:439665MATERIAL RECEIVING INSPECTION41911/4/12 14:199683VISUAL AND PT INSPECTION OF SHELL TO BOTTOM OUTSIDE CORNER WELD ROOT PASS BEFORE STARTING SUBSEQUENT PASS.51011/4/12 14:299685VISUAL INSPECTION OF 3RD SHELL HORIZONTAL AND VERTICAL JOINTS, PRE-WELDING PLUMBNESS, PEAKING AND BANDING CHECKING.51111/4/12 14:299686VISUAL INSPECTION OF 3RD SHELL HORIZONTAL AND VERTICAL JOINTS, PRE-WELDING PLUMBNESS, PEAKING AND BANDING CHECKING.42611/4/12 14:299687VISUAL INSPECTION OF 3RD SHELL HORIZONTAL AND VERTICAL JOINTS, PRE-WELDING PLUMBNESS, PEAKING AND BANDING CHECKING.42711/4/12 14:339689VISUAL AND VACCUM BOX TEST FOR BOTTOM LAP JOINTS87411/4/12 16:019709Inspection of Repair on Weld Joints or Base Metal by Welding.54611/4/12 16:029710In-process verification of solvent-removable colorcontrast penetrant examination52911/4/12 16:049711Inspection of Surface preparation & Prior to Application of liquid Coating System52811/4/12 16:069712In-Process Inspection of Primer Coat43411/5/12 6:179765MT ON BACKGOUGED AREA OF SHELL GIRTH JOINT GT1-2.43511/5/12 6:199766MT ON BACKGOUGED AREA OF 4TH RING VERTICAL JOINTS.34811/5/12 6:249767IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC-WALL PANEL.34911/5/12 6:289768PRE-WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.41411/5/12 6:319769FULL WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.43111/5/12 13:119772VISUAL INSPECTION AND SFT FOR BOTTOM LAP JOINTS.43211/5/12 13:169773VISUAL AND PT INSPECTION OF SHELL TO BOTTOM OUTSIDE ROOT PASS WELD BEFORE SUBSEQUENT PASS.43311/5/12 13:199774VERIFY BOTTOM SURFACE CLEANLINESS PRIOR TO BENG PLACED IN POSITION AND VISUAL INSPECTION OF BOTTOM COMPLETED JOINTS.45011/5/12 13:229775FITUP INSPECTION OF 3RD SHELL GIRTH JOINT GT 2-3.55311/5/12 15:339801Inspection of Primer Coat prior to Top Coat Application43611/6/12 6:089819Padding Inspection58411/6/12 16:149870receiving inspection of welding consumables56311/6/12 16:159871Positive material identification of alloy piping & alloy components.94511/6/12 16:159871Positive material identification of alloy piping & alloy components.45211/7/12 6:499893VISUAL AND SFT INSPECTION OF BOTTOM LAP JOINTS.43911/7/12 6:559894VISUAL AND PT INSPECTION OF SHELL TO BOTTOM INSIDE FILLET JOINT.43811/7/12 11:059895VERIFICATION OF EQUIPMENT CALIBRATION.48211/7/12 11:149896MATERIAL RECEIVING INSPECTION OF SPHERE COLUMN ASSEMBLY.45111/7/12 11:199897VISUAL INSPECTION OF 4TH RING VERTICAL AND HORIZONTAL JOINTS AND PLUMBNESS, PEAKING AND GIRTH JOINT#3 BANDING CHEKING.43711/7/12 11:249898FITUP INSPECTION OF SHELL GIRTH JOINT#3.44011/7/12 11:279899MT ON BACKGOUGING AREA OF TOP ANGLE TOGETHER AND TO SHELL.46811/7/12 11:339900VISUAL INSPECTION OF 3RD RING SHELL VERTICAL AND HORIZONTAL JOINTS AND PLUMBNESS, PEAKING AND JOINT#3 BANDING CHECKING.103311/7/12 15:419937Data base reporting101211/7/12 15:429938Pre-Welding & Weld Joint Fit-up Inspection100111/7/12 15:439939In-Process Weld Inspection99811/7/12 15:459940Post-Welding Visual Inspection105311/7/12 15:469941Welding Consumable Control (Storage, Handling, Issuance & Conditioning)105411/7/12 15:479942Selection of welds for NDT69311/7/12 15:499943Post-weld heat treatment for On-plot piping50811/7/12 17:219951PADDING PLATE ELEVATION INSPECTION130611/7/12 17:219951PADDING PLATE ELEVATION INSPECTION233511/7/12 17:219951PADDING PLATE ELEVATION INSPECTION97111/7/12 17:239952PADDING PLATE ELEVATION INSPECTION51211/8/12 11:509970VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT GT1-2 INT 2A, GT1-2 INT 2AR151311/8/12 11:529971VISUAL INSPECTION OF WELD REPAIR REMOVAL AREA OF JOINT VT 1C, VT 1H AND VT 1CR1, VT 1HR1.52011/8/12 13:089972VISUAL INPECTION OF WELD REPAIR REMOVAL JOINT VT 2A, VT 2AR1.51511/8/12 13:129973VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT GT1-2INT2D, GT1-2INT2DR1.44111/8/12 13:159974FITUP INSPECTION OF 4TH RING SHELL VERTICAL JOINTS.46511/8/12 13:179975FITUP INSPECTION OF GT 3-4 GIRTH JOINT.83211/10/12 14:4810008Visual Inspection at test Pressure # NSH-FD-1016-HDT-0001585211/10/12 14:5410011Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0001565411/10/12 14:5910013Inspection Filling Pressurization # NSH-FD-1016-HDT-0001666311/10/12 15:0110015Visual Inspection at test Pressure # NSH-FD-1016-HDT-0001663711/10/12 15:0210016Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0001680711/10/12 15:0410017Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0001678811/10/12 15:0510018Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0001680211/10/12 15:0710020Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-0001865111/10/12 15:0910021Inspection of Material Storage & Handling at Fab. Shop # MRR-P-09165811/10/12 15:1110022Receiving Inspection of Pipe and Pipe Nipples # MRR-P-09180011/10/12 15:1410024Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00021#90511/10/12 15:1710025Review of Test Package Preparation # NSH-FD-1016-HDT-00016#77411/10/12 15:1910026Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00020#67811/10/12 15:2010028Receiving Inspection of Pipe and Pipe Nipples # MRR-P-095 #67711/10/12 15:2410029Receiving Inspection of Pipe and Pipe Nipples # MRR-P-094 #65211/10/12 15:2510030Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00016#85911/10/12 15:2610031Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00019#85511/10/12 15:2810032Receiving Inspection of Pipe and Pipe Nipples # MRR-P-073 #86211/10/12 15:2910033Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00017 #65311/10/12 15:3110034Review of Test Package Preparation # NSH-FD-1016-HDT-00017 #71311/10/12 15:3310035Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00017 #82411/10/12 15:3510036Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00017 #77211/10/12 15:3710037Inspection Filling Pressurization # NSH-FD-1016-HDT-00017 #85411/10/12 15:3910038Visual Inspection at test Pressure # NSH-FD-1016-HDT-00017 #80811/10/12 15:4010040Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00017 #64711/10/12 15:4210044Review of Test Package Preparation # NSH-FD-1016-HDT-00018 #76811/10/12 15:4410046Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00018 #86311/10/12 15:4510049Inspection Filling Pressurization # NSH-FD-1016-HDT-00018 #71411/10/12 15:4610051Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00018 #85711/10/12 15:4810053Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00018 #82811/10/12 15:4910057Visual Inspection at test Pressure # NSH-FD-1016-HDT-00018 #63811/10/12 15:5010059Review of Test Package Preparation # NSH-FD-1016-HDT-00019 #74911/10/12 15:5210061Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00019 #83111/10/12 15:5310063Inspection Filling Pressurization # NSH-FD-1016-HDT-00019 #64811/10/12 15:5510067Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00019 #65011/10/12 15:5610069Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00019 #80411/10/12 15:5710070Visual Inspection at test Pressure # NSH-FD-1016-HDT-00019 #90011/10/12 15:5910073Review of Test Package Preparation # NSH-FD-1016-HDT-00026 #80511/10/12 16:0010075Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00026 #83711/10/12 16:0210078Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00026 #90211/10/12 16:0310080Inspection Filling Pressurization # NSH-FD-1016-HDT-00026 #82611/10/12 16:0410081Visual Inspection at test Pressure # NSH-FD-1016-HDT-00026 #90111/10/12 16:0510084Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00026 #87311/10/12 16:0610086Review of Test Package Preparation # NSH-FD-1016-HDT-00027 #83411/10/12 16:0810088Review of Test Package Preparation # NSH-FD-1016-HDT-00028 #77011/10/12 16:1010090Review of Test Package Preparation # NSH-FD-1016-HDT-00029 #41711/10/12 16:3610099Pad plate elevation inspection of item B92-K-0011A,B,C,D,E42311/10/12 16:5010101Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0003.42411/10/12 16:5310102Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0005.61011/10/12 17:0410104Inspection of Material Storage & Handling at Fab. Shop # MRR-P-095 #82711/10/12 17:0610105Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00027 #86811/10/12 17:0810108Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00027 #86411/10/12 17:0910110Visual Inspection at test Pressure # NSH-FD-1016-HDT-00027 #82511/10/12 17:1110113Inspection Filling Pressurization # NSH-FD-1016-HDT-00027 #85311/10/12 17:1410115Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00027 #79611/10/12 17:1510117Visual Inspection at test Pressure # NSH-FD-1016-HDT-00028 #63911/10/12 18:2810136Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00028 #75011/10/12 18:2910138Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00028 #83011/10/12 18:3110140Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00028 #78711/10/12 18:3210142Inspection Filling Pressurization # NSH-FD-1016-HDT-00028 #63311/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002563411/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002574411/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002574511/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002580611/10/12 18:3310145Visual Inspection at test Pressure # NSH-FD-1016-HDT-00029 #80911/10/12 18:3510147Depressurization & Disposal of HydrotestWater# NSH-FD-1016-HDT-0002574611/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #74711/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #84111/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #84211/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #64911/10/12 18:3610150Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00029 #83311/10/12 18:3710151Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-0002277611/10/12 18:3810153Inspection Filling Pressurization # NSH-FD-1016-HDT-00029 #86711/10/12 18:3910155Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00029 #85811/10/12 18:3910156Review of Test Package Preparation # NSH-FD-1016-HDT-0003061311/10/12 18:4110157Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0003066411/10/12 18:4110158Inspection Filling Pressurization # NSH-FD-1016-HDT-00026 #85011/10/12 18:4210160Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0003082311/10/12 18:4410162Inspection Filling Pressurization # NSH-FD-1016-HDT-0003079711/10/12 18:4610165Visual Inspection at test Pressure # NSH-FD-1016-HDT-0003082911/10/12 18:4810167Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0003065911/10/12 18:4910169Review of Test Package Preparation # NSH-FD-1016-HDT-0002066111/10/12 18:5110171Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0002061611/10/12 18:5210173Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0002077511/10/12 18:5410175Inspection Filling Pressurization # NSH-FD-1016-HDT-0002069411/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002069511/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002083911/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002084011/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002067911/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002068011/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002077811/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002077911/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002065511/10/12 18:5810181Review of Test Package Preparation # NSH-FD-1016-HDT-0002161211/10/12 19:0010183Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0002185111/10/12 19:0210185Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0002168111/10/12 19:1310197Inspection Filling Pressurization # NSH-FD-1016-HDT-0002187111/10/12 19:1510201Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002178611/10/12 19:1610203Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002179511/10/12 19:1810205Review of Test Package Preparation # NSH-FD-1016-HDT-0002261511/10/12 19:1910207Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0002287211/10/12 19:2010208Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0002283611/10/12 19:2110209Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00026 #90311/10/12 19:2110210Inspection Filling Pressurization # NSH-FD-1016-HDT-0002286611/10/12 19:2210211Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00026 #61411/10/12 19:2310212Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002279811/10/12 19:2410213Visual Inspection at test Pressure # NSH-FD-1016-HDT-00026 #77111/10/12 19:2510214Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00026 #80311/10/12 19:2610215Review of Test Package Preparation # NSH-FD-1016-HDT-00026 #77311/10/12 19:2810216Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00025 #77711/10/12 19:2910217Inspection Filling Pressurization # NSH-FD-1016-HDT-00025 #79911/10/12 19:3110218Review of Test Package Preparation # NSH-FD-1016-HDT-00025 #83811/10/12 19:3210219Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00025 #79411/11/12 6:1310227Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00022 #66011/11/12 6:1410229Review of Test Package Preparation # NSH-FD-1016-HDT-00023 #84711/11/12 6:1610230Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00023 #78511/11/12 6:1710231Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00023 #61111/11/12 6:1810232Inspection Filling Pressurization # NSH-FD-1016-HDT-00023 #86511/11/12 6:2010233Visual Inspection at test Pressure # NSH-FD-1016-HDT-00023 #66511/11/12 6:2110234Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00023 #51611/11/12 13:5910236VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT NO:VERT.3A. AND AFTER REMOVAL, VERT.3AR151711/11/12 14:0510237VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT TA-3 AND AFTER REMOVAL TA-3R1.51911/11/12 14:0910238VISUAL INSPECTION RING 1&2 VERTICAL AND HORIZONTAL JOINTS, PLUMBNESS, PEAKING AND BANDING OF 1ST AND 2ND RING.46111/11/12 14:1210239PT EXAMINATION OF SHELL TO BOTTOM OUTSIDE FILLET WELD ROOT PASS. JT#BCJ149911/11/12 14:1910241VISUAL EXAMINATION OF TOP ANGLE TOGETHER AND TOP ANGLE TO SHELL COMPLETED BUTT JOINTS.46711/11/12 14:2210243FIT-UP INSPECTION OF 4TH SHELL COURSE VERTICAL BUTT JOINTS.48511/11/12 14:2510244MT ON BACKOUGING AREA OF SHELL GIRTH JOINT GT 3-4.45911/11/12 14:3010246PRE-WELDING FITUP INSPECTION46911/11/12 14:3310247IN-PROCESS WELDING INSPECTION.92811/11/12 14:3610248POST WELDING FINAL INSPECTION49211/11/12 14:3910249POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO DOUBLE TEE SLAB.47011/11/12 14:4310250PRE-WELDING FITUP INSPECTION OF STRUCTURAL PLATE TO DOUBLE TEE SLAB.47311/11/12 14:4610251IN-PROCESS WELDING INSPECTION OS STRUCTURAL PLATE TO DOUBLE TEE SLAB.46011/11/12 14:5010252IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC-WALL PANEL.47411/11/12 14:5410253PRE-WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.45511/11/12 14:5710254POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.48111/11/12 15:5710263Equipment receiving inspection of item B92-E-0001AB and B92-E-0051A,B,C,D,E.49811/11/12 16:0810271Storage, handling and preservation inspection of item B92-E-0001AB and B92-E-0051A,B,C,D,E.54711/11/12 18:4710363Inspection of Top coat Application (Dry /Cured coating)54811/11/12 18:4810364Inspection of Surface preparation & Prior to Application of liquid Coating System54911/11/12 18:4910365In-Process Inspection of Primer Coat55011/11/12 18:5110366Inspection of Surface preparation & Prior to Application of liquid Coating System55111/11/12 18:5210367In-Process Inspection of Primer Coat105011/11/12 18:5310368Inspection of Primer Coat prior to Top Coat Application56411/11/12 18:5510369Verify hardness testing72111/11/12 18:5610370Positive material identification of alloy piping & alloy components.47211/12/12 15:0310410Pad plate elevation inspection of item B90-D-0116AB126411/12/12 15:0310410Pad plate elevation inspection of item B90-D-0116AB46311/12/12 15:0710411Pad plate elevation inspection of item B90-D-0118AB126611/12/12 15:0710411Pad plate elevation inspection of item B90-D-0118AB45711/12/12 15:1010412Pad plate elevation inspection of item B90-D-0117AB126511/12/12 15:1010412Pad plate elevation inspection of item B90-D-0117AB55211/12/12 17:0410453Inspection of Surface preparation & Prior to Application of liquid Coating System55411/12/12 17:0610455In-Process Inspection of Primer Coat58311/12/12 17:1710457Data base reporting58011/12/12 17:1910458Pre-Welding & Weld Joint Fit-up Inspection65611/12/12 17:2010459In-Process Weld Inspection52511/12/12 17:2110460Post-Welding Visual Inspection58211/12/12 17:2210461Welding Consumable Control (Storage, Handling, Issuance & Conditioning)58811/12/12 17:2410462Selection of welds for NDT89611/12/12 17:2610463Post-weld heat treatment for On-plot piping60611/12/12 17:3210464In-process verification of techniques & procedure implementation of UT78111/12/12 17:3510465Cutting And Assembly Fit-Up( Weekly RFI Nov-08 To Nov-14-2012 )76411/12/12 17:3710466Cutting And Assembly Fit-Up ( Weekly RFI Nov-01 To Nov-07-2012 )68211/12/12 17:3810467Review of Test Package# NSH-FD-1016-HDT-0003182211/12/12 17:4010468Piping /EquipmentInternalCleaning# NSH-FD-1016-HDT-0003184911/12/12 17:4210469Inspection of PressureTestPreparation# NSH-FD-1016-HDT-0003190411/12/12 17:4310470InspectionFillingPressurization# NSH-FD-1016-HDT-0003180111/12/12 17:4410471VisualInspectionattestPressure # NSH-FD-1016-HDT-0003176911/12/12 17:4610472Depressurization&DisposalofHydrotestWater # NSH-FD-1016-HDT-0003146411/12/12 18:3010473CEMENT BASE NON-SHRINK GROUT SURFACE PREPARATION AND FORMWORK INSPECTION49311/12/12 18:3210474MIXING PLACEMENT,SAMPLING, TESTING CURING AND FINAL INSPECTION.48411/13/12 6:4510537MT ON TEMPORARY ATTACHMENT WELD REMOVAL AREA NEAR GIRTH JOINT GT 2-3 AND NEAR 3RD RING VERTICAL JOINTS.46611/13/12 6:4810538MT ON TEMPORARY ATTACHMENT WELD REMOVAL AREA NEAR 1ST RING GIRTH JOINT AND VERTICAL JOINTS.45811/13/12 6:5110539VISUAL AND OIL PENETRANT TESTING OF SHELL TO BOTTOM INSICE FILLET ROOT PASS.47711/13/12 6:5310540MT ON BACKGOUGING AREA OF GIRTH JOINT GT 3-4.51811/13/12 7:1510541MT ON BACKGOUGING AREA OF 4TH RING SHELL VERTICAL JOINTS.50211/13/12 7:1210542INSPECTION OF PERFORMING WELD REPAIR OF JOINT TA-4.55511/13/12 18:2610576Inspection of Top coat Application (Dry /Cured coating)82111/13/12 19:4310577"MATERIAL RECEIVING INSPECTION STRUCTURAL PLATES - 62 PCS. ASTM A36 PLATE MATERIAL 2000 X 6000 (VARIOUS THICKNESS) FOR ABOVE GROUND PIPING PIPE SUPPORTS. PLATE ASTM A36 20MM X 2000MM X 6000MM = 22PCS. PLATE ASTM A36 16MM X 2000MM X 6000MM = 6PCS. PLATE ASTM A36 15MM X 2000MM X 6000MM = 3PCS. PLATE ASTM A36 14MM X 2000MM X 6000MM = 1PC. PLATE ASTM A36 12MM X 2000MM X 6000MM = 15PCS. PLATE ASTM A36 10MM X 2000MM X 6000MM = 13PCS. PLATE ASTM A36 8MM X 2000MM X 6000MM = 2PCS."47111/14/12 13:2210605Recieving Inspection of Welding consumables -55611/14/12 18:3110659Inspection of Primer Coat prior to Top Coat Application (APCS 17A - Single Coat Final inspection)55711/14/12 18:3210660Inspection of Surface preparation & Prior to Application of liquid Coating System ( WEEKLY RFI - Nov. 15 to Nov. 21, 2012)55911/14/12 18:3410661Inspection of Primer Coat prior to Top Coat Application ( WEEKLY RFI - Nov. 15 to Nov. 21, 2012)56011/14/12 18:3510662Verification and visual Inspection of Paint and Abrasive (Sigma Thinner 91-92)66611/14/12 18:3710663Data base reporting58711/14/12 18:3810664Pre-Welding & Weld Joint Fit-up Inspection60511/14/12 18:3910665In-Process Weld Inspection52611/14/12 18:4010666Post-Welding Visual Inspection58611/14/12 18:4210667Welding Consumable Control (Storage, Handling, Issuance & Conditioning)89711/14/12 18:4410668Selection of welds for NDT55811/14/12 18:4810669In-Process Inspection of Primer Coat ( WEEKLY RFI - Nov. 15 to Nov. 21, 2012)47511/15/12 9:0110678PRE WELDING FITUP INSPECTION OF PIPE SUPPORT WELDING46211/15/12 9:0310679INPROCESS WELDING OF PIPE SUPPORT WELDING48611/15/12 9:0610680POST WELDING VISUAL INSPECTION OF PIPE SUPPORT WELDING49011/15/12 9:1110681PREWELDING INSPECTION OF SUPPORT BASE PLATE WELDING48911/15/12 9:1210682INPROCESS WELDING INSPECTION OF SUPPORT WELDING TO BASE PLATE49111/15/12 9:1610683MATERIAL RECIEVING INSPECTION OF A36 PLATE FOR CLOSE OUT OF NCR SG2420-SS-NCR-003947611/15/12 9:1910684PREWELDING FIT UP INSPECTION OF BASE PLATE TO GUSSET PLATE48711/15/12 9:2110685IN PROCESS WELDING INSPECTION OF BASE PLATE TO GUSSET PLATE48811/15/12 9:2610686POST WELDING VISUAL INSPECTION OF BASE PLATE TO GUSSET PLATE44411/15/12 9:2810688RECIEVING INSPECTION OF WELDING CONSUMABLES44311/15/12 9:3310689WELDING CONSUMABLE CONTROL - CHECKING OVEN CONSUMABLE ISSUANCE RECORD AND TEMPERATURE44211/15/12 9:4010690WELCING MACHINE CALIBRATION CHECK106611/15/12 9:5010691CALIBRATION VERIFICATION OF WELDING OVENS106711/15/12 9:5410692CALIBRATION VERIFICATION OF WELDING MACHINE57611/16/12 10:3610774Review of Test Package Preparation # NSH-FD-1016-HDT-0032 #54311/16/12 10:1810777Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0032 #103711/16/12 10:2010780Inspection of pressure test preparation # NSH-FD-1016-HDT-0014 #56911/16/12 10:2110781Inspection Filling Pressurization # NSH-FD-1016-HDT-0032 #57811/16/12 10:2310782Visual Inspection at test Pressure # NSH-FD-1016-HDT-0032 #54011/16/12 10:2610783Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0032 #54511/16/12 10:2810784Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0024 #54411/16/12 10:3010785Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0023 #56611/16/12 10:3210786Material Receiving Inspection Fitting( Elbow,Red Tee,Red ( MRR-P-0101 )57311/16/12 10:3410787Inspection of Material ,Storage And Hadling at Fabr (MRR-P-0101)57411/16/12 10:3510788Cutting And Assembly Fit-Up ( Weekly RFI Nov-15 To Nov-21-2012 )76111/17/12 13:3310798VISUAL INSPECTION OF GT3-4 AND 4th RING VERTICAL JOINTS, PEAKING AND PLUMBING OF 4th RING, BANDING OF GT 3-4.81811/17/12 13:3510799VISUAL INSPECTION OF GT3-4 AND 4th RING VERTICAL JOINTS, PEAKING AND PLUMBING OF 4th RING, BANDING OF GT 3-4.67611/17/12 14:1910800FITUP INSPECTION OF 3RD RING VERTICAL JOINTS.84411/17/12 13:3910801FITUP INSPECTION OF ANGLE TO ROOF84511/17/12 13:4710804PT EXAMINATION OF SHELL TO BOTTOM OUTSIDE FILLET ROOT PASS.84611/17/12 13:5010805VISUAL INSPECTION OF SHELL NOZZLE CUTOUT EDGES FOR LAMINATIONS67411/17/12 13:5410806MT ON BACKGOUGING AREA OF 3RD RING VERTICAL JOINTS.64011/17/12 13:5810807FITUP INSPECTION OF SHELL MANWAY NOZZLE AND ROOF NOZZLES.73111/17/12 14:1110808FIT-UP INSPECTION OF BOTTOM LAP JOINTS.64111/17/12 14:0610809FIT-UP INSPECTION OF ROOF LAP JOINT.64211/17/12 14:1610810FIT-UP INSPECTION OF ROOF TO TOP ANGLE.64311/17/12 14:2210812MT ON BACKGOUGING AREA OF 4TH RING VERTICAL JOINTS.64411/17/12 14:2410813FIT-UP INSPECTION OF 4TH RING VERTICAL JOINTS.71611/17/12 15:0510823Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-000371711/18/12 10:0910824Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0006.66711/17/12 16:3110845Inspection of Repair on Weld Joints or Base Metal by Welding.89811/17/12 16:3210846In-process verification of solvent-removable colorcontrast penetrant examination57111/17/12 16:4110848Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0025 #52411/17/12 16:4310849Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0026 #57011/17/12 18:2210858Final