23
Curriculum Vitae Of Quinton Swarts 9 Years Safety Related Experience Practices Nr CHSO/143/2015 November 2015

QS CV 2015 November

Embed Size (px)

Citation preview

Page 1: QS CV 2015 November

Curriculum Vitae

Of

Quinton Swarts

9 Years Safety Related Experience

Practices Nr CHSO/143/2015

November 2015

Page 2: QS CV 2015 November

PERSONAL DETAILS:

Name & Surname: Quinton Swarts

Nationality: South African

RSA ID No: 8506145072086

Date of Birth: 14th June 1985

Age: 30

Sex: Male

Driver’s License: Code 8

Martial Status: Engaged

Dependants: 3

Languages: English

Afrikaans

Contact numbers: (c) 081 328 8716

(h) 016 950 8162

Current Company: Stefanuti Stocks- MEIP

Project Sasol 1 Phase 2 FT Wax Expansion

2

Page 3: QS CV 2015 November

SECONDARY EDUCATION

School Attended: Three Rivers HighVereeniging

Highest Grade Achieved: Grade 12

Year Completed: 2004

Subject’s passed: Afrikaans-First LanguageEnglish-Second LanguageMathematicsEconomicsBiologyGeography

TERTIARY EDUCATION

Course: Electrical Engineering2005 (Orientation)

Institution: Sedibeng College Vereeniging

FURTHER TRAINING AND EDUCATION

3

Page 4: QS CV 2015 November

Registered with the SACPCMP as a Professional Health and Safety Officer Practices Nr CHSO/143/2015

Institution: NOSA

Course: a. SAMTRACb. Introduction to Samtracc. Applying SHE Principles & Proceduresd. OHSACT

e. OSHAS 18001 Management System Implementation.

Institution: NOSA

Course: a. Nebosh International General Certificate Exam date 16.11.2015

Institution: IRCA

Course: a. HIRAOct 2009

b. IRCON Oct 2009

c. ICAM (Root Cause Analysis) Sep 2010

Institution: DQS Academy (Management System Solutions)

Course: a. ISO 9001 Quality Management System

May 2013

Institution: Safety Advantage

Course: a. Legal Liability (Subordinate Managers)

Institution: Trauma Rescue

Course: a. First Aid Level 1

STRENGTHS

4

Page 5: QS CV 2015 November

Deadline Driven

Goal Orientated

Organized & systematic

Good Attention to Detail

Creative & team player

Excellent Communication Skills

Knowledge on Excel, Word, , Power Point

Active, Dynamic & highly motivated

People orientated & trustworthy

Hard worker – work well under pressure

Reliable & loyal

Safety Management Systems Implementation

Quality Management System Implementation

OSHAS 18001 Implementation

ISO 9001 Implementation

ISO 14001 Implementation

5

Page 6: QS CV 2015 November

PRESENT EMPLOYMENT

Company: Stefanuti Stocks - MEIP

Project: FT Wax Expansion Project Sasol 1 Phase 2

Duration: June 2015- November 2015

Reference: Divisional Safety Manager: Renier Botha Cell: 082 305 1824

Position: Site HSE Officer

Responsibilities:

Assisting the Site Manager in his duties to uphold the requirements of the Occupational Health and Safety Act and Regulations of (85 of 1993).

Ensuring that all staff members adhere to Sasol standards and procedures. Ensuing task are executed according to Sasol Permit requirements and conditions Ensuring all HSE documentation is develop and implemented before affected activities

commence. Established and maintain systems to monitor and assess understanding and continuous

compliance to legislation regarding Safety and Health by employees. Provide guidance and direction on occupation health and hygiene, ensuring continuous review of

the projects SHEQ strategy with implementation of new, or updating of current, programs where required.

Understand and interpret all safety relevant Safety, Health, Environmental and Quality related legislation, regulations and standards as it applies to the projects operations and manage implementation on a project wide basis.

Provide leadership and management to a diverse team incorporating all SHEQ disciplines to ensure consistent high standards/ best practices.

Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all Supervisors/ Foreman personnel complete Job Safety Analysis/ DSTI’s and

communicate it to the work force prior to work commencing. Attend and Assist Project team on PDA’s (Planed Deviation Analysis. Coordinate site accesses and security. Monitor and compile SMP(Safety Management Program) reports for management Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations,

behavior observations. Chair Safety Committee Meetings. Develop and Facilitate Risk Assessments. Ensure all Supervisors/ Foreman complete weekly HSE documentation as per site requirements.

(PTO,VFL’s) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording

thereof. Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. High risk activities for the week ahead. Conduct Weekly, Monthly and Quarterly Audits Statistics for previous week regarding man-hours, ,RA’S completed, induction and medicals

(entry and exit)

6

Page 7: QS CV 2015 November

PREVIOUS EMPLOYMENT

Company: Aveng- Grinaker –LTA- MEIP Project: FT Wax Expansion Project Sasol 1 Phase 1

Duration: Des 2014- May 2015

Reference: Regional Safety Manager: Willy Coetzee Cell: 072 891 3581

Position: Senior HSE Officer

Responsibilities:

Assisting the Site Manager in his duties to uphold the requirements of the Occupational Health and Safety Act and Regulations of (85 of 1993).

Ensuring that all staff members adhere to Sasol standards and procedures. Ensuing task are executed according to Sasol Permit requirements and conditions Ensuring all HSE documentation is develop and implemented before affected activities

commence. Established and maintain systems to monitor and assess understanding and continuous

compliance to legislation regarding Safety and Health by employees. Provide guidance and direction on occupation health and hygiene, ensuring continuous review of

the projects SHEQ strategy with implementation of new, or updating of current, programs where required.

Understand and interpret all safety relevant Safety, Health, Environmental and Quality related legislation, regulations and standards as it applies to the projects operations and manage implementation on a project wide basis.

Provide leadership and management to a diverse team incorporating all SHEQ disciplines to ensure consistent high standards/ best practices.

Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all Supervisors/ Foreman personnel complete Job Safety Analysis/ DSTI’s and

communicate it to the work force prior to work commencing. Attend and Assist Project team on PDA’s (Planed Deviation Analysis. Coordinate site accesses and security. Monitor and compile SMP(Safety Management Program) reports for management Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations,

behavior observations. Chair Safety Committee Meetings. Develop and Facilitate Risk Assessments. Ensure all Supervisors/ Foreman complete weekly HSE documentation as per site requirements.

(PTO,VFL’s) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording

thereof. Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. High risk activities for the week ahead. Conduct Weekly, Monthly and Quarterly Audits Statistics for previous week regarding man-hours, ,RA’S completed, induction and medicals

(entry and exit)

Company: Aveng-Grinaker –LTA- M&E

Project: Sishen Solar Facility (Renewable Power Plant)

7

Page 8: QS CV 2015 November

Position: Site SHEQ Coordinator

Duration: July 2014 – December 2014 Reference: Regional Safety Manager: Willy Coetzee Cell: 072 891 3581

Responsibilities

Assisting the Site Manager in his duties to uphold the requirements of the Occupational Health and Safety Act and Regulations of (85 of 1993).

Ensuring that all staff members adhere to Sishen Solar Facility rules and procedures. Ensuring Pre-employment medicals are booked for all personnel Facilitating Site specific Inductions and all relevant training. Coordinating Quality Control inspectors implementing Quality Management Plan accordingly. Managing the document control function Evaluate NCRs to isolate problem areas, establish frequency of occurrence and then facilitate

changes to ensure these are resolved. Implementing the company’s Quality Management System ensuring all relevant documentation

is implement according client specifications Ensuring all HSE documentation is develop and implemented before affected activities

commence. Ensuring the delivery against quality assurance goals and objectives. Managing of Safety officers ensuring Company Safety Management System is implemented

accordingly. Ordering and issuing of PPE according to task being performed and keeping recorded thereof Established and maintain systems to monitor and assess understanding and continuous

compliance to legislation regarding Safety and Health by employees. Provide guidance and direction on occupation health and hygiene, ensuring continuous review of

the projects SHEQ strategy with implementation of new, or updating of current, programs where required.

Understand and interpret all safety relevant Safety, Health, Environmental and Quality related legislation, regulations and standards as it applies to the projects operations and manage implementation on a project wide basis.

Provide leadership and management to a diverse team incorporating all SHEQ disciplines to ensure consistent high standards/ best practices.

Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all Supervisors/ Foreman personnel complete DSTI’s and communicate it to the

work force prior to work commencing. Coordinate site accesses and security. Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations,

behavior observations. Chair Safety Committee Meetings. Develop and Facilitate Risk Assessments. Ensure all Supervisors/ Foreman complete weekly HSE documentation as per site requirements.

(PTO,VFL’s) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording

thereof. Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. High risk activities for the week ahead. Conduct Weekly, Monthly and Quarterly Audits Statistics for previous week regarding man-hours, complement ,RA’S completed, induction and

medicals (entry and exit)

Company: Aveng-Grinaker –LTA- M&E

Project: Emergency Shut Down Replacement Project

8

Page 9: QS CV 2015 November

Duration: May 2014 – July 2014

Reference: Head Office Safety Manager: Louis Erasmus Cell: 082 333 6926

Position: Senior SHEQ Officer

Responsibilities:

Assisting the Site Manager in his duties to uphold the requirements of the Occupational Health and Safety Act and Regulations of (85 of 1993).

Ensuring that all staff members adhere to Sasol standards and procedures. Ensuing task are executed according to Sasol Permit requirements and conditions Ensuring all HSE documentation is develop and implemented before affected activities commence. Established and maintain systems to monitor and assess understanding and continuous compliance to

legislation regarding Safety and Health by employees. Provide guidance and direction on occupation health and hygiene, ensuring continuous review of the

projects SHEQ strategy with implementation of new, or updating of current, programs where required.

Understand and interpret all safety relevant Safety, Health, Environmental and Quality related legislation, regulations and standards as it applies to the projects operations and manage implementation on a project wide basis.

Provide leadership and management to a diverse team incorporating all SHEQ disciplines to ensure consistent high standards/ best practices.

Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all Supervisors/ Foreman personnel complete Job Safety Analysis/ DSTI’s and communicate it

to the work force prior to work commencing. Attend and Assist Project team on PDA’s (Planed Deviation Analysis. Coordinate site accesses and security. Monitor and compile SMP(Safety Management Program) reports for management Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations, behavior

observations. Chair Safety Committee Meetings. Develop and Facilitate Risk Assessments. Ensure all Supervisors/ Foreman complete weekly HSE documentation as per site requirements.

(PTO,VFL’s) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording thereof. Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. High risk activities for the week ahead. Conduct Weekly, Monthly and Quarterly Audits Statistics for previous week regarding man-hours, ,RA’S completed, induction and medicals (entry and

exit)

Company: Aveng-Grinaker –LTA- (Mechanical and Electrical)

Project: Waterfall Smelter Acid Plant- (Energy Recovery Project Anglo American

9

Page 10: QS CV 2015 November

Duration: Jan 2014 –May 2014

Position: Senior HSE Officer

Reference: Site Safety Manager: François Norje Cell: 082 568 8214

Responsibilities:

Assisting the Appointed Construction Manager in his duties to uphold the requirements of the Mine Health & Safety Act and Regulations of (29 of 1996)

Ensuring that all staff members adhere to Anglo American standards and procedures. Ensuring all relevant employees has gone through Anglo American onboarding process. Ensuring that Legal documentation is completed before any activity commenced. Ensuring all HSE documentation is develop and implemented before affected activities

commence. Established and maintain systems to monitor and assess understanding and continuous

compliance to legislation regarding Safety and Health by employees. Provide guidance and direction on occupation health and hygiene, ensuring continuous review of

the projects SHEQ strategy with implementation of new, or updating of current, programs where required.

Understand and interpret all safety relevant Safety, Health, Environmental and Quality related legislation, regulations and standards as it applies to the projects operations and manage implementation on a project wide basis.

Provide leadership and management to a diverse team incorporating all SHEQ disciplines to ensure consistent high standards/ best practices.

Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all Supervisors/ Foreman personnel complete PRE-WORK HIRAS and communicate

it to the work force prior to work commencing. Log legal inspection into Anglo American safety system. Coordinate site accesses and security. Monitor and compile SMP(Safety Management Program) reports for management Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations,

behavior observations. Chair Safety Committee Meetings. Develop and Facilitate Risk Assessments. Ensure all Supervisors/ Foreman complete weekly HSE documentation as per site requirements.

(PTO,VFL’s) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording

thereof. Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. High risk activities for the week ahead. Conduct Weekly, Monthly and Quarterly Audits Statistics for previous week regarding man-hours, complement ,RA’S completed, induction and

medicals (entry and exit)

Company: Aveng-Grinaker –LTA- (Mechanical and Electrical) Project: Coal Processing Bunker Radar Level Project/ Dual Vessel Replacement

10

Page 11: QS CV 2015 November

Sasol 2

Duration: May 2013- Jan 2014

Position: Senior SHEQ Officer

Reference: Head Office Safety Manager: Louis Erasmus Cell: 082 333 6926

Responsibilities:

Assisting the Project Superintendent in his duties to uphold the requirements of the Occupational Health and Safety Act and Regulations of (85 of 1993).

Ensuring that all staff members adhere to Sasol standards and procedures. Ensuing task are executed according to Sasol Permit requirements and conditions Ensuring all HSE documentation is develop and implemented before affected activities

commence. Established and maintain systems to monitor and assess understanding and continuous

compliance to legislation regarding Safety and Health by employees. Provide guidance and direction on occupation health and hygiene, ensuring continuous review of

the projects SHEQ strategy with implementation of new, or updating of current, programs where required.

Understand and interpret all safety relevant Safety, Health, Environmental and Quality related legislation, regulations and standards as it applies to the projects operations and manage implementation on a project wide basis.

Provide leadership and management to a diverse team incorporating all SHEQ disciplines to ensure consistent high standards/ best practices.

Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all Supervisors/ Foreman personnel complete Job Safety Analysis/ DSTI’s and

communicate it to the work force prior to work commencing. Attend and Assist Project team on PDA’s (Planed Deviation Analysis. Coordinate site accesses and security. Monitor and compile SMP(Safety Management Program) reports for management Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations,

behavior observations. Chair Safety Committee Meetings. Develop and Facilitate Risk Assessments. Ensure all Supervisors/ Foreman complete weekly HSE documentation as per site requirements.

(PTO,VFL’s) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording

thereof. Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. High risk activities for the week ahead. Conduct Weekly, Monthly and Quarterly Audits Statistics for previous week regarding man-hours, complement ,RA’S completed, induction and

medicals (entry and exit)

Company: Aveng-Grinaker –LTA- (Mechanical and Electrical)

Project: Sishen Solar Facility Prototype Tracker Deben (Kathu) Northern Cape

11

Page 12: QS CV 2015 November

Reference: Regional Safety Manager: Willy Coetzee Cell: 072 891 3581

Duration Jan 2013- April 2015

Position: Site Safety Manager

Responsibilities:

Assisting the Project Manager in his duties to uphold the requirements of the Occupational Health and Safety Act and Regulations of (85 of 1993).

Ensuring that all staff members adhere to Aveng –Grinaker-LTA M&E standards and procedures. Ensuing that the EMP in place at that all relevant legislation requirements are met prior to any

construction work takes place. Ensuring all HSE documentation is develop and implemented before affected activities commence. Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all Supervisors/ Foreman personnel complete Job Safety Analysis/ DSTI’s and

communicate to work force prior to work commencing. Coordinate site accesses and security. Responsible for purchasing all Safety, Health, and Environmental and Quality equipment required on

site. Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations, behavior

observations. Chair Safety Committee Meetings. Develop and Facilitate Risk Assessments. Ensure all Supervisors/ Foreman complete weekly HSE documentation as per site requirements.

(PTO,VFL’s) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording thereof. Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. High risk activities for the week ahead. Conduct Weekly, Monthly and Quarterly Audits Statistics for previous week regarding man-hours, complement ,RA’S completed, induction and

medicals (entry and exit)

Company: ANGLO GOLD ASHANTI

Projects: URANIUM EXSPANSION PROJECT

12

Page 13: QS CV 2015 November

Constructing Stockpile Conveyer SystemHigh Grade Thickeners upgradeConstructing of new Overflow TanksLime tank ProjectAFU Demolition ProjectQueen Mary Dam ProjectCompartment 4 Pipe Line Project

Duration: Jan2012- December 2012

Reference: Senior Safety Manager: Danny Kole Cell: 071 673 4014

Position: Projects Safety Coordinator

Responsibilities:

Assisting Project Manager in his duties to uphold the requirements of the Mine Health and Safety Act.

Ensuring all HSE documentation is develop and implemented before affected activities commence. Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all involved Contractor’s personnel prior to commencement of any work complete Risk

Assessments and Daily Task instructions and reviewing it and communicating to all personnel. Coordinate All HSE induction training requirements and conduct contractor specific for Contractor

supervision. Coordinate site accesses and security. Monitor and compile RMS reports for management Liaison with all relevant stakeholders on issues related to injuries, incidents, investigations, behavior

observations. Chair Safety Committee Meetings. Facilitate Risk Assessments. Physical Condition Rating inspections and progress updates AngloGold Ashanti Incident investigation Program Compile and present a weekly HSE report that included: Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. Contractors Planned Tasked Observations (PTO) for the week ahead. STA quality and effectiveness. Management walkabouts including participation and findings. High risk activities for the week ahead. Risk Assessment plan for the week ahead, based on construction plan. Statistics for previous week regarding man-hours, complement ,RA’S completed, induction and

medicals (entry and exit) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording thereof. Final check and sign of RA’s before submitting to Project Manager for approval. Conduct Weekly, Monthly and Quarterly Audits

Company: SOUTHEY CONTRACTING (Sandblasting & Painting)

Project: NMPP TM 2/TRANSNET HEIDELBERG TANKFARM

13

Page 14: QS CV 2015 November

Duration: May 2011 – November 2011

Reference: Site Manager: Dustine Botha Cell: 076 7223 337

Position: Site Safety Manager

Responsibilities:

Assisting Project Manager in his duties to uphold the requirements of the OHSAct as well as the Construction Regulations.

Ensuring all HSE documentation is develop and implemented before affected activities commence. Advise Site Management team on HSE Issues and suggested solutions. Ensure all Incidents are thoroughly investigated to avoid re-occurrence. Ensure that all involved Contractor’s personnel prior to commencement of any work complete Risk

Assessments and Daily Task instructions and reviewing it and communicating to all personnel. Coordinate All HSE induction training requirements and conduct contractor specific for Contractor

supervision. Coordinate site accesses and security. Compile and present a weekly HSE report that included: Incident trend analyses and preventive measures. Injury trend analyses and preventive measures. Contractors Planned Tasked Observations (PTO) for the week ahead. STA quality and effectiveness. Management walkabouts including participation and findings. High risk activities for the week ahead. Risk Assessment plan for the week ahead, based on construction plan. Statistics for previous week regarding man-hours, complement ,RA’S completed, induction and

medicals (entry and exit) Co- ordinate and ensure the pre-check of all tools, plant and equipment and the recording thereof. Final check and sign of RA’s before submitting to Project Manager for approval. Conduct Weekly, Monthly and Quarterly Audits

Company: SENYATI (Electrical & Civil Engineering)

Project: 50 KV Power upgrade Iron Ore line (Transnet)

14

Page 15: QS CV 2015 November

Duration: Aug 2010- April 2011

Reference: Site Safety Manager: Nico Bezuidenhout 084 276 8601

Position: Site Safety Manager

Responsibilities:

Ensuring compliance to OHS Act / MHS Act and Client specification Implementing and maintenance of Safety Plan Updating of Safety File Toolbox Talks Safe Behavior Observation Plan Task Observation Visible Felt Leadership Incident Investigation Incident Reporting Risk Assessments DSTI’s Site inspections Attend safety meetings Supervise H&S Reps

Company: TUBULAR (Structural & Mechanical Engineering)

Project: SISHEN SOUTH MINE (KUMBA) KOLOMELA MINE

Duration: Feb 2010 – Aug 2010

Reference: Site Safety Manager: P. Moekoena 082 563 3963

Position: Senior Safety Officer

Responsibilities:

Toolbox Talks Safe Behavior Observation Weekly and Monthly Safety meetings Management Walkabouts Assisting Project Manager with compliance of the OHSAct Plan Task Observation Visible Felt Leadership Incident Investigation Incident Reporting Auditing of Sub-Contractors & Foreman’s Risk Assessments DSTI’S

Company: GRINAKER/LTA (Civil Engineering)

15

Page 16: QS CV 2015 November

Project: SISHEN SOUTH MINE (KUMBA) KOLOMELA MINE

Duration: SEPT-2009-FEB-2010

Reference: Site Manager: Andre Koekemoer 071 426 8512(deceased)

Position: Night Shift Safety Officer

Responsibilities:

Ensuring night shift permits are up to date Ensuring compliance of the OSHAct and client specifications. Compiled Risk Assessments Incident Investigations Revise Safe Operating Procedures Morning meetings with management and supervision Plant walks Weekly and monthly audits on sub-contractors and supervision. Weekly and monthly checks on all tools and plant equipment.

Company: GRINAKER/LTA (Civil Engineering)

Project: SOCCER CITY

Duration: JAN-2009 –OCT 2009

Reference: Site Manager: Andre Koekemoer 071 426 8512(Deceased)

Position: Site Safety Officer

Responsibilities:

Ensuring night shift permits are up to date Ensuring compliance of the OSHAct and client specifications. Compiled Risk Assessments Incident Investigations Revise Safe Operating Procedures Morning meetings with management and supervision Plant walks Weekly and monthly audits on sub-contractors and supervision. Weekly and monthly checks on all tools and plant equipment.

Company: UK - Construction 7 Shake Spear Rd

16

Page 17: QS CV 2015 November

WakefieldUnited Kingdom

Project: Hospital Facility Upgrade

Reference: Site Agent Stephen Welding (+44) 22 321 5581

Position: Safety Officer

Duration: Jan 2007 – Nov 2008 Working Visa

Responsibilities:

Compiled Risk Assessments Incident Investigations Revise Safe Operating Procedures Morning meetings with management and supervision Plant walks Weekly and monthly audits on sub-contractors and supervision. Weekly and monthly checks on all equipment.

Company: OS-Construction 22 York St, WakefieldUnited Kingdom

Reference: Site Agent Mike Armstrong (+44) 22 348756

Project: Heineken Brewery Expansion Position: Junior Safety Officer / Safety Rep

Duration: Nov 2005 – Oct 2006 Working Visa

Responsibilities:

Compiled Risk Assessments Accident Investigation Revise Safe Operating Procedures Set Up Safety Files & Audits

Interests: Rugby CricketSocializing

17

Page 18: QS CV 2015 November

Sport: RugbyIndoor Cricket

Hobbies: Watching RugbyPlaying Indoor Cricket

MY VISION

Provide strategic and tactical leadership and direction to ensure the successful development, implementation and continuous improvement of policies, procedures and

systems for the company.

DECLARATION

I hereby declare that all information given is accurate and correct.

18