MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xlsBMS DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Building Management System
BM-01 R2 1 0
BM-02 R2 2
BM-03 R2 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Security & Access Control
SA-01 R1 1 0
SA-02 R1 2
SA-03 R1 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Telecommunication
S-03 R2 1 0
T-01 R1 2
T-02 R1 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Voice Alarm
VA-01 R1 1 0
VA-02 R1 2
VA-03 R1 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
QRD-OP-08
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Electrical
E-00 1 0 ESD-00
E-01 R1 2
E-02 R1 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Fire Fighting
FF-01 R1 1 0
FF-02 R1 2
FF-03 R1 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Drainage (Foul & waste Water)
S-01 R2 1 0
DR-01 R2 2
DR-02 R1 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Cold & Hot Water Supply
S-0 R1 1 0
PL-01 R2 2
PL-02 R2 3
etc …….. ….. ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Lighting Protection
LP-01 R1 1 0
LP-02 R1 2
LP-03 R1 3
LP-04 R2 4 ….. ……..
MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY
document.xls DSP-qf-PRJ-02 Rev.1
PROJECT Number Contractor Shop Drawings Submittal Log Client : Page
Contractor: Approval & Signature Sequen Report Date
Contract & Project Name : Project Director 2nd Ap
Project Contact Person (i.e PM / PE / etc..) Site Representative 1st Ap.
Design Engineer # 1
Design Engineer # 2
Design Engineer # 3
RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE YES / NO REV.
Action Code:Document Item Rev. Sub. Shop Drawing Description A = Approved as Submitted Notes
Specification No. No. Sequence B = Approved as Notedor B.O.Q No. C = Not Approved
(Or Teansmittal Number) D = For Information
APPOINTED DES Eng
DES#1, or 2 or 3 Planned Date Returned Action Approval Required
Sub. Date Submitted By A/E Needed By On Site
Air Conditioning & Ventilation
AC-01 - 1 Of 2 R3 1 0
AC-02 - 2 Of 2 R2 2
AC-02 R3 3
etc …….. ….. ….. ……..