Quality Manual [Based on ISO 9001:2008 QMS - Requirements]
Karnataka State Police Housing Corporation Limited
# 59, Richmond Road, BANGALORE – 560 025 Ph: +91 80 25584402 / 25584102 Fax: +91 80 25584402
Websites: www.ksphc.org, www.ksphc.co.in
KSPHC Quality Manual
0.1 DOCUMENT INFORMATION
Document Title
Quality Manual
Document Code
QM 01
Date of Initial Release
1st January 2005
System Effective Date
1st January 2005
Current Document Revision No
Revision “02”
Current Revision Date
30th March 2010
Revision Effective Date
30th March 2010
Document Owner
Management Representative – QMS
Document Author(s) Management Representative – QMS
Chief Coordinator – QMS
Document / Document Change Reviewer
Executive Director
Document Approver
Chairman & Managing Director
Document Status
Approved
Document Revision Details
Refer to Revision Record – Section 0.4
SUMMARY OF PAGES IN THE DOCUMENT
This document comprises a front cover, Page I – X, Pages 1 to 54 and a back cover.
Revision: 02 Rev. Date: 30.03.2010 Page I
KSPHC Quality Manual
0.2 DOCUMENT AUTHORIZATION
This Quality Manual has been prepared to address the requirements of International
Standard 9001:2008. In this edition, the previous edition of Quality Manual which was based
on ISO 9001:2000 has been amended to incorporate changes made to ISO 9001:2008. In
preparation of this quality manual, appropriate guidelines for quality management in projects
given in ISO 10006:2003 have been incorporated. Guidelines provided in ISO/TR
10013:2001 have been considered during the preparation of this Quality Manual and other
system documentation.
This Quality Manual is prepared by the Management Representative – QMS and the Chief
Coordinator – QMS and is reviewed by the Executive Director. The Chairman and Managing
Director authorises the Quality Manual for release and system implementation by endorsing
his approval in this section. Whenever revisions are made to this document, such revisions
are recorded in the revision record by giving a brief note on revisions made and accordingly
this section of the manual is updated. Control of this document is ensured in accordance
with Procedure for Control of documents QSP 01
The Quality Manual Rev 01 is approved and released for implementation and it comes in to
effect from 09.09.2009.
Reviewed by: Prem Shankar Meena
Executive Director
Approved by : S.C Saxena
Chairman & Managing Director
Prepared by :
M.B Burjji.
CE (P&D) &
Management Representative – QMS
Chitra Mani,
Public Relations Officer and
Chief Coordinator - QMS
Revision: 02 Rev. Date: 30.03.2010 Page II
KSPHC Quality Manual
0.3 CONTENTS
Section Element description Page
0.1 Document information I
0.2 Document authorization II
0.3 Contents III
0.4 Revisions record VI
0.5 Introduction to the organization VII
1 Scope 1
1.1 General 1
1.2 Application 1
2 References 4
3 Abbreviations, Terms and definitions 5
3.1 Abbreviations 5
3.2 Terms and definitions 6
4 Quality Management system (QMS) 10
4.1 General requirements 10
4.2 Documentation requirements 10
4.2.1 General 10
4.2.2 Quality Manual 11
4.2.3 Control of documents 11
4.2.4 Control of records 12
5 Management responsibility 13
5.1 Management commitment 13
5.2 Customer focus 13
5.3 Vision, Mission and Quality Policy 17
5.4 Planning 19
5.4.1 Quality Objectives 19
5.4.2 Quality Management System planning 19
Revision: 02 Rev. Date: 30.03.2010 Page III
KSPHC Quality Manual
Section
Element description
Page
5.5 Responsibility, authority and communication 19
5.5.1 Responsibility and authority 19
5.5.2 Management Representative 19
5.5.3 Internal communication 20
5.6 Management review 20
5.6.1 General 20
5.6.2 Review inputs 21
5.6.3 Review outputs 21
6 Resource Management 22
6.1 Provision of resources 22
6.2 Human resources 24
6.2.1 General 24
6.2.2 Competence,training and awareness 25
6.3 Infrastructure 25
6.4 Work environment 25
7 Implementation and operation 26
7.1 Planning of product realization 26
7.2 Customer-related processes 27
7.3 Design and development 30
7.4 Purchasing 34
7.5 Production and service provision 37
7.5.1 Control of production and service provision 37
7.5.2
Validation of processes for production and service provision
37
7.5.3
Identification and traceability
38
7.5.4 Customer property 38
7.5.5
Preservation of products
39
7.6
Control of monitoring and measuring equipment
39
Revision: 02 Rev. Date: 30.03.2010 Page IV
KSPHC Quality Manual
Section
Element description
Page
8 Measurement, Analysis and Improvement 40
8.1 General 40
8.2 Monitoring and Measurement 40
8.2.1 Customer satisfaction 40
8.2.2 Internal Audit 40
8.2.3 Monitoring and measurement of processes 41
8.2.4 Monitoring and measurement of product 41
8.3 Control of nonconforming product 41
8.4 Analysis of data 42
8.5 Improvement 43
8.5.1 Continual improvement 43
8.5.2 Corrective action 43
8.5.3 Preventive action 43
ANNEXES
Annex No.
Annex Title
Page
1
QMS Processes – Sequence and Interaction
45
2
Organization chart
46
3
Responsibilities and authorities
48
4
List of Quality System Procedures
54
Revision: 02 Rev. Date: 30.03.2010 Page V
KSPHC Quality Manual
0.4 Revision record
The first edition of the Quality Manual was released on 05.05.2005; subsequently,
05.05.2005 through 01.08.2007 the document had undergone minor changes. Now, the
Quality Manual has been updated to incorporate changes made in ISO 9001:2008. In
addition to this, organizational changes have been updated. Previously, the Quality Manual
was having Issue Number for the whole document, and, sections were given separate
revision status. Now, only revision status is given for the whole document. Whenever
changes are made to any section / clause, the revision number is incremented by “1” and the
documented is updated accordingly. Hence, the present document has been assigned with
Revision Status – “01”. Further revisions made to this document is recorded in the below
table.
Sl. No.
Rev. No.
Date of Revision
Section / Clause Revised
Page Ref.
Revision Details
1
01
09.09.2009
All
All
Quality Manual updated to incorporate ISO 9001:2008 changes. Organizational changes updated
2
02
30.03.2010
All
All
Quality Manual updated to incorporate ISO 9001:2008 changes. (R1) Annexure1 –
Key Processes of
QMS- sequence
(R0) Annexure 2 -
Organisation Chart-
KSPHC 010105
(R2)Annexure -3
Responsibilities and
authorities300310
(R2) Annexure – 4
List of Quality
system
(R2) Annexure 5 -
List of Controlled
Copy Holders300310
(R0) QM Cover
page 010105
(R2) 0.1 Document
information 300310
(R2) 0.2 Document
authorization 300310
(R2) 0.3 -
Contents 300310
(R2) 0.4 –
Revision record
300310
(R2) 0.5 –
Introduction to
organization.300310
(R2) 1.2.1 –
Locations covered
under the
(R2) 3.1 –
Abbreviations300310
(R2) 7.0 – Product
realization
(R2) 7.5.1 –
Control of
production and
Revision: 02 Rev. Date: 30.03.2010 Page VI
KSPHC Quality Manual
0.5 Introduction to the organization
Karnataka State Police Housing Corporation Limited (KSPHC) is a fully owned undertaking
of the State Government of Karnataka, headquartered in Bangalore, India. Set up in 1985,
the Company was mandated to build residential and non-residential buildings for the Police,
Fire and other auxiliary services in the State. Project costs and the administrative expenses
were being met by the Government and the Company had no income generating activity of
its own. In the year 2006-07, KSPHC has undergone a transformation. The process of
transformation began in 2001 and has taken six years to complete. Following figures
indicate the path traversed by the Company before, during and after the transformation.
Period Aggregate value of works
(Actual / Projected)
During 16 years from 1985 to 2001 INR 1184.22 Million (INR 74.01 M / year)
During six years from 2001 to 2007 INR 5250.14 Million (INR 875.02 M / year)
During five years from 2007 to 2012 INR 10 Billion (INR 2 Billion per year) (projected)
THE TRANSFORMATION
KSPHC’s Web based Project Management System (WBPMS) is one of the transformation
initiatives started in 2001, along with computerization of all its activities in a phased manner.
The other transformation initiatives include transparency, accountability, stakeholder
involvement, Right to Information, professional approach to management, etc. KSPHC’s
transformation is a continuous process of self-improvement, imbibing all principles of good
governance including e-governance, with an objective to achieve world-class standards in all
its endeavours. The transformation promotes total transparency in all its operations, and
makes possible cost effective and timely delivery of quality buildings constructed innovatively
to enhance the functioning of the essential public services like the Police, Fire forces, Home
Guards and Prisons. The transformation initiative helped KSPHC to come to grips with the
myriad problems associated with increased workload and project execution in remote
locations in Karnataka
The transformation helps tackle the emerging issues in executing projects efficiently and in a
better manner than ever before. From a computer located anywhere, the status of the
projects can now be reviewed 24X7 by any of the stakeholders and this helps to initiate
Revision: 02 Rev. Date: 30.03.2010 Page VII
KSPHC Quality Manual
appropriate and timely intervention strategies that are necessary to improve project
implementation. The system enables KSPHC to cope with the challenges of distance, time
pressures, inadequate resources, lack of knowledge and skills and facilitates collaborative
workflow, information sharing and good governance. When non-compliances occur or are
noticed, alerts are generated either automatically or manually, and remedial measures can
then be initiated and accountability fixed
BETTER SYSTEM THAN RTI: Though the recently promulgated Right to Information Act
(RTI) is very progressive, procedural requirements are required to be satisfied before the
information is made available. All such bureaucratic procedures are removed with the
implementation of WBPMS and any information pertaining to any project at any stage is just
a mouse-click away for any interested party. Equally importantly, the WBPMS has an inbuilt
mechanism to receive and register feedback and complaints. A regularly updated
Complaints Register helps the public/customer to find the status of their complaint in real-
time. In many instances, this also helps the Project-in-Charge to initiate proper, timely
corrective action
THE RESULT: Government programs are generally beset with delays, cost escalations and
lack of accountability. The web-enabled Project Management System of KSPHC brings in
total transparency in public spending, facilitating stakeholder involvement, team effort and
information sharing. Many of the best practices advocated by professional bodies like the
Project Management Institute, International Organization for Standardization (ISO) and
Institute of Chartered Accountants of India are integrated in the WBPMS developed by
KSPHC. By adopting this tool for better planning, control and executing its projects with
decreasing time and cost overruns, KSPHC has demonstrated that its transformation model
can create value and wealth for the Government
RECOGNITIONS GALORE: On World Habitat Day (3 Oct 2006), the Government of India
selected KSPHC to receive the First Prize and Best Practices Award in recognition of the
pioneering work done in the field of Quality Management and e-governance. Other awards
conferred during the last year include Golden Peacock Awards for Corporate Social
Responsibility, Eco Innovation and Innovative Management and GOLD rating under LEED
certification process from the US Green Building Council.
Revision: 02 Rev. Date: 30.03.2010 Page VIII
KSPHC Quality Manual
The transformation has helped KSPHC win the trust and confidence of all its customers and
to become a self-reliant professionally run company working on commercial lines in a
competitive environment from its earlier status of being dependent on Government funds.
SOME INDICATORS OF MEASUREMENT OF TRANSFORMATION:
Indicators
During 16 years prior to transformation
During 5 years post-transformation
Average work done /year
INR 74.02 M
INR 875.03 M
Average administrative expenses / year
INR 9.67 M
INR 74.61 M
Average annual income INR 1.40 M INR 33.79 M
Administrative expenses as % of work done
13.06 %
8.52 %
ACHIEVEMENTS
The single most important achievement of the WBPMS is that it aims to provide
accountability for public money invested in Government projects. Any member of the public
can visit the website, open the WBPMS and check how well the money is being spent. With
a complaint mechanism built into the tool, the WBPMS proves better than the Right to
Information Act. The WBPMS has enabled KSPHC to imbibe professionalism while
executing publicly funded projects, from conception to completion. Consciousness about
several important focus areas of project management has been brought home in a dramatic
manner by the WBPMS and this has facilitated a gradual assimilation in KSPHC of the best
practices in project management prevalent across the world.
THE OBJECTIVES
The goal of the transformation is to satisfy as many of these concerns as possible. In this
direction, KSPHC has designed the WBPMS and computerization of its activities, and the
integration of its activities in WBPMS to deliver satisfactory resolution of the concerns of its
stakeholders. The goal of the transformation is to be able to show measurable improvements
capable of independent evaluation. Financial institutions desire proper fund utilization;
remote monitoring of project progress and cost / sq ft of construction data available in the
WBPMS meets the requirement. e-tendering, e-billing and ability for remote monitoring of
status of bill satisfy the Contractors’ needs. KSPHC employees are concerned about their
work environment the betterment of which increases their productivity; this is measured by
Revision: 02 Rev. Date: 30.03.2010 Page IX
KSPHC Quality Manual
productivity/employee. Auditors are concerned about traceability, fund flow details and data
security; e-billing capabilities, accounting and WBPMS integration, job progress monitoring,
and log sheet meet their requirements. Password protection, firewalls, backup facility, and
server farms allay their security concerns. Process integrity, a constant concern of
management, is assured by the internal and surveillance audits carried out as part of ISO
9001 requirements, which has incorporated Project Management features of ISO 10006.
Environmental concerns are being addressed by planning of implementation of ISO 14001
during 2007. Information Security Management in line with ISO/IEC 27001 will be initiated
soon. The following table summarizes the Company’s achievements as against the
stakeholders’ expectations for the last two years:
Stake holder
Chief Concern
Response in WBPMS
Metric
Measuring Outcome
2008-09
2009-10
Government
Budgetary control on Projects
Financial controls in
place
% Cost Overrun
% projects with NO cost
overrun
83.48%
#
Client
Department
Speedy work
execution
Alert
generation
% Time Overrun
% projects with No time
over run
5.17%
44.23%
Revision: 02 Rev. Date: 30.03.2010 Page X
KSPHC Quality Manual
1 Scope
1.1 General
This quality manual which is based on ISO 9001:2008, is intended to provide directions
through the quality management system so as to enable KSPHC
a) to demonstrate its ability to consistently provide product that meets customer and
applicable statutory and regulatory requirements, and
b) to enhance customer satisfaction through the effective application of the system,
including processes for continual improvement of the system and the assurance of
conformity to customer and applicable statutory and regulatory requirements.
1.2 Application The established Quality Management System is applied to all the operations and activities
associated with Design, Development, Construction of Buildings and Associated
Infrastructure, Project Management Services, e-Tendering Services and e-commerce
services.
1.2.1 Locations covered under the scope:
Karnataka State Police Housing Corporation Limited – H.O, Divisions and associated Sub-
divisions across Karnataka are covered under the scope of QMS. Below list provide the
location details; the complete addresses are published on company’s website and are
updated should there be a change in address and contact details.
1) Head Office, # 59, Richmond Road, BANGALORE – 560 025
Functional divisions include
• Planning, Design, Technical and Architecture
• Finance
• Quality control
• Contracts (includes e-tendering services)
• Project Management
• Establishment and Administration (includes HR)
• Public relations
• E-Commerce
Revision: 02 Rev. Date: 30.03.2010 Page 1
KSPHC Quality Manual
2) Bangalore Urban Division and associated sub-divisions
a) Bangalore No. 1 SD, Bangalore
b) Bangalore No. 2 SD, Bangalore
3) Bangalore Rural Division and associated sub-divisions
a) No. 19 SD, Bangalore
b) Kolar SD, (located in Bangalore).
4) Electrical Division, Bangalore and associated sub-divisions
a) Electrical SD (South), Bangalore
b) Electrical SD (North), Davanagere
5) Mysore Division and associated sub-divisions
a) Mysore SD
b) Chamaraja Nagar SD
c) Hassan SD
d) Mangalore SD
6) Belgaum Division and associated sub-divisions
a) Belgaum SD, Belagaum
b) Dharwad SD, Dharwad
c) Haveri SD, Haveri
7) Davanagere Division and associated sub-divisions
a) Davanagere SD, Davanagere
b) Shimoga SD, Shimoga
c) Hospet SD, Hospet
8) Gulbarga Division and associated sub-divisions
a) Gulbarga SD, Gulbarga
b) Bagalkot SD, Bagalkot Revision: 02 Rev. Date: 30.03.2010 Page 2
KSPHC Quality Manual
1.2.2 Activities associated with core business activity (Construction Management)
Encompasses following key processes:
1) Project planning.
2) Identification of the processes involved for obtaining administrative
approval and monitoring the implementation.
3) Identification of site and feasibility study including soil testing.
4) Identification of the resources required for execution of the project.
5) Human Resource Management.
6) Financial Engineering and Financial Closure.
7) Preparation of layout plans and building plans.
8) Obtaining statutory approval for construction.
9) Preparation of estimates.
10) Scrutiny and technical sanction for estimates.
11) Registration of contractors.
12) Tendering and selection of contractors.
13) Handing over of the site and site markings.
14) Detailed Engineering and issue of construction drawings.
15) Purchase (Direct / Indirect) of raw materials and quality assurance.
16) Supervision and Quality Control during construction at all stages from
excavation to finishing.
17) Periodical review and crisis management if necessary.
18) Calibration and control of measuring / testing devices.
19) Internal audit.
20) Managing Cash Flow.
21) Maintenance of field data.
22) Managing site stores and materials preservation.
23) Availing of outside services (Water, Electricity, and Sewage).
24) Quality check before handing over of the building.
25) Obtaining Completion Certificates from Statutory Authority.
26) Handing over of the building.
27) Preparation and approval of Revised Estimates.
28) Measurement and certification for final payment. Revision: 02 Rev. Date: 30.03.2010 Page 3
KSPHC Quality Manual
29) Inspection of building before expiry of defect liability period and
necessary repairs.
30) Release of EMD and Security Deposits.
KSPHC outsource the construction and related activity to eligible contractors by
awarding contracts through established tendering system. At times, KSPHC
outsource design activity.
1.2.3 Exclusions: None of the requirements of ISO 9001:2008 are excluded from
their application
2 References
Information available in the following standards / guidance documents were considered while
developing the Quality Management System documentation:
a) ISO10006:2003 Quality management systems — Guidelines for quality management in
projects
b) ISO 10002:2004, Quality management — Customer satisfaction — Guidelines for
complaints handling in organizations
c) ISO/TR 10013:2001 – Guidelines for quality management system documentation.
Revision: 02 Rev. Date: 30.03.2010 Page 4
KSPHC Quality Manual
3 Abbreviations, terms and definitions
3.1 Abbreviations
KSPHC - Karnataka State Police Housing Corporation Limited
ISO - International Organization for Standardization
QMS - Quality Management System
CMD - Chairman and Managing Director
ED - Executive Director
FA - Financial Advisor
CAO - Chief Accounts Officer
AS - Accounts Superintendent
AO - Accounts Officer
AAO - Assistant Administrative Officer
CE - Chief Engineer CE (W) - Chief Engineer (Works) CE (P&D) - Chief Engineer (Planning and Design)
SE - Superintending Engineer
EE - Executive Engineer
Elect - Electrical
MR - Management Representative
CC - Chief Coordinator
AEE - Assistant Executive Engineer
AE - Assistant Engineer
JE - Junior Engineer
DES - Design
PM - Project Management
PMS - Project Monitoring System
Q & C - Quality and Contracts
DVN - Division
SD. - Sub-division
QM - Quality Manual
QSP - Quality System Procedure
WI - Work Instructions
IQA - Internal Quality Audit
PRO - Public Relation Officer
PUR - Purchase
STR - Stores
Revision: 02 Rev. Date: 30.03.2010 Page 5
KSPHC Quality Manual
3.2 Terms and definitions
For the purpose of this QMS, the definitions given in ISO 9000:2005 and ISO 10006:2003
shall apply. Definitions of important terminology are given below (reproduced from the
referred standards).
1) Activity – smallest identified item of work in a project process.
2) Audit – Systematic, independent and documented process for obtaining audit evidence and
evaluating it objectively to determine the extent to which audit criteria are fulfilled.
3) Capability – ability of an organization, system or process to realize a product that will fulfill the
requirements for that product.
4) Characteristic – Distinguishing feature
5) Client – A person or a company or a department who engages the professional advice or
services of another.
6) Competence – Demonstrated ability to apply knowledge and skills.
7) Concession – Permission to use or release a product that does not conform to specified
requirement.
8) Conformity – Fulfillment of a requirement.
9) Continual Improvement – Recurring activity to increase the ability to fulfill the requirements.
Note: The process of establishing objectives and finding opportunities for improvement is a
continual process through the use of audit findings and audit conclusions, analysis of data,
management reviews or other means and generally leads to corrective action or preventive
action.
10) Corrective Action – Action to eliminate the cause of a detected nonconformity or other
undesirable situation.
11) Correction – Action to eliminate a detected nonconformity.
12) Customer – Organization or person that receives a product.
Note: A customer can be internal or external to the organization.
13) Customer satisfaction – customer’s perception of the degree to which the customer’s
requirements have been fulfilled.
Note 1: Customer complaints are a common indicator of low customer satisfaction but their
absence does not necessarily imply high customer satisfaction.
Note 2: Even when customer requirements have been agreed with the customer and fulfilled, this
does not necessarily ensure high customer satisfaction.
14) Defect – Non-fulfillment of a requirement related to an intended or specified use.
15) Design and Development – Set of processes that transform requirements into specified
characteristics or into the specifications of a product, process or system.
16) Deviation Permit – Permission to depart from the originally specified requirements of a product
prior to realization.
Revision: 02 Rev. Date: 30.03.2010 Page 6
KSPHC Quality Manual
17) Document – Information and its supporting medium.
18) Effectiveness – Extent to which planned activities are realized and planned results achieved.
19) Efficiency – Relationship between the results achieved and the resources used.
20) Inspection - Conformity evaluation by observation and judgment accompanied as appropriate by
measurement, testing or gauging.
21) Interested Party – Person or group having an interest in the performance or success of an
organization (e.g. Customers, owners, people in the organization, suppliers, bankers, unions,
partners or society).
22) Management – Coordinated activities to direct and control an organization.
23) Management system – system to establish policy and objectives and to achieve those
objectives.
Note: Management System of an organization can include different Management systems, such
as a quality management system, a financial management system or an environmental
management system.
24) MoU – Memorandum of understanding that is a document containing agreed terms and
conditions between two or more parties which also includes side letters i.e., subsequent
correspondence which will form a part of MoU.
25) Non-conformity – Non-fulfillment of a requirement.
26) Objective Evidence – Data supporting the existence or veracity of something.
27) Process – Set of inter-related or interacting activities, which transforms inputs into outputs.
Note 1: Inputs to a process are generally outputs of other processes.
Note 2: Processes in an organization are generally planned and carried out under controlled
conditions to add value.
Note 3: A process where the conformity of the resulting product cannot be readily or
economically verified is frequently referred to as a special process.
28) Procedure – Specified way to carry out an activity or a process.
29) Product – Result of a process
Note 1: There are four generic product categories such as Services (E.g. transport), Software
(E.g. Computer programme, dictionary), Hardware (E.g. Engine mechanical part) and Processed
Materials (E.g. Lubricants)
Note 2: In KSPHC, product includes buildings constructed / maintained by it and the services
offered by KSPHC such as Project Monitoring Services.
30) Progress evaluation – assessment of progress made on achievement of the project objectives
31) Project – Unique process consisting of a set of coordinated and controlled activities with start
and finish dates, undertaken to achieve an objective conforming to specific requirements,
including the constraints of time, cost and resources.
32) Project management – planning, organising, monitoring, controlling and reporting of all aspects
of a project and the motivation of all those involved in it to achieve the project objectives.
Revision: 02 Rev. Date: 30.03.2010 Page 7
KSPHC Quality Manual
33) Project management plan – document specifying what is necessary to meet the objective(s) of
the project.
34) Preventive action – Action to eliminate the cause of a potential nonconformity or other
undesirable potential situation.
35) Purchase - to obtain by paying money or its equivalent
36) Qualification Process – Process to demonstrate the ability to fulfill specified requirements.
Note: Qualification can concern persons, products, processes or systems.
37) Quality – degree to which a set of inherent characteristics fulfils requirement
Note 1: The term quality can be used with adjectives such as poor, good or excellent
Note 2:“Inherent”, as opposed to “assigned”, means existing in something, especially as a
permanent characteristic.
38) Quality Assurance – Part of quality management focused on providing confidence that quality
requirements will be fulfilled.
39) Quality Characteristic – Inherent characteristic of a product, process or system related to a
requirement.
40) Quality Control – Part of quality management focused on fulfilling quality requirements.
41) Quality Improvement – Part of quality management focused on the increasing the ability to fulfill
the quality requirements.
Note: The requirements can be related to any aspect such as effectiveness, efficiency or
traceability.
42) Quality Management – Coordinated activities to direct and control an organization with regard to
quality.
Note: Directions and control with regard to quality generally includes establishments of quality
policy and quality objectives, quality planning, quality control, quality assurance and quality
improvement.
43) Quality Management System – Management system to direct and control an organization with
regard to quality
44) Quality Manual – Document specifying the quality management system of an organization.
45) Quality Objective – Something sought, or aimed for, related to quality.
Note 1: Quality Objectives are generally based on the organization’s quality policy.
Note 2: Quality objectives are generally specified for relevant functions and levels in the
organization.
46) Quality Plan – Document specifying which procedures and associated resources shall be
applied by whom and when to a specific project, product, process or contract.
47) Quality Planning – Part of Quality management focused on setting quality objectives and
specifying necessary operational processes and related resources to fulfill the quality objectives.
Note: Establishing quality plans can be part of quality planning.
Revision: 02 Rev. Date: 30.03.2010 Page 8
KSPHC Quality Manual
48) Quality Policy – Overall intentions and direction of an organization related to quality as formally
expressed by top management.
Note 1: Generally the quality policy is consistent with the overall policy of the organization and
provides a framework for the setting of quality objectives.
Note 2: Quality Management principles presented in this international standard forms the basis
for the establishment of the quality policy of the organization.
49) Record - anything (such as a document or a photograph) providing permanent evidence of or
information about past events; it also includes documents in digital form
50) Repair – Action on a nonconforming product to make it acceptable for the intended use.
51) Requirement – need or expectation that is stated, generally implied or obligatory.
52) Review – Activity undertaken to determine the suitability, adequacy and effectiveness of the
subject matter to achieve established objectives.
53) Re-work – Action on a nonconforming product to make it conform to the requirements.
54) Scrap – Action on a nonconforming product to preclude its originally intended use.
55) Side letter – Any correspondence between KSPHC and other outside agencies which forms part
of agreement document.
56) Specification – Document stating requirements.
57) SR – Schedule of rates of respective PWD Circles
58) Supplier – Organisation or person that provides a product (A producer, distributor, retailer or
vendor of a product, or a provider of a service or information; in contractual situation, a supplier is
sometimes called a “contractor”; in the context of projects, ‘contractor’ or ‘subcontractor’ is often
used in place of “supplier”).
Note: A supplier can be internal or external to the organization.
59) System – set of interrelated or interacting elements
60) Test – Determination of one or more characteristics according to a procedure.
61) Top Management – Person or group of people who direct and control an organization at the
highest level. (in case of KSPHC, it is Board of Directors represented by CMD).
62) Top Management Committee – A sub – committee of top management consisting of Chairman
and Managing Director, Executive Director, Chief Engineer and Financial Advisor to review the
detailed QSPs and implement the same through out the Corporation. Further it also consists of
the Management Representative and also the Chief co – ordinator for implementation of QMS as
its co – opted members.
63) Traceability – Ability to trace the history, application or location of that which is under
consideration.
64) Validation – Confirmation, through the provision of objective evidence, that the requirements for
a specific intended use or application have been fulfilled.
65) Verification – Confirmation, through the provision of objective evidence, that specified
requirements have been fulfilled.
Revision: 02 Rev. Date: 30.03.2010 Page 9
KSPHC Quality Manual
4 Quality Management system (QMS)
4.1 General requirements
The Quality Management System is established, documented, implemented and maintained
and its effectiveness is continually improved in accordance with adopted management
system standard. While developing QMS following are ensured:
a) Determination of the processes needed for the management system and their application
throughout the organization (no exclusions are made),
b) Determination of the sequence and interaction of these processes,
c) Determination of criteria and methods needed to ensure that both the operation and
control of these processes are effective,
d) Availability of resources and information necessary to support the operation and
monitoring of these processes,
Monitoring, measurement and analysis of these processes are carried out, and actions
necessary to achieve planned results and continual improvement of these processes are
implemented appropriately. These processes are managed in accordance with the
requirements of QMS standard. Processes needed for the quality management system
referred to above include processes for management activities, provision of resources,
product realization and measurement.
AT KSPHC, Management of Construction Projects is the core business operation. The
construction activity is contracted to competent contractors. However, the project monitoring
and control is taken care by the respective Divisions / Sub-divisions. In support of this,
quality monitoring activity is performed by appointed agencies and this is carried out in
addition to quality control activities performed by the contractors as part of construction
contracts. Controls over outsourced processes are exercised to ensure achievement of
organizational objectives.
4.2 Documentation requirements 4.2.1 General
The quality management system documentation include
a) Documented statements of Quality Policy and Quality Objectives
b) Quality Manual,
Revision: 02 Rev. Date: 30.03.2010 Page 10
KSPHC Quality Manual
c) Documented procedures and controls required by ISO 9001:2008 standard,
d) Documents that are determined to be needed by the organization to ensure the effective
planning, operation and control of its processes, and
e) Records required by the adopted management system standard and those determined by
the organization.
4.2.2 Quality Manual
This Quality Manual provides a broad overview of the KSPHC system practices and it
includes details of:
a) The scope of the quality management system (none of the elements of clause 7 are
excluded),
b) The references of documented procedures established for the quality management
system (referred under relevant clause numbers), and
c) A description of the interaction between the processes of the quality management
system (see Annex 1).
4.2.3 Control of documents
A procedure has been established for controlling all documents required by the QMS. The
procedure defines the controls needed to
a) approve documents for adequacy prior to issue,
b) review (periodically and/or when necessary) and update as necessary and re-
approve the documents,
c) ensure that changes and current revision status of documents are identified,
d) ensure that relevant versions of applicable documents are available at points of use,
e) ensure that documents remain legible and readily identifiable,
f) ensure that documents of external origin determined by KSPHC to be necessary for
the planning and operation of QMS are identified and their distribution is controlled,
and
g) prevent the unintended use of obsolete documents and apply suitable identification if
they are retained for any purpose.
MR (QMS) maintains Master list of documents QMS/ML/01 which indicates the latest
revision status of all QMS documents, and a list of controlled copyholders of various QMS
Revision: 01 Rev. Date: 09.09.2009 Page 11
KSPHC Quality Manual
documents. The documents are issued / controlled and maintained in soft copy / hard copies
as described in the procedure for control of documents.
Applicable procedure: QSP 01– Control of documents.
4.2.4 Control of records
QMS records are established and maintained to demonstrate the conformity to the
requirements of QMS standard. Documented procedure has been established and
maintained for the identification, maintenance, retrieval, retention and disposal of QMS
records. Relevant legal and/or Regulatory requirements are taken in to account while
determining the controls for records.
Applicable procedure: QSP 02– Control of records
Revision: 01 Rev. Date: 09.09.2009 Page 12
KSPHC Quality Manual
5 Management Responsibility
5.1 Management Commitment
Top management of KSPHC is committed to the development and implementation of the
Quality Management System and to continually improve its effectiveness. It has established
its Vision, Mission and quality policy (see Clause 5.3) and objectives, which form the basis
for developing, implementing, monitoring and controlling the quality systems and to provide
resources for this achievement. For ensuring effectiveness and continual improvements of
the QMS, the importance of Quality Policy and Quality Objectives, Customer’s requirements,
applicable statutory and regulatory requirements for the product is communicated within the
organization. The continuing suitability of QMS is assessed though management reviews.
5.2 Strategic process
Top management of KSPHC has developed its Quality Management System based on the
application of quality management principles.
5.2.1 Customer focus
KSPHC is aware of the fact that its product (buildings) and services (e-tendering and e-
commerce, project monitoring) contribute to the well being of personnel in their living and
work area, which influences public duties performed by them. Secondly, as public money is
being spent, KSPHC’s performance is accountable to public and the public is the prime
interested party in the performance of KSPHC. For this reason, KSPHC maintains
transparency in its activities and provides relevant information to public through its portal
(visit www.ksphc.org).
To maintain Quality, transparency, cost and time optimization are the permanent objectives
of KSPHC in all its activities. While determining the balance between time or cost and
product (buildings) quality, potential impacts on the project is evaluated, taking into
consideration customers’ requirements.
Revision: 01 Rev. Date: 09.09.2009 Page 13
KSPHC Quality Manual
5.2.2 Leadership
Top management of KSPHC has established unity of purpose and direction of the
organization. KSPHC provides and maintains the internal environment in which people can
become fully involved in achieving the organization’s objectives.
For each of the project taken by KSPHC, Executive Engineer (EE) of a particular division is
treated as the Project Manager. The Executive Engineer is vested with the defined
responsibility and requisite authority for managing the project.
The top management of KSPHC assumes leadership in creating a culture for quality
• By setting the quality policy and identifying the objectives (including the quality
objectives) for the project,
• By providing the infrastructure and resources to ensure achievement of project
objectives,
• By providing an organizational structure conducive to meet project objectives,
• By making decisions based on data and factual information,
• By empowering and motivating all project personnel to improve the project processes
and product, and
• By planning for future preventive actions. 5.2.3 Involvement of people
People at all levels are the essence of an organization and their full involvement enables
their abilities to be used for the organization’s benefit. The top management of KSPHC
strives to enhance the involvement of people by encouraging through various means such
as recognitions, rewards, suggestion schemes etc.,
At KSPHC, personnel have well-defined responsibility and authority for their participation in
the projects. The authority delegated to the project participants correspond to their
responsibility.
Revision: 01 Rev. Date: 09.09.2009 Page 14
KSPHC Quality Manual
In order to improve the performance, top management of KSPHC envisages and provides
appropriate tools, techniques and methods to the personnel to enable them to monitor and
control the processes.
5.2.4 Process approach
A desired result is achieved more efficiently when activities and related resources are
managed as a process.
KSPHC has identified all the processes of its business. The key processes of the Quality
Management System, their sequence and interactions are briefly illustrated in Annex A.
Further, project processes have been identified and documented (relevant procedures are
referenced under product realization processes. The originating organization (e.g., Govt. of
Karnataka, Police department, Prisons department, Forest department) may communicate
the experience gained in developing and using its own processes, or those from its other
projects to KSPHC (the project organization). KSPHC takes into account this experience
when establishing the project’s processes and exchanges with the user an instrument /
document setting forth the parameters and responsibilities and deliverables of the project. In
this instrument, KSPHC sets over the processes that are unique to the project,
- By identifying the appropriate processes for the project,
- By identifying the inputs, outputs and the objectives for the project’s processes,
- By identifying the process owners and establishing their authority and responsibility,
- By designing the project’s processes to anticipate future processes in the life cycle of
the project, and
- By defining the interrelations and interactions among the processes.
Process effectiveness and efficiency are assessed through internal (KSPHC) or external
review. Where and to the extent possible, assessments are made by benchmarking or
evaluating the processes against a maturity scale. Maturity scales typically range in degrees
of maturity from “no formal system” to “best-in-class”. KSPHC intends to implement, as a
part of continual improvement, appropriate maturity models developed from different
applications.
Revision: 01 Rev. Date: 09.09.2009 Page 15
KSPHC Quality Manual
5.2.5 System approach to management
Identifying, understanding and managing interrelated processes as a system, contributes to
the organization’s effectiveness and efficiency in achieving its objectives. In general, the
system approach to management allows for the coordination and compatibility of an
organization’s planned processes and a clear definition of their interfaces.
KSPHC carries out each project as a set of planned, interrelated and interdependent
processes. KSPHC, the project organization, defines and links the processes needed, to
integrate and manage them as a system aligned with the originating organization’s overall
system (where necessary).
5.2.6 Continual Improvement
Continual improvement of the organization’s overall performance is a permanent objective of
the organization. The cycle of continual improvements is based on “Plan-Do-Check-Act”
(PDCA) concept.
KSPHC assumes as its responsibility to continually improve the effectiveness and efficiency
of the processes for which it is responsible. Management of projects is treated as a process
rather than an isolated task. The established Quality Management System enables it to
record and analyze the information gained during a project, for use in a continual
improvement process. Internal / external audits and assessments are valued as a source to
identify opportunities for improvement.
5.2.7 Factual approach to decision making
Effective decisions are based on analysis of data and information
Information about the project’s progress and performance are recorded using web-based
project monitoring system. Performance and progress evaluations are carried out in order to
assess the project status. The information from performance and progress evaluations are
analyzed to make effective decisions regarding the project and for revising the project
management plan. Information from project closure reports of previous projects are
appropriately analyzed and used to support the improvement of current or future projects.
Revision: 01 Rev. Date: 09.09.2009 Page 16
KSPHC Quality Manual
5.2.8 Mutually beneficial supplier relationships
An organization and its suppliers are interdependent and a mutually beneficial relationship
enhances the ability of both to create value.
KSPHC defines its strategies for obtaining external products / services (services of
contractors); where required it collaborates with contractors for defining its strategies,
especially in the case of project of long duration and of multiple / complex phases.
KSPHC evaluates and determines suppliers ability to meet its requirements for processes
and products, and takes into account the customer’s preferred suppliers or selection criteria
where required.
KSPHC supports its suppliers including contractors technically and financially within the
limits of company’s policy and procedural limitations; this includes for example, training its
contractor on usage of web-based PMS, advising about the external laboratory services
available for testing and calibration, providing financial advances for those who fulfill the
prescribed company’s criteria, etc.,
5.3 Vision, Mission and the Quality Policy
KSPHC has established its vision, mission and quality policy as part of its strategic business
management and to excel as one among the best-organized Government Organization in
providing services. This provides a framework for establishing and reviewing quality
objectives. The top management ensures that the organization’s vision, mission and the
quality policy is communicated and understood within the organization. Organization’s vision,
mission and the quality policy is reviewed at appropriate times for its continuing suitability.
In the following page, the full text of Organization’s vision, mission and quality policy is
reproduced from approved document. This document is subject for top management’s
periodical review at least once every two years and it is revised and updated as necessary.
Revision: 01 Rev. Date: 09.09.2009 Page 17
KSPHC Quality Manual
Karnataka State Police Housing Corporation Limited
OUR VISION
To organize ourselves as total quality people to achieve world-class standards in all
our endeavours, and be a role-model for excellence in public service
MISSION
� Karnataka State Police Housing Corporation Limited (KSPHCL) commits
itself to continually improving the competence of its personnel to meet the
changing needs of business for e-governance, and shall implement total
e-governance in phases for all business facets, ensuring complete
transparency and the right of the public to obtain information
� Construction of buildings and providing services, according to specifications,
will be carried out by fulfilling intended user requirements, ensuring optimized
quality and achieving sustainable development
� KSPHC shall comply with ISO 9001 Quality Management Systems, and
continually improve the efficiency of the system processes and contribute to
the optimal utilization of the project resources in a cost-effective and timely
manner
QUALITY POLICY
KSPHC is committed to innovatively building for better Police-community relations by
adhering to total transparency and right to information and striving continually to
provide improved quality products and services that are cost-effective and delivered
in time.
1st January, 2005 Sd/-
Bangalore Chairman & Managing Director
Revision: 01 Rev. Date: 09.09.2009 Page 18
KSPHC Quality Manual
5.4 Planning
5.4.1 Quality Objectives
With the aim of achieving the quality policy, to achieve continual improvement, Quality
objectives are established at relevant functions and levels within the organization (refer to
document CMD / QMS / QO / 01). These objectives are measurable and are consistent with
the company’s quality policy. Quality objectives are time-bound target achievements and
hence, document CMD / QMS / QO / 01 is prepared for every financial year. It is periodically
reviewed and revised as appropriate, at least once a year. The Board reviews annually the
records of continual improvement, plan and sets the standards and objectives to be followed
in the subsequent years.
5.4.2 Quality management system planning
The Quality Management System planning is carried out considering the required resources
that are necessary to provide checks and controls within the processes of the Quality
Management System. These are documented in the QMS documentation at various levels
and are subjected to periodical review for ascertaining their continued suitability and
effectiveness.
The integrity of Quality Management System is maintained whenever changes to the Quality
Management System are planned and implemented.
5.5 Responsibility, authority and communication
5.5.1 Responsibility and authority
Organization Chart is given Annex 2. Process owners responsible for various processes of
QMS are given in Annex 3 - Responsibility and authorities of personnel. Responsibility and
authorities are further described in relevant quality system procedures.
5.5.2 Management representative
Top Management (C&MD / ED) appoints the Management Representative and the Chief
Coordinator-QMS through an office order. The Management Representative (M.R) will be a
Revision: 01 Rev. Date: 09.09.2009 Page 19
KSPHC Quality Manual
member of organization’s own management. M.R will be assisted by Chief Coordinator –
QMS who will support M.R in all his/her endeavours. The Management Representative is
assigned with the additional responsibility and authority for:
a) Ensuring that processes needed for the Quality Management System are
established implemented and maintained.
b) Reporting to top management of the performance of the Quality Management
System and any need for improvement, and
c) Ensuring the promotion of awareness of customer requirements throughout the
organization.
5.5.3 Internal communication
KSPHC strongly believes that internal communication regarding the effectiveness of the
Quality Management System will aid in the organization’s performance improvements and
directly involves its people in the achievement of quality objectives. For this one or more of
the following methods are used:
� Management-led communication in work areas, team briefings and other meetings
� Notice Boards, E-mails, Bulletin boards, Discussion Forum…etc
� Employee suggestion schemes
5.6 Management Review
5.6.1 General
The CMD / Executive Director ensure review of the Quality Management System at least
once in 6 months to assess its continuing suitability, adequacy and effectiveness. A report
is placed before the Board of Directors annually giving the status and suggestions for
improving of quality objectives. The decisions of the Board of Directors are in turn
implemented within the corporation.
CMD, Executive Director, Chief Engineer, Financial Advisor, MR and CC-QMS will evaluate
the need for changes to the organization’s Quality Management System, including quality
Revision: 01 Rev. Date: 09.09.2009 Page 20
KSPHC Quality Manual
policy and quality objectives. Other personnel appropriate and required for the specific
review subject will be invited.
5.6.2 Review input
MR and CC-QMS collect & compile the data from process owners and provide following
information as the input for management review which include information on
a) Follow-up actions from previous management reviews
b) Results of QMS audits,
c) Customer feedback,
d) Process performance and product conformity
e) Progress evaluations of projects*
f) Status of preventive and corrective actions,
g) Changes (proposed) that could affect the Quality Management System,
h) Recommendations for improvement, and
i) Progress made in respect of achieving quality policy and quality objectives set at
functional levels (depending upon the target time set) and its continuing suitability.
5.6.3 Review output
MR / CC-QMS will record the management review details and maintain it. MR / CC- QMS
will communicate to all concerned about the decisions and actions related to
a) Improvement of the effectiveness of the QMS and its processes,
b) Improvement of product related to customer requirements (identified & perceived
requirements)
c) Resource needs.
Applicable procedure: QSP 05 - Management Review
Revision: 01 Rev. Date: 09.09.2009 Page 21
KSPHC Quality Manual
6 Resource management
6.1 Provision of resources - General
Top Management determines and provides the resources needed
a) To implement and maintain the Quality Management System and to continually improve
its effectiveness, and
b) To enhance customer satisfaction by meeting requirements. The resources required for the effective management of Quality System in the organization
include the following:
1) Financial resources 2) Human resources
3) Infrastructure and
4) Work environment
6.1.1 Financial resource
One of the important activities to avoid time and cost overrun in any project is dependent
upon proper finance management. In this regard, KSPHC has put in a system to achieve the
desired results and the processes identified towards achieving the desired results are:
�� Preparation of annual budget
�� Accounting of all the financial transactions
�� Compliance to statutory requirements
�� Finalization of accounts 6.1.1.1 Preparation of annual budget
In this process, the proposed projects to be taken up in the succeeding financial year based
on the requirement of user departments are reviewed. The financial implications are worked
out for the proposed projects to be taken up during the next financial year in the last quarter
of the preceding year. Further the financial resources required to meet the expenditure
towards other related resources required along with the infrastructure necessities are also
forecast. As this process is multi-disciplinary activity the reviews are performed along with
Revision: 01 Rev. Date: 09.09.2009 Page 22
KSPHC Quality Manual
project and other relevant functional heads to ensure that sufficient and timely resources are
available to meet the project objectives.
6.1.1.2 Accounting of all the financial transactions
KSPHC has put in an accounting process for all its financial transactions, which are
transparent. It has put in a process for proper accounting of all the financial transactions to
facilitate providing of information to all its stakeholders including the general public. A system
for internal Audit and AGs audit has been established to ensure proper verification and
accounting of all the financial transactions.
6.1.1.3 Compliance to statutory requirements
KSPHC functions under the provisions of the Companies Act, 1956 and other applicable
statutes like Income Tax Act, Sales Tax Act, PWD Finance Code and Government orders /
Circulars issued from time to time.
The KSPHC has formulated suitable process and has documented the same. 6.1.1.4 Finalization of accounts
KSPHC has put in a process for finalization of accounts as per the provisions of Companies
Act, 1956 and applicable accounting standards as issued by the Institute of Chartered
Accountants of India from time to time. It has established a process for conducting of
statutory audits and supplement by audit from the officers of Accountant General.
6.1.2 Financial Resource control
Reviews are performed along with project and other relevant functional heads to ensure that
sufficient resources are available to meet the project objectives.
Deviations from the resource plans are identified, analyzed, acted upon and recorded. Decisions on actions to be taken are made after considering the implications for other project
processes and objectives. Changes that affect the project objectives are agreed with the
customer and relevant interested parties before implementation. Revisions of forecasts of
resource requirements are coordinated with other project processes when developing the
plan for remaining work.
Revision: 01 Rev. Date: 09.09.2009 Page 23
KSPHC Quality Manual
Root causes for shortages or excesses in resources are identified, recorded and used as
input for continual improvement.
Applicable procedure: QSP 06 - Finance management 6.2 Human processes
6.2.1 General
Initially, the human resource requirements of the company has been determined as given in
State Gazette notification dated 28 January 1995 and amended form time to time (Main
section 4, sub-section 2-C (i)) No.57), as per Government of Karnataka’s order No. HD 209
PO PE SE 94 dated 27.01.1995. The top management of KSPHC identifies and determines
the resources needed for the project (on-hand as well as potential) and get necessary
sanction for it from appropriate authority. Top management, with the help of establishment
section (AAO) plan and indicate how, and from where, resources will be obtained and
allocated. If applicable, this planning also includes the manner of disposition of excess
resources. The plans are made suitable for resource control.
The Top Management and other relevant functional heads verify the validity of the inputs to
resource planning. The stability, capability, and performance of organizations supplying
resources (e.g. KPWD, KPC, etc.,) are evaluated along with the capability and suitability of
personnel who are being inducted. Pre-induction verification of the suitability and post-
induction training to fulfill the perceived gaps in skills required would be arranged by the Top
Management together with the familiarization programme.
Personal attributes are considered in the selection of project personnel. Special attention is
given to the competence requirements of key personnel.
The assignment of personnel to specific jobs or roles are confirmed and communicated to all
concerned. The overall performance, including the effectiveness and efficiency of personnel
in their job assignments, are monitored to verify that the assignments are appropriate. Based
on results, appropriate actions are taken such as re-training or recognizing achievement.
Revision: 01 Rev. Date: 09.09.2009 Page 24
KSPHC Quality Manual
6.2.2 Competence, training and awareness KSPHC recognizes the importance of identifying & imparting training needed for its
personnel to ensure effective operation / performance of QMS.
A procedure has been established, implemented & maintained for the identification and
provisioning of training needs to ensure that:
a) the necessary competence for personnel performing work affecting conformity to product
requirements are determined,
b) where applicable, training or other actions are taken to achieve the necessary
competence,
c) the effectiveness of the actions taken is evaluated,
d) personnel are aware of the relevance and importance of their activities and how they
contribute to the achievement of the quality objectives, and
e) appropriate records of education, training, skills and experience are maintained
Applicable procedure: QSP 08 - Human resource development
6.3 Infrastructure Top Management considers the needs for providing or changing the infrastructure through
reviewing the present and future needs of the business. Management review will be one of
the platforms that provide further inputs. With this, they determine the actual needs and
provide it.
Functional Heads ensure proper maintenance of the infrastructure provided. Applicable procedure: QSP 10 - Infrastructure maintenance
6.4 Work environment Through formal or informal methods, Top Management ascertains the requirements
pertaining to work environment, which are necessary for achieving conformity to product
requirements and ensure it’s provisioning.
Work environment for construction are process specific and these requirements are taken
care by providing necessary instructions to contractors by incorporating in the tender
conditions itself.
Revision: 01 Rev. Date: 09.09.2009 Page 25
KSPHC Quality Manual
7 Product realization
KSPHC is a Government owned company, which is entrusted with such works as
Government feels and as set out in Memorandum of Association and KSPHC in turn gets
these projects executed through registered agencies as required.
In this section, the clauses of ISO 9001 - pertaining to product realization is integrated with
those of ISO 10006 to provide an integrated system that fulfills the KSPHC Quality
Management System. Further, since Clause 7.1 and 7.5 is common to many of the
functions, descriptions given under these clauses are not exhaustive. The relevant QSP will
provide more details.
7.1 Planning of product realization
In order to realize product that would fulfill product quality requirements, all necessary
processes have been identified and established giving due consideration for the following as
appropriate:
a) Quality objectives and requirements for the product;
b) The need to establish processes, documents, and provisioning of resource specific to the
product;
c) Required verification, validation, monitoring, inspection, and test activities specific to the
product and criteria for product acceptance;
d) Records needed to provide evidence that the realization processes and the resulting
product fulfill requirements
The seven project management process groupings (ISO 10006:2003) necessary to produce
the project’s product are as follows:
1) Interdependency-related processes
2) Scope-related processes
3) Time-related processes
4) Cost-related processes
5) Communication-related processes
6) Risk-related processes, and
7) Purchasing-related processes
Revision: 01 Rev. Date: 09.09.2009 Page 26
KSPHC Quality Manual
Requirements of elements of above stated processes are integrated with the requirements of
ISO 9001 elements in the following clauses.
7.2 Customer related processes
7.2.1 Determination of requirements related to the product
KSPHC mainly executes construction projects for its client organizations; thus its chief
products are buildings and services. Other products and services are as set out in the
Memorandum of Association and / or as decided by the Board.
KSPHC always strives to add value to its products and services. Every effort is made in
order to identify and fulfill the requirements of these products/ services. Requirements
related to product are determined by various means. This includes, but is not limited to,
1) Available standards published by the National / International organizations related to
construction and related subjects,
2) Determining customer expectations for the product by
a) Analysing product features and value with that of competitor’s products,
b) Enhancing product’s “value for the money” optimizing Quality-Cost relationship
c) Considering cultural and other needs of product users,
d) Changing needs and future projected expectations of the customers
e) Attending various conferences related to technical advances in product and project
management and also by referring to available literature and consulting experts.
While planning for the execution of projects, following points are considered:
a) Requirements specified by the customer including the requirements for delivery,
post-delivery activities and for maintenance purposes.
b) Requirements not stated by the customer but necessary for specified or intended
use where known,
c) Statutory and regulatory requirements related to the product if any (e.g., stipulated
requirements by the local / regional authorities such as corporations, municipal
councils, act and rules related to construction and related activities etc.,), and
d) Any additional requirements determined by the organization
Revision: 01 Rev. Date: 09.09.2009 Page 27
KSPHC Quality Manual
7.2.1.1 Concept development
Customer needs and expectations for product and processes, both stated and generally
implied, are translated into documented requirements, including statutory and regulatory
aspects which, when required by the customer, are mutually accepted.
Other stake holders are identified and their needs established. These are translated into
documented requirements and, where relevant, accepted by the customer.
7.2.2 Review of requirements related to the product.
SUPERINTENDING ENGINEER (HQ & S) and Executive Engineer (Quality / Contracts)
review the contract requirements related to the product. This review is conducted prior
to the organization’s commitment to supply a product to the customer to ensure that,
a) Product requirements are defined,
b) Order requirements differing from those previously expressed are resolved, and,
c) The organization has the ability to meet the defined requirements.
Records of the result of the review and action arising from the reviews are maintained.
KSPHC has identified all the processes of its business. The key processes of the Quality
Management System, their sequence and interactions are briefly illustrated in Annex 1.
Further, project processes have been identified and documented (relevant procedures are
referred in Annex A under product realization processes. The originating organization (e.g.,
Govt. of Karnataka, Police department, Prisons department, Forest department) may
communicate the experience gained in developing and using its own processes, or those
from its other projects to KSPHC (the project organization). KSPHC takes into account this
experience when establishing the project’s processes and exchanges with the user an
instrument / document setting forth the parameters and responsibilities and deliverables of
the project. In this instrument KSPHC set out the processes that are unique to the project.
7.2.2.1 Scope development and control
When developing the project scope, the characteristics of the project’s product are identified
and documented in measurable terms and as completely as is possible. These
characteristics are used as the basis for design and development. Project management plan,
Revision: 01 Rev. Date: 09.09.2009 Page 28
KSPHC Quality Manual
which makes reference to the quality plan, specifies how these characteristics will be
measured or how their conformity to the customers and other requirements of the other
stakeholders will be assessed. KSPHC ensures that product and process characteristics are
traceable to the documented requirements of the customer and other stakeholders.
When alternative approaches and solutions are considered during scope development,
supporting evidence (including the analysis performed and other considerations used) are
documented and referred in the scope.
Where the customer provides no documented statement of requirement, the customer
requirements are confirmed before acceptance.
7.2.2.2 Change management
Change management covers the identification, evaluation, authorization, documentation,
implementation and control of change. Before a change is authorized, the intent, extent and
impact of the change are analyzed. Those changes that affect the project objectives are
agreed with the customer and other relevant stakeholders.
Change management takes the following into account:
- Managing changes to project scope, project objectives, and to the project management
plan;
- Coordinating changes across inter-linked project processes and resolving any conflicts.
Changes may result in negative impacts (e.g. claims) on the project and are identified as
soon as possible. The root causes of negative impacts are analyzed and the results used to
produce prevention-based solutions and implement improvements in the project process.
Where Product requirements are changed, it is ensured that relevant documents are
amended and concerned department / personnel are made aware of the change in
requirement.
7.2.3 Customer communication
Concerned Superintending Engineer ensures implementation of effective communication
established (as described in the procedure QSP 12) for communicating with customer in
relation to
Revision: 01 Rev. Date: 09.09.2009 Page 29
KSPHC Quality Manual
a) Product information,
b) Enquiries, and
c) Customer feedback, including customer complaints
7.2.3.1 Communication planning
KSPHC ensures that appropriate communication processes are established for the project,
and that communication takes place regarding the effectiveness and efficiency of the Quality
Management System.
Communication planning takes into account the needs of the originating organization,
customers and other stakeholders, and should result in a documented communication plan.
This communication plan defines the information that will be formally communicated, the
media used to transmit it and the frequency of communication. The requirements for the
purpose, frequency, timing and records of meetings are defined in the communication plan.
The format, language and structure of project documents and records as far as possible in
digital form are planned to ensure compatibility. The communication plan defines the
information management system, identify who will send and receive information, and
reference to the relevant document control, record control and security procedures. The
format for progress evaluation reports is designed to highlight deviations from the project
management plan.
Applicable Procedure: QSP 12 - Project Management
7.3 Design and development
7.3.1 Design and development planning
Superintending Engineer- [SE- (HQ & S)] plans and controls the design and development of
product designed specifically for the customer (originating organization) requirements that is
provided / specified in Memorandum of Understanding or other customer communication.
SE- (HQ & S) coordinates with originating organization or their representative for the
development
of product and determine
Revision: 01 Rev. Date: 09.09.2009 Page 30
KSPHC Quality Manual
a) The product development stages
b) The review, verification and validation that are appropriate to each stage of product
development
c) The responsibilities and authorities for various development activities.
SE- (HQ & S) manages the interface between different groups involved in the
development of project management plan to ensure effective communication and clear
assignment of responsibility and fulfilling of liaison requirements.
Design development planning is updated, as appropriate, as the development progresses.
Design development plan is referred in the project management plan.
7.3.2 Design and development inputs
SE- (HQ & S) or his designated representative determines inputs relating to the
product requirements. Records of design inputs are maintained. The inputs include
a) Product characteristics,
b) Applicable statutory and regulatory requirements, (if any), and
c) Where applicable, information derived from previous similar products and other
requirements essential for product development
These inputs are reviewed for adequacy to ensure that requirements are complete,
unambiguous and not in conflict with each other.
7.3.2.1 Conceptual design for customer approval
Customer needs and expectations for product and processes, both stated and generally
implied, are translated into documented requirements, including statutory and regulatory
aspects after being reviewed by the customer and mutually accepted. Based on this,
conceptual drawings are made and sent to customer for approval. The approved conceptual
drawings are used as design input to develop design outputs and a set of approved
drawings is made available to the customer for record. The executing agency is required to
follow these drawings faithfully. Any difficulty encountered during execution will be brought to
the notice of KSPHC by the agency for immediate resolution in consultation with customer
Revision: 01 Rev. Date: 09.09.2009 Page 31
KSPHC Quality Manual
7.3.2.2 Time related issues (constraints) as design inputs
The time related processes aim to determine dependencies and the duration of the activities
and to ensure timely completion of the project. The constraint of project time (duration) is
taken into account while designing the product or process specifications (for example, using
quick setting methods / materials to avoid time-overrun). Any time spent on obtaining
statutory and regulatory licenses is to be excluded from the project time, as it is the duty of
the customer to obtain these licenses.
7.3.2.3 Risk identification and assessment as input to design
Risk identification is performed at the initiation of the project when significant decisions are
made. Experience and historical data from previous projects are used for this purpose. The
output of this process is recorded as a part of design input records. Examples of risk
identification – land condition, surrounding environmental conditions, potential natural risks,
and applicable current and anticipated statutory and regulatory requirements.
Risk assessment is the process of analysing and evaluating identified risks to the project
processes and to the project’s product.
A quantitative and / or qualitative analysis is made for the risks identified and the risk
assessment results are used as design input.
7.3.3 Design and development outputs
The product development outputs are provided in a form that enables verification against the
development input and are approved before release.
SE- (HQ & S) reviews the product development outputs to ensure that
they a) Meet the input requirements for product development,
b) Provide appropriate information for purchasing (contracting) and construction
activities,
c) Contain or reference product acceptance criteria, and
d) Specify the characteristics of the products that are essential for its safe and proper
use.
Revision: 01 Rev. Date: 09.09.2009 Page 32
KSPHC Quality Manual
7.3.4 Design and Development Review
At suitable stages, systematic reviews of product development are performed in accordance
with planned arrangements (documented in design and development plan).
a) To evaluate the ability of the results of design & development to meet requirements, and
b) To identify any problems and propose necessary actions.
Participants in such reviews include the representatives of functions concerned (client, if
necessary) with the design and development stage that are being reviewed. Records of the
results of the reviews and action taken are maintained.
7.3.5 Design and Development Verification
Verification is performed in accordance with the procedure to ensure that product
development outputs have met the product development input requirements. Records of the
results of the verification and action taken are maintained.
7.3.6 Design and Development Validation
It is impracticable to validate the project’s product (buildings) before its delivery. However,
product characteristics and related process specifications are established using proven data
or using a national / international standard. In addition to this, complaints received regarding
product / product performance during the maintenance period, subsequent action taken to
resolve it are correlated with relevant monitoring and measurement data to determine
deficiency in product / process specifications. This information is analysed to determine the
design related deficiency and to validate the design.
7.3.7 Control of Design and Development changes
The changes identified during any stage of design and development cycle are reviewed,
verified and validated, as appropriate, and approved before implementation. The review of
product development changes includes evaluation of the effect of the changes on the
product already delivered (i.e., in case of similar previous projects such mistakes that have
happened will be identified and evaluated to initiate necessary action).
Records of the results of the review of changes and any necessary actions are maintained.
Revision: 01 Rev. Date: 09.09.2009 Page 33
KSPHC Quality Manual
Applicable procedures:
1) QSP 13 - Design and development
2) QSP 14 - Eco-friendly measures
3) QSP 15 - Energy saving and other alternatives
7.4 Purchasing
7.4.1 Purchasing process
At KSPHC, the core business element is contractor control activity since the project is
generally contracted and executed. Also, the purchase activity carried out by the
organization for supporting administrative and for providing infrastructure and related
maintenance services are covered under this process. The purchase activities are being
carried out through tendering process.
The purchase-related processes deal with obtaining finished product (building) and also
other products/ services required by the organization. The purchase-related processes are
a) Purchase planning and control,
b) Registration of suppliers (open ended process),
c) Documentation of purchase requirements,
d) Supplier evaluation,
e) Contracting, and
f) Contract control.
7.4.1.1 Purchase planning and control
For projects, which are administratively approved by the competent authority, and for which
expenditure has been sanctioned, the estimates are prepared by the Concerned Executive
Engineer, based on the “Schedule of Rates” (SR) wherever applicable to a particular circle.
These estimates are subjected to technical approval / sanction by competent authority. In
case the project is under deposit contribution scheme, client’s approval is sought for the
estimate. These technically cleared estimates form the basis for purchase planning and
further activities.
Revision: 01 Rev. Date: 09.09.2009 Page 34
KSPHC Quality Manual
The purchase activities carried out by the organization for supporting administrative and for
providing infrastructure and related maintenance services are carried out by functional
Heads within the ambit of the powers delegated.
7.4.1.2 Registration of suppliers
For any supplier carrying out business with KSPHC, registration with KSPHC is a pre-
requisite. This registration process is an open ended process which can be done by the
suppliers either through on-line or through direct approach.
7.4.1.3 Documentation for purchase
Each project taken by KSPHC is treated as unique since project characteristics are generally
unique. The designated functional heads prepare following documentation for purchase.
a) Notice inviting tenders including terms and conditions and pre-qualifying criteria for
suppliers (for the project under consideration)
b) Tender documents
E-tendering system is also in vogue. Where and to the extent possible, this facility will be
utilized.
7.4.1.4 Purchase Procedure
Purchase process is carried out in the following stages.
• Evaluation of intending suppliers
• Approval of eligible suppliers by competent authority
• Issue of tender documents
• Pre-bid meeting whenever required
• Training to prospective suppliers in case of e-tendering
• Receipt of offers
• Evaluation of offers
• Approval of the supplier by the competent authority
• Issue of letter of acceptance
• Entering into contract
Revision: 01 Rev. Date: 09.09.2009 Page 35
KSPHC Quality Manual
7.4.2 Purchase information
Purchase information describes the product to be purchased, including where appropriate
a) Requirements for approval of product, procedures, processes and equipment,
b) Requirements for qualification of personnel, and
c) Quality management system requirements.
KSPHC will ensure the adequacy of specified purchase requirements prior to their
communication to the supplier.
7.4.3 Verification of purchased product
Purchase activities are carried out against purchase documents. In case of construction
activities, it is dealt in detail under clause number 7.5.1 (Control of production and service
provision).
In case of construction activities, Contract control starts with the issue of letter of
acceptance. Web based project monitoring system has been established to assist in contract
control. Contract control includes the establishment of appropriate contractual relationships
and the integration of the outputs for overall management of the project.
Supplier performance is monitored continuously to ensure it meets contract conditions. The
results of monitoring are provided to suppliers to initiate necessary corrective actions.
Prior to contract closure, it is verified that all contract conditions have been met and that
feedback on supplier performance has been obtained to update the register of approved
suppliers. This data is used for future evaluation or determining re-evaluation of the
suppliers.
Applicable procedure:
1) QSP 16 – Purchasing - General
2) QSP 17 - Construction contracts & providing e-Tendering services
Revision: 01 Rev. Date: 09.09.2009 Page 36
KSPHC Quality Manual
7.5 Production and service provision
7.5.1 Control of production and service provision (project execution and control)
Control of production and service provision encompasses four main business activities
such as:
1) Construction management
2) E-Tendering services
3) E-Commerce services 4) Web based project management system
Concerned Executive Engineer (of particular division to which the project is assigned) with
due delegation to respective sub-division and designated AEE, AE / JE plan and carry out
project execution activities under controlled conditions. Controlled conditions includes, as
applicable
a) The availability of work instructions/check list to approve the current activity/task & proceed to next activity/task, as necessary
b) The use of the suitable equipment,
c) The availability and use of monitoring and measuring devices,
d) The implementation of monitoring and measurement,
e) Frequent quality checks including third party checks if necessary and
f) The implementation of release, delivery and post-delivery activities.
Since the project execution activities are contracted, responsibilities of KSPHC personnel
are mainly to exercise control on project’s product through effective monitoring and quality
control of project’s product characteristics as per contract conditions. The process of project
execution and control is carried out in accordance with established quality system
procedure.
Applicable procedures:
1) QSP 17 – Construction contracts & providing e-Tendering services
2) QSP 18 – Construction management
3) QSP 11 – E-Commerce 7.5.2 Validation of processes for production and service provision
KSPHC executes construction projects for the originating organization. Some of the
processes of construction and related activities require validation. Processes where the
resulting output cannot be verified by subsequent monitoring or measurement are validated.
Revision: 01 Rev. Date: 09.09.2009 Page 37
KSPHC Quality Manual
This includes any processes where the deficiencies become apparent only after the product
is in use or the service (Construction) has been delivered.
Validations of these processes are made considering:
� Product and process characteristics
� Acceptance criteria
� Quality test methods
These validations demonstrate the ability of these processes to achieve planned results.
Generally, national standards are made available for such processes, which provide
necessary requirements for the process and the product characteristics. KSPHC adopts
these standards. These quality system requirements are communicated to the contractor(s).
Concerned Project Engineers establish arrangements with contractors for these processes
including, as applicable:
a) Defined criteria for review and approval of the processes,
b) Approval of equipment and qualification of personnel,
c) Use of specific methods and procedures
d) Requirements for records
e) Revalidation.
7.5.3 Identification and traceability
Through out the process of construction, products / materials (used for construction) are
identified for their status (Fitness for use). Where traceability is a requirement (pre-
determined at the stage of project initiation), methods are evolved for the purpose. Examples
include, Cement (make, batch number), steel (make, grade).
7.5.4 Customer property
Customer property provided by the originating organization to KSPHC may include one or
more of the following:
a) Land for construction,
b) Intellectual property such as architectural design,
c) Interiors – fittings etc.,
Revision: 01 Rev. Date: 09.09.2009 Page 38
KSPHC Quality Manual
Necessary controls are applied to ensure that customer property (material) is identified,
verified, protected and safeguarded. If any customer property is lost, damaged or otherwise
found to be unsuitable for use, it is reported to the customer and those records are
maintained.
7.5.5 Preservation of product
Project Engineers with due delegation to contractors and by carrying out monitoring
activities, ensure proper identification, handling, storage and protection of construction
materials, equipment and the product (building) during the course of project execution.
While evolving procedures, considerations are given for the special requirements arising
from the nature of the product, application/use of products that are unique where product
quality may deteriorate.
7.6 Control of monitoring and measuring equipment
The established system procedures ensure that monitoring and measurement can be carried
out and are carried out in a manner that is consistent with the monitoring and measurement
requirements.
Quality system procedure provides details on checks and controls needed to ensure that
monitoring and measuring devices are controlled so as to ensure that results obtained
through them are correct and valid.
Applicable procedure: QSP 19 - Control of monitoring and measuring equipment
Revision: 01 Rev. Date: 09.09.2009 Page 39
KSPHC Quality Manual
8 Measurement, analysis and improvement
8.1 General
The Quality management system of KSPHC encompasses the systems that are planned
and implemented for the monitoring, measurement, analysis and improvement processes
needed:
a) To demonstrate conformity of the product
b) To ensure conformity of the quality management system, and
c) To continually improve the effectiveness of the quality management system
Document – QMS Processes and Process measures CMD/QMS/02 provides details on
applicable method, including statistical techniques, and the extent of their use.
8.2 Monitoring and measurement
8.2.1 Customer satisfaction
KSPHC collects comments, complaints and suggestions, from its stakeholders. These data
are compiled, consolidated and analyzed to initiate suitable corrective and preventive action
in order to enhance customer satisfaction. The above feedbacks will be used for continual
improvement.
Applicable procedure: QSP 20- Customer complaints and feedbacks 8.2.2 Internal audit
MR and CC-QMS arranges for and conduct internal audits at planned intervals in
accordance with documented quality system procedure for internal audits- QSP 21. The
internal audits are aimed to determine whether the quality management system
a) Conforms to the planned arrangements (see 7.1), to the requirements of the
international standard ISO 9001 and to the quality management system requirements
established by KSPHC, and
b) Is effectively implemented and maintained.
MR and CC-QMS plan the audit program taking into consideration the status and importance
of the processes and areas to be audited, as well as the results of previous audits. The audit
criteria, scope, frequency and methods are defined in the audit schedule. Selection of
Revision: 01 Rev. Date: 09.09.2009 Page 40
KSPHC Quality Manual
auditors and conduct of audits ensures objectivity and impartiality of the audit process.
Auditors do not audit their own work. The responsibilities and requirements for planning and
conducting audits, and for reporting results and maintaining records are defined in the
procedure.
The management responsible for the area being audited takes action without undue delay to
eliminate detected nonconformities and their causes. Follow-up activities include verification
of the action taken and the reporting of verification results.
Applicable procedure: QSP 21 - Internal audits (QMS) 8.2.3 Monitoring and measurement of processes
All functions at KSPHC have established suitable methods for monitoring and where
applicable, measurement of the quality management system processes. These methods
demonstrate the ability of the processes to achieve planned results. When planned results
are not achieved, functional heads initiates correction and corrective action, as appropriate,
to ensure conformity of the product (of the process).
See document – QMS Processes and Process measures CMD/QMS/02
8.2.4 Monitoring and measuring of product
Project Engineers monitor and measure the characteristics of the product to verify that
product requirements are fulfilled. This is carried out at appropriate stages of the product
realization process in accordance with the planned arrangements (see 7.1). Engineers of
Quality & Contracts division support this activity. Evidence of conformity with the acceptance
criteria is maintained in product release records. Product release and service delivery will not
proceed until the planned arrangements have been satisfactorily completed, unless
otherwise approved by a relevant authority, and where applicable by the customer.
Applicable procedure: QSP 23- Quality Control
8.3 Control of nonconforming product
Project Engineers and Site Engineers (of sub-contractor agency) ensure that product as well
as process which does not conform to requirements is identified and controlled to prevent its
unintended use or delivery. The controls and responsibilities and authorities for dealing with
nonconforming product are detailed in QSP 24 - procedure for control of nonconforming
products.
Revision: 01 Rev. Date: 09.09.2009 Page 41
KSPHC Quality Manual
Project Engineers and Site Engineers (of Contractor agency) maintain records of the nature
of nonconformities and subsequent action taken, including concession obtained with regard
to nonconforming products. KSPHC in its contract management system has made provisions
for ensuring that non-conformities notified during execution of the project are set right by the
concerned contractors as per the provisions laid down in QSP 24. When nonconforming
product is detected after delivery or use has started, concerned Executive Engineer or the
designated AEE initiates action appropriate to the effects, or potential effects, of the
nonconformity.
Applicable procedure: QSP 24 - Control of nonconforming product 8.4 Analysis of data
KSPHC quality management system helps in generation of useful M.I.S. reports in addition
to inspection & test records and internal audit reports. Requirements of this information are
described in system procedures. Data is collected which provide information relating to
a) Customer satisfaction (see 8.2.1).
b) Conformity to product requirements (see 8.2.4),
c) Characteristics and trends of processes and product including opportunities for
preventive action (8.2.3 and 8.2.4), and
d) Suppliers / Contractors (7.4) Through Web-based Project Monitoring System, project status can be known at any given
point of time. Project status is updated as and when progress is made. Data from this source
is used to generate useful M.I.S, which enables the concerned functional personnel to
initiate timely correction and corrective action.
All the data thus maintained is analyzed to determine the suitability and effectiveness of the
quality management system and to evaluate where continual improvement of the quality
management system can be made.
Applicable procedure: QSP 25 - Project monitoring system
Revision: 01 Rev. Date: 09.09.2009 Page 42
KSPHC Quality Manual
8.5 Improvement
8.5.1 Continual improvement
KSPHC is committed to continually improve the effectiveness of the quality management
system through the use of the quality policy, quality objectives, audit results, analysis of
data, corrective and preventive actions and management review. M.R. maintains the records
of continual improvement plans and action taken.
The relevant information needed to learn form projects is derived from information contained
within the project, including feedback from customers and other interested parties.
Information is also derived from other sources such as project monitoring / project
management system, appropriate closure reports, claims, audit results, analysis of data,
corrective and preventive actions and project reviews.
8.5.2 Corrective action
All process owners take action to eliminate the cause of nonconformity in order to prevent
recurrence. They ensure that corrective actions taken are appropriate to the effects of the
nonconformities encountered.
Documented procedure defines requirements for
a) Reviewing nonconformities (including customer complaints)
b) Determining the causes of nonconformities,
c) Evaluating the need for action to ensure that nonconformities do not recur,
d) Determining and implementing action needed,
e) Records of the results of action taken, and
f) Reviewing the effectiveness of corrective action taken.
Applicable procedure: QSP 26 - Corrective action
8.5.3. Preventive action
All process owners determine action required for eliminating the causes of potential
nonconformities in order to prevent their occurrence. Preventive actions taken are
appropriate to the potential problems.
Revision: 01 Rev. Date: 09.09.2009 Page 43
KSPHC Quality Manual
Documented procedure defines requirements for
a) Determining potential nonconformities and their causes,
b) Evaluating the need for action to prevent occurrence of nonconformities,
c) Determining and implementing action needed,
d) Records or results of action taken, and
e) Reviewing the effectiveness of preventive action taken.
Applicable procedure: QSP 27 - Preventive action
Revision: 01 Rev. Date: 09.09.2009 Page 44
Supplier Quality
See QSP 13
Plan & Control Production / Service
See QSP 11, 17 and 18
Develop Product Quality
Plans See QSP 23
Monitor Product Quality
(Receiving, In-process &
Final)
See QSP 23
Plan & Maintain Facilities Qualify & Train Workforce
Plan & Maintain
Documents / Data
See QSP 10 See QSP 08 See QSP 01, 02
Purchase & verify needed Materials & services
See QSP 16, QSP 24
Design /Validate Production Processes
See Section 7.5.2
Establish & Maintain Product identification and Traceability
See Section 7.5.3, QSP 23
Customer Property and Preserve Product (Purchased product,
In-process material & Finished Goods)
Control Monitoring &
Measuring Equipment
See Section 7.5.4, 7.5.5, QSP 13, 16, 17, 18, 19 and 23 See QSP 19
Monitor Production / Service Processes
See QSP 16,17 and 18
Control of Nonconforming Product
See QSP 24
Revision: 02 Date: 09.09.2009
Chairman & Managing Director
Executive Director Management
Representative-QMS
Chief Coordionator -
QMS
Chief
Engineer
Financial
Advisor
SE-
South
/ SE-
(HQ &
S)
SE-North Finance
& Accounts
Electrical
Division
Planning
rban Divn Elec SD (North)
Design DVG SD
Elec SD -South DVG Divn. Shimoga
SD
Dy. Architect Hospet SD
ural Divn
PMS Belgaum
SD Belgaum Divn Dharwad
SD
Contracts Haveri
Gulbarga
Divn
E-Commerce Bagalkot SD
Page 46
Revision: 02 Date: 09.09.2009
An overview of General Staff arrangement at various Divisions /
Sections (Note: Organizational arrangement up to Supervisory staff is
described here)
Executive Sub-divisions Establishment Section
Assistant Executive Engineer Superintendent Of Police
Assistant Engineer Assistant Administrative
Junior Engineer Security Superintendent
Second Division Assistant First Division Assistant(s)
Second Division
Finance & Accounts
Financial
Advisor
Chief Accounts
Officer
Chartered
Accountant Asst. Chartered
Accountant Accounts
Superintendent(s) Sec.
Superintendent
Stores
Second Division Assistant
provided is the general arrangement and it is not exhaustive. The staff requirements (quantity) is determined by
are provisioend to fulfill work requirements
Page
47
KSPHC Quality Manual
Annex 3: Responsibilities and authorities Note 1: This annex gives the details of overall responsibilities and authorities assigned for the various activities related to Quality Management system. Further,
system procedures provide details of responsibilities and authorities for a specific activity.
Note 2: Responsibility indicates the primary duty assigned to a function or personnel to ensure that activities are carried out as per QMS requirements. Authority
indicates the ownership for the activity with powers to take decisions on implementation means and methods, delegation of works. Personnel with assigned
authority shall be accountable for the results of action taken and also for the consequence of the results of the activity.
ISO 9001:2008 Clause Ref
Activity description
Responsibility
Authority
4.2.1
Documentation – Preparation of QMS Manual MR and Chief Coordinator
M.R
4.2.1
Documentation – Preparation of System procedures
HODs and M.R
M.R
4.2.1
Documentation – Quality Objectives
ED
CMD
4.2.3
Review of QMS Manual
ED
-
4.2.3
Approval of QMS Manual
-
CMD
4.2.3
Approval of QMS Documents other than Quality Manual
ED
CMD
Revision: 02 Revision Date: 09.09.2009 Page 48
KSPHC Quality Manual
ISO 9001:2008 Clause Ref
Activity description
Responsibility
Authority
4.2.3
Reviewing and updating of documents
HODs and M.R
M.R
4.2.3
Issue control of Quality Manual and other system documentation
M.R
M.R
4.2.4
Control of records Respective Originators
of Records Respective
HODs
5.3 Develop Quality policy; Establish overall direction C.M.D C.M.D
5.3 Approve management system policy C.M.D C.M.D
5.3 b), 7.2.1 c)
Identification of legal and other requirements; its communication to relevant personnel
MR and Chief Coordinator
MR
5.3 d)
Communication of policy to all personnel and ensuring its availability to public
M.Rs
M.Rs
5.4.1
Identifying, implementing and achieving QMS objectives
HODs
ED & CMD
5.5.1, 5.5.2
Defining roles, responsibilities and authorities
ED
CMD
5.5.2 b)
Reporting QMS performance
MR and Chief Coordinator
M.R
5.5.3
Internal communication and reporting related to QMS MR and Chief Coordinator
M.R
Revision: 02 Revision Date: 09.09.2009 Page 49
KSPHC Quality Manual
ISO 9001:2008 Clause Ref
Activity description
Responsibility
Authority
5.6
Conducting periodical management review
CMD
CMD
5.6
Ensuring implementation of actions of Management review
ED
CMD
6.1
Provisioning of resources for implementing QMS
CMD
CMD
6.2
Determination of competence requirements for performing tasks Respective
HODs
ED
6.2.2
Provisioning of training requirements
AAO
AAO
6.2.2
Maintenance of training records
AAO
AAO
7.2.1
Determination of requirements related to product
SE- (HQ & S) Dy. Architect
CE
7.2.2
Review of requirements related to product
SE- (HQ & S) Dy. Architect
CE
7.2.3
Customer communication Respective Project
AEE/AE Respective Divisional EE
Revision: 02 Revision Date: 09.09.2009 Page 50
KSPHC Quality Manual
ISO 9001:2008 Clause Ref
Activity description
Responsibility
Authority
7.4
Purchasing process – General Purchases
AAO
FA & ED
7.4.1
Purchasing - Contracts
AEE-Contracts EE- of Respective
Divisions
EE-Contracts
7.4.2
Ensuring correctness of contract agreements
AEE-Contracts
EE-Contracts
7.4.3
Verification of purchased product (General Purchases) Indenting Dept.
Personnel Indenting Dept.
Head
7.4.3
Verification of purchased product – Construction contracts Respective Divisional
AEE/AE Respective Divisional EE
7.5.1
Control of production and service provision
Respective HODs Respective
HODs
7.5.2
Validation of applicable (construction) processes Respective Divisional
AEE/AE Respective Divisional EE
7.5.3
Identification and traceability Respective Divisional
AEE/AE Respective Divisional EE
7.5.4
[Control of] Customer property Respective Divisional
AEE/AE Respective Divisional EE
Revision: 02 Revision Date: 09.09.2009 Page 51
KSPHC Quality Manual
ISO 9001:2008 Clause Ref
Activity description
Responsibility
Authority
7.5.5
Preservation of products (Stores) – General Purchases
Stores Superintendent Stores
Superintendent
7.5.5
Preservation of products (Stores) – at construction project sites Respective Divisional
AEE/AE Respective Divisional EE
7.6
Calibration of monitoring and measurement equipment Respective Divisional
AEE/AE Respective Divisional EE
8.2.1
Monitoring and measurement –Customer satisfaction related information Respective Divisional
AEE/AE Respective Divisional EE
8.2.2
Planning and conducting internal audits MR and Chief Coordinator
M.R
8.2.3
Monitoring and measurement of processes Respective
HOD Respective
HOD
8.2.4 Monitoring and measurement of product (Construction related quality parameters)
Respective Divisional AEE/AE
Respective Divisional EE
8.3
Control of nonconforming product (Construction related quality requirements)
Respective Divisional AEE/AE
Respective Divisional EE
8.3
Recording, analyzing and liaison with concerned and resolving customer complaints and its communication to the concerned
PRO 1
SE (North & South)
Revision: 02 Revision Date: 09.09.2009 Page 52
KSPHC Quality Manual
ISO 9001:2008 Clause Ref
Activity description
Responsibility
Authority
8.4
Analysis of data
Respective HOD
Respective HOD
8.5.2
Implementation of corrective action (as determined); ensuring its effectiveness
Respective HOD
Respective HOD
8.5.3
Implementation of preventive action (as determined); ensuring its effectiveness
Respective HOD
Respective HOD
Revision: 02 Revision Date: 09.09.2009 Page 53
KSPHC Quality Manual
ANNEX 4: LIST OF QUALITY SYSTEM PROCEDURES
Sl. No. QSP No. QSP - Title Description
1 QSP 01 Control of documents
2 QSP 02 Control of records
3 QSP 03 RESERVED
4 QSP 04 RESERVED
5 QSP 05 Management review
6 QSP 06 Finance Management
7 QSP 07 RESERVED
8 QSP 08 Human Resource Development
9 QSP 09 RESERVED
10 QSP 10 Infrastructure maintenance
11 QSP 11 E-Commerce
12 QSP 12 Project Management
13 QSP 13 Design and development
14 QSP 14 Eco-Friendly measures
15 QSP 15 Energy saving and other alternatives
16 QSP 16 Purchasing - General
17 QSP 17 Construction contracts & providing e-Tendering services
18 QSP 18 Construction management
19 QSP 19 Control of monitoring and measuring equipment
20 QSP 20 Handling customer complaints and feedbacks
21 QSP 21 Internal audits
22 QSP 22 RESERVED
23 QSP 23 Quality Assurance
24 QSP 24 Control of nonconforming product
25 QSP 25 Project Monitoring System
26 QSP 26 Corrective action
27 QSP 27 Preventive action
Revision: 02 Rev. Date: 30.03.2010 Page 54