Upload
sameer313
View
53
Download
7
Embed Size (px)
Citation preview
RFI Data of Project
report_rfidataRFI Data of Project 10-00167-0002S#DateRFI#RFI Description16/30/12 18:083044Prewelding Inspection of Structural Plate to Precasting Panel Date 24-06-12 to 30-06-12 At 6 AM to 6 PM26/30/12 18:113045Inprocess welding Inspection of Structural Plate to Precasting Panel Date 24-06-12 to 30-06-12 At 6 AM to 6 PM36/30/12 18:133046Post weld visual Inspection of Structural Plate to Precasting Panel Date 24-06-12 to 30-06-12 At 6 AM to 6 PM76/30/12 18:043124Receiving Inspection and Verification of Welding Consumable Controls in Place (Properties, type, source, segregation, storage, Issue, Handling, etc.) Rescheduled to Date 01-07-12 at 7 AM to 7 PM.67/1/12 9:353397Prewelding Inspection of Structural Plate to Precasting Panel Date 02-07-12 to 07-02-12 At 6 AM to 6 PM57/1/12 9:393398Inprocess welding Inspection of Structural Plate to Precasting Panel Date 02-07-12 to 07-07-12 At 6 AM to 6 PM47/1/12 9:483399Post weld visual Inspection of Structural Plate to Precasting Panel Date 02-07-12 to 07-07-12 At 6 AM to 6 PM87/8/12 5:463510Pre-welding Inspection of structural plateto Precasting panel Date 07-07-2012 to 14-07-2012 at 6AM to 6PM.117/8/12 5:493513In-process welding Inspection of structural plate to Precasting panel Date 07-07-2012 to 14-07-2012 at 6AM to 6PM.127/8/12 5:523516Post welding final Inspection of structural plate to Precasting panel Date 07-07-2012 to 14-07-2012 at 6AM to 6PM.137/7/12 18:253752Pre-welding inspection of structural plate to Precasting panel Date 07-07-2012 to 13-07-2012 at 6AM to 6PM.97/7/12 18:313755Inprocess welding inspection of structural plate to Precasting panel Date 07-07-2012 to 13-07-2012 at 6AM to 6PM.107/7/12 18:353757Post weld visual inspection of structural plate to Precasting panel Date 07-07-2012 to 13-07-2012 at 6AM to 6PM.147/15/12 10:214020Pre-welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.177/15/12 10:254021In-process welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.187/15/12 10:274022Post weld final inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.157/15/12 10:304023Pre-welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.167/15/12 10:334024In-process welding inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.197/15/12 10:354025Post weld final inspection of structural plate to precasting panel date 14-07-2012 to 20-07-2012 at 6AM to 6PM.337/22/12 4:434332PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PRE-CASTING PANEL DATE 22-07-2012 TO 28-07-2012 AT 6AM TO 6PM377/22/12 4:484333IN PROCESS WELSING INSPECTION OF STRUCTURAL PLATE TO PRECASTING PANEL DATE 22-07-2012 TO 28-07-12 AT NGL TRAIN 1 B90-302267/22/12 4:564334POST WELD FINAL INSPECTION FO STRUCTURAL PLAT TO PRE-CASTING PANEL DATE 22-07-2012 TO 28-07-2012 AT NGL TRAIN 1 B90-302307/24/12 10:424403Material receiving & visual inspection of bottom sump assembly w/ CBI P/L # 10 & mark # 0519-A,annular plates w/ CBI P/L # 10 & mark #0506-1, bottom rectangular plates w/ CBI P/L # 11 & mark # 0506-12,CBI P/L # 13 & mark # 0506-B2 R/L,0506-B3 R/L,0506-B4 R/L,0506-B6 R/L at B92-D-0007 AB area. (P.O. # 4500081069)317/25/12 15:454508Material receiving and visual inspection of sump assembly w/ CBI P/L # 10 & mark # 0119-A,0219-A,0319-A,CBI P/L # 12 & mark # 0419-A,0818-A,1119-A,bottom plate w/ CBI P/L # 12 & mark # 0106-B1 R/L,0206-B1,0206-B2 R/L,0206-B3,0306-B1,0306-B2,0306-B3 R/L,roof sketch plate w/ CBI P/L # 13 & mark # 0311-R1 R/L,0311-R2 R/L,0311-R3 R/L,0311-R4 at B92-D-0007AB Area (P.O. # 4500081069-70)347/27/12 7:374615In process welding inspection of structural plate to precasting panel date 28-07-12 to 04-08-12 at 6am to 6pm.357/30/12 17:554617Pre welding inspection of structural plate to precasting panel date 28-07-12 to 04-08-12 at 6m to 6pm.297/27/12 7:594618Post weld final inspection of structural plate to precasting panel date 28-07-12 to 04-08-12 at 6am to 6pm.207/28/12 16:284636RECIEVING OF PIPING AND PLANT PIPING MATERIALS AT LAYDONW YARD FABRICATION AREA NSH217/28/12 16:304641RECIEVING INSPECTION OF PIPING AND PLANT PIPING AT LAYDOWN YARD NSH FABRICATION YARD237/29/12 14:374690RECIEVING INSPETION OF PIPE AND PIPE FITTING AT NSH FABRICATION LAYDOWN YARD247/29/12 14:404691RECIEVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD277/29/12 14:424692RECIEVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD257/30/12 15:034752RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD.387/30/12 15:034752RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD.227/30/12 15:114753RECEIVING INSPECTION OF PIPE AND PIPE FITTINGS AT NSH LAYDOWN YARD FABRICATION AREA.287/30/12 15:114753RECEIVING INSPECTION OF PIPE AND PIPE FITTINGS AT NSH LAYDOWN YARD FABRICATION AREA.328/1/12 16:274870Material receiving and visual inspection of bottom sketch plates with CBI P/L # 14 and mark # 0506-B1, 0506-B2 R/L, 0506-B4 R/L, 0506-B5 R/L, 0506-B6 R/L and 0506-B7398/2/12 12:244937MATERIAL INSPECTION OF PIPE AND FITTINGS WITH COLOR CODINGS AT NSH LAYDOWN YARD4538/2/12 12:254938RECEIVING INSPECTION OF PIPE AND FITTINGS WITH COLOR CODINGS AT NSH LAYDOWN YARD408/2/12 12:284953INSPECTION OF MATERIAL STORAGE AND HANDLING AT NSH LAY DOWN YARD FABRICATION AREA368/4/12 16:085038Material receiving and visul inspection of shell plate with P/L # 18 and mark # 0507-1A,1B,1C,2A,7A,8A, P/L # 17 and mark # 0507-3, P/L # 16 and mark # 0507-1,2,bottom rectangular plates P/L # 15 and mark # 0506-6528/4/12 17:065068Pre-welding inspection of structural to pre-casting panel date 04-08-2-2012 to 10-08-2012 at 6 AM to 6PM.588/4/12 17:105069In-process welding inspection of structural to pre-casting panel date 04-08-2-2012 to 10-08-2012 at 6 AM to 6PM.438/4/12 17:145070Post weld visual inspection of structural to pre-casting panel date 04-08-2-2012 to 10-08-2012 at 6 AM to 6PM.538/5/12 15:145071Pre-welding inspection of structural plate to plate date 05-08-2012 to 10-08-2012 at 6AM to 6PM.448/5/12 15:155072Inprocess welding inspection of structural plate to plate date 05-08-2012 to 10-08-2012 at 6AM to 6PM.598/5/12 15:165073Post weld visual inspection of structural plate to plate date 05-08-2012 to 10-08-2012 at 6AM to 6PM.458/6/12 10:455104Pre-welding inspection of structural plate to precasting panel(TOP LEVEL) Date 04-08-2012 to 10-08-2012 at 6AM to 6PM.608/6/12 10:495105In-process welding inspection of structural plate to precasting panel(TOP LEVEL) Date 04-08-2012 to 10-08-2012 at 6AM to 6PM.618/6/12 10:535106Post weld visual inspection of structural plate to precasting panel(TOP LEVEL) Date 04-08-2012 to 10-08-2012 at 6AM to 6PM.428/6/12 16:285126Material receiving and visual inspection of shell plate with P/L # 19 and mark # 0507-1, P/L # 20 and mark # 0507-7418/7/12 17:155173RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD.468/8/12 15:175188Visual inspection of annular plate(FITP :B92-D-0007A,Activity no:2.4).628/8/12 15:235189SFT vacuum box annular plate butt welds (FITP :B92-D-0007A,Activity no:2.5).638/8/12 15:275190Visual inspection of annular plate(FITP :B92-D-0007B,Activity no:2.4).648/8/12 15:335191SFT vacuum box annular plate butt welds (FITP :B92-D-0007B,Activity no:2.5).548/9/12 15:595221Material receiving and visualinspection of shell plates with P/L # 21 and mark # 0307-1,0307-2,0307-3,0307-4, P/L # 22 and mark # 0107-1,0107-2,0107-3,0107-4, P/L # 23 and mark # 0507-5,0507-6, P/L # 24 and mark # 0507-2,0507-5,top angles with P/L # 22 and mark # 0107-5,0207-6,0307-5478/12/12 5:505345Material receiving and visual inspection of shell plates with P/L # 25 and mark # 0507-4 and P/L # 26 mark # 0507-24948/12/12 16:055385RECEIVING INSPECTION OF PIPE AND FITTINGS AT NSH FABRICATION LAYDOWN YARD518/13/12 14:145402Verify Test Equipment(Safety Assessment) Calibration Test Report-Pressure Test Reliel Valve/ Valve serial No.625485-12, set Pressure 210 PSI, 3/4".558/12/12 18:035404Review of MT examine the back surface of all double sided full penetration butt weld joints.488/12/12 18:055405Review of MT examine the back surface of all double sided full penetration butt weld joints.498/12/12 18:105406Review of verify bottom surface cleanliness /coating prior to being placed in position @ tank bottom & sump.508/12/12 18:125407Review of verify bottom surface cleanliness /coating prior to being placed in position @ tank bottom & sump.1898/12/12 18:175408Pre-welding inspection of sturctural plate to plate date 12-08-2012 to 17-08-2012.2058/12/12 18:195409Inprocess welding inspection of sturctural plate to plate date 12-08-2012 to 17-08-2012.2538/12/12 18:215410Post weld visual inspection of sturctural plate to plate date 12-08-2012 to 17-08-2012.578/13/12 16:315450Material receiving and visual inspection of shell plates with P/L # 27 and mark # 0507-3,P/L # 28 and mark # 0507-8,P/L # 29 and mark # 0507-4,P/L # 30 and mark # 0507-54548/13/12 17:235473RECEIVING INSPECTION OF PIPE AND FITTINGS AT LAY DOWN YARD NSH FABRICATION4958/13/12 17:215474STORAGE AND HANDLING INSPECTION LAYDOWN YARD NSH FABRICATION.658/14/12 15:285492Material receiving and visual inspection of shell plates with P/L # 31 and mark # 0507-3A,0507-4A,0507-5A,0507-6A,0507-7A1509/17/12 10:535513RECEIVING INSPECTION OF MANUAL VALVES (POST INDICATOR VALVE - 16" AND 18" GATE VALVE BODY ONLY)FOR UNDERGROUND PIPING568/14/12 17:575520verify bottom surface cleanlines/coating prior to being placed to position( FITP NO: B92-D-0005A,ACTIVITY NO:2.1).668/14/12 17:595521verify bottom surface cleanlines/coating prior to being placed to position( FITP NO: B92-D-0005B,ACTIVITY NO:2.1).2068/15/12 9:465523Verify flush grinding on annular plate weld (FITP NO : B92-D-0007A,ACTIVITY NO: 2.7).2148/15/12 9:475524Verify flush grinding on annular plate weld (FITP NO : B92-D-0007B,ACTIVITY NO: 2.7).699/7/12 7:385621MASTIC TAPING OF 12 POINTS FOR METAL DOOR GROUNDING & FUEL TANK ROOM GROUNDING BAR & GENERATOR ROOM GROUNDING BAR & ELECTRICAL ROOM GROUNDING BAR AT B56-110, EMERGENCY GENERATOR BUILDING. ( NOTE: LATE QMIS ENTRY DUE TO SYSTEM NOT AVAILABLE )679/9/12 5:435716Pad plate elevation inspection of item B90-E-0103689/9/12 5:475717Pad plate elevation inspection of item B90-E-0104709/9/12 5:505718Pad plate elevation inspection of item B90-E-0105719/9/12 5:545719Pad plate elevation inspection of item B90-E-0106729/9/12 5:565720Pad plate elevation inspection of item B90-E-0113759/9/12 15:485753Pad plate elevation inspection of item B90-E-0108739/9/12 15:525754Pad plate elevation inspection of item B90-E-0107749/9/12 15:565756Pad plate elevation inspection of item B90-E-0109939/9/12 16:095763Material receiving and visual inspection of roof & shell nozzle assembly P/L # 45 and mark #0523-A,C,1123-A,B,0215-9,0222-7,0422-7,0815-9,0816-16,17,18,0523-A,C,1123-A,B,0215-9,0222-7,0815-9,0816-16,17,18,04227-7.889/9/12 16:235765Material receiving and visual inspection of shell plates with P/L # 34 and mark # 0507-6, 0507-7949/9/12 16:315767Material receiving and visual inspection of shell plates with P/L # 35 and mark # 0508-B,C,P/L # 39 and mark # 0507-2, 0507-1A,0507-4,bottom plates with P/L # 39 and mark # 0406-B1,0406-B2,0406-B3 R/L.929/9/12 16:365768Material receiving and visual inspection of shell plates with P/L # 37 and mark # 0407-1,2,3, P/L # 38 and mark # 1107-1,2,3.919/9/12 16:425769Material receiving and visual inspection of shell plates with P/L # 40 and mark # 0207-1,2,3,4,5, & P/L # 42 and mark # 0508-A.1009/9/12 16:525770Material receiving and visual inspection of shell and roof nozzle assembly, pad plate with P/L # 36 and mark # 0116-B,C,D,E,F,G,0123-B,C,D,E,0216-11,12,13,14,0216-A,B,C,D,E,0316-A,B,C,D,E,F,0323-A,B,C,D,0407-5,0416-A,0423-B,C,D,0516-18,19,21,23,0523-B,D,0816-15,19,0816-G,0823-A,C,D,1116-10,1116-A,B,D,E,F,1123-C,D,E,F,G,H,J.859/9/12 16:565771Material receiving and visual inspection of shell plates with P/L # 41 and mark # 0508-E,0508-F.869/9/12 17:015772Material receiving and visual inspection of roof plates with P/L # 43 and mark # 0222-A,0323-B,C,0416-A,B,D,0423-A,B,D,E,0816-C,D,0823-B,0511-3,0511-R3,R4,R5 R/L.819/10/12 11:285788Witness of One PRV Calibration for hydrotest.1019/10/12 11:365789Witness of One PRV Calibration for Hydrotest.999/10/12 17:325843Material receiving and visual inspection of shell plate with P/L # 46 and mark # 0508-D, P/L # 47 and mark # 0807-1,2,3.789/11/12 8:315941Witness of Two PRV Calibration for Hydrotest Purpose.829/11/12 9:535950Witness of one PRV Calibration for Hydrotest Purpose.899/11/12 9:595951Witness of one PRV Calibration for Hydrotest Purpose.799/11/12 10:075952Witness of one PRV Calibration for Hydrotest Purpose.849/11/12 15:255978Material receiving and visual inspection of bottom plates, roof plates, roof manhole assembly with P/L # 48 and mark # 0511-6, 0511-6A, 0511-R1 R/L, 0511-R3 R, 0511-R4 R, 0511-R5 L, 0422-A/B, 0322-A/B, 0822-A/B, 0122-A/B, P/L # 49 and mark # 0806-B1, 0806-B2, 0806-B3 R/L, 0806-B4 R/L, 0511-R6 R/L.2529/11/12 18:526082POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO BEAM2189/11/12 18:576088PRE WELDING INSPECTION OF STRUCTURAL PLATE TO BEAM2199/11/12 19:216090POST WELD VISUAL INSPECTOR OF STRUCTURAL PLATE TO BEAM1789/11/12 19:206093IN PROCESS WELDING OF STRUCTURAL PLATE TO BEAM2509/11/12 19:236097PRE WELDING INSPECTION OF STEEL STRUCTURE PLATE TO BEAM2109/11/12 19:316104IN PROCESS WELDING INSPECTION OF STRUCTURAL STEEL TO PC WALL PANEL2029/11/12 19:346107PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2549/11/12 19:366109POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2279/11/12 19:416112PRE WELDING INSPECTION2039/11/12 19:446114PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2229/11/12 19:466116IN PROCESS WELDING INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL2139/11/12 19:486118POST WELD VISUAL INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL1949/11/12 19:516120IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PLATE2179/11/12 19:556124POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO BEAM1559/11/12 19:586127PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2499/11/12 20:006129IN PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2489/11/12 20:026132POST WELDING VISUAL INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL2479/11/12 20:056133PRE WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2469/11/12 20:076135IN PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2089/11/12 20:106137POST WELD VISUAL INSPECTION OF STRUCTURAL STEEL PLATE TO PC WALL PANEL2459/11/12 20:156140PRE WELDING INSPECTION OF STRUCTION STEEL PLATE TO THE PC WALL PANEL2449/11/12 20:176142IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2169/11/12 20:196143POST WELD VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL2349/11/12 20:296148VISUAL INSPECTION OF ANNULAR PLATE WELD (REPAIR WELD J-BA4R1539/11/12 20:316149OIL PENETRANT EXAMINE INSIDE FILLET WELD ROOT PASS BEFORE WELDING SECOND PASS AT B92-D-005A1909/11/12 20:336150SOLUTION FILM LEAK TEST BY VACUUM BOX OF ANNULAR PLATE (REPAIR WELD J-BA4R1)1709/11/12 20:336151VISUAL INSPECTION OF INSIDE FILLET WELD ROOT PASS AT STORAGE TANK1549/11/12 20:356152VISUALLY INSPECT COMPLETE WELD OF BOTTOM PLATE FOR POTENTIAL DEFECT & LEAKS1499/11/12 20:356153MT EXAMINED THE BACK GOUGE SURFACE PRIOR TO SECOND SIDE WELD OF RING TANK.2939/11/12 20:376154OIL PENETRANT EXAMINE INSIDE FILLET WELD ROOT PASS BEFORE DEPOSITION PASSES1819/11/12 20:376155SFT VACUUM BOX BOTTOM LAP WELDS1809/11/12 20:396156VISUAL INSPECTION OF SECOND SHELL VERTICAL JOINTS2019/11/12 20:396157VISUALLY INSPECT COMPLETED WELDS OF BOTTOM PLATE1799/11/12 20:406158VISUAL INSPECTION OF SECOND SHELL VERTICAL JOINTS2159/11/12 20:416159MT EXAMINED ARE STRIKE AND TEMPORARY1999/11/12 20:416160SFT VACCUM BOX BOTTOM LAP WELDS2099/11/12 20:426161MT EXAMINED ARC STRIKE AND TEMPORARY ATTACHMENT REMOVAL AREA1639/11/12 20:436162MT EXAMINED (J-BA4R)1719/11/12 20:436163VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENTS AT B92-D-005A.1829/11/12 20:456164VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENTS AT B92-D-005B.1929/11/12 20:456165VISUAL INSPECTION OF ANNULAR PLATE WELD REPAIR JOINT1749/11/12 20:476166VERIFICATION OF BOTTOM SURFACE1879/11/12 20:476167SFT BY VACCUUM BOX OF ANNULAR PLATE WELD REPAIR JOINT2009/11/12 20:486168VISUAL INSPECTION OF BOTTOM PLATE CORNER JOINT FOR FILLET WELD REPAIRED1699/11/12 20:506169MT EXAMINED AT WELD JOINT REPAIR AREA AFTER GAUGING BOTTOM ANNULAR JOINT909/12/12 8:296172VISUAL INSPECTION AT TEST PRESSURE FOR TEST PACKAGE NO. UG-FW-045989/12/12 8:326173VERIFICATION OF TESTING MEDIA FOR HYDROSTATIC TESTING (WATER QUALITY) FOR TEST PACKAGE NO. UG-FW-066979/12/12 8:356174PRE-TEST PUNCHLISTING OF ON-PLOT PIPING PRIOR TO HYDROTEST OF TEST PACKAGE NO. UG-FW-066839/12/12 9:026175Inspection of one PRV Calibration for Hydrotest Purpose.769/12/12 9:116176Inspection of one PRV Calibration for Hydrotest Purpose.809/12/12 10:406183INTERNAL CLEANLINESS AND/OR FLUSHING INSPECTION PRIOR TO HYDROTEST OF TEST PACKAGE NO. UG-FW-066969/12/12 10:416184VERIFICATION OF TESTING EQUIPMENT (INCLUDING SAFETY REQUIREMENTS) INSPECTION FOR TEST PACKAGE NO. UG-FW-066959/12/12 10:536185VERIFICATION OF TEST PREPARATION FOR TEST PACKAGE NO. UG-FW-066879/12/12 10:566186INSPECTION OF FILLING AND PRESSURIZATION FOR TEST PACKAGE NO. UG-FW-06779/12/12 11:006187VISUAL INSPECTION AT TEST PRESSURE FOR TEST PACKAGE NO. UG-FW-066.1029/12/12 11:116190NEOPRENE WRAPPING INSTALLATION INSPECTION FOR 16"-FW-2462-16FE0U1 (TP UG-FW-060)1489/12/12 18:106253MT EXAMINED THE BACK GAUGE SURFACE PRIOR TO WELDING SECOND SIDE OF 1ST RING VERTICAL JOINT1759/12/12 18:126256MT EXAMINED THE BACK OF GAUGE SURFACE PRIOR TO WELDING SECOND SIDE OF THE 1ST RING VERTICAL JOINT1649/12/12 18:156259VISUAL INSPECTION OF VERTICAL JOINT1889/12/12 18:176262VISUAL INSPECTION OF VERTICAL JOINT1689/12/12 18:196264VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENT AFTER SURFACE RESTORATION1669/12/12 18:226267VISUAL INSPECTION OF REMOVAL OF TEMPORARY ATTACHMENTS AFTER SURFACE RESTORATION1919/12/12 18:256271VERIFY BOTTOM SURFACE CLEANLINESS/COATING PRIOR TO BEING PLACED IN POSITION2429/12/12 18:276274VERIFY BOTTOM SURFACE CLEANLINESS/COATING PRIOR TO BEING PLACED IN POSITION1769/12/12 18:296276VISUAL INSPECTION OF INSIDE FILLET WELD ROOT PASS1779/12/12 18:316280MT EXAMINED OF BACK GAUGED SURFACE PRIOR TO WELDING SECOND SIDE OF 2ND RING VERTICAL JOINT3969/12/12 20:186374Visual inspection of first shell couse vertical butt weld at B92-D-007A( FITP: B92-D-007A Activity no:5.5).4119/12/12 20:266382Visual inspection of shell to annular plate corner joint fillet weld root pass at B92-D-007A( FITP: B92-D-007A Activity no:4.2).3339/12/12 20:306386Visual inspection of second shell vertical butt weld joint at B92-D-007A( FITP: B92-D-007A Activity no:5.5).2869/12/12 20:356391Verify bottom plate cleanliness/coating prior to be placed position at B92-D-0051 (FITP:B92-D-0051,Activity no:2.1).1369/13/12 5:526401Roundness, plumbness and peaking inspection of first course for item B92-D-0007A.1379/13/12 5:586402Roundness, plumbness, peaking and banding inspection of first and second course for item B92-D-0005A/B.2569/13/12 20:136491MT examined arc strike removal area and temporary attachments on GT-1-2 at B92-D-005A ,activity no:8.1).1479/13/12 20:176492Visual inspection of second shell horizontal butt joint at B92-D-005A,activity no:4.5.1519/13/12 20:216493Visual inspection of second shell horizontal joint at B92-D-005B,activity no:4.5.1529/13/12 20:256494Visual inspection of temporary attchments weld removal areas at B92-D-005A,activity no;8.1.1729/13/12 20:296495Visual inspection of temporary attachments weld removal areas (second shell horizontal butt weld joint) at B92-D-005B,activity no:8.1.1739/13/12 20:326496Visual inspection of temporary attachments weld removal areas(first shell vertical butt joint) at B92-D-007A,activity no:9.1.2519/15/12 17:106617Pre-welding inspection of structural plate to beam at NGL pipe rack.2079/15/12 17:116618Inprocess welding inspection of structural plate to beam at NGL pipe rack.1849/15/12 17:126619Post weld visual inspection of structural plate to beam at NGL pipe rack.1039/16/12 14:506637Material receiving inspection of grouting material (Master Flow 524L)at lay down area package # 2.1089/16/12 14:566638Pad plate elevation inspection of item B90-E-0203.1099/16/12 15:016640Pad plate elevation inspection of item B90-E-0213.1049/16/12 15:046643Pad plate elevation inspection of item B90-E-0204.1059/16/12 15:086646Pad plate elevation inspection of item B90-E-0205.1109/16/12 15:156654Pad plate elevation inspection of item B90-E-0207.1129/16/12 15:236659Pad plate elevation inspection of item B90-E-0208.1119/16/12 15:306664Pad plate elevation inspection of item B90-E-0209.1859/17/12 15:076687Pre-welding inspection of structural plate to TT slap at B90-302,date:08-09-2012 to 14-09-2012.2329/17/12 15:106688Inprocess welding inspection of structural plate to TT slap at B90-302,date:08-09-2012 to 14-09-2012.2209/17/12 15:126689Post weld visual inspection of structural plate to TT slap at B90-302,date:08-09-2012 to 14-09-2012.2339/18/12 14:006782Pre-welding inspection of structural plate to PC wall panel at B90-302,Date:08-09-2012 to 14-09-2012.1869/18/12 14:036783Inprocess welding inspection of structural plate to PC wall panel at B90-302,Date:08-09-2012 to 14-09-2012.1679/18/12 14:046784Post weld visual inspection of structural plate to PC wall panel at B90-302,Date:08-09-2012 to 14-09-2012.1069/19/12 15:136861Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0002.1079/19/12 15:196862Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0003.1969/20/12 11:226931MT EXAMINED ARC STRIKE & TEMPORARY ATTACHMENT REMOVAL AREA ON 1ST RING VERTICAL JOIN (FITP ACTIVITY NO. 8.2)2119/20/12 11:246932MT EXAMINED ARC STRIKE AND TEMPORARY ATTACHMENT REMOVAL ARE ON FIRST RING VERTICAL JOINT (ACTIVITY NO. 8.2)2289/21/12 9:556933MT EXAMINED THE BACK GAUGED SURFACE PRIOR TO WELD SECOND SITE OF 1ST RING VERTICAL JOINT (ACTIVITY NO. 5.4)2579/20/12 11:286934MT EXAMINED THE BACK GAUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF GIRTH SEAM (ACTIVITY NO. 4.4)1979/20/12 11:306935MT EXAMINED THE BACK GAUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF GIRTH SEAM (ACTIVITY NO. 4.4)2219/20/12 11:326936VISUAL INSPECTION OF BOTTOM PLATE ANNULAR JOINT REPAIR WELD (BA-12 ACTIVITY NO. 2.4)1959/20/12 11:336937MT EXAMINED AFTER GAUGED REPAIR WELD OF ANNULAR JOINT (BA12 ACTIVITY NO. 2.3)1989/20/12 11:356938SOLUTION FILM LEAK TEST BY VACCUUM BOX ON BOTTOM PLATE ANNULAR JOINT REPAIR WELD (BA-12 ACTIVITY NO. 2.5)2559/20/12 11:386939OIL PENETRANT LEAK TEST ON ROO PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD JOINT (ACTIVITY NO. 4.3)1389/20/12 13:196940MT Examined arc strike removal area & temporary attachment removal area at B92-D-005B2299/20/12 13:246941Visual inspection of repair weld (j-BA 4R1T1,BA 6R1T1 & BA 12R1T1) AT B92-D-007A.2309/20/12 13:286942SFT by vaccum box on bottom plate annular repair weld (BA-4R1T1,BA-6R1T1 & BA-12R1T1) AT B92-D-007A.2319/20/12 13:326943Visual inspection of first shell vertical joints butt weld at B92-D-007B.2369/20/12 13:366946Visual inspection of temporary attachment weld removal area near first vertical joint at B92-D-007B.2049/20/12 13:406948SFT by vaccum box on bottom lap weld at B92-D-005110449/22/12 10:276998Data Base reporting for the period of 13-19 September 2012 @ NSH Fabrication Shop10179/22/12 10:256999PRE WELDING & WELD JOINT FIT-UP INSPECTION FROM SEP. 20-26, 2012 @ NSH FABRICATION SHOP10559/22/12 10:347000IN-PROCESS WELD INSPECTION FROM SEP. 20-26, 2012 @ NSH Fabrication Shop10569/22/12 10:367001POST WELDING VISUAL INSPECTION FROM SEP. 20-26, 2012 @ NSH Fabrication Shop10409/22/12 10:387002WELDING CONSUMABLE CONTROL (STORAGE, HANDLING, ISSUANCE & CONDITIONING) FROM SEP. 20-26, 2012 @ NSH Fabrication Shop9729/22/12 10:407003SELECTION OF WELDS FOR NDT FROM SEP. 20-26, 2012 @ NSH Fabrication Shop1569/22/12 10:447004INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATION OF LIQUID COATING SYSTEM FROM SEPT. 22-27, 2012, 11:00 AM TO 4:30PM @ NSH Fabrication Shop4839/22/12 10:467005IN PROCESS INSPECTION OF PRIMER COAT FROM SEPT. 22-27, 2012, 11:30AM TO 5:00 PM2249/22/12 10:497006INSPECTION OF PRIMER COAT PRIOR TO TOP COAT APPLICATION FROM SEPT. 22-27, 2012 @ NSH Fabrication Shop2399/22/12 16:187054Material receiving and visual inspection of roof plates with P/L # 51 and mark # 0511-R4 L, 0511-R2, 0511-R7, 0111-R1 R/L, 0111-R2 R/L, 0111-R3 R/L, 0111-R4, P/L # 52 and mark # 0122-7, 0216-f, 0422-7, 0511-12, 0511-12A, 0616-B, 0623-A,B,C,D,F,H, 0807-3,4, 0816-A,F, 0823-E, 0516-B2379/22/12 16:227057Roundness, plumbness and peaking inspection of first course shell plates.2359/23/12 11:057098Visual inspection of bottom lab weld breakdown area at B92-D-0004.2129/23/12 11:097099Visual inspection of bottom lab weld breakdown area at B92-D-006A.2599/23/12 11:127100Visual inspection of bottom lab weld breakdown area at B92-D-006B.2389/23/12 11:157101Oil penetrant leak test inside root pass of shell to annular corner joint at B92-D-007B.2589/23/12 11:197102SFT by vaccum box on bottom lab weld breakdown area at B92-D-006B.2439/23/12 11:237103SFT by vaccum box on bottom lab weld brakdown area at B92-D-006A.1839/23/12 11:277104SFT by vaccum box on bottom lab weld break down area at B92-D-004.1179/23/12 14:057137Receiving inspection of equipment item # B90-E-103,104,105 and emergrncy vent manway, breather valve and base plates for item # B90-E-103,203,104,204,105,106.2829/23/12 14:097143Storage, handling and preservation inspection of equipment item # B90-E-103,104,105.1589/24/12 15:287222EQUIPMENT INSPECTION @ NSH FABRICATION SHOP1599/24/12 15:347223VERIFICATOIN AND VISUAL INSPECTION OF PAIN AND ABRASIVE @ NSH FABRICATION SHOP1609/24/12 15:367224STORAGE AND HANDLING OF PAINTS AND ABRASIVE @ NSH FABRICATION SHOP1619/24/12 15:397225INSPECTION OF SURFACE OF PRIMER COAT @ NSH FABRICATION SHOP1629/24/12 15:417226IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP4979/24/12 15:517228INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATOIN OF LIQUID COATING SYSTEM @ NSH FABRICATION SHOP4969/24/12 15:537229IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP4459/24/12 15:557230INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATION OF LIQUID COATING SYSTEM @ NSH FABRICATION SHOP4469/24/12 16:067234IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP5009/24/12 16:097235INSPECTION OF PRIMER COAT PRIOR TO TOP COATING @ NSH FABRICATION SHOP4479/24/12 16:127236INSPECTION OF PRIMER COAT PRIOR TO TOP COATING @ NSH FABRICATION SHOP4489/24/12 16:157237INSPECTION OF SURFACE PREPARATION & PRIOR TO APPLICATION OF LIQUID COATING SYSTEM @ NSH FABRICATION SHOP4499/24/12 16:197238IN-PROCESS INSPECTION OF PRIMER COAT @ NSH FABRICATION SHOP4789/25/12 16:097316INSPECTION OF TOP COAT APPLICATION 9DRY/CURED COATING)4799/25/12 16:117317VERIFICATION AND VISUAL INSPECTION OF PAINT AND ABRASIVE1159/26/12 14:297337Pad plate elevation inspection of GAS MOLE SIEVE DEHYDRATION VESSELS item # B90-D-0110 A,B,C,D.1169/26/12 14:257344Pad plate elevation inspection of DE-METHANIZER COLUMN item # B90-C-0101.1149/27/12 6:377351Pad plate elevation inspection of REFRIGERANT GAS COMPRESSOR item # B90-K-0103A.1189/26/12 14:487354Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0002.1139/26/12 15:047363Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:PRV-P2-0003.10389/26/12 17:267386PRODUCTION WELD AND WELDER REPAIR RATE ASSESSMENT FOR ON PLOT PIPING FROM SEP. 27 TO OCT. 3, 2012.10189/26/12 17:297387PRE WELDING AND WELD JOINT FIT-UP INSPECTION FROM SEP. 27 TO OCT. 3, 2012.10439/26/12 17:317388IN PROCESS WELD INSPECTION FROM SEP. 27 TO OCT. 3, 2012.10459/26/12 17:337389POST WELDING VISUAL INSPECTION FROM SEP. 27 TO OCT. 3, 2012.10429/26/12 17:357390WELDING CONSUMABLE CONTROL STORAGE AND HANDLING ISSUANCE AND CONDITIONING FROM SEP. 27 TO OCT. 3, 2012.10399/26/12 17:377391SELECTION OF WELDS FOR NDT FROM SEP. 27 TO OCT. 3, 2012.2639/27/12 15:167409MT Examination at Vertical joint of the backgouged surface at first ring (VT1A,VT1B,VT1C,VT1D,VT1E,VT1G)10289/27/12 15:217410MT Examination at Arcstrike removal area and temporary attachments on girth seam joint GT-1-210299/27/12 15:257411MT Examination at Arcstrike removal area and temporary attachments weld removal area on first ring vertical joint (VT1A,VT1D,VT1E,VT1F,VT1G,VT1H)10309/27/12 15:277412MT Examined on the backgouged surface of the second side of the 3rd ring vertical joint VT3A, VT3B, VT3C2649/27/12 15:317413MT examined arc strike removal area and temporary attachment removal area after surface restoration on 1st ring vertical area of JT# VT1A,VT1B,VT1C,VT1D,VT1E,VT1H2749/27/12 15:347414MT EXAMINED ON THE BACKGOUGEDSURFACE ON 2ND RING OF VERTICAL JOINT VT2A, VT2B, VT2D, VT2E, VT2E, VT2F, VT2G10319/27/12 15:377415MT EXAMINED ON THE BACKGOUGEDSURFACE ON 1ST RING OF VERTICAL JOINT VT1A, VT1B, VT1C2659/27/12 15:427416MT EXAMINED ON THE BACKGOUGED SURFACE OF 1ST RING OF VERTICAL JT VT1A, VT1B, VT1C2669/27/12 15:457417MT EXAMINED THE BACKGOUGE SURFACE ON THE 1ST RING VERTICAL JT VT1A, VT1B, VT1C2679/27/12 15:477418MT EXAMINED ON THE BACKGOUGEDSURFACEOF 1ST RING OF VERTICAL JOINT VT1A, VT1B,VT1C2689/27/12 15:517419MT EXAMINED THE BACKGOUGESURFACE OF 3RD RING VERTICAL JOINT VT3A, VT3B, VT3C2759/27/12 15:537421MT EXAMINED ON THE BACK GOUGE SURFACE ON THE SECOND SIDE OF GIRTH SEAM JOINT GT-2-32699/27/12 15:567423VISUAL INSPECTION ON TEMPORARY ATTACHMENT WELD REMOVAL AREA NEAR FIRST SHELL2769/27/12 15:597424VISUAL INSPECTION ON FIRST COURSE VERTICAL BUTT WELD JOINTS2779/27/12 16:017426MT EXAMINATION ON ARC STRIKE REMOVAL AREA ON 1ST RING VERTICAL JOINT VT1A, VT1B, VT1C24010/2/12 17:147526Material receiving and visual inspection of bottom sketch plate and shell plate ring with P/L # 53 and mark # 0606-B1, 0606-B2 R/L, 0606-B3 R/L, 0606-B4, P/L # 54 and mark # 0607-1, 0607-2, 0607-3, P/L # 55 and mark # 0606-6, 0606-3, 0619-A.36710/4/12 17:457609Material receiving and visual inspection of roof plates with P/L # 56 and mark # 0511-12, 0511-12A, P/L # 55 and mark # 0411-R1 R/L, 0411-R2 R/L, 0411-R3 R/L, 0411-R4, 0321-1, 0421-136810/6/12 17:247674Material receiving and visual inspection of lower column assembly P/L # 02, 03, 04, 08, 12 and mark # 0106-A.48010/7/12 9:487675Inspection of Surface preparation & Prior to Application of liquid Coating System22610/7/12 9:507676In-Process Inspection of Primer Coat19310/7/12 9:527677Verification and visual Inspection of Paint and Abrasive22510/7/12 9:547678Inspection of Primer Coat prior to Top Coat Application24110/7/12 9:557679Inspection of Top coat Application (Dry /Cured coating)13010/7/12 10:207684Visual Inspection on third shell horizontal and vertical butt joints VT3A,VT3B,VT3C,GT2-313110/7/12 10:237685MT Examination onBackgouged surface prior to weld the second side of girth seam GT-2-3 in tank B92-D-0005A14410/7/12 10:267686VISUAL INSPECTION OF ROOT PASS WELDING BEFORE DEPOSITING SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT27010/7/12 10:317688VISUAL INSPECTION OF ROOT PASS WELDING BEFORE SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT J#BCJ112410/7/12 10:347689MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELDING THE SECOND SURFACE OF SECOND RING VERTICAL JOINTS JT # VT2A, VT2B, VT2C, VT2C, VT2D, VT2E, VT2F, VT2G14510/7/12 10:367690OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD13210/7/12 10:377691OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD12610/7/12 10:387692OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD14310/7/12 10:407693VISUAL INSPECTION OF ROOT PASS WELDING BEFORE SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT J#BCJ112910/7/12 10:417694OIL PENETRANT LEAK TEST EXAMINATION INSIDE FILLET WELD ROOT PASS BEFORE WELDING THE SECOND PASS OF SHELL TO BOTTOM PLATE CORNER WELD14610/7/12 10:437695MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS ON 3RD RING VERTICAL JOINTS VT31, VT3B, VT3C13310/7/12 10:457696VISUAL INSPECTION OON THIRD SHELL COURSE VERTICAL AND HORIZONTAL BUTT WELD JOINTS VT3A, VT3B, VT3C, GT2-312510/7/12 10:477697MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS ON SURFACE RESTORATION ON GIRTH SEAM JOINT GT-2-313410/7/12 10:487698MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS AFTER SURFACE RESTORATION ON GITH SEAM JT GT-2-313510/7/12 10:507699MT EXAMINATION ON TEMPORARY WELD AND ARC STRIKE REMOVAL AREAS ON 3RD RING VERTICAL JOINTS VT31, VT3B, VT3C12710/7/12 10:547700VISUAL INSPECTION OF ROOT PASS WELDING BEFORE SUBSEQUENT PASSES FOR SHELL TO BOTTOM PLATE CORNER JOINT BCJ198810/7/12 17:147756Inspection of Primer Coat prior to Top Coat Application98110/7/12 18:217758Inspection of Surface preparation & Prior to Application of liquid Coating System104710/7/12 18:267762In-Process Inspection of Primer Coat13910/8/12 17:147830Material receiving and visual inspection of lower column jacking base plates with P/L # 5 and mark # 0106-14 and lower column assembly with P/L # 14 and mark # 0106-A.98710/8/12 16:177890Inspection of Top Coat Application (Dry/Cured coating)27810/9/12 10:447899Pre welding Fit up inspection of Steet structure modification as per site condition27110/9/12 10:477900Inprocess Welding Inspection of Steel Structure modification as per site27210/9/12 10:507901POSTWELDING VISUAL INSPECTION OF STEEL STRUCTURE MODIFICATION AS PER SITE11910/9/12 10:547902VISUAL INSPECTION ON TEMPORARY ATTACHMENT WELD REMOVAL AREAS NEAR 3RD SHELL COURSE VERTICAL AND HORIZONTAL BUTT WELD JOINT VT3A, VT3B, VT3C, GT-2-312010/9/12 10:567903VISUAL INSPECTION ON TEMPORARY ATTACHMENT WELD REMOVAL AREA ON 3RD SHELL COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT3A, VT3B, VT3C, GT2-212310/9/12 10:587904MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C12110/9/12 11:007905MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C12210/9/12 11:027906BOTTOM SURFACE CLEANLINESS/COATING PRIOR TO BE PLACED IN POSITION14010/9/12 11:047907MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C14110/9/12 11:057908MT EXAMINATION ON BACKGOUGED SURFACE ON 2ND RING VERTICAL JOINT VT2A, VT2B, VT2C14210/9/12 11:107909MT EXAMINATION ON BACKGOUGED SURFACE ON 4TH RING VERTICAL JOINT VT4A, VT4B, VT4C12810/9/12 13:307910MT EXAMINATION ONBACKGOUGED SURFACE ON 4TH RING VERTICAL JOINT VT4A, VT4B, VT4C59610/10/12 10:357975PRODUCTION WELD & REPAIR RATE ASSESSMENT FOR ON-PLOT PIPING97410/10/12 10:377976PRE-WELDING INSPECTION SHOP OF PLANT PIPING FROM 11-OCT-12 TO 17-OCT-201270710/10/12 10:397977IN-PROCESS WELDING INSPECTION FROM 11-OCT-2012 TO 17-OCT-201259210/10/12 10:507978POST WELDING VISUAL INSPECTION FROM 11-OCT-2012 TO 17-OCT-201250310/10/12 10:447979CONTROL OF WELDING CONSUMABLES-PLANT PIPING (SITE STORAGE, HANDLING, CONDITIONING & ISSUANCE) FROM 11-OCT-2012 TO 17-OCT-201250510/10/12 10:467980SELECTION OF WELDS FOR NDE (ON-PLOT PIPING) FROM 11-OCT-2012 TO 17-OCT-201226110/10/12 16:558020Material receiving and visual inspection of reinforcing pad plates for roof fittings with P/L # 57 and mark # 0522-7,0622-6,0622-20 and nozzle assembly with mark # 0323-E,0327-A,0327-2,0416-C,0416-E,0416-F,0416-G,0422-A,0427-A,0427-2,0423-A,0523-D.22310/13/12 16:038165Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:-PRV-P2-0004.15710/13/12 16:068174Inspection of one PRV Calibration for Hydrotest Purpose. Tag No:-PRV-P2-0005.98210/12/12 7:428215Verification and visual Inspection of Paint and Abrasive16510/12/12 8:158216Material receiving and visual inspection of flat bar for diagonal column bracing and horizontal column bracing assembly with P/L # 13 and mark # 0108-1, 0108-A26010/12/12 11:438217Material receiving and visual inspection of reinforcing pad plate for shell nozzle, internal pipe support, roof nozzle, roof manhole assembly, plate for roof manhole hinge and compression bar support with P/L # 50 and mark # 0116-14,0122-6,0123-10,0123-12,0123-17,0222-6,0316-11,0318-11,0318-8,0322-6,0323-12,0323-14,0323-15,0326-6,0416-12,0418-11,0418-14,0422-6,0423-12,0423-14,0422-6,0423-12,0423-14,0423-15,0426-12,0426-6,0510-2,0518-17,0522-6,0522-A,0523-12,0523-13,0623-29,0623-30,0623-31,0822-6,0823-10,0823-11,0823-17,0416-13100410/13/12 16:038271RECEIVING INSPECTION OF PIPE AND FIITINGS (LATE INPUT DUE TO QMIS SHUTDOWN)76210/13/12 16:058272STORAGE AND HANDLING INSPECTION73710/13/12 16:068273RECEIVING INSPECTION OF PIPE AND FIITINGS99210/13/12 16:088274STORAGE AND HANDLING INSPECTION101610/13/12 16:098276RECEIVING INSPECTION OF PIPE AND FIITINGS59710/13/12 16:108278STORAGE AND HANDLING INSPECTION73610/13/12 16:128279RECEIVING INSPECTION OF PIPE AND FIITINGS68610/13/12 16:148280STORAGE AND HANDLING INSPECTION100510/13/12 16:158281RECEIVING INSPECTION OF PIPE AND FIITINGS92010/13/12 16:168282STORAGE AND HANDLING INSPECTION104110/13/12 16:188283RECEIVING INSPECTION OF PIPE AND FIITINGS91910/13/12 16:198284STORAGE AND HANDLING INSPECTION73410/13/12 16:208285RECEIVING INSPECTION OF PIPE AND FIITINGS70810/13/12 16:228286STORAGE AND HANDLING INSPECTION67210/13/12 16:238287RECEIVING INSPECTION OF PIPE AND FIITINGS73510/13/12 16:398288CUTTING AND ASSEMBLY FIT-UP92310/13/12 16:408289CUTTING AND ASSEMBLY FIT-UP92110/13/12 16:418290CUTTING AND ASSEMBLY FIT-UP73310/13/12 16:438291RECEIVING INSPECTION OF PIPE AND FIITINGS99010/13/12 16:448292STORAGE AND HANDLING INSPECTION67110/13/12 16:518293RECEIVING INSPECTION OF PIPE AND FIITINGS91810/13/12 16:538294RECEIVING INSPECTION OF PIPE AND FIITINGS70610/14/12 6:398304RECEIVING INSPECTION OF WELDING CONSUMABLES70510/14/12 6:428305Inprocess verification of solvent-removable color contrast penetrant examination71110/14/12 6:448306Inspection of epair on weld joints or base metal by welding.92210/14/12 15:328324RECEIVING INSPECTION OF PIPE FITTINGS59810/14/12 15:358325CUTTING AND ASSEMBLY FIT-UP97510/14/12 15:378330RECEIVING INSPECTION OF PIPE FITTINGS99410/14/12 15:398332RECEIVING INSPECTION OF PIPE FITTINGS101510/14/12 15:438336CUTTING AND ASSEMBLY FIT-UP69210/14/12 15:458339FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL99110/14/12 15:478341RECEIVING INSPECTION OF PIPE FITTINGS67010/14/12 15:488343RECEIVING INSPECTION OF PIPE FITTINGS93710/14/12 15:508345FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL63510/14/12 15:528347CUTTING AND ASSEMBLY FIT-UP68910/14/12 15:538349RECEIVING INSPECTION OF PIPE FITTINGS68710/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL68810/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL69010/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL69110/14/12 15:558351FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL76310/14/12 15:578353FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL97310/14/12 15:598355FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL67310/14/12 16:008357FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL99310/14/12 16:028359FINAL INSPECTION FOR RELEASE OF FABRICATED SPOOL98910/14/12 16:038361CUTTING AND ASSEMBLY FIT-UP98410/14/12 16:208364Inspection of Top coat Application (Dry /Cured coating)32310/14/12 17:188365STEEL STRUCTURE MODIFICATION AS PER SITE CONDITION FOR THE FOLLOWING COLUMN POST, GIRDER FOR 1144128-1054. 1144128-1094, 1144128-202332210/14/12 17:218366STEE STRUCTURE MODIFICATION OF COLUMN POST AND GIRDER AS PER SITE CONDITION FOR THE FOLLOWING DRAWING 1144128-2031,2032,2033,2107.1144025,101B2528510/14/12 17:238368IN PROCESS WELDING OF STEE STRUCTURE MODIFICATION OF COLUMN POST AND GIRDER AS PER SITE CONDITION FOR THE FOLLOWING DRAWING 1144128-2031,2032,2033,2107.1144025,101B2532110/14/12 17:258370PROCESS WELDING OF STEE STRUCTURE MODIFICATION OF COLUMN POST AND GIRDER AS PER SITE CONDITION FOR THE FOLLOWING DRAWING 1144128-2023,1054,109428410/14/12 17:288373PRE WELDING FIT UP INSPECTION32010/14/12 17:318375INPROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL AT B95-31231910/14/12 17:338377POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL39210/14/12 17:388381PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)37110/14/12 17:438384PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)39310/14/12 17:438386PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)39110/14/12 17:468387PRE EQUIPMENT INSTALLATION (PADDING INSPECTION)104610/15/12 15:058408Verification and visual Inspection of Paint and Abrasive (Sigma Cover-410 Ral-Alu gray,7035, Each-1480 lts and 7042-2980 lts)98510/15/12 15:128409Inspection of Surface preparation & Prior to Application of liquid Coating System104910/15/12 15:148410In-Process Inspection of Primer Coat68310/16/12 7:138434Cutting And Assembly Fit-Up81010/16/12 7:158435Recv Inspection of Pipe & Pipe Nipples ( Plant Piping )81110/16/12 7:178436Recv Inspection of Pipe & Pipe Nipples ( Plant Piping )81210/16/12 7:198437Recv Inspection of Pipe & Pipe Nipples ( Plant Piping )/ Material Receiving Inspection Forged Fitting( MRR-P-069 )88710/16/12 7:308440Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0001 #88810/16/12 7:338441Verify Test Equipment (Safety Assessment) # NSH-FD-1016-HDT-0001 #88910/16/12 7:358442Review of Test Package Preparation # NSH-FD-1016-HDT-0001 #89010/16/12 7:378443Inspection of pressure test preparation # NSH-FD-1016-HDT-0001 #89110/16/12 7:408444Inspection Filling Pressurization # NSH-FD-1016-HDT-0001 #88210/16/12 7:428445Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0001 #88410/16/12 7:448446Visual Inspection at test Pressure # NSH-FD-1016-HDT-0001 #88310/16/12 8:028447Material Receiving Inspection Forged Fitting( MRR-P-066 )88510/16/12 7:488448Material Receiving Inspection Forged Fitting ( MRR-P-080 )89210/16/12 7:538449Material Receiving Inspection Flange ( MRR-P-079 )88610/16/12 7:558450Material Receiving Inspection Flange ( MRR-P-079 )81310/16/12 15:198476Inspection of Primer Coat prior to Top Coat Application50710/16/12 16:068481RECEIVING INSPECTION OF WELDING CONSUMABLES30410/16/12 17:018482Material Recieving Inspection of Roof Plate Assembly33210/16/12 17:038483MATERIAL RECIEVING INSPECTION OF COUPLING, PLUG AND PLATES31010/16/12 17:058484MATERIAL RECIVING INSPECTION OF COLUMN STUB87510/17/12 6:558488Review of Test Package Preparation # NSH-FD-1016-HDT-0002 #87610/17/12 6:588489Piping /Equipment Internal Cleaning #NSH-FD-1016-HDT-0002#87710/17/12 6:598490Inspection Filling Pressurization # NSH-FD-1016-HDT-0002 #87810/17/12 7:018491Inspection of pressure test preparation # NSH-FD-1016-HDT-0002 #87910/17/12 7:038492Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002 #88010/17/12 7:048493Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002 #88110/17/12 7:068494Review of Test Package Preparation # NSH-FD-1016-HDT-0003 #73810/17/12 7:088495Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0003 #73910/17/12 7:108496Inspection Filling Pressurization # NSH-FD-1016-HDT-0003 #74010/17/12 7:128497Inspection of pressure test preparation # NSH-FD-1016-HDT-0003 #89310/17/12 7:138498Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0003 #74110/17/12 7:158499Visual Inspection at test Pressure # NSH-FD-1016-HDT-0003 #74210/17/12 18:318541Review of Test Package Preparation # NSH-FD-1016-HDT-0004 #75110/17/12 18:338543Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0004 #75210/17/12 18:348545Inspection Filling Pressurization # NSH-FD-1016-HDT-0004 #75310/17/12 18:358548Inspection of pressure test preparation # NSH-FD-1016-HDT-0004 #75410/17/12 18:388551Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0004 #75510/17/12 18:398553Visual Inspection at test Pressure # NSH-FD-1016-HDT-0004 #75610/17/12 18:408554Material Receiving Inspection Pipe S/S ( MRR-P-066 )74310/17/12 18:428557Cutting And Assembly Fit-Up ( Weekly RFI Oct-11 To Oct-18-2012 )76610/17/12 18:478562Material Receiving Inspection Forged Fitting ( MRR-P-066 )89410/17/12 18:498563Material Receiving Inspection Forged Fitting ( MRR-P-080 )73010/17/12 18:508565Review of Test Package Preparation # NSH-FD-1016-HDT-0006 #59110/17/12 18:528566Data base reporting62110/17/12 18:528567Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0006 #60710/17/12 18:538568Pre-Welding & Weld Joint Fit-up Inspection62210/17/12 18:548569Inspection Filling Pressurization # NSH-FD-1016-HDT-0006 #71210/17/12 19:078570In-Process Weld Inspection62310/17/12 18:568571Inspection of pressure test preparation # NSH-FD-1016-HDT-0006 #60810/17/12 18:568572Post-Welding Visual Inspection62410/17/12 18:578573Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0006 #59310/17/12 18:578574Welding Consumable Control (Storage, Handling, Issuance & Conditioning)50610/17/12 18:588575Selection of welds for NDT62510/17/12 18:598576Visual Inspection at test Pressure # NSH-FD-1016-HDT-0006 #62610/17/12 19:008577Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0004 #62710/17/12 19:028578Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0005 #72210/17/12 19:038579Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0006 #72310/17/12 19:058580Review of Test Package Preparation # NSH-FD-1016-HDT-0005 #72410/17/12 19:078581Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0005 #72510/17/12 19:088582Inspection Filling Pressurization # NSH-FD-1016-HDT-0005 #62810/17/12 19:108583Inspection of pressure test preparation # NSH-FD-1016-HDT-0005 #72610/17/12 19:128584Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0005 #72710/17/12 19:138585Visual Inspection at test Pressure # NSH-FD-1016-HDT-0005 #72810/17/12 19:158586Review of Test Package Preparation # NSH-FD-1016-HDT-0007 #72910/17/12 19:168587Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0007 #89510/17/12 19:188588Inspection Filling Pressurization # NSH-FD-1016-HDT-0007 #81410/17/12 19:198589Inspection of pressure test preparation # NSH-FD-1016-HDT-0007 #81510/17/12 19:218590Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0007 #81610/17/12 19:228591Visual Inspection at test Pressure # NSH-FD-1016-HDT-0007 #81710/17/12 19:248592Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0007 #90610/17/12 19:268593Material Receiving Inspection Fitting ( MRR-P-087 )90710/17/12 19:278594Review of Test Package Preparation # NSH-FD-1016-HDT-0008 #90810/17/12 19:288596Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0008 #90910/17/12 19:308597Inspection Filling Pressurization # NSH-FD-1016-HDT-0008 #91010/18/12 6:268600Inspection of pressure test preparation # NSH-FD-1016-HDT-0008 #91110/18/12 6:278601Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0008 #91310/18/12 6:288602Visual Inspection at test Pressure # NSH-FD-1016-HDT-0008 #91410/18/12 6:378603Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0008 #64610/18/12 6:398604Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0009 #27310/18/12 15:268619Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0004.26210/18/12 15:338620Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0005.62910/19/12 7:148621Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0010 #63010/19/12 7:168622Review of Test Package Preparation # NSH-FD-1016-HDT-0009 #91510/19/12 7:188623Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0009 #91610/19/12 7:208624Inspection Filling Pressurization # NSH-FD-1016-HDT-0009 #69610/19/12 7:218625Inspection of pressure test preparation # NSH-FD-1016-HDT-0009 #69710/19/12 7:238626Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0009 #69810/19/12 7:248627Visual Inspection at test Pressure # NSH-FD-1016-HDT-0009 #69910/19/12 7:268630Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0011 #70010/19/12 7:288633Review of Test Package Preparation # NSH-FD-1016-HDT-0010 #70110/19/12 7:298635Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0010 #91210/19/12 7:318637Inspection Filling Pressurization # NSH-FD-1016-HDT-0010 #66810/19/12 7:328638Inspection of pressure test preparation # NSH-FD-1016-HDT-0010 #66910/19/12 7:348639Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0010 #91710/19/12 7:358640Visual Inspection at test Pressure # NSH-FD-1016-HDT-0010 #106310/19/12 7:358641Inspection of Top coat Application (Dry /Cured coating)68410/19/12 7:418642Inspection of Material ,Storage And Hadling at Fabr ( Weeky RFI 4-Oct -To 11-Oct,2012 )68510/19/12 7:438643Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0012 #78210/19/12 7:448644Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0013 #61710/19/12 7:458645Material Receiving Inspection Flange ( MRR-P-090 )79010/19/12 7:488646Cutting And Assembly Fit-Up ( Weekly RFI Oct-18 To Oct-31-2012 )61910/19/12 7:508647Review of Test Package Preparation # NSH-FD-1016-HDT-0011 #76510/19/12 7:518648Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0011 #78310/19/12 7:538649Inspection Filling Pressurization # NSH-FD-1016-HDT-0011 #61810/19/12 7:558650Inspection of pressure test preparation # NSH-FD-1016-HDT-0011 #62010/19/12 7:578651Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0011 #78410/19/12 8:008652Visual Inspection at test Pressure # NSH-FD-1016-HDT-0011 #45610/19/12 8:028653Review of Test Package Preparation # NSH-FD-1016-HDT-0012 #63110/19/12 8:078654Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0012 #79310/19/12 8:078655Inspection Filling Pressurization # NSH-FD-1016-HDT-0012 #63210/19/12 8:098656Inspection of pressure test preparation # NSH-FD-1016-HDT-0012 #74810/19/12 8:118657Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0012 #78010/19/12 8:128658Visual Inspection at test Pressure # NSH-FD-1016-HDT-0012 #79110/19/12 8:148659Review of Test Package Preparation # NSH-FD-1016-HDT-0013 #79210/19/12 8:168660Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0013 #83510/19/12 8:178661Inspection Filling Pressurization # NSH-FD-1016-HDT-0013 #66210/19/12 8:188662Inspection of pressure test preparation # NSH-FD-1016-HDT-0013 #86010/19/12 8:218663Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0013 #84810/19/12 8:238664Visual Inspection at test Pressure # NSH-FD-1016-HDT-0013 #86110/19/12 8:268665Review of Test Package Preparation # NSH-FD-1016-HDT-0014 #65710/19/12 8:288666Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0014 #86910/19/12 8:298667Inspection Filling Pressurization # NSH-FD-1016-HDT-0014 #85610/19/12 8:318668Inspection of pressure test preparation # NSH-FD-1016-HDT-0014 #87010/19/12 8:328669Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0014 #78910/19/12 8:338670Visual Inspection at test Pressure # NSH-FD-1016-HDT-0014 #98310/20/12 16:168728Verification and visual Inspection of Paint and Abrasive, Indian Garnet 30/6059010/21/12 6:588756Inspection of Repair on Weld Joints or Base Metal by Welding.70910/21/12 6:598757In-process verification of solvent-removable colorcontrast penetrant examination30210/21/12 10:478760POST WELDING VISUAL INSPECTION OF STEEL STRUCTURE MODIFICATION OF STTEL STRUCTURE COLUMN, GIRDER, POST30110/21/12 10:528762FULL WELDING FINAL VISUAL INSPECTION OF EMBEDDED PLATE TO ANGLE BAR WELDING31810/21/12 10:578763PRE WELDING FITUP INSPECTION OF ANGLE BAR TO STRUCTURAL EMBEDDED PLATE31710/21/12 11:038764MT EXAMINATION ON BACKGOUGED SURFACE OF GIRTH 1-2 WHICH DID NOT DONE BY AGW31610/21/12 11:058765MT EXAMINATION ON BACKGOUGED SURFACE OF GIRTH 1-2 WHICH DID NOT DONE BY AGW31510/21/12 11:078766MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-1-230010/21/12 11:088767MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-1-229810/21/12 11:108768MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-3-428110/21/12 11:118769MT EXAMINATION ON BACKGOUGED SURFACE PRIOR TO WELD THE SECOND SIDE OF THE GIRTH SEAM GT-3-429710/21/12 11:148770SFT VACCUM BOX TEST ON BREAK DOWN AREAS ON JT# BLS1, BLS5, BLS6, BLS11, BLS15, BLS16, BLS20, BSS5, BSS6, BSS9, BSS10 AT 3.5 PSIAND REPEAT AT 10 PSI VACCUM28010/21/12 11:208771MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G29910/21/12 11:228772VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G30310/21/12 11:238773VISUAL INSPECTION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS AFTER RESTORING NEAR 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.30510/21/12 11:248774VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G AND GT-1-232410/21/12 11:278775VISUAL INSPECTION OF THE BOTTOM WELLAP WELD LAP BREAKDOWN AREA 12" LONG FROM OUTER JOINTS28710/21/12 11:288776VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G AND GT-1-229010/21/12 11:298777VISUAL INSPECTION OF SHELL TO BOTTOM PLATE JOINT OUTSIDE FILLET ROOT PASS BEFORE SUBSEQUENT PASS.29410/21/12 11:308778VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G ANG GT-1-232710/21/12 11:318779MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, VT2E, VT2F, VT2G AND GT-1-231410/21/12 11:328780VISUAL INSPECTION OF SHELL TO BOTTOM PLATE JOINT OUTSIDE FILLET ROOT PASS BEFORE SUBSEQUENT PASS. JOINT NO:BCJ132610/21/12 11:338781VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, AND GT-1-230610/21/12 11:358782VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, VT2D, ANF GT-1-233010/21/12 11:378783MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, AND GT-1-232810/21/12 11:378784VISUAL INSPECTION OF 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.30810/21/12 11:388785MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C,AND GT-1-229510/21/12 11:408786PT EXAMINATION FOR OUTSIDE CORNER FILLET WELD INITIAL PASS BEFORE WELDING SUBSEQUENT PASS.31110/21/12 11:408787SFT VACCUM BOX TEST FOR LAP WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS3 AT 3-5 PSI AND REPEAT AT 10 PSI VACCUM30710/21/12 11:418788SFT VACCUM BOX TEST FOR LAP WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS3 AT 3-5 PSI AND REPEAT AT 10 PSI VACCUM31310/21/12 11:428789VISUAL INSPECTION OF SECOND COURSE HORIZONTAL AND VERTICAL BUTT WELD JOINTS VT2A, VT2B, VT2C, AND GT-1-230910/21/12 11:438790MT EXAMINATION FOR BACKGOUGED SURFACE OF GIRTH 1-2 PRIOR TO WELDING.29210/21/12 11:448791VISUAL EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT2A, VT2B, VT2C, AND GT-1-2 ON SECOND SHELL COURSE HORIZONTAL AND VERTICAL JOINTS33110/21/12 11:458792PT EXAMINATION OF OUTSIDE CORNER FILLET WELD INITIAL PASS BEFORE WELDING SUBSEQUENT PASS.29110/21/12 11:468793VISUAL INSPECTION ON BOTTOM PLATE LAP JOINT WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS328810/21/12 11:478794VISUAL INSPECTION OF BOTTOM PLATE LAP JOINTS WELDS BLS1, BLS2, BLS3, BLS4, BLS5, BLS6, BSS1, BSS2AND BSS332510/21/12 11:498795PT EXAMINATION ON OUTSIDE CORNER FILLET WELD INITIAL PASSBEFORE SUBSEQUENT PASSES31210/21/12 11:508796MT EXAMINATION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS & ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 3-4 AND ALONG VERTICAL JOINT: VT4A,VT4B, VT4C.29610/21/12 11:508797MT EXAMINATION ON TEMPORARY ATTACHMENT WELD AND ARC STRIKE REMOVAL AREAS ON VERTICAL JOINTS VT4A, VT4B, VT4C, AND GT-3-428910/21/12 11:528798VISUAL INSPECTION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS AFTER RESTORING NEAR 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.32910/21/12 11:548799VISUAL INSPECTION OF 4TH SHELL VERTICAL & HORIZONTAL BUTT WELD JOINTS NO: VT4A, VT4B, VT4C & GT3-4.33910/21/12 17:068807PADDING INSPECTION104810/21/12 18:578854Inspection of Surface preparation & Prior to Application of liquid Coating System53610/21/12 18:588855In-Process Inspection of Primer Coat53510/22/12 16:208891Inspection of Primer Coat prior to Top Coat Application34710/23/12 15:298933Pre welding Fitup Inspection of Steel Structure Modification34310/23/12 15:308934In process Welding Inspection of Steel Structure Modification40910/23/12 15:318935Post Welding Visual Inspection of Steel Structure Modification33810/24/12 16:029042PRE WELDING FIT UP INSPECTION OF STEEL STRUCTURE MODIFICATION AS PER THE DRAWING/ SITE CONDITIONS34410/24/12 16:059043INPROCESS WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION AS PER SITE CONDITION38110/30/12 6:199044PAD PLATE ELEVATION INSPECTION60910/24/12 16:159045Data base reporting38010/30/12 6:209046PAD PLATE ELEVATION INSPECTION50110/30/12 6:209046PAD PLATE ELEVATION INSPECTION71010/24/12 16:179047Pre-Welding & Weld Joint Fit-up Inspection59510/24/12 16:189049In-Process Weld Inspection70410/24/12 16:209050Post-Welding Visual Inspection70310/24/12 16:219051Welding Consumable Control (Storage, Handling, Issuance & Conditioning)34010/30/12 6:189052PAD PLATE ELEVATION INSPECTION89910/24/12 16:229053Selection of welds for NDT41210/30/12 6:169054PAD PLATE ELEVATION INSPECTION40310/30/12 6:159055PAD PLATE ELEVATION INSPECTION37010/30/12 6:139056PAD PLATE ELEVATION INSPECTION39010/30/12 6:129057PAD PLATE ELEVATION INSPECTION41310/30/12 6:109058PAD PLATE ELEVATION INSPECTION38710/30/12 6:099059PAD PLATE ELEVATION INSPECTION40210/30/12 6:079060PAD PLATE ELEVATION INSPECTION37910/24/12 16:489061MT INSPECTION ON BACKGOUGED AREA OF 3RD RING VERTICAL JOINTS.37710/24/12 16:539063MT ON BACKGOUGED SURFACE OF TOP ANGLE JOINT TOGETHER PRIOR TO WELDING ON SECOND SIDE.35410/24/12 16:579066MT ON WELD REPAIR REMOVAL AREA OF GIRTH 1-2 INTERSECTION 2E, 2F AND EXAMINED AFTER THE COMPLETION OF WELD.38610/25/12 10:019078MT OF BACKGOUGED SURFACE OF VERTICAL JOINTS VT3A, VT3B, VT3C PRIOR TO WELDING40510/25/12 10:069079MT ON 3RD RING VERTICAL JOINTS BACKGOUGED SURFACE FOR THE JOINT NO: VT3A, VT3B, VT3C38411/1/12 10:519083MT ON TEMPORARY ATTACHMENT WELD REMOVAL AREAS AND ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 1-2 AND VERTICAL VT2A, VT2B, VT2C38311/1/12 10:529084MT ON 3RD RING VERTICAL JOINTS BACKGOUGED SURFACE PRIOR TO WELDING JOINT NO: VT3C, VT3D, VT3E, VT3F38511/1/12 10:539085MT ON TEMPORARY ATTACHMENTS WELD REMOVAL AREA AND ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 1-2 AND VERTICAL JOINTS VT2A, VT2B, VT2C.35311/1/12 10:569086VISUAL INSPECTION OF 2ND SHELL COURSE HORIZONTAL AND VERTICAL BUTT JOINTS NO: VT2A, VT2B, VT2C, GT1-235211/1/12 10:559087MT ON BACKGOUGED SURFACE OF VERTICAL JOINTS PRIOR TO WELDING. JOINT NO: VT1A, VT1B, VT1C, VT1D35111/1/12 10:579088VISUAL INSPECTION OF SHELL TO BOTTOM CORNER JOINT OUTSIDE FILLET WELD ROOT PASS. JOINT NO: BCJ135011/1/12 10:589089VISUAL INSPECTION OF TEMPORARY ATTACHMENT WELD REMOVAL AREAS AFTER RESTORATION NEAR 2ND COURSE VERTICAL AND HORIZONTAL JOINTS.38211/1/12 10:599090VISUAL INSPECTION OF TEMPORARY ATTACHMENTS WELD REMOVAL AREAS AFTER RESTORATION NEAR HORIZONTAL AND VERTICAL BUTT JOINTS.40411/1/12 10:599091VISUAL INSPECTION OF SECOND SHELL HORIZONTAL AND VERTICAL BUTT JOINTS. JOINT NO: VT2A, VT2B,VT2C, GT1-235511/1/12 11:009092MT ON TOPANGLE TO SHELL BACKGOUGED SURFACE AREA PRIOR TO WELDING.41011/1/12 11:029093MT ON BACKGOUGED SURFACE OF 3RD RING VERTICAL BUTT JOINTS. JOINT NO: VT3A, VT3B, VT3C.28310/25/12 14:439099Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0004.27910/25/12 14:469100Inspection of one PRV Calibration for Hydrotest Purpose, Tag No:-PRV-P2-0005.53410/29/12 6:409197Inspection of Top coat Application (Dry /Cured coating)53310/29/12 6:419198Inspection of Surface preparation & Prior to Application of liquid Coating System53210/29/12 6:429199In-Process Inspection of Primer Coat53110/29/12 6:439200Inspection of Primer Coat prior to Top Coat Application37810/30/12 14:239303VISUAL INSPECTION OF WELD REPAIR REMOVAL AREA GT1-2-INT2E, GT1-2-INT2F AND POST WELDING VISUAL INSPECTION OF GT1-2-INT2ER1, GT1-2-INT2FR139510/30/12 14:289308MT ON REPAIR AREA REMOVAL OF GIRTH 1-2-2D AND THE COMPLETED WELDS39410/30/12 14:309310MT ON BACKGOUGING AREA OF GIRTH 2-3 PRIOR TO WELDING.35810/31/12 13:599311MT ON BACKGOUGING AREA OF GIRTH 2-3 PRIOR TO WELDING.35910/30/12 14:36931435610/30/12 14:469318MT ON BACKGOUGED AREA OF 6TH RING VERTICAL JOINTS VT6A, VT6B, VT6C, VT6D PRIOR TO WELDING.35710/30/12 14:499320PT ON SHELL TO BOTTOM OUTSIDE CORNER FILLET WELD INITIAL PASS BEFORE STARTING SUBSEQUENT PASS.36010/30/12 14:529321MT ON TEMPORARY ATTACHMENT REMOVAL AREAS AND ARC STRIKE AFTER SURFACE RESTORATION ALONG GIRTH 2-3, VERTICAL VT3A, VT3B, VT3C.59410/31/12 6:259341Verify hardness testing50410/31/12 6:269342receiving inspection of welding consumables34510/31/12 11:149349FULL WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.33510/31/12 11:199351IN-PROCESS WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.34610/31/12 11:249352PRE-WELDING FITUP INSPECTION OF STEEL STRUCTURE MODIFICATION.33710/31/12 11:279353MATERIAL RECEIVING INSPECTION39810/31/12 13:449354CENTERING / PLUMBNESS INSPECTION37210/31/12 13:449355CENTERING AND PLUMBNESS INSPECTION40610/31/12 13:459357CENTERING AND PLUMBNESS INSPECTION38910/31/12 13:459358CENTERING AND PLUMBNESS INSPECTION37310/31/12 13:469359CENTERING AND PLUMBNESS INSPECTION36210/31/12 13:199360MATERIAL RECEIVING INSPECTION39710/31/12 13:519364PRE-WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL.39910/31/12 14:079365IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.37510/31/12 14:029366POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.40710/31/12 14:069367POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.33610/31/12 14:109368PRE-WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.33410/31/12 14:139369IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.36310/31/12 14:319370VISUAL INSPECTION OF 3RD RING VERTICAL AND HORIZONTAL JOINTS.37610/31/12 14:359371PLUMBNESS, PEAKING AND BANDING CHECKING IN 3RD RING VERTICAL AND HORIZONTAL JOINTS.40810/31/12 14:409372VISUAL AND PT EXAMINATION OF SHELL TO BOTTOM PLATE CORNER WELD OUTSIDE ROOT PASS BEFORE DEPOSITING SUBSEQUENT PASS.36410/31/12 14:449373FITUP INSPECTION OF SHELL GIRTH JOINT.41510/31/12 14:479374MT ON BACKGOUGING AREA OF SHELL VERTICAL JOINTS.41610/31/12 14:509375MT ON BACKGOUGED AREA OF SHELL GIRTH JOINT.37410/31/12 14:559376IN-PROCESS WELDING INSPECTION OF STEEL STRUCTURE.40010/31/12 14:589379POST WELDING VISUAL INSPECTION OF STEEL STRUCTURE.58110/31/12 16:009414Data base reporting58510/31/12 16:029415Pre-Welding & Weld Joint Fit-up Inspection58910/31/12 16:039416In-Process Weld Inspection70210/31/12 16:049417Post-Welding Visual Inspection84310/31/12 16:069418Welding Consumable Control (Storage, Handling, Issuance & Conditioning)52710/31/12 16:079419Selection of welds for NDT53010/31/12 16:109421Inspection of Top coat Application (Dry /Cured coating)36111/1/12 11:069455MT ON 3RD RING VERTICAL JOINTS BACKGOUGED SURFACE PRIOR TO WELDING JOINT NO: VT3A, VT3B, VT3C.100611/3/12 6:219564COATING FINAL INSPECTION FOR REPAIR/TOUCH UP GALV.COATING FOR ST.STRUCTURES41811/3/12 11:279574VISUAL INSPECTION OF COMPLETED WELD VERTICAL AND HORIZONTAL JOINTS.51411/3/12 11:089575CHECKING OF 3RD RING PLUMBNESS, VERTICAL JOINT PEAKING, GIRTH JOINT BANDING.50911/3/12 11:139576VISUAL AND PT INSPECTION OF SHELL TO BOTTOM CORNER WELD OUTSIDE ROOT PASS BEFORE SUBSEQUENT PASS.36911/3/12 11:169577VISUAL INSPECTION OF SHELL TO BOTTOM COMPLETED WELD INSIDE AND OUTSIDE AND PT FROM INSIDE.42811/3/12 11:189578PRE-WELDING INSPECTION OF SHELL TO BOTTOM CORNER JOINT.42911/3/12 11:219579VISUAL INSPECTION OF COMPLETED WELD OF TOP ANGLE TOGETHER AND TOP ANGLE TO SHELL.40111/3/12 11:249580PRE-WELDING FITUP INSPECTION OF 4TH RING SHELL VERTICAL AND HORIZONTAL JOINTS.42511/3/12 11:329581WELD MATERIAL RECEIVING INSPECTION.43011/3/12 11:359582MT ON BACKGOUGED AREA OF SHELL VERTICAL JOINTS.42211/3/12 11:389583MT ON BACKGOUGED AREA OF BOTTOM BUTT WELD JOINTS PRIOR TO WELDING ON SECOND SIDE.42111/3/12 11:409584MATERIAL RECEIVING INSPECTION42011/3/12 11:429585MATERIAL RECEIVING INSPECTION34211/4/12 9:149640Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0003.34111/3/12 17:039641Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0005.38811/4/12 6:299662Padding Elevation Inspection36611/4/12 11:449664MATERIAL RECEIVING INSPECTION36511/4/12 11:439665MATERIAL RECEIVING INSPECTION41911/4/12 14:199683VISUAL AND PT INSPECTION OF SHELL TO BOTTOM OUTSIDE CORNER WELD ROOT PASS BEFORE STARTING SUBSEQUENT PASS.51011/4/12 14:299685VISUAL INSPECTION OF 3RD SHELL HORIZONTAL AND VERTICAL JOINTS, PRE-WELDING PLUMBNESS, PEAKING AND BANDING CHECKING.51111/4/12 14:299686VISUAL INSPECTION OF 3RD SHELL HORIZONTAL AND VERTICAL JOINTS, PRE-WELDING PLUMBNESS, PEAKING AND BANDING CHECKING.42611/4/12 14:299687VISUAL INSPECTION OF 3RD SHELL HORIZONTAL AND VERTICAL JOINTS, PRE-WELDING PLUMBNESS, PEAKING AND BANDING CHECKING.42711/4/12 14:339689VISUAL AND VACCUM BOX TEST FOR BOTTOM LAP JOINTS87411/4/12 16:019709Inspection of Repair on Weld Joints or Base Metal by Welding.54611/4/12 16:029710In-process verification of solvent-removable colorcontrast penetrant examination52911/4/12 16:049711Inspection of Surface preparation & Prior to Application of liquid Coating System52811/4/12 16:069712In-Process Inspection of Primer Coat43411/5/12 6:179765MT ON BACKGOUGED AREA OF SHELL GIRTH JOINT GT1-2.43511/5/12 6:199766MT ON BACKGOUGED AREA OF 4TH RING VERTICAL JOINTS.34811/5/12 6:249767IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC-WALL PANEL.34911/5/12 6:289768PRE-WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.41411/5/12 6:319769FULL WELDING INSPECTION OF STEEL STRUCTURE MODIFICATION.43111/5/12 13:119772VISUAL INSPECTION AND SFT FOR BOTTOM LAP JOINTS.43211/5/12 13:169773VISUAL AND PT INSPECTION OF SHELL TO BOTTOM OUTSIDE ROOT PASS WELD BEFORE SUBSEQUENT PASS.43311/5/12 13:199774VERIFY BOTTOM SURFACE CLEANLINESS PRIOR TO BENG PLACED IN POSITION AND VISUAL INSPECTION OF BOTTOM COMPLETED JOINTS.45011/5/12 13:229775FITUP INSPECTION OF 3RD SHELL GIRTH JOINT GT 2-3.55311/5/12 15:339801Inspection of Primer Coat prior to Top Coat Application43611/6/12 6:089819Padding Inspection58411/6/12 16:149870receiving inspection of welding consumables56311/6/12 16:159871Positive material identification of alloy piping & alloy components.94511/6/12 16:159871Positive material identification of alloy piping & alloy components.45211/7/12 6:499893VISUAL AND SFT INSPECTION OF BOTTOM LAP JOINTS.43911/7/12 6:559894VISUAL AND PT INSPECTION OF SHELL TO BOTTOM INSIDE FILLET JOINT.43811/7/12 11:059895VERIFICATION OF EQUIPMENT CALIBRATION.48211/7/12 11:149896MATERIAL RECEIVING INSPECTION OF SPHERE COLUMN ASSEMBLY.45111/7/12 11:199897VISUAL INSPECTION OF 4TH RING VERTICAL AND HORIZONTAL JOINTS AND PLUMBNESS, PEAKING AND GIRTH JOINT#3 BANDING CHEKING.43711/7/12 11:249898FITUP INSPECTION OF SHELL GIRTH JOINT#3.44011/7/12 11:279899MT ON BACKGOUGING AREA OF TOP ANGLE TOGETHER AND TO SHELL.46811/7/12 11:339900VISUAL INSPECTION OF 3RD RING SHELL VERTICAL AND HORIZONTAL JOINTS AND PLUMBNESS, PEAKING AND JOINT#3 BANDING CHECKING.103311/7/12 15:419937Data base reporting101211/7/12 15:429938Pre-Welding & Weld Joint Fit-up Inspection100111/7/12 15:439939In-Process Weld Inspection99811/7/12 15:459940Post-Welding Visual Inspection105311/7/12 15:469941Welding Consumable Control (Storage, Handling, Issuance & Conditioning)105411/7/12 15:479942Selection of welds for NDT69311/7/12 15:499943Post-weld heat treatment for On-plot piping50811/7/12 17:219951PADDING PLATE ELEVATION INSPECTION130611/7/12 17:219951PADDING PLATE ELEVATION INSPECTION233511/7/12 17:219951PADDING PLATE ELEVATION INSPECTION97111/7/12 17:239952PADDING PLATE ELEVATION INSPECTION51211/8/12 11:509970VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT GT1-2 INT 2A, GT1-2 INT 2AR151311/8/12 11:529971VISUAL INSPECTION OF WELD REPAIR REMOVAL AREA OF JOINT VT 1C, VT 1H AND VT 1CR1, VT 1HR1.52011/8/12 13:089972VISUAL INPECTION OF WELD REPAIR REMOVAL JOINT VT 2A, VT 2AR1.51511/8/12 13:129973VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT GT1-2INT2D, GT1-2INT2DR1.44111/8/12 13:159974FITUP INSPECTION OF 4TH RING SHELL VERTICAL JOINTS.46511/8/12 13:179975FITUP INSPECTION OF GT 3-4 GIRTH JOINT.83211/10/12 14:4810008Visual Inspection at test Pressure # NSH-FD-1016-HDT-0001585211/10/12 14:5410011Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0001565411/10/12 14:5910013Inspection Filling Pressurization # NSH-FD-1016-HDT-0001666311/10/12 15:0110015Visual Inspection at test Pressure # NSH-FD-1016-HDT-0001663711/10/12 15:0210016Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0001680711/10/12 15:0410017Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0001678811/10/12 15:0510018Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0001680211/10/12 15:0710020Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-0001865111/10/12 15:0910021Inspection of Material Storage & Handling at Fab. Shop # MRR-P-09165811/10/12 15:1110022Receiving Inspection of Pipe and Pipe Nipples # MRR-P-09180011/10/12 15:1410024Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00021#90511/10/12 15:1710025Review of Test Package Preparation # NSH-FD-1016-HDT-00016#77411/10/12 15:1910026Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00020#67811/10/12 15:2010028Receiving Inspection of Pipe and Pipe Nipples # MRR-P-095 #67711/10/12 15:2410029Receiving Inspection of Pipe and Pipe Nipples # MRR-P-094 #65211/10/12 15:2510030Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00016#85911/10/12 15:2610031Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00019#85511/10/12 15:2810032Receiving Inspection of Pipe and Pipe Nipples # MRR-P-073 #86211/10/12 15:2910033Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-00017 #65311/10/12 15:3110034Review of Test Package Preparation # NSH-FD-1016-HDT-00017 #71311/10/12 15:3310035Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00017 #82411/10/12 15:3510036Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00017 #77211/10/12 15:3710037Inspection Filling Pressurization # NSH-FD-1016-HDT-00017 #85411/10/12 15:3910038Visual Inspection at test Pressure # NSH-FD-1016-HDT-00017 #80811/10/12 15:4010040Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00017 #64711/10/12 15:4210044Review of Test Package Preparation # NSH-FD-1016-HDT-00018 #76811/10/12 15:4410046Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00018 #86311/10/12 15:4510049Inspection Filling Pressurization # NSH-FD-1016-HDT-00018 #71411/10/12 15:4610051Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00018 #85711/10/12 15:4810053Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00018 #82811/10/12 15:4910057Visual Inspection at test Pressure # NSH-FD-1016-HDT-00018 #63811/10/12 15:5010059Review of Test Package Preparation # NSH-FD-1016-HDT-00019 #74911/10/12 15:5210061Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00019 #83111/10/12 15:5310063Inspection Filling Pressurization # NSH-FD-1016-HDT-00019 #64811/10/12 15:5510067Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00019 #65011/10/12 15:5610069Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00019 #80411/10/12 15:5710070Visual Inspection at test Pressure # NSH-FD-1016-HDT-00019 #90011/10/12 15:5910073Review of Test Package Preparation # NSH-FD-1016-HDT-00026 #80511/10/12 16:0010075Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00026 #83711/10/12 16:0210078Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00026 #90211/10/12 16:0310080Inspection Filling Pressurization # NSH-FD-1016-HDT-00026 #82611/10/12 16:0410081Visual Inspection at test Pressure # NSH-FD-1016-HDT-00026 #90111/10/12 16:0510084Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00026 #87311/10/12 16:0610086Review of Test Package Preparation # NSH-FD-1016-HDT-00027 #83411/10/12 16:0810088Review of Test Package Preparation # NSH-FD-1016-HDT-00028 #77011/10/12 16:1010090Review of Test Package Preparation # NSH-FD-1016-HDT-00029 #41711/10/12 16:3610099Pad plate elevation inspection of item B92-K-0011A,B,C,D,E42311/10/12 16:5010101Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0003.42411/10/12 16:5310102Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0005.61011/10/12 17:0410104Inspection of Material Storage & Handling at Fab. Shop # MRR-P-095 #82711/10/12 17:0610105Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00027 #86811/10/12 17:0810108Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00027 #86411/10/12 17:0910110Visual Inspection at test Pressure # NSH-FD-1016-HDT-00027 #82511/10/12 17:1110113Inspection Filling Pressurization # NSH-FD-1016-HDT-00027 #85311/10/12 17:1410115Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00027 #79611/10/12 17:1510117Visual Inspection at test Pressure # NSH-FD-1016-HDT-00028 #63911/10/12 18:2810136Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00028 #75011/10/12 18:2910138Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00028 #83011/10/12 18:3110140Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00028 #78711/10/12 18:3210142Inspection Filling Pressurization # NSH-FD-1016-HDT-00028 #63311/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002563411/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002574411/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002574511/10/12 18:3310144Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002580611/10/12 18:3310145Visual Inspection at test Pressure # NSH-FD-1016-HDT-00029 #80911/10/12 18:3510147Depressurization & Disposal of HydrotestWater# NSH-FD-1016-HDT-0002574611/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #74711/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #84111/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #84211/10/12 18:3510148Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00029 #64911/10/12 18:3610150Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00029 #83311/10/12 18:3710151Final Inspection for Release of Fabricated Piping - Report # NSH-FD-1016-FI-0002277611/10/12 18:3810153Inspection Filling Pressurization # NSH-FD-1016-HDT-00029 #86711/10/12 18:3910155Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00029 #85811/10/12 18:3910156Review of Test Package Preparation # NSH-FD-1016-HDT-0003061311/10/12 18:4110157Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0003066411/10/12 18:4110158Inspection Filling Pressurization # NSH-FD-1016-HDT-00026 #85011/10/12 18:4210160Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0003082311/10/12 18:4410162Inspection Filling Pressurization # NSH-FD-1016-HDT-0003079711/10/12 18:4610165Visual Inspection at test Pressure # NSH-FD-1016-HDT-0003082911/10/12 18:4810167Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0003065911/10/12 18:4910169Review of Test Package Preparation # NSH-FD-1016-HDT-0002066111/10/12 18:5110171Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0002061611/10/12 18:5210173Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0002077511/10/12 18:5410175Inspection Filling Pressurization # NSH-FD-1016-HDT-0002069411/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002069511/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002083911/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002084011/10/12 18:5510177Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002067911/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002068011/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002077811/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002077911/10/12 18:5710179Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002065511/10/12 18:5810181Review of Test Package Preparation # NSH-FD-1016-HDT-0002161211/10/12 19:0010183Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0002185111/10/12 19:0210185Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0002168111/10/12 19:1310197Inspection Filling Pressurization # NSH-FD-1016-HDT-0002187111/10/12 19:1510201Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002178611/10/12 19:1610203Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0002179511/10/12 19:1810205Review of Test Package Preparation # NSH-FD-1016-HDT-0002261511/10/12 19:1910207Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0002287211/10/12 19:2010208Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-0002283611/10/12 19:2110209Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00026 #90311/10/12 19:2110210Inspection Filling Pressurization # NSH-FD-1016-HDT-0002286611/10/12 19:2210211Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00026 #61411/10/12 19:2310212Visual Inspection at test Pressure # NSH-FD-1016-HDT-0002279811/10/12 19:2410213Visual Inspection at test Pressure # NSH-FD-1016-HDT-00026 #77111/10/12 19:2510214Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00026 #80311/10/12 19:2610215Review of Test Package Preparation # NSH-FD-1016-HDT-00026 #77311/10/12 19:2810216Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00025 #77711/10/12 19:2910217Inspection Filling Pressurization # NSH-FD-1016-HDT-00025 #79911/10/12 19:3110218Review of Test Package Preparation # NSH-FD-1016-HDT-00025 #83811/10/12 19:3210219Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00025 #79411/11/12 6:1310227Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00022 #66011/11/12 6:1410229Review of Test Package Preparation # NSH-FD-1016-HDT-00023 #84711/11/12 6:1610230Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-00023 #78511/11/12 6:1710231Inspection of Pressure Test Preparation # NSH-FD-1016-HDT-00023 #61111/11/12 6:1810232Inspection Filling Pressurization # NSH-FD-1016-HDT-00023 #86511/11/12 6:2010233Visual Inspection at test Pressure # NSH-FD-1016-HDT-00023 #66511/11/12 6:2110234Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-00023 #51611/11/12 13:5910236VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT NO:VERT.3A. AND AFTER REMOVAL, VERT.3AR151711/11/12 14:0510237VISUAL INSPECTION OF WELD REPAIR REMOVAL JOINT TA-3 AND AFTER REMOVAL TA-3R1.51911/11/12 14:0910238VISUAL INSPECTION RING 1&2 VERTICAL AND HORIZONTAL JOINTS, PLUMBNESS, PEAKING AND BANDING OF 1ST AND 2ND RING.46111/11/12 14:1210239PT EXAMINATION OF SHELL TO BOTTOM OUTSIDE FILLET WELD ROOT PASS. JT#BCJ149911/11/12 14:1910241VISUAL EXAMINATION OF TOP ANGLE TOGETHER AND TOP ANGLE TO SHELL COMPLETED BUTT JOINTS.46711/11/12 14:2210243FIT-UP INSPECTION OF 4TH SHELL COURSE VERTICAL BUTT JOINTS.48511/11/12 14:2510244MT ON BACKOUGING AREA OF SHELL GIRTH JOINT GT 3-4.45911/11/12 14:3010246PRE-WELDING FITUP INSPECTION46911/11/12 14:3310247IN-PROCESS WELDING INSPECTION.92811/11/12 14:3610248POST WELDING FINAL INSPECTION49211/11/12 14:3910249POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO DOUBLE TEE SLAB.47011/11/12 14:4310250PRE-WELDING FITUP INSPECTION OF STRUCTURAL PLATE TO DOUBLE TEE SLAB.47311/11/12 14:4610251IN-PROCESS WELDING INSPECTION OS STRUCTURAL PLATE TO DOUBLE TEE SLAB.46011/11/12 14:5010252IN-PROCESS WELDING INSPECTION OF STRUCTURAL PLATE TO PC-WALL PANEL.47411/11/12 14:5410253PRE-WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.45511/11/12 14:5710254POST WELDING VISUAL INSPECTION OF STRUCTURAL PLATE TO PC WALL PANEL.48111/11/12 15:5710263Equipment receiving inspection of item B92-E-0001AB and B92-E-0051A,B,C,D,E.49811/11/12 16:0810271Storage, handling and preservation inspection of item B92-E-0001AB and B92-E-0051A,B,C,D,E.54711/11/12 18:4710363Inspection of Top coat Application (Dry /Cured coating)54811/11/12 18:4810364Inspection of Surface preparation & Prior to Application of liquid Coating System54911/11/12 18:4910365In-Process Inspection of Primer Coat55011/11/12 18:5110366Inspection of Surface preparation & Prior to Application of liquid Coating System55111/11/12 18:5210367In-Process Inspection of Primer Coat105011/11/12 18:5310368Inspection of Primer Coat prior to Top Coat Application56411/11/12 18:5510369Verify hardness testing72111/11/12 18:5610370Positive material identification of alloy piping & alloy components.47211/12/12 15:0310410Pad plate elevation inspection of item B90-D-0116AB126411/12/12 15:0310410Pad plate elevation inspection of item B90-D-0116AB46311/12/12 15:0710411Pad plate elevation inspection of item B90-D-0118AB126611/12/12 15:0710411Pad plate elevation inspection of item B90-D-0118AB45711/12/12 15:1010412Pad plate elevation inspection of item B90-D-0117AB126511/12/12 15:1010412Pad plate elevation inspection of item B90-D-0117AB55211/12/12 17:0410453Inspection of Surface preparation & Prior to Application of liquid Coating System55411/12/12 17:0610455In-Process Inspection of Primer Coat58311/12/12 17:1710457Data base reporting58011/12/12 17:1910458Pre-Welding & Weld Joint Fit-up Inspection65611/12/12 17:2010459In-Process Weld Inspection52511/12/12 17:2110460Post-Welding Visual Inspection58211/12/12 17:2210461Welding Consumable Control (Storage, Handling, Issuance & Conditioning)58811/12/12 17:2410462Selection of welds for NDT89611/12/12 17:2610463Post-weld heat treatment for On-plot piping60611/12/12 17:3210464In-process verification of techniques & procedure implementation of UT78111/12/12 17:3510465Cutting And Assembly Fit-Up( Weekly RFI Nov-08 To Nov-14-2012 )76411/12/12 17:3710466Cutting And Assembly Fit-Up ( Weekly RFI Nov-01 To Nov-07-2012 )68211/12/12 17:3810467Review of Test Package# NSH-FD-1016-HDT-0003182211/12/12 17:4010468Piping /EquipmentInternalCleaning# NSH-FD-1016-HDT-0003184911/12/12 17:4210469Inspection of PressureTestPreparation# NSH-FD-1016-HDT-0003190411/12/12 17:4310470InspectionFillingPressurization# NSH-FD-1016-HDT-0003180111/12/12 17:4410471VisualInspectionattestPressure # NSH-FD-1016-HDT-0003176911/12/12 17:4610472Depressurization&DisposalofHydrotestWater # NSH-FD-1016-HDT-0003146411/12/12 18:3010473CEMENT BASE NON-SHRINK GROUT SURFACE PREPARATION AND FORMWORK INSPECTION49311/12/12 18:3210474MIXING PLACEMENT,SAMPLING, TESTING CURING AND FINAL INSPECTION.48411/13/12 6:4510537MT ON TEMPORARY ATTACHMENT WELD REMOVAL AREA NEAR GIRTH JOINT GT 2-3 AND NEAR 3RD RING VERTICAL JOINTS.46611/13/12 6:4810538MT ON TEMPORARY ATTACHMENT WELD REMOVAL AREA NEAR 1ST RING GIRTH JOINT AND VERTICAL JOINTS.45811/13/12 6:5110539VISUAL AND OIL PENETRANT TESTING OF SHELL TO BOTTOM INSICE FILLET ROOT PASS.47711/13/12 6:5310540MT ON BACKGOUGING AREA OF GIRTH JOINT GT 3-4.51811/13/12 7:1510541MT ON BACKGOUGING AREA OF 4TH RING SHELL VERTICAL JOINTS.50211/13/12 7:1210542INSPECTION OF PERFORMING WELD REPAIR OF JOINT TA-4.55511/13/12 18:2610576Inspection of Top coat Application (Dry /Cured coating)82111/13/12 19:4310577"MATERIAL RECEIVING INSPECTION STRUCTURAL PLATES - 62 PCS. ASTM A36 PLATE MATERIAL 2000 X 6000 (VARIOUS THICKNESS) FOR ABOVE GROUND PIPING PIPE SUPPORTS. PLATE ASTM A36 20MM X 2000MM X 6000MM = 22PCS. PLATE ASTM A36 16MM X 2000MM X 6000MM = 6PCS. PLATE ASTM A36 15MM X 2000MM X 6000MM = 3PCS. PLATE ASTM A36 14MM X 2000MM X 6000MM = 1PC. PLATE ASTM A36 12MM X 2000MM X 6000MM = 15PCS. PLATE ASTM A36 10MM X 2000MM X 6000MM = 13PCS. PLATE ASTM A36 8MM X 2000MM X 6000MM = 2PCS."47111/14/12 13:2210605Recieving Inspection of Welding consumables -55611/14/12 18:3110659Inspection of Primer Coat prior to Top Coat Application (APCS 17A - Single Coat Final inspection)55711/14/12 18:3210660Inspection of Surface preparation & Prior to Application of liquid Coating System ( WEEKLY RFI - Nov. 15 to Nov. 21, 2012)55911/14/12 18:3410661Inspection of Primer Coat prior to Top Coat Application ( WEEKLY RFI - Nov. 15 to Nov. 21, 2012)56011/14/12 18:3510662Verification and visual Inspection of Paint and Abrasive (Sigma Thinner 91-92)66611/14/12 18:3710663Data base reporting58711/14/12 18:3810664Pre-Welding & Weld Joint Fit-up Inspection60511/14/12 18:3910665In-Process Weld Inspection52611/14/12 18:4010666Post-Welding Visual Inspection58611/14/12 18:4210667Welding Consumable Control (Storage, Handling, Issuance & Conditioning)89711/14/12 18:4410668Selection of welds for NDT55811/14/12 18:4810669In-Process Inspection of Primer Coat ( WEEKLY RFI - Nov. 15 to Nov. 21, 2012)47511/15/12 9:0110678PRE WELDING FITUP INSPECTION OF PIPE SUPPORT WELDING46211/15/12 9:0310679INPROCESS WELDING OF PIPE SUPPORT WELDING48611/15/12 9:0610680POST WELDING VISUAL INSPECTION OF PIPE SUPPORT WELDING49011/15/12 9:1110681PREWELDING INSPECTION OF SUPPORT BASE PLATE WELDING48911/15/12 9:1210682INPROCESS WELDING INSPECTION OF SUPPORT WELDING TO BASE PLATE49111/15/12 9:1610683MATERIAL RECIEVING INSPECTION OF A36 PLATE FOR CLOSE OUT OF NCR SG2420-SS-NCR-003947611/15/12 9:1910684PREWELDING FIT UP INSPECTION OF BASE PLATE TO GUSSET PLATE48711/15/12 9:2110685IN PROCESS WELDING INSPECTION OF BASE PLATE TO GUSSET PLATE48811/15/12 9:2610686POST WELDING VISUAL INSPECTION OF BASE PLATE TO GUSSET PLATE44411/15/12 9:2810688RECIEVING INSPECTION OF WELDING CONSUMABLES44311/15/12 9:3310689WELDING CONSUMABLE CONTROL - CHECKING OVEN CONSUMABLE ISSUANCE RECORD AND TEMPERATURE44211/15/12 9:4010690WELCING MACHINE CALIBRATION CHECK106611/15/12 9:5010691CALIBRATION VERIFICATION OF WELDING OVENS106711/15/12 9:5410692CALIBRATION VERIFICATION OF WELDING MACHINE57611/16/12 10:3610774Review of Test Package Preparation # NSH-FD-1016-HDT-0032 #54311/16/12 10:1810777Piping / Equipment Internal Cleaning # NSH-FD-1016-HDT-0032 #103711/16/12 10:2010780Inspection of pressure test preparation # NSH-FD-1016-HDT-0014 #56911/16/12 10:2110781Inspection Filling Pressurization # NSH-FD-1016-HDT-0032 #57811/16/12 10:2310782Visual Inspection at test Pressure # NSH-FD-1016-HDT-0032 #54011/16/12 10:2610783Depressurization & Disposal of Hydrotest Water # NSH-FD-1016-HDT-0032 #54511/16/12 10:2810784Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0024 #54411/16/12 10:3010785Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0023 #56611/16/12 10:3210786Material Receiving Inspection Fitting( Elbow,Red Tee,Red ( MRR-P-0101 )57311/16/12 10:3410787Inspection of Material ,Storage And Hadling at Fabr (MRR-P-0101)57411/16/12 10:3510788Cutting And Assembly Fit-Up ( Weekly RFI Nov-15 To Nov-21-2012 )76111/17/12 13:3310798VISUAL INSPECTION OF GT3-4 AND 4th RING VERTICAL JOINTS, PEAKING AND PLUMBING OF 4th RING, BANDING OF GT 3-4.81811/17/12 13:3510799VISUAL INSPECTION OF GT3-4 AND 4th RING VERTICAL JOINTS, PEAKING AND PLUMBING OF 4th RING, BANDING OF GT 3-4.67611/17/12 14:1910800FITUP INSPECTION OF 3RD RING VERTICAL JOINTS.84411/17/12 13:3910801FITUP INSPECTION OF ANGLE TO ROOF84511/17/12 13:4710804PT EXAMINATION OF SHELL TO BOTTOM OUTSIDE FILLET ROOT PASS.84611/17/12 13:5010805VISUAL INSPECTION OF SHELL NOZZLE CUTOUT EDGES FOR LAMINATIONS67411/17/12 13:5410806MT ON BACKGOUGING AREA OF 3RD RING VERTICAL JOINTS.64011/17/12 13:5810807FITUP INSPECTION OF SHELL MANWAY NOZZLE AND ROOF NOZZLES.73111/17/12 14:1110808FIT-UP INSPECTION OF BOTTOM LAP JOINTS.64111/17/12 14:0610809FIT-UP INSPECTION OF ROOF LAP JOINT.64211/17/12 14:1610810FIT-UP INSPECTION OF ROOF TO TOP ANGLE.64311/17/12 14:2210812MT ON BACKGOUGING AREA OF 4TH RING VERTICAL JOINTS.64411/17/12 14:2410813FIT-UP INSPECTION OF 4TH RING VERTICAL JOINTS.71611/17/12 15:0510823Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-000371711/18/12 10:0910824Inspection of one PRV Calibration for Hydro test Purpose, Tag No:-PRV-P2-0006.66711/17/12 16:3110845Inspection of Repair on Weld Joints or Base Metal by Welding.89811/17/12 16:3210846In-process verification of solvent-removable colorcontrast penetrant examination57111/17/12 16:4110848Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0025 #52411/17/12 16:4310849Final Inspection for Release of Fabricated Piping # NSH-FD-1016-FI-0026 #57011/17/12 18:2210858Final