21
DEPARTMENT EPARTMENT OF OF H HUMAN UMAN S SERVICES ERVICES <See Instructions: Enter DHS Cluster and/or Unit-Office <See Instructions: Enter DHS Cluster and/or Unit-Office Name> Name> <Project Name> <Project Name> Project Quality Management Plan Project Quality Management Plan Template Document Template Document Author: PMO Office : /home/website/convert/temp/convert_html/54442024afaf9fb0098b46f5/ document.doc Created on:8/17/2022

Quality Management Plan 12-15-05

  • View
    2.121

  • Download
    1

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Quality Management Plan 12-15-05

DDEPARTMENTEPARTMENT OFOF H HUMANUMAN S SERVICESERVICES

<See Instructions: Enter DHS Cluster and/or Unit-Office Name><See Instructions: Enter DHS Cluster and/or Unit-Office Name>

<Project Name> <Project Name> Project Quality Management Plan TemplateProject Quality Management Plan Template DocumentDocument

From: <unit, team, group, etc>To: <ITGC?, Exec Staff?, DHS Cabinet?>File Name: <file name>Date First Created: <mm/dd/yyyy>Date Last Updated: <mm/dd/yyyy this date is very

important because there may be multiple versions as new data is analyzed>

Author: PMO Office/tt/file_convert/54442024afaf9fb0098b46f5/document.docCreated on: 4/7/2023

Page 2: Quality Management Plan 12-15-05

<project name> Quality Management Plan

Purpose of the DocumentThe purpose of this Quality Management Plan is to ensure that the project will satisfy the needs for which it was undertaken.

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Last printed 10/8/2002 02:58:00 PM

Page 3: Quality Management Plan 12-15-05

<project name> Quality Management Plan

Document Change ActivityThe following is a record of the changes that have occurred on this

document from the time of its original approval# Change Description Author Date

Template Instructions

The template instructions are brief and rely on the user to use the Project Management Guide and current examples available on both the PMO web site, http://egov.oregon.gov/DHS/admin/pmo/,

and within the organization.

This template contains suggested boilerplate language and assumes that the project will make appropriate additions, deletions and

changes for their specific needs.

Insert information between left and right brackets - <>Delete brackets.

Additional template instructions in the document are noted in italics.Delete all italicized instructions.

Under “File” on the menu bar go to Properties; in the Summary Folder enter the document title and author (person or group).

Projects of low complexity may want to review this template for concept, but would generally describe briefly the Quality Plan directly

in the Integrated Project Plan template.

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Last printed 10/8/2002 02:58:00 PM

Page 4: Quality Management Plan 12-15-05

<project name> Quality Management Plan

1 Quality Management Plan Purpose.............................................12 Quality Management Approach...................................................13 Quality Management Plan............................................................5

3.1 Quality Standards - Operational Definitions..........................53.2 Quality Checklists.................................................................6

4 Quality Control.............................................................................74.1 QC Reviews..........................................................................74.2 Quality Control Change Requests and Tracking...................8

5 Quality Assurance........................................................................85.1 QA Status and Improvement Report.....................................8

6 Quality Procedures....................................................................107 Appendix....................................................................................11

7.1 Quality Standards Definition and Checklist - Template.......117.2 QA Status Improvement Report - template.........................117.3 Quality Procedures.............................................................11

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Last printed 10/8/2002 02:58:00 PM

Page 5: Quality Management Plan 12-15-05

<project name> Quality Management Plan

1 QUALITY MANAGEMENT PLAN PURPOSE

The purpose of this Quality Management Plan is to ensure that the project will satisfy the needs for which it was undertaken.

This Quality Management Plan includes “all activities of the overall management function that determine the quality policy, quality standards, and responsibilities and implements them by means such as quality planning, quality control, quality assurance and quality improvement.”

This document includes quality standards for the process and product, and has established plans to achieve these standards. The project has adjusted the overall project plan and schedule to satisfy these quality standards.

The goals of the project’s Quality Management are:

1. The <PROJECT NAME> Project quality management activities are planned.

2. The <PROJECT NAME> Project defines measurable quality standards and their priorities for the project.

3. The <PROJECT NAME> Project progress in achieving the quality standards is quantified and managed.

2 Quality Management Approach

This section is included to give the readers of the quality plan (project team, sponsor, or others associated with the project) an overview of what Quality Management Activities are being planned for the project.

Quality Management is defined as, “a subset of project management that includes the processes required to ensure that the project will satisfy the needs for which it was undertaken.” It consists of quality planning, quality assurance, and quality control.The approach for ensuring the appropriate Quality Management activities are conducted will be from the Project Management Institute’s (PMI) Standard as described in the Project Management Book of Knowledge (PMBOK). Additional detail was obtained from the Software Engineering Institute and the Control Objectives (CoBit).

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 1 Last printed 10/8/2002 02:58:00 PM

Page 6: Quality Management Plan 12-15-05

<project name> Quality Management Plan

This includes all activities of Quality Management that determine the quality policy, objectives, and responsibilities and implements them by means such as quality planning, quality control, quality assurance, and quality improvements.

For the purpose of this document the term “quality standards” shall refer to both “process” and “product” quality standards. “Process” quality standards will cover political influences, management support, decision drivers, project management, schedule, resourcing, experience, and others. “Product” quality standards will cover product content, development, deployment, environment, technology, maintainability and others.

The <enter project name> project’s Quality Management approach adheres to and includes work activities in support of the following quality management processes:

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 2 Last printed 10/8/2002 02:58:00 PM

Page 7: Quality Management Plan 12-15-05

<project name> Quality Management Plan

Quality Planning – Identifying and/or verifying quality standards that are relevant to the project and determining how to satisfy them.

Quality Planning will involve review of organizational policy, the complexity and uniqueness of the project, and quality templates (available through the DHS OIS PMO) to identify quality standards and measurements that are relevant to the project, and if not incorporated will result in low quality results creating significant risk to the project. In addition to identifying these quality standards, quality planning involves determining how to satisfy each quality standard via the project schedule, resourcing and internal procedures. The Quality Management plan must address how these quality standards will be implemented, inspected, controlled and reported.

Quality Control – Monitoring specific project results and deliverables to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance.

Quality Control involves monitoring both the process and products, to determine if the project is meeting the quality standards and identifying ways to mitigate risk or eliminate causes of unsatisfactory results. Examples of Quality Control techniques include:

Assessment – review of key project documentation (i.e., business requirements, technical documentation, management plans, budgets and project reports) and interviews with key business and technical staff.

Peer Review – a methodical examination of work products by the producer’s peers to identify defects and other needed changes. Examples of Peer Review methods include inspections, structured walkthroughs, and active reviews.

Software Testing - verification that the products of each software life-cycle phase satisfy the standards, practices, and requirements for correctness, completeness, consistency, and accuracy.

Quality Assurance – Periodic executive review and evaluation of the overall project performance to provide confidence that the project will satisfy the relevant quality standards.

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 3 Last printed 10/8/2002 02:58:00 PM

Page 8: Quality Management Plan 12-15-05

<project name> Quality Management Plan

Quality assurance includes evaluating, identifying, and recommending adjustments to the activities or tasks (and associated resources) that must be performed in the project to provide confidence that the project will satisfy the relevant quality standards.

In support of this approach the <project name> project will Choose or tailor your projects options:

Option 1

Contract for a third party contractor, with DAS oversight to work with the project to further develop the Quality Management Plan and determine the appropriate quality assurance activities and activity estimates, and conduct the quality assurance. The standard DHS-OIS Quality Management Statement of Work and other associated materials will be used to define the specific contract expectations.

A third party contract to do QA is required on project where the total cost of the project is expected to exceed $500,000. Any exceptions to this requirement must be approved by OIS Executive Staff and DAS IRMD.

Option 2

Implement Quality Management, based on the complexity and need of the project as part of the overall work of the project as described in this document. This will include a combination of responsibilities by the project team and others within DHS to ensure quality in the process and products.

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 4 Last printed 10/8/2002 02:58:00 PM

Page 9: Quality Management Plan 12-15-05

<project name> Quality Management Plan

3 QUALITY MANAGEMENT PLAN

The <contractor, or project manager, or PMO, or other assigned staff> worked with the project team during its early stages to establish agreements on the Quality Management (QM) Plan, Quality Standards, and Processes. To satisfy these agreements, constraints of the project, and organizational polices the group verified, modified or added project work tasks, resourcing and supplemental procedures.

The project manager verified that the Quality Management Plan and the updated project plan, standards, processes and work tasks fit the project’s needs, add value, reduce risk and will be usable for performing quality reviews, inspections, and uncovering quality problems throughout the life cycle of the project.

3.1Quality Standards - Operational Definitions

The plan includes the selection of applicable process and product quality standards for the <enter project name> project. The Generic Software Quality Standards Template, see appendix a, was used and modified as follows to identify the specific quality standards for this project:

1. Identified only those process and product quality standards, risk cues or measurements appropriate for the <enter project name> project based on the project’s current business and technical complexity assessment.

2. Added additional quality standards based on this type of project, current phase of the project, or expert opinion where the absence of these quality standard would present high risk to the project.

3. Eliminated unnecessary quality standards based on the project’s business and technical complexity assessment or current phase of the project. However, the following process and quality standards were not eliminated:

Process Quality Standards Definition of the project, development schedule, delivery

commitment, cost controls, budget and resource size, project management approach (standards #10,11,12, 23, 25, 26, 27)

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 5 Last printed 10/8/2002 02:58:00 PM

Page 10: Quality Management Plan 12-15-05

<project name> Quality Management Plan

Political influences, organizational stability (standard #6, 37) Leadership, project management authority, executive

involvement (standard #12,17,41) Team productivity, team member availability, user involvement

(standard #28,34,44)

Product Quality Standards (Depending on products planned to be produced during the QA the project may adjust these Quality Standards to specific products of the contract period. All products to be reviewed or inspected during the Quality Control process must be included in the template). An appropriate, useful, and maintainable set of requirements

(standard #50) An appropriate, useful, and maintainable set of engineering and

design specifications (standard #58) Appropriate, useful, and maintainable code, utility, object, etc.,

construction (standard #80) Appropriate, useful, and maintainable test planning, test

execution, and test corrective actions (standard #51) The product or application is fit for use (standard #46, 76) Appropriate, thorough and maintainable implementation

(standard #53,81)

3.2Quality Checklists

As part of the quality planning process the project determined how the quality standards would be monitored and measured. This is represented in a checklist which combines the selected quality standards with the expected monitoring activities to be used by the quality control process. The checklist is the projects tool to ensure that the quality standards are being met on the project. The checklist, see appendix x., includes information: indicating the schedule for review, who is responsible to perform

the task and who is responsible to review,(this may first be accomplished by working through the checklist but will eventually need to be added to the projects WBS).

indicating if there is a specific review procedure to follow, i.e. a procedure for schedule analysis, code walk-through, peer review, interviews, lessons learned, test methodology …

to verify and record that a set of required inspections have been performed,

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 6 Last printed 10/8/2002 02:58:00 PM

Page 11: Quality Management Plan 12-15-05

<project name> Quality Management Plan

to indicate that the minimum quality standard has or has not been met,

record the measurements, identify the expected risk cue or measurement, indicate the expected acceptability or tolerance, indicate the rank of only the quality standards where risk was

found unacceptable, indicate change in risk rank since previous review, and indicate a reference to which will describe what was reviewed, who

was interviewed, and the information or reasoning that this quality standard causes risk.

4 QUALITY CONTROL

The assigned QC reviewer(s) will review project activities, interview, and inspect specified work product deliverables throughout the life of the project to verify compliance and provide the project manager, project team and other management with visibility as to whether the project is adhering to its established plans, process and product quality standards, and associated quality work tasks.

They will identify, document, and track deviations to closure and verify that corrections have been made. They will address issues within the project first for resolution. Issues not resolvable within the project will be escalated to a designated level of management within <organization name> for resolution. Continued escalation of high risk issues will be presented to designated OIS Executive Staff using the QA Status and Improvements Report from the Quality Assurance Task.

4.1QC Reviews

The QC reviewer(s) will conduct scheduled periodic Quality Control Reviews by following the Quality Management Plan and using the adjusted and approved Software Quality Standard checklists. The deliverable will be a checklist indicating that the reviews for the process and products in the current period have been completed, measured, ranked and reported by the review(s). Identified reviews on a particular Quality Standard, for example, “Testing Process” means that a sampling of the actual Testing Activities will be

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 7 Last printed 10/8/2002 02:58:00 PM

Page 12: Quality Management Plan 12-15-05

<project name> Quality Management Plan

reviewed – not all testing. The completed checklist will be reviewed with the <project team and specify any others if necessary> and the results will be the input to the Quality Status and Improvements Report.

4.2Quality Control Change Requests and Tracking

The QC reviewer(s) will develop and submit written recommendations for improvement, verify corrections have been made, and track and document to closure using the project’s change management process, change request forms, and change tracking tool. The change request form will define the requested change, analyze the change impact in modified work descriptions, schedule, and cost values, and recommend a solution. The change-tracking tool will indicate the current status of all the recommendations, including those that the organization doesn’t agree with. The <Project Manager, and Sponsor, Steering Committee, other> will decide which recommendations to implement. If the change is to be implemented the project manager will update the project plan and assign implementation responsibility. The Reviewer(s) will follow-up to verify that the change or correction was made and indicate status and closure on the finding.

5 QUALITY ASSURANCE

The <Quality Assurance Reviewer> will provide overall quality consultation, periodically examine Quality Control Reviews results, checklists, change requests and tracking, and summarize the results for executive review and oversight throughout the life of the project. The <Quality Assurance Reviewer> will participate in facilitated lessons learned sessions with the project team.

5.1QA Status and Improvement Report

The <Quality Assurance Reviewer> will periodically create and deliver the - QA Status and Improvement Report which at a minimum shall contain the:

1. Overall risk rank for the project.

2. Executive Summary paragraph of the entire report. It should contain information such as; A brief description the primary

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 8 Last printed 10/8/2002 02:58:00 PM

Page 13: Quality Management Plan 12-15-05

<project name> Quality Management Plan

achievement in the last period. A brief description of the highest ranked primary (if any) quality risks covered in the following detail of the report. A brief description of the impact or consequence of the risk if left unresolved.

3. Summary of the Current Progress Points followed by major milestones.

4. Brief project effectiveness statements on all the high level categories from exhibit x., Generic Software Quality Standards template. Categories where no risks were identified should simply be

indicated in one line, for example, Decision Drivers – no risks currently identified, or not evaluated at this time.

Categories which contained a significant risk should briefly describe the risk, describe the factors used to determine the risk, describe the potential impact, indicate the risk severity rating, and provide a recommended resolution strategy.

The following are the categories from exhibit x., Generic Software Quality Standards Template.

Business Mission and Goals Decision Drivers Project Management Project Parameters Project Team Organization Management Customer/User Product Content Deployment Development Process Development Environment Technology Maintenance

5. Risks Resolved Since Last Period. Provide the previous risk rank, and brief status or the actions taken on risks and results.

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 9 Last printed 10/8/2002 02:58:00 PM

Page 14: Quality Management Plan 12-15-05

<project name> Quality Management Plan

The QA Status and Improvement Report Template and an example, is available on the PMO web site.

The QA Status and Improvements Report will be submitted to the Project Manager, Steering Committee and OIS executive staff for review and determination of completeness and accuracy of facts, before presentation or delivery to others within DHS or external to DHS. This format will be used to report to the Department of Administrative Services Information Resources Management Division. At a minimum, QA Status and Improvement Reports must be submitted quarterly.

6 QUALITY PROCEDURES

1. List or reference any specific Quality Procedures to be used or written for the project(see 3.2 Quality Checklists). These may include procedures for schedule analysis, interview processes, code walk-through, peer review, interviews, lessons learned, test methodology. Either in the checklist or here indicated if the process is formal or informal for example:

2. Schedule Analysis Procedure – formal Monte Carlo Simulation,3. Technical Architecture Peer Review – informal review by peer

technical representative or group who is/are not part of the project team,

4. Code Peer Review – formal by following standard Peer Review Procedure using a combination of one developer on project and a developer from another project.

/tt/file_convert/54442024afaf9fb0098b46f5/document.doc Page 10 Last printed 10/8/2002 02:58:00 PM

Page 15: Quality Management Plan 12-15-05

<project name> Quality Management Plan

7 APPENDIX

The following are available templates. They are included in the plan template to aid in understanding of the creator and readers of the plan.

7.1Quality Standards Definition and Checklist - Template

The actual template is available in the PMO website templates page under “Controlling”.

7.2QA Status Improvement Report - templateThe actual template is available on the PMO website templates page under “Controlling”.

7.3Quality Procedures

Record any specific quality procedures the project will develop, implement and use. For example will you follow a formal peer review process, and what will be the process.