Upload
msandeepraja
View
32
Download
6
Tags:
Embed Size (px)
DESCRIPTION
Quality Master Data
Citation preview
QMT140 Quality Master Data
Introductions
Agenda
1
1. Welcome & Introductions
2. Quality Management (QM) Overview
3. Manage QM Master Data
4. Manage Quality Info Records (QIRs)
5. QM Reports
6. Summary
Course Objectives
2
� After completing this course, you will be able to:
– Create, change, and track changes to QM master data
– Create, change, and track changes to the Q-info record
– Generate QM reports
Attendance - Sign In
� Please ensure you have
signed the Training
Attendance Sheet.
Logistics
– Emergencies
• Alarms
• Stairwells/Exits
– Restrooms
– Break Areas
Expectations
– Introduce the training materials� All cell phones and
pagers must be turned off
during the class.
� “Parking Lot”
Ground Rules
Ground Rules and Logistics
3
Course Format
� Tell me ���� Concepts
– Instructor-delivered information you need to
know to successfully perform job-related tasks
� Show me ���� Demonstrations
– Demonstrations of job-related tasks performed
in SAP
� Let me ���� Exercises
– Student practice tasks performed in the
(program name) solution
� Help me ���� Help/Handouts
– Training tools to assist you back on the job
Show Me
Let Me
4
Assessments
� At the end of the course, there will be a ten question assessment:
– The passing score is 80% (8 out of 10 correct)
– You can use your training materials as reference
5
Agenda
6
1. Welcome & Introductions
2. Quality Management (QM) Overview
3. Manage QM Master Data
4. Manage Quality Info Records (QIRs)
5. QM Reports
6. Summary
Quality Management (QM) Overview
Lesson Objectives
� Upon the completion of this lesson, you should be able to:
– Describe the Quality Management (QM) process in (program name)
– Define key (program name) terms and concepts relevant to performing QM
– Explain integration points between QM and Procurement, Planning, Production,
Inventory/Warehouse Management and Finance
8
(program name) Process Scope
9
Process Sub-process
Planning and Manufacturing
Execution
� Perform short, medium, and long range production planning
� Schedule and execute production
� Plan and maintain production related data, and reporting parameters
� Control and report production operations
Procurement � Maintain supplier certification and monitor performance
� Create and maintain purchase requisitions, and purchase materials
� Create and manage supplier contracts
� Create Supplier Network Collaboration Hub
Quality Management �Perform incoming quality assurance, and manage product disposition
�Determine discrepant material disposition
Inventory & Warehouse
Management
� Receive and put away materials – supplier, non supplier
� Manage inventory storage and movement
� Manage consignment materials and inventory program
� Plan and manage shipping
Finance � Support product costing
� Manage multiple valuation situations
� Invoice verification & accounts payable
Master Data � Manage product obsolescence
� Maintain product related data
System Benefits
� Automated cycle time metrics
� Traceability of materials in SAP
� Common definition of requirements for (name of site) sites
� Standard SAP among (name of site) sites
� Optimized workflows
� Real time information
� Data handling by electronic means
� Compliance with 21 CFR Part 11
10
The (program name) Process Map (Top Level)
Manufacturing Execution
Quality
Perform In-process
Inspection
Final Inspection /
Disposition
Perform Receiving
Inspection
Discrepant Material Disposition
Inventory /
Warehouse Mgt
Receive Materials & Services
Receive and Put Away
Product
Receive Material -
non suppliersManage Lots/Batches
Pick OrderManage Inventory, Storage &
Movement
Pack Order
Finance
Perform Transaction
Processing
Support Product Costing
Enable Payment
Procurement
Procure Materials
and Services
Manage Supplier
Agreements
Create & Maintain
Purchase Requisitions
Manage Subcontractor
Manufacturing
Maintain Approved Suppliers
Manage Supplier
Managed Inventory
Planning and
Manufacturing
Perform Demand Input
& Supply Planning
Perform Production
Planning
Schedule
ProductionExecute Production
Manage Line Replenishments
Control & Report
Production Operations
1
2
1
2
Perform Overhead
Accounting & Allocation
3
3
1
2
3
Demand
Plan
Goods Issue
To sub-con
Goods Issue To production
Goods Issue
To shipments
Supply Area replenishment
4
4
5
5 External operation
6
6
Purchased Material
Disposition
Miscellaneous Quality Processes
1Recurring
Inspection /
Samples
Maintain Suppliers Related Data
Maintain Customer Master Related Data
Maintain New Product Code Registration
Maintain Production Related Data
Calculate Order Price
Process Sales Order
Billing for Sales Order Item
Execution
Operations
Imperfection Tracking
Master Data
QM – High Level Process Integration Diagram
12
Plant, Material, and Vendor Controls
Discrepant Material
Disposition
Final Inspection Disposition
Recurring Inspection: Lot
Expiring/ed MaterialsBatches Restricted
Vendor Block/Un-Blocked
First Article Inspection established / dropped
Retained Sample Management
Manufacturing: Final QA Release for Production / Process Order
Inventory: Update batch status
Calculate Expiry Date
Manufacturing: WIP QA Release for Production / Process Order
Recurring Inspection Intervals
Batch Expiry
Vendor Block / Un-Block
First Article Inspection
Procurement: - Purchase Orders-Subcontracting
Inventory: - Goods movement
Purchase Orders / Incoming Batch
Finished ProductBatches available for Disposition
In-Process Inspection of Material Batch
X
X
Incoming: QA Disposition of material
Semi-finished materials available for production
Raw Material / Component available for production
Manufacturing:- Work Orders- Order Status
Inventory: - Goods movement
XY
Y
Nonconformance
Perform In-Process
Inspection
Perform Receiving Inspection
Miscellaneous Quality
Processes
NC’s impacting Batches & Vendors
Material Settings
Imperfection Tracking
Hold/Quarantine, Scrap, Rework, Re-inspect, Accept Decisions
Vendor QA Scorecard input
Manufacturing at RiskShip Under Quarantine
Key Terms
13
Term Definition
Batch Management Batches are subsets of the total quantity of a material held in stock.
Batches are managed separately from other subsets of the same
material
Batch Status Indicates the availability of a specific batch for use. Comprised of two
statuses: restricted use and unrestricted use. Controls usability at the
batch level
Characteristic Values Product quality characteristic specifications that are measured for
QA purposes
Doc URLs Hyper link within inspection lots to access the controlled documents
in PLM System(i.e., OTIS).
Key Terms (cont’d)
14
Term Definition
Dynamic Modification
Rule(DMR)
A master data record that contains the definition of inspection
stages(Normal, Tightened, Reduced) and conditions that lead to
inspection stage changes
Goods Movement Physical or logical movement of materials leading to a change in
stock levels or resulting in the direct consumption of the material
Inspection Lot Batch of materials subject to quality inspection. Created to document
or trigger an inspection request and used to store inspection results
and usage decisions
Inspection Plan Describe the series of processing steps that take place to inspect or
test a material in order to sample and record results
Inspection type Determines when and how an Inspection Lot is to be created
Key Terms (cont’d)
15
Term Definition
Inventory Status Comprised of three statuses: Quality Inspection, Blocked Stock,
Unrestricted Stock. Controls usability at the inventory level.
Master Data Static data which represents things, rather than events
Master Inspection
Characteristic (MIC)
Describes what needs to be inspected and defines the testing
requirements for materials and products
Material Master A data record containing all the information required to manage a
material.
Posting Change Refers to a “bookkeeping” change (a change of information) about a
particular material or batch
Key Terms (cont’d)
16
Term Definition
Qualitative Attributive parameters
Quantitative Measurable Quantifiable data
Quality Info Record
(QIR)
Record which gives information about the qualification status of a
vendor based on a material/vendor/plant combination
Sampling Procedure Defines the rules for calculating the sample size for an inspection.
Sample Scheme A sampling plan which contains information about the sample size
for a specific lot size and defines how acceptance or rejection
decisions are made and why(ANSI/AQL).
Storage Location Area within a plant where materials are stored
Key Terms (cont’d)
17
Term Definition
Usage Decision Final SAP disposition of a material based on SAP results recording
of the quality inspection. Note: formal material GxP batch release is
conducted outside of SAP via specific company procedures.
Warehouse Area within a storage location where material is stored
(program name) Quality Management
18
� (program name) deployment is implementing a basic and simple QM
configuration with minimal interfaces and enhancements
� Fully leveraging existing product lifecycle management (PLM), non-conformance
(NC), and inspection systems
� QM is established to support and standardize existing processes and terminology
across the (name of site) locations providing:
– Additional safeguards for QA in monitoring varied batch, material, vendor and order
statuses
– Additional controls over production/process orders
– Enhanced statuses for controlling batches (such as Manufacturing At Risk (MAR), Ship
Under Quarantine (SUQ), First Article Inspection (FAI)
– Automated processes (auto restrictions, HardStop, auto Usage Decision (UD)
– A direct systematic linkage and control for QA over the planning, movement, and
disposition of material
(program name) Quality Management – Key Features
� Integration with inspection systems (LIMS)
� Integration with Non-conformance systems (QERTS)
� Manual integration with PLM systems
� Direct-Ship scenarios and use of Advance Ship Notices
19
QM Integration with Materials Management
� Triggers inspections for goods movements, for example, goods receipt
� Blocks vendor actions (ordering, receiving, payments)
� Manages the inventory of goods during the inspection and remains visible for MRP planning purposes
� Carries out batch determination using characteristic values from batches (restricted/unrestricted) quality inspections
� Monitors the shelf-life of batches and the deadline for recurring inspections
� Evaluates vendors on the basis of quality using quality scores from audits, goods receipt inspections, and nonconformances
20
QM Integration with Production
� Integrates inspection planning and work scheduling
� Handles inspection characteristics and operations
� Manages quality inspections for manufacturing orders
� Triggers the creation of the finished goods inspection lot at the time of order release
– There are exceptions where the inspection lot is triggered at the time of goods
receipt
� Provides batch control when noncomformances exists
21
Quality Inspection Cycle
Maintain
Master Data
Inspect
Quality
Inspection
Record
Inspection Data
1
Inspection
Trigger
2
Usage
Decision
5
4 3
1. Maintain Master Data: The required data created and maintained in the QM module before a material or process is inspected and the result of the inspection is recorded.
2. Inspection Trigger: The prerequisite SAP transaction required to trigger the QM process and initiate the inspection lots for inspection. Usually this is a goods receipt against an incoming shipment or a production / process order release.
3. Inspect: Inspection, test, or examination of a material or documentation. Inspection and evaluation are performed externally to SAP.
4. Record Inspection Data: Recording of the qualitative (pass/fail) and quantitative results of the inspection in SAP. Specific quantitative inspection results are recorded outside of SAP. Defects or non-conforming data are captured and managed in external systems outside of SAP.
5. Usage Decision: Captures the decision on disposition of the material, based on the results of the inspection event(s).
22
Master Data
� Master data is data that is centrally stored and used across all SAP application modules and all functional areas within (name of site).
� Master data remains static over an extended period, and containsinformation that is needed often and in the same form. It is required to perform transactions such as results recording.
23
SAP SAP Document
Master DataInspection Plan
TransactionsInspection Lot
Org Structure
Plant
OutputInput
Examples QM Master Data Uses
� The following are examples of QM Master Data and their use:
– Triggers inspection lots giving quality control of batches
– Identifies where inspection is performed
– Provides planning data for inspection
– Provides re-inspection intervals
– Enables automatic usage decision
– Triggers first article inspection, dock-to-stock scenarios, and blocking of
vendor/material
– Provides data for sample management
– Supports the vendor evaluation process
24
Elements of an Inspection Plan
25
� Defines how the inspection will occur
� Made up of the following master data:
Sampling Scheme
Inspection
Plan
Inspection
Lot
Sampling Procedure
Material Master
MIC
Work Center
How(External to CR)
Where
What
Sampling Procedure
� Defines the rules on how a sample size is calculated and provides details on how inspection characteristics are evaluated(attributive, Variable, Manual) during results recording
26
Quality Information Record
� Created for a specific material-vendor-plant combination
� Uses:
– Flag a material-vendor combination
as first-article inspection (FAI)
– Designate a material-vendor
combination as dock-to-stock (no
inspection)
– Block a material-vendor
combination.
Vendor
QIR
MaterialSite
27
Inspection Lot Creation
� Inspection lots are created each time a Quality inspection is required
– Request to a work center to carry out a quality inspection
� Inspection lots can be created automatically or on demand
28
au
tom
ati
co
n d
em
an
d
01 Goods Receipt for PO – Receiving/Incoming Insp
0101 Goods Receipt for PO – First Article Inspection
04 Goods Receipt from process order or the release of a
process order
09 Recurring Inspection of Batches
08 On-Demand (creation via QA01 – not stock relevant)
08 On-Demand (creation via MIGO_TR – stock relevant)
Simple Inspection / UD Process Flow
29
GR In-coming (01)
Process Order Release (04)
GR Production (04)
On Demand(08)
Recurring(09)
Inspection Lot Trigger
Auto
Creation of IL
Posting Change Notice
(WM)
Transfer
Posting (IM)
Batch Status
Stock Status
Expiry Date
Generate IL
Lot Work List
(QA33/QE72)
Record
Results (QA32)
Stock
Posting(QA32)
Usage
Decision(QA32)
IL Closed
Abbreviations:GR – Goods Receipt
IL – Inspection Lot
IM – Inventory Management IT – Inspection Type
WM – Warehouse Management
Legend:(XXXX) Transaction
relevant for performing
the activity
Note: 08 Inspection Lot Types are triggered by a manually initiated goods transfer or a manual creation of an inspection lot.
Recording Results
30
� The documentation of quantitative and/or qualitative results for inspection performed
� Criteria for results determination and documentation is maintained/performed externally via legacy systems and processes
� Recording Results allows you to:
– Record if the result(s) is acceptable or not
– Create a history of defects for the material, product or process
– Trigger notifications to external nonconformance systems of failures
– Perform UD
Usage Decision
31
� Determines the final disposition on materials after the inspection process is completed
� Includes all materials
– Incoming
– Process/WIP
– Finished
Purpose of Usage Decision Process
32
� Change the status of a material
– Move material from quality inspection (QI) stock to blocked stock or unrestricted
stock in the inventory system
� Inventory Status Types
– Quality Inspection (QI): material quarantined pending QA decision on
status/disposition
– Blocked stock: used to isolate material from being used in the production
process or from being distributed
– Unrestricted stock: material available for use in production process and
available to be distributed
– Scrap: used to scrap material and charge the appropriate cost center. Material
is not available for planning or use.
Purpose of Usage Decision Process (cont'd)
� Change the status of a batch
– Batch statuses control the entire inventory quantity assigned to the batch,
meaning a batch can have only one of two status types
� Batch status types
– Unrestricted: the entire batch is available for use
– Restricted: the entire batch is unavailable for general use, certain ‘restrictions’
apply to the batch and manufacturing or distribution of a batch in this status is
limited
� Closes the inspection lot record in SAP
33
Set the Stage - Stock Status
34
Stock status Definition
Unrestricted Available; approved
Blocked Not available
Quality Inspection Not tested; under testing
Key Status Types
QUALITY INSPECTION
UNRESTRICTED STOCK
BLOCKED STOCK
= Unavailable for use
= Available for use
= Unavailable for use and
planning
Stock Status
UNRESTRICTED
RESTRICTED
= Available for use
= Unavailable for use
Batch Status
35
Key Status Types
36
Note: When batch status is changed to
restricted, the stock status becomes
restricted as well.
RESTRICTEDRESTRICTED
UNRESTRICTED UNRESTRICTED
QUALITY INSPECTION QUALITY INSPECTION
Stock StatusStock Status
UNRESTRICTEDUNRESTRICTED
Batch StatusBatch Status
QUALITY INSPECTIONQUALITY INSPECTION
BLOCKED BLOCKED
BLOCKED BLOCKED
RESTRICTEDRESTRICTED
Usage decision Codes - (program name)
37
UD
codesDescription Score Posting Proposal Valuation Batch status Stock status
ACCP Meets all Quality Requirements –
01/04/08
100 To Un-restricted use, Un-restricted
batch status
Accept Unrestricted Unrestricted
ALTU Meets Requirements for Reclassification – 01/04/08/09
75 To Un-restricted use, Un-restricted batch status
Accept Unrestricted Unrestricted
APAR Partial Batch Accept - Meets Qlty
reqmts
75 Accept
ARED Reset Expiry date - Meets Quality reqmts - 09
To Un-restricted use, Un-restricted batch status
Accept Unrestricted Unrestricted
ARPR Unconditional accept after Repair –
04/08
75 To Un-restricted use, Un-restricted
batch status
Accept Unrestricted Unrestricted
ASUQ Conditional accept-Ship under Quarantine – 04/01/08/09
90 To Un-restricted use, Blocked batch status
Accept Restricted Restricted
AUAI Unconditional acceptance-Disposition NC – 01/04/08/09
50 To Un-restricted use, Un-restricted batch status
Accept Unrestricted Unrestricted
AWRK Unconditional accept after
Rwk/Reinsp – 04/08
50 To Un-restricted use, Un-restricted
batch status
Accept Unrestricted Unrestricted
MAR Conditional accept InspLot - Mfg at Risk – 01/04/08
1 To Un-restricted use, Blocked batch status
Accept Restricted Restricted
RRTV Entire batch is rejected - RTV'd 1 To Blocked stock, Blocked batch
status
Reject Restricted Blocked
RRWK Entire batch rejected for Rwk/Reinsp 1 To Blocked stock, Blocked batch status
Reject Restricted Blocked
RSCP Entire batch is rejected - Scrap 1 To Blocked stock, Blocked batch
status
Reject Restricted Blocked
Note:- Block batch status means restricted batch status
Checkpoint
1. Give examples of where QM master data is used. (Select all that apply)
a. Triggers Inspection lots
b. Provides data for inspection
c. Support vendor evaluation
d. Enables automatic usage decision
2. What is the name of the (program name) QM enhancement that prevents restricted batches from being distributed to end customers?
a. Hold
b. HardStop
c. First Article Inspection
d. Distribution Hold
38
Agenda
39
1. Welcome & Introductions
2. Quality Management (QM) Overview
3. Manage QM Master Data
4. Manage Quality Info Records (QIRs)
5. QM Reports
6. Summary
Manage QM Master Data
Lesson Objectives
41
� Upon the completion of this lesson, you should be able to:
– Extend the quality view of the material master
– Change and maintain quality view of the material master
– Create and change inspection methods, inspection plans, work centers, and
Quality Information Records (QIR)
Master Data
� Master Data is information that is setup in SAP which does not change frequently. Examples include: Material Master, Inspection Plan, Master Inspection Characteristics(MIC).
� Transactional Data is a data record which is created frequently. It applies to specific batches or quantities
42
QM Master Data Flow
43
Work Centers
� A work center is where inspections are
conducted
– QM work centers are used in the
inspection plans
– Several inspection
characteristics(parameters like Viscosity,
pH) can be inspected in each work
center
44
CRQ1 – QM Work Center - Create
� Use transaction CRQ1 to create a new
quality management (QM) work center
� The work center designates where the
inspection occurs and is referenced in
an inspection plan
– It should be created prior to the creation
of the inspection plan
� The fields, Plant, Work center, and
Work center cat. are mandatory fields
on the initial screen
45
Exercise 3.01: CRQ1 - Create QM Work Center
46
� You need to create a quality management work center
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: CRQ1 Create QM Work Center
CRQ2 – QM Work Center - Change
� Use transaction CRQ2 to change an existing QM work center
� Reference the existing work center using the required fields, Plant and Work center on the initial screen
47
Exercise 3.02: CRQ2 - Change QM Work Center
48
� You need to change a quality management work center
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: CRQ2 Change QM Work Center
Document Info. Record
� Use this procedure to create a document that will be linked to an Inspection Method. (program name) uses the document to house information specific to a material's inspection plan.
– This document resides in a method that resides in an inspection plan
� When users record results, these documents are available and guide them to the relevant system where the formal Procedures are documented. The document is linked to the Inspection Method contains an embedded link.
� This document will contain a URL that links to the relevant inspection method stored in system.
49
CV01N – Document Info. Record - Create
� Use transaction CV01N to create a
document and link it to an Inspection
Method
� A document can be created from a
copy or a new one
50
Exercise 3.03: CV01N - Create Document
� You need to create a document that is linked to an inspection method
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: CV01N Create Document
51
CV02N – Inspection Method Document - Change
� Use transaction CV02N to update a document that is linked to an inspection method
– Use the Document field to lookup the document that requires modification
� Modifications that can be made once the document is retrieved, include the following:
– Description of the document
– Hyperlink that the document points to (Originals tab)
– Method(Object Links tab)
52
Exercise 3.04: CV02N - Change Document
� You need to change a document that is linked to an inspection method
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: CV02N Change Document
53
Material Master Quality Management View
� The Quality Management View
contains data required to prepare a
material for inspections when the
material is received or produced
– The settings must be activated in the
material master record in order to trigger
inspection Lots for that material
� The Quality Management View is
maintained for all material types
except for NLAG (Non-Stock Material)
54
Material Master Quality Management View (cont’d)
� Open the Inspection setup screen by clicking on the button on the Quality View
55
Material Master Quality View: Inspection Setup Screen
56
• Access the Inspection type section of the screen by clicking on thebutton on Inspection setup screen
Material Master Quality View: Inspection type Section
� The Inspection type must be selected
and activated in this section for the
material to identify when the
inspection is performed
– Inspection types used can be 01, 04, 05,
08, 09, or 0101
– Any material that are expiry relevant
should always have a 09 inspection type
associated with it.
– Every material must have 08 inspection
type active.
57
MM01 – Create Material: Master Quality View
� Use transaction MM01 to extend the
quality view in the material master and
assign the appropriate inspection
types for a given material
� Use MM01 only when the material
master for a given material has been
created and was not created with a
quality view
58
Demo 3.05: MM01 - Create Material: Extend Quality View
59
� You need to extend the quality view in the material master
– Watch the Demo executed by the trainer
– Work Instruction: MM01 Create Material – Extend Quality View
MM02 – Change Material: Quality View
� Use transaction MM02 to change the field values of the quality view in the material master for a given material
– Use when you need to add or delete inspection types, change the Auto UD
setting or change the trigger of the inspection lot creation in the quality view of a
material master
� Use the field, Material on the initial screen to search for the required material
60
Exercise 3.06: MM02 - Change Material Quality View
61
� You need to update a material master
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: MM02 Change Material – Change Quality View
Create Change Master Record
� Requestor initiates in SAP ECO as usual and upon SAP ECO approval, the planner or engineer will populate the change control number
� Local data owner creates a change master record in (program name)
� Parameters and validity dates are maintained in the change master record
62
CC01 - Create Change Master
� Use transaction CC01 to keep a record of all the changes for a particular object, in this case, routings
63
CC01 - Create Change Master (cont’d)
� Following are some of the critical
steps needed to create a change
master:
1. Leave Change Number field blank if
you want a system generated number
2. In the Type section, select Change
Master (only option currently available)
3. In the Function section, select Without
Release Key (only option currently
available)
4. Press Enter
11
22
33
64
66
77
88
CC01 - Create Change Master (cont’d)
5. Enter the Change Master Without Release Key
6. In the Description section, enter a Valid From date
7. Enter Reason for Change (Agile number)
8. Click icon in the Change no. status field and select Active to allow for
change number
9. Press Enter
77
55
65
CC01 - Create Change Master (cont’d)
10. Check boxes as applicable
11. Click Save – a confirmation message appears
1111
66
Exercise 3.07: CC01 - Create a Change Master Record
� You need to create a change number to create an inspection plan
– Watch the Demo executed by the trainer
– Complete the exercise using Exercise Guide
– Work Instruction: CC01 Create Change Master Record
67
Inspection Planning in (program name)
� An inspection plan is a “template” indicating how a quality inspection is to take place. Other QM master data elements like QM data in material master, inspection methods, work centers are prerequisites before you create an inspection plan.
� The inspection plan includes:
– One or more inspection operations
– Characteristics to be inspected in each operation
– The range of expected results or specifications available for each
characteristic(MIC).
– The sample calculations can be included for certain materials.
– For Quantitative results calculations may be included.
68
QP01 - Create Inspection Plan
69
� Use transaction QP01 to create an inspection plan
� An inspection plan is a comprehensive description of the inspection process for materials, including attributes, specifications, testing requirements, and sample sizes
– Once a plan is created and materials assigned to the plan, the inspections are
carried out according to the plan
Exercise 3.08: QP01 - Create Inspection Plan
70
� You need to create an inspection plan
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QP01 Create Inspection Plan
QP02 – Change Inspection Plan
� Use transaction QP02 to change an
inspection plan for a specific material-
plant combination
– Update the Usage
– Update the definition
– Add a new MIC
71
Exercise 3.09: QP02 - Change Inspection Plan
72
� You need to update an inspection plan
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QP02 Change Inspection Plan
QP02 – Change Inspection Plan With Quantitative
Characteristics
� Use transaction QP02 to modify an
inspection plan with quantitative
characteristics for a specific material
and plant combination
73
Exercise 3.10: QP02 - Change Inspection Plan With
Quantitative Characteristics
� You need to change an inspection plan with quantitative characteristics for a specific material and plant combination
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QP02 Inspection Plan - Change
74
QP06 – Missing/Non-Usable Plans Report
� Use transaction QP06 to generate a
list of missing or non-usable inspection
plans to facilitate data cleansing
� Use the fields on the initial screen to
run a list is focused to your needs.
Examples include:
– All plants and materials
– Single material
– A range of materials in a plant
75
Exercise 3.11: QP06 – Missing/Non-Usable Plans Report
76
� You are helping to clean up inspection plans and need to generate a list of missing/non-usable inspection plans for a material
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QP06 Run report of missing/non-usable inspection
QP07 – Missing or Unusable Goods Receipt Plans Report
� Use transaction QP07 to generate a list of missing or unusable goods receipt inspection plans
� A goods receipt inspection plan is considered missing if the quality view specifies an inspection type(01 and 0101 only) that has not been created for materials that have an incoming inspection type and a planned receipt within the specified lead time
– It is considered unusable if the inspection plan is incomplete or has not been
released
77
Exercise 3.12: QP07 – Missing or Unusable Goods Receipt
Plans Report
78
� You need to generate a list of missing/unusable good receipt inspection plans
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QP07 Run report of missing/unusable goods receipt
inspection plans
QP60 – Inspection Plan Changes
� Use transaction QP60 to generate a
list of updates made to the inspection
plan for a specific material in a plant
� This transaction generates the change
history including type of change, date
of change and the person responsible
79
Exercise 3.13: QP60 - Display inspection plan changes
80
� You need to view a list of updates for an inspection plan
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QP60 Inspection Plan Changes
QP05 – Inspection Plan - Print
� Use transaction QP05 to print an
inspection plan
� The initial screen provides various
fields such as Material, Plant, Group
etc.
� To specify the task list usage, use the
“Use” field
81
Exercise 3.14: QP05 - Generate an inspection plan printable
report
� You want to generate a printable report of an existing inspection plan
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QP05 Inspection Plan - Print
82
QS31 – Inspection Method - Create
� Use transaction QS31 to create a new
inspection method
– Standard methodology to perform a test
– Describes how the inspection is to be
carried out for an inspection
characteristic
– Used as a link to the document info
records via embedded URL
83
Exercise 3.15: QS31 - Create Inspection Method
84
� You need to set up a new inspection method which indicates how the inspection is to be carried out for an inspection characteristic
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QS31 Inspection Method - Create
QS32 – Create Inspection Method Version
� Use transaction QS32 to update an inspection method or to createanother version of an existing inspection method
85
Exercise 3.16: QS32 - Change Inspection Method
86
� You need to update an inspection method
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QS32 Change Inspection Method
Checkpoint
87
1. What object serves as a “template” to indicate how a quality inspection is to take place? (Select the best answer.)
a. Inspection Lot
b. Usage decision
c. Inspection Plan
d. Routing
2. Where are the inspections conducted? (Select the best answer.)
a. Profit Centers
b. Work Centers
c. Costs Centers
d. Work Shops
Checkpoint
3. What transaction code is used to create inspection plans? (Select the best answer.)
a. QA01
b. MM01
c. MM03
d. QP01
88
Agenda
89
1. Welcome & Introductions
2. Quality Management (QM) Overview
3. Manage QM Master Data
4. Manage Quality Info Records (QIRs)
5. QM Reports
6. Summary
Manage Quality Info Records
Lesson Objectives
91
� Upon the completion of this lesson, you should be able to:
– Create Quality Info Record
– Change Quality Info record
Quality Information Record
� Created for a specific material-vendor-plant combination
� Uses:
– Flag a material-vendor
combination as first-article
inspection (FAI)
– Designate a material-vendor-plant
combination as dock-to-stock (no
inspection)
– Block a material-vendor
combination.
92
Vendor
QIR
MaterialSite
Quality Info Records (cont'd)
� (program name) uses the Quality Info Record (QIR) to:
– Block a vendor for a particular material on an as-needed basis
• Provides QA with the means to prevent ordering and receipts of materials from
specified vendors
– Flag First Article Inspection (FAI) vendor/material combinations
• Provides the business with an additional means of flagging for unique inspection
handling, materials designated as FAI (0101 inspection type and Inspection Lot User
Status of FAI)
• Provides with a safeguard to prevent FAI batches from being released until an
authorized user changes the batch status
– Flag a specific vendor, material and plant combination for dock-to-stock
handling (no inspection lot upon goods receipt)
93
Quality Info Records (cont'd)
� If a QIR is created for a material-vendor-plant combination, then a QIR must be created for each vendor of the same material for that plant to allow continued ordering on those other vendors.
– For example, three vendors supply a material, three QIRs need to be created
with the combination material-vendor-plant
� (name of site) establishes QIRs on an exception basis to block material/vendors or establish dock-to-stock models.
� (name of site) establishes QIR’s as a matter of default to facilitate dual sourcing of materials from external vendors and affiliates, whereby affiliate materials would be dock-to-stock. (name of site) will also create a QIR to block material-vendor-plant combination or establish a material-vendor-plant combination for first article inspection (FAI) handling.
94
Selected Codes for Vendor Evaluation
95
� Quality Scores associated with UD’s made for (name of site) vendors are maintained using QS52 to facilitate automated calculation of this portion of the Quality Score
� QA at (name of site) will maintain the Complaint portion of the Quality Score manually via ME61
QI01 – Quality Info Record - Create
� Use transaction QI01 to create a
quality info record (QIR) for a material-
vendor-plant combination
� Use when a material at a specific
plant, from a specific vendor should be
one of the following:
– Blocked
– Set up for "dock-to-stock
– Established for "first article inspection"
(FAI)
� To be able to create a QIR, the "QM
proc active" and the "QM control key =
ZQM1" must be populated in the
Material master quality view
96
Exercise 4.01: QI01 - Create Quality Info Record
97
� Use transaction QI01 to create a info record
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QI01 Create Quality Info Record
QI02 – Quality Info Record - Change
� Use transaction QI02 to make updates to an existing quality info record (QIR) for a material-vendor-plant combination
98
Exercise 4.02: QI02 - Change Quality Info Record
� You need to change a quality info record
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QI02 Change Quality Info Record
99
QDV1 – Sampling Procedure - Create
� Use transaction QDV1 to create a new sampling procedure
� A sampling procedure provides the rule for the calculation of the sample size that is required input during creation of Inspection Plan
100
Exercise 4.03: QDV1 - Create Sampling Procedure
� You need to create a sampling procedure
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDV1 - Sampling Procedure - Create
101
QDV2 – Sampling Procedure - Change
� Use transaction QDV2 to update an existing sampling procedure
� You should change only the text description for the sampling procedure.
102
Exercise 4.04: QDV2 - Change Sampling Procedure
� You need to update an existing sampling procedure
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDV2 - Sampling Procedure - Change
103
QDB1 – Assign Sampling Procedure
� Use transaction QDB1 to maintain the relationship between a Sampling Procedure and Dynamic Modification Rule
� Use when a new Sampling Procedure or a new Dynamic Modification rule has been created, and you want to link them for the inspection severity change to work
104
Exercise 4.05: QDB1 - Assign Sampling Procedure
� You need to maintain the relationship or link between a SamplingProcedure and Dynamic Modification Rule
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDB1 Change View Allowed Relationships Sampling
Procedures/Dynamic Mod Rules
105
QDB3 – Display Sampling Procedure
� Use transaction QDB3 to display the relationship between a Sampling Procedure and Dynamic Modification Rule
� Perform this procedure when you need to view the link between the two entities
106
Exercise 4.06: QDB3 - Display Sampling Procedure
� You need to display the relationship between a Sampling Procedure and Dynamic Modification Rule
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDB3
107
QDP1 – Create Sampling Scheme
� Use transaction QDP1 to create a new sampling scheme to draw samples
– Always enter a maximum sample size of 10000000000 in the sample plan
– Maintain sample plans for all the required severity levels and AQL values
108
Exercise 4.07: QDP1 - Create Sampling Scheme
� You need to create a new sampling scheme
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDP1 Create Sampling Scheme
109
QDP2 – Change Sampling Scheme
� Use transaction QDP2 to change an existing sampling scheme
� Perform this procedure when you need to:
– Add a new sample plan to the existing scheme
– Copy an existing plan and modify it to create a new plan
110
Exercise 4.08: QDP2 - Change Sampling Scheme
� You need to change an existing sampling scheme
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDP2 Change Sampling Scheme
111
Dynamic Modification Rule
� Dynamic Modification Rule contains :
– the definition of the inspection stages
– the dynamic modification time (at lot
creation or after the usage decision has
been made),
– the conditions for the inspection stage
change
� Inspection stage changes occur on the
on the basis of their acceptance or
rejection
112
QDR1 – Create Dynamic Modification Rule
� Use transaction QDR1 to create dynamic modification rule.
� The inspection scope can be varied using dynamic modification rules. A dynamic modification rule can be assigned in one of the following places:
– In the inspection plan at the header level
– In the inspection plan at the characteristic level
– In the inspection setup of the material master record at the inspection type level
113
Exercise 4.09: QDR1 - Create Dynamic Modification Rule
� You need to create new Dynamic Modification Rule
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDR1 Create Dynamic Modification Rule
114
QDR2 – Change Dynamic Modification Rule
� Use transaction QDR2 to change an existing dynamic modification rule
� One example of a modification would be a need to add an inspection severity or change the initial stage of inspection
– When adding an inspection severity, ensure that the sampling scheme
assigned to the linked sampling procedure has the same severity and AQL
value entry
115
Exercise 4.10: QDR2 - Change Dynamic Modification Rule
� You need to change the initial stage of inspection for an existing Dynamic Modification Rule
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QDR2 Change Dynamic Modification Rule
116
QS21 – Create Master Inspection Characteristic
� Use transaction QS21 to create a master inspection characteristic (MIC) for a
specific plant
– When creating a new MIC, always select Released from the Status drop-down menu
– For Quantitative MIC, Use the QuantData button to enter the unit of measure for a
characteristic
117
Exercise 4.11: QS21 - Create or Update Quantitative MIC
� You need to create a quantitative master inspection characteristic (MIC) for a specific plant
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QS21 Master Inspection Characteristic - Create
118
Checkpoint
119
1. What transaction code do you use to create a quality info record? (Select the best answer)
a. QA01
b. QI01
c. QA32
d. QE72
2. If a QIR is created for a material-vendor-plant combination, a QIR have to be created for each of the three vendors of the same material for that plant to allow continued ordering on those other vendors. (True or False)
a. True
b. False
Checkpoint (cont’d)
120
3. QIR’s - Quality Info Records are used to block vendors, flag first article inspections, and flag vendor, material and plant combinations. (True or False?)
a. True
b. False
4. Inspection stage changes occur on the on the basis of their acceptance or rejection. (True or False)
a. True
b. False
Agenda
121
1. Welcome & Introductions
2. Quality Management (QM) Overview
3. Manage QM Master Data
4. Manage Quality Info Records (QIRs)
5. QM Reports
6. Summary
QM Reports
Lesson Objectives
123
� Upon the completion of this lesson, you should be able to:
– Display inspection lot selections, catalogs, selected sets, and quality
notifications
Display Usage Decision
124
� Usage decision (UD) specifies whether the inspected goods are accepted or rejected for use
� The UD displays basic inspection lot information and UD information
� Examples of UD codes:
– ACCP: meets all quality requirements
– ALTU: meets requirements for reclassification
– ARPR: unconditional accept after repair
– ASUQ: conditional accept – ship under quarantine
– AUAI: unconditional acceptance – disposition NC
– AWRK: unconditional accept after rework/reinspection
– MAR: conditional accept – manufacture at risk
– RRWK: entire batch rejected for rework/reinspection
– RSCP: entire batch rejected - scrap
QA33 – Inspection Lot - Display Usage Decision
� Use transaction QA33 to display a
single inspection lot or a worklist of
inspection lots
� The worklist can be executed to focus
on various criteria such as batch,
material, or plant
� It can also be used to display one or
more usage decisions at the batch,
material, or plant level depending on
whether a usage decision has been
performed
125
Exercise 5.01: QA33 - Display Usage Decision
126
� You need to display a usage decision for a batch
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QA33 Display inspection lot selection – Display UD
ZQM_PT_BRULE – Business Readiness Report Quality
Management
� Use transaction ZQM_PT_BRULE to
generate a business readiness report
for Quality management
– Check to see if the correct inspection
types are assigned to a material based
on procurement types
– If the assignment is incorrect, the report
checks to see if inspection plans exist
for them or not
� QA would typically run this report
when a new material is setup to check
the master data and settings against
standard business rules
127
Exercise 5.02: ZQM_PT_BRULE - Display Business
Readiness Report – Quality Management
128
� You need to obtain a business readiness report for Quality Management master data objects
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: ZQM_PT_BRULE Business Readiness Report – Quality
Management
QS42 – Catalog - Display
� Use transaction QS42 to display a
catalog of usage decision (UD) codes
or characteristic attributes
� Catalogs make it easier to record
inspection results during inspection lot
processing
– The catalog contains unique, non-
numerical data in the system that is
defined at client or plant level
– You can directly assign catalogs to
master inspection characteristics
129
Exercise 5.03: QS42 - Display Catalog
� You need to display a catalog of usage decision codes and characteristic attributes
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QS42 Display Catalog
130
QS52 – Selected Sets - Display
� Use transaction QS52 to display
selected sets of UD codes or
characteristics for a specific plant
� In the Catalog field select one of the
following:
– Characteristic attributes to display a
selected set of characteristic attributes
that are used in results recording (such
as "PASSFAIL")
– Usage decisions to display a selected
set of UD codes
131
Exercise 5.04: QS52 - Display Selected Sets
� You need to display UDs for a specific plant
– Watch the Demo executed by the trainer
– Complete the exercise using the Exercise Guide
– Work Instruction: QS52 Display selected sets
132
Checkpoint
133
1. All of the following are examples of a Usage Decision except: (Select the best answer.)
a. ACCP
b. ALTU
c. ARPR
d. MARS
Agenda
1. Welcome & Introductions
2. Quality Management (QM) Overview
3. Manage QM Master Data
4. Manage Quality Info Records (QIRs)
5. QM Reports
6. Summary
134
Quality Master Data
Summary
Work Instruction List
� CRQ1 - Create QM Work Center
� CRQ2 - Change QM Work Center
� CV01N - Create Document
� CV02N - Change Document
� MM01 - Create Material: Extend
Quality View
� MM02 - Change Material Quality View
� CC01 - Create a Change Master
Record
� QP01 - Create Inspection Plan
� QP02 - Change Inspection Plan
� QP02 - Change Inspection Plan With
Quantitative Characteristics
� QP06 – Missing/Non-Usable Plans
Report
� QP07 - Run report of missing/unusable
goods receipt inspection plans
� QP60 - Display inspection plan
changes
� QP05 - Inspection Plan – Print
� QS31 - Create Inspection Method
� QS32 - Change Inspection Method
� QI01 - Create Quality Info Record
� QI02 - Change Quality Info Record
� QDV1 - Create Sampling Procedure
� QDV2 - Change Sampling Procedure
� QDB1 - Assign Sampling Procedure
� QDB3 - Display Sampling Procedure
136
Work Instruction List (cont'd)
� QDP1 - Create Sampling Scheme
� QDP2 - Change Sampling Scheme
� QDR1 - Create Dynamic Modification
Rule
� QDR2 - Change Dynamic Modification
Rule
� QS21 - Create or Update Quantitative
MIC
� QA33 - Display inspection lot selection
– Display UD
� ZQM_PT_BRULE - Display Business
Readiness Report – Quality
Management
� QS42 - Display Catalog
� QS52 - Display Selected Sets
137
Course Objectives Review
� You should now be able to:
– Create, change, and track changes to QM master data
– Create, change, and track changes to the Q-info record
– Generate QM reports
138
Assessments
139
� Now that you have completed the course, it is time to complete the assessment
– The passing score is 80% (8 out of 10 correct)
– You can use your training materials as reference
� Please complete the evaluation for the course prior to leaving the classroom
Evaluation
140