EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
QUALITY PROCEDURE
LIQUID PENETRANT TESTING
THIS PROCEDURE CONTAINED HEREIN IS
T H E PROPERTY OF ITECSOLUTIONS
QUALITY GROUP PTE LTD WHERE IS
ISSUED AND CONTROLLED BY THE
QUALITY MANAGER AND SHALL NOT BE
REVISED, AMENDED OR ANYWAY ALTERED
WITHOUT HIS APPROVAL.
Rev Date Prepared by Reviewed & Approved by0 23/12/2013 Y.ARUN
Branch ManagerV.S.Naidu
Technical Manager
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
SIGNATURE/STAMP SIGNATURE/STAMP
1.0 OBJECTIVE
This procedure establishes conditions required for performing non-destructive Testing by means of liquid penetrant in order to detect discontinuities in welded Joint and components as carried out by iTecsolutions Quality Group Pte Ltd.
2.0 SCOPE & REFERENCES
2.1 SCOPE
Applies to all Liquid Penetrant Testing Examination in the company and itsProcedure derived in-conjunction to the following Reference standards as Item 2.2.1 with acceptance and rejection criteria meeting to one of the
Following Applicable standards as Item 2.2.2
2.2 REFERENCES
2.2.1 REFERENCES STANDARDS
ASME SECTION V 2010 EditionASTM E165 2010 EditionBS EN ISO 3452-1 2013 EditionBS EN 10228-2 1998 EditionBS ISO EN 23277 2009 Edition
2.2.2 APPLICABLE STANDARDS
ASME SECTION I 2010 EditionASME SECTION VIII DIV. 1 & 2 2010 EditionASME SECTION IX 2010 EditionASME/ANSI B31.1 2012 EditionASME/ASNI B31.3 2012 EditionAWS D1.1 2010 EditionAP1 650 2013 EditionAPI 1104 2013 EditionAPI RP 2X 2004 EditionBS EN 1289 1998 EditionBS EN ISO5817 2013 Edition
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
3.0 PROCEDURES
3.1 MATERIAL TO BE TESTED
3.1.1 MaterialsCarbon steel, low alloy steel, austenitic stainless steel, ferritic stainless
steel, martensitic stainless steel, titanium and nickel base alloys.
3.1.2 Manufacturing Process Welded joints, Casting or Forging components.
3.2 PERSONNEL QUALIFICATION
3.2.1 Personnel performing and interpreting Liquid Penetrant Testing shall be ASNT SNT-TC- lA Level II or Level III or PCN Level II Personnel.
3.2.2 Reports shall only be reviewed and signed by PCN Level II or ASNT Level III personnel.
3.3 PRODUCT TO BE USED
Liquid penetrants used are visible penetrant using the solvent-removable process.
3.3.1 Only products within their validity terms shall be used, as well as having their sensitivity proved by tests upon being received, as per
Item 3.11.2.
3.3.2 In austenitic stainless steel and titanium inspection, only shall be used those penetrants having chemical analysis certificates in respect to the contaminant content (chlorine and fluorine), that shall not exceed values, prescribed in Item 3.3.2.1 and 3.3.2.2.
3.3.2.1 When examining austenitic or duplex stainless steel and titanium, all penetrant material, the total halogens content shall not exceed 1% by weight in accordance with SE-165, Annex 4 (2010 edition)
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
3.3.2.2 The summation of the chlorine and fluorine contents shall not exceed 1% by weight in accordance with SE-165 Annex 2 for chlorine and Annex 3 for fluorine.
3.3.3 In inspection of nickel base alloys, only those penetrants having chemical analysis certificates in respect to the contaminant content
(sulphur) shall be used, which shall not exceed the value prescribed in 3.3.3.l .and 3.3.3.2.
3.3.3.1 When examining nickel base alloys, all penetrant materials, for sulphur content shall not exceed 1% by weight in accordance with SE-165 Annex 4.
SAMPLE OF LIQUID PENETRANT MATERIAL
Penetrant Ardrox 996 or parameter of Spotcheck SKL-HF/S Cleaner Ardrox 9PR551 or Spotcheck SKC-S Developer Ardrox 9D6 or Spotcheck SKD-S2
Others equivalent brand shall be used but no inter-mixing of brand types.
The material selected conform to the requirements of MIL-25135 and DTD 929, being non-flammable having a low toxicity and being essentially free of all Sulpurs, Sodium compounds, Chlorides and Potential ash- forming
residues.
3.4 SURFACE PREPARATION
3.4.1 Surfaces to be inspected and 25mm of an adjacent area shall be clean from grease, oil, oxides, dripping, slag, etc. Mechanical cleaning by wire brushing or grinding shall be performed, followed by solvent cleaning.
NOTE: When inspection is to be done on stainless steels, tools shall be made from Stainless steel or coated with this material; brushes shall be
made from stainless steel and cutting discs shall have a nylon core or similar. These tools shall be used exclusively on stainless steels.
3.4.2 Drying Method and Time
3.4.2.1 Drying method: normal evaporation 3.4.2.2 Drying Time : >5 minutes
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
3.5 LIQUID PENETRANT APPLICATION METHOD AND PENETRATION TIME
3.5.1 Application shall be done by aerosol, spraying or by brushing.
3.5.2 The penetration time shall be at least 5 minutes: it shall never be greater than 10 minutes. The minimum penetration time shall be as required
in ASME Section V minimum dwell times table or as per client Specification; or as qualified by demonstration for specific applications.
3.6 TEMPERATURE RANGE FOR INSPECTION
3.6.1 Both the surface and penetrant materials are to be in a temperature range between 5°C and 52°C during the whole inspection.
3.7 METHOD FOR REMOVING THE LIQUID PENETRANT EXCESS
3.7.1 For solvent removable penetrant, the excess is to be first removed with dry and clean cloths. After this first cleaning, cloths slightly moistened in
cleaner shall be used. Cleaner products shall not be applied directly on the test piece.
3.8 DRYING METHOD AND TIME, BEFORE APPLICATION OF THE DEVELOPER
3.8.1 Drying method: normal evaporation
3.8.2 Drying time: > 5 minutes
3.9 METHOD AND MAXIMUM TIME FOR APPLICATION OF THE DEVELOPER
3.9.1 The developer shall be applied by aerosol spraying immediately after drying of the surface and in a 30-minute maximum period after finishing the removal of the excess.
3.10 TIME FOR INTERPRETATION
3.10.1 The initial interpretation shall be done immediately after application of the developer.
3.10.2 The final interpretation shall be done not less than 10 minutes nor more than 60 minutes after application of the developer.
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
3.11 ADDITIONAL REQUIREMENTS
3.11.1 The minimum illumination during the whole examination by liquid penetrant shall be 1000 lux (100fc).
3.11.2 Testing penetrant materials upon being received
3.11.2.1 Only those penetrant materials containing on their packages the manufacturing date, the validity term and the lot
manufacturing number shall be accepted.
3.11.2.2 For each lot received testing shall be performed, in order to check whether the testing sensitivity is maintained. The test
when receiving shall be performed by using the Magnaflux Corporation Test Panel Z5 that complies with Pratt & Whitney
TAM 146040. At least four indications should be visible when the panel is used. Test result shall be documented. Only those materials with sensitivity equal or greater than that shown in the block shall be accepted.
3.12 FLOW DIAGRAM FOR PENETRANT FLAW DETECTION, INTERPRETATION AND RESULT ASSESSMENT
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
3.13 INTERPRETATION OF INDICATION
3.13.1 Interpretation shall be made at intervals during the "bleed out" process so that large indication may be viewed before excessive
diffusion occurs.
3.13.2 Indication shall be classified as "false", "irrelevant", or "relevant".
"False" cause by poor washing or cleaning during removal of excess penetrant process.
"Irrelevant" cause by localize surface imperfections such as machining marks, surface conditions or an incomplete bind between base metal and cladding.
"Relevant" indication are those which result from mechanical discontinuities.
3.13.3 Linear indications are those indications in which the length is three times more than the width. Only indication with major dimensions greater than I/16 in. (1.6mm) shall be considered relevant.
3.13.4 Rounded indications are indications, which are circular or elliptical shape with length equal to or less than three times the width.
3.13.5 Any questionable or doubtful indications shall be retest to verify whether or not actual defects are presents.
3.13.6 Any assessment of result shall be in accordance to Item 3.14
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
3.14 RESULT ASSESSMENT CRITERION
This criterion for assessing results shall be in accordance to client as specified in their material specification or contractual documents for
Acceptance and Rejection.
This assessment criterion shall be as per one of the following specification requirement : -
ASME SECTION I 2010 EditionASME SECTION VIII DIV. 1 & 2 2010 EditionASME /ANSI B31.1 2013 EditionASME/ANSI B31.3 2013 EditionAWS D1.1 2010 EditionAPI 650 2013 EditionAP1 1104 2013 EditionAPI RP 2X 2004 EditionBS EN 1289 1998 EditionBS EN ISO5817 2013 Edition
3.15 FINAL CLEANING
It shall be done with a hand brush, industrial cleaning cloths and solvent. For stainless steels and nickel base alloys, take into account items 3.3.2 and 3.3.3
3.16 SAFETY
Refer to QP – 18 Safety.
4.0 RECORDS
Result of inspection shall be recorded in a report form Appendix 1 and a copy retained by company for at least 5 years.
5.0 APPENDICES
APPENDIX 1
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
APPENDIX 1
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.
EFFECTIVE DATE:23 DEC 2013 REV: 0 DOC NO:QP -14 PAGE NO: Page 9 of 9
NS-EN ISO 9001-2008 . Certificate No 1221
This Document is property of IQG.No reproduction is allowed without prior to written permission from the managementof IQG.violators may be prosecuted.