Capital Projects
Quarterly Status Report 4th Quarter FY2016: April 1 – June 30, 2016
Prepared for the September 7, 2016 SamTrans Board Meeting
San Mateo County Transit District
San Mateo County Transit District
QUARTERLY CAPITAL PROGRAM STATUS REPORT Status Date: June 30, 2016
TABLE OF CONTENTS
Capital Program – Budget Status Summary ..................................................................... 1
Traffic Light Report ........................................................................................................... 3
Information Technology Projects: 21505 – Replace & Upgrade Servers & Out of Warranty Equipment Project .................. 5
Facilities / Construction Projects: 21111 – Bus Stop Improvement Project ........................................................................... 6
21232 - Bus Lift Overhaul Project ..................................................................................... 6
21503 – Replace Mobile Bus Lifts Project ........................................................................ 7
21237 - San Carlos Transit Center Project ....................................................................... 8
Safety and Security Projects: 21211 – Receptionist Area Security Improvement Project ............................................... 9
21310 - Central Office Access Control Improvements Project ........................................ 10
21411 – Install CCTV to enhance safety at Central & North & South Bases Project ...... 11
DBE Status Report .......................................................................................................... 12
Definition of Terms .......................................................................................................... 13
Performance Status (Traffic Light) Criteria ..................................................................... 15
This page is intentionally left blank.
FY2011 FY2012 FY2013 FY2014 FY2015 FY2016
1. Revenue Vehicles Replacement $603 $1,000 $31,363 $2,092 $48,193 $35,312
2. Revenue Vehicle Support $2,243 $1,117 $949 $1,431 $1,883 $1,421
3. Information Technology $2,326 $13,815 $5,010 $5,659 $1,938 $5,775
4. Development $1,000 $1,424 $1,165 $786 $894 $2,350
5. Facilities/Construction $652 $1,901 $445 $297 $804 $1,190
6. Safety and Security $0 $0 $1,990 $1,000 $1,370 $1,830
7. Contingency $1,800 $250 $250 $250 $250 $250
$8,624 $19,507 $41,172 $11,515 $55,332 $48,128
Total Audited Expenditures by FY (2) $14,480 $11,049 $10,466 $33,113 $32,859 (3) $20,113 (3)
Some of the major projects completed include, but are not limited to the following:
Brewster Depot Improvements Project
Revenue Collection System
South Base Bus Washer ProjectReplacement of ten 2005 El Dorado Cutaway VehiclesFire Alarm System UpgradeSafety and Risk Management Office Remodel Project
Comprehensive Operational Analysis ProjectEmergency Operation Center Relocation Project
Business Optimization ProgramRadio Backbone Upgrade Project
Total Board Approved Budget by FY (1)
SamTrans - Capital Program - Budget Status Summary
Programs
4th Quarter FY2016 - April 1 to June 30, 2016
All Costs in $1,000's
Replacement of 10 Paratransit Cutaway VansReplacement of 14 Paratransit Vans
(3) Expenditures shown for FY2015 and FY2016 have not been audited.
North Base Emergency Generator Upgrades ProjectReplacement of 135 Fixed Route Buses
South Base Generator Replacement Project
Network Maintenance and Technology Refresh ProjectTransit Fleet Vehicle 2010 California Air Resource Board (CARB) Regulation Project
Implementation of Hastus ATP, Minbus & GEO Scheduling and Operation Modules
Technology Refresh Projects
Replacement of 62 - 1998 Gillig BusesReplacement of 19 - 2007 Eldorado Cutaway Vans
Note: (1) The "Total Board Approved Budget by FY" reflects the annual budget approved by the SamTrans Board
(2) "Total Audited Expenditures by FY" reflects total cost expended in the fiscal year; funding source for the expenditures could be from prior fiscal years.
Unspent budget in a fiscal year will be carried forward to subsequent budget years. of Directors for each fiscal year. This authorizes the amount that could be spent on projects.
Page 1
This page is intentionally left blank.
Page 2
Apr 1, 2016 - Jun 30, 2016 SamTrans Quarterly ReportTRAFFIC LIGHT REPORT
Active Capital Projects
PageQ3 FY16 Q4 FY16 Q3 FY16 Q4 FY16 Q3 FY16 Q4 FY16 Q3 FY16 Q4 FY16
(1) Information Technology Projects:
21505 -5
(2) Facilities / Construction Projects:
21111 - Bus Stop Improvement Project 6
21232 - Bus Lift Overhaul Project 6
21503 - Replace Mobile Bus Lifts Project 7
21237 - San Carlos Transit Center Project 8
(3) Safety and Security Projects:
21211 - Receptionist Area Security Improvement Project 9
10
1121411 - Install CCTV to enhance safety at Central Project
FUNDING
The following projects represent a sub-set of the total Capital Program and have been selected for inclusion into the Quarterly Report due to project value, operational significance, and/or impact on customers.
SCOPE BUDGET
21310 - Central Office Access Control Improvements Project
SCHEDULE
Replace & Upgrade Servers & Out of Warranty Equipment Project
G G GG G G
G G G G
G G G G G
G G GG G G
G G GG G G
G G G
G GGG G G
G
G
GG G
Y
R
Y
G G G G
G G G G
R
R
Y
R
G G
G G
Page 3
This page is intentionally left blank.
Page 4
(a)
(b)
(c)
(d)
(e)
(f)(g
) = (e
) + (f
)(h
)(i)
= (j
) - (h
)(j)
(k) =
(g) -
(j)
(l) =
(h) /
(j)
(m)
(n)
(o)
Proj
ect
No.
Proj
ect N
ame
Scop
e /
Issu
es /
Key
Act
iviti
esA
ppro
ved
Fund
ing
Orig
inal
Bud
get
App
rove
d C
hang
esC
urre
nt B
udge
tEx
pend
ed +
A
ccru
al T
o D
ate
Estim
ate
to
Com
plet
eEs
timat
e at
C
ompl
etio
nVa
rianc
e at
C
ompl
etio
n%
Exp
ende
d of
EA
CEs
t. Ph
ysic
al
% C
ompl
ete
Cur
rent
B
asel
ine
/ C
urre
nt
Star
t
Cur
rent
B
asel
ine
/ C
urre
nt
Fini
sh
Scop
e: T
his
proj
ect w
ill re
plac
e D
istri
ct’s
ser
vers
and
dat
a st
orag
e, c
opie
rs/p
rinte
rs, r
oute
rs a
nd s
witc
hes,
AC
, UP
S
and
othe
r app
lianc
es th
at a
re a
t the
end
of t
heir
expe
cted
se
rvic
e lif
e an
d so
on to
be
out o
f war
rant
y. T
he p
roje
ct w
ill
proc
ure
new
equ
ipm
ent t
o re
plac
e ol
d an
d ou
t of w
arra
nty
equi
pmen
t in
Cen
tral’s
Dat
a C
ente
r, N
orth
Bas
e, a
nd
Sou
th B
ase
as w
ell a
s pr
ofes
sion
al s
ervi
ces
for s
etup
and
co
nfig
urat
ion.
Issu
es: N
one.
Key
Act
iviti
esTh
is Q
uart
er:
(1) P
rocu
red
addi
tiona
l ser
vers
, net
wor
k ro
uter
s an
d sw
itche
s to
repl
ace
the
out o
f war
rant
y eq
uipm
ent.
Nex
t Qua
rter
: (1
) Pro
cure
add
ition
al s
erve
rs, n
etw
ork
rout
ers
and
switc
hes
to re
plac
e th
e ou
t of w
arra
nty
equi
pmen
t.
2150
5
Rep
lace
& U
pgra
de
Ser
vers
& O
ut o
f W
arra
nty
Equ
ipm
ent P
roje
ct
$995
,000
$995
,000
$0$9
95,0
00$7
78,9
95$2
16,0
05$9
95,0
00$0
07/0
1/14
/
07
/01/
14A
12/3
1/15
/12
/31/
16
Sam
Tran
s - M
ajor
Cap
ital P
roje
ct -
Qua
rter
ly R
epor
t - Q
4 FY
2016
Apr
01,
201
6 to
Jun
30,
201
6
INFO
RM
ATI
ON
TEC
HN
OLO
GY
PRO
JEC
TS:
78.3
%90
.0%
Page 5
(a)
(b)
(c)
(d)
(e)
(f)(g
) = (e
) + (f
)(h
)(i)
= (j
) - (h
)(j)
(k) =
(g) -
(j)
(l) =
(h) /
(j)
(m)
(n)
(o)
Proj
ect
No.
Proj
ect N
ame
Scop
e /
Issu
es /
Key
Act
iviti
esA
ppro
ved
Fund
ing
Orig
inal
Bud
get
App
rove
d C
hang
esC
urre
nt B
udge
tEx
pend
ed +
A
ccru
al T
o D
ate
Estim
ate
to
Com
plet
eEs
timat
e at
C
ompl
etio
nVa
rianc
e at
C
ompl
etio
n%
Exp
ende
d of
EA
CEs
t. Ph
ysic
al
% C
ompl
ete
Cur
rent
B
asel
ine
/ C
urre
nt
Star
t
Cur
rent
B
asel
ine
/ C
urre
nt
Fini
sh
Sam
Tran
s - M
ajor
Cap
ital P
roje
ct -
Qua
rter
ly R
epor
t - Q
4 FY
2016
Apr
01,
201
6 to
Jun
30,
201
6
Scop
e: T
his
proj
ect w
ill u
pgra
de a
nd re
plac
e bu
s st
op
amen
ities
and
enh
ance
bus
sto
p si
te in
frast
ruct
ure
resu
lting
in a
dec
reas
e in
repa
ir an
d am
enity
repl
acem
ent
cost
s an
d an
incr
ease
in ri
ders
hip
by p
rovi
ding
pat
rons
sa
fe, c
lean
and
attr
activ
e bu
s st
op fa
cilit
ies.
Th
e sc
ope
incl
udes
pro
cure
men
t of n
ew, u
pgra
ded,
bus
st
op b
ench
es a
nd tr
ash
cans
. The
impr
oved
mod
els
will
be
com
pris
ed o
f pow
der c
oate
d st
eel t
o w
ithst
and
hars
h w
eath
er c
ondi
tions
and
van
dalis
m. B
oth
amen
ities
will
be
bolte
d to
a c
oncr
ete
surfa
ce fo
r sta
bilit
y.
Issu
es:
(1) D
elay
in p
roje
ct s
ched
ule
is d
ue to
del
ay in
the
prep
arat
ion
of S
pecs
for C
ontra
cts
& P
rocu
rem
ent.
Key
Act
iviti
es
This
Qua
rter
:(1
) Dev
elop
ing
new
spe
cs.
Nex
t Qua
rter
: (1
) Req
uest
for P
ropo
sal (
RFP
) for
new
spe
cs w
ill b
e de
liver
ed to
C&
P.
(2) A
dver
tise
for p
ropo
sals
rath
er th
an b
ids.
Scop
e: T
his
proj
ect w
ill o
verh
aul h
ydra
ulic
lift
cylin
ders
an
d th
eir c
ontro
l sys
tem
loca
ted
at N
orth
and
Sou
th B
ase.
Th
e in
-floo
r hyd
raul
ic li
fts a
re u
sed
to ra
ise
and
low
er
buse
s fo
r ins
pect
ion
and
mai
nten
ance
of D
istri
ct re
venu
e ve
hicl
es. T
hey
are
the
orig
inal
lifts
inst
alle
d w
hen
the
base
s w
ere
built
in 1
985
and
1988
, and
hav
e ne
ver b
een
over
haul
ed.
The
purp
ose
of th
is p
roje
ct is
to o
verh
aul t
he in
-floo
r hy
drau
lic li
ft sy
stem
s by
re-fu
rbis
hing
the
hydr
aulic
(lift
) cy
linde
rs, r
epla
cing
con
trol v
alve
s, s
eals
, and
oth
er w
orn
parts
of t
he s
yste
m. I
n ad
ditio
n, lo
ckin
g co
mpo
nent
s th
at
secu
re th
e lif
t will
be
insp
ecte
d an
d re
plac
ed a
s ne
eded
.
Issu
es:
Pro
ject
sch
edul
e w
as e
xten
ded
due
to a
del
ay in
or
derin
g an
d de
liver
y of
mat
eria
l fro
m th
e fa
ctor
y.
Key
Act
iviti
es
This
Qua
rter
:(1
) Com
plet
ed re
plac
emen
t of t
he li
fts.
(2) C
ontin
ued
with
pro
ject
clo
seou
t.
Nex
t Qua
rter
: N
one.
Not
e: T
his
will
be
the
last
Qua
rter
ly re
port
for t
his
proj
ect.
$0
85.7
%$0
$932
,500
Bus
Lift
Ove
rhau
l P
roje
ct10
0.0%
04/0
2/13
/04
/02/
13A
04/3
0/14
/ TB
D
$133
,580
$231
,165
$932
,500
03/3
1/15
/ 06
/30/
16A
19.0
%6.
1%01
/17/
12/
01/1
7/12
A21
111
2123
2$0$0
Bus
Sto
p Im
prov
emen
t P
roje
ct$2
46,0
84
$932
,500
$798
,920
$246
,084
$14,
919
$932
,500
$246
,084
FAC
ILIT
IES
/ CO
NST
RU
CTI
ON
PR
OJE
CTS
:
$246
,084
Page 6
(a)
(b)
(c)
(d)
(e)
(f)(g
) = (e
) + (f
)(h
)(i)
= (j
) - (h
)(j)
(k) =
(g) -
(j)
(l) =
(h) /
(j)
(m)
(n)
(o)
Proj
ect
No.
Proj
ect N
ame
Scop
e /
Issu
es /
Key
Act
iviti
esA
ppro
ved
Fund
ing
Orig
inal
Bud
get
App
rove
d C
hang
esC
urre
nt B
udge
tEx
pend
ed +
A
ccru
al T
o D
ate
Estim
ate
to
Com
plet
eEs
timat
e at
C
ompl
etio
nVa
rianc
e at
C
ompl
etio
n%
Exp
ende
d of
EA
CEs
t. Ph
ysic
al
% C
ompl
ete
Cur
rent
B
asel
ine
/ C
urre
nt
Star
t
Cur
rent
B
asel
ine
/ C
urre
nt
Fini
sh
Sam
Tran
s - M
ajor
Cap
ital P
roje
ct -
Qua
rter
ly R
epor
t - Q
4 FY
2016
Apr
01,
201
6 to
Jun
30,
201
6
Scop
e: T
his
proj
ect i
s to
fund
the
purc
hase
of s
hop
equi
pmen
t and
tool
ing
that
ena
bles
the
mai
nten
ance
team
to
per
form
rout
ine
dutie
s in
acc
orda
nce
with
mai
nten
ance
S
OP
’s a
nd O
EM
reco
mm
enda
tions
. In
FY
’15
the
Dis
trict
w
ill ta
ke d
eliv
ery
of (2
1) c
lean
die
sel b
uses
and
(12)
29-
ft bu
ses;
spe
cial
tool
ing
is re
quire
d to
mai
ntai
n th
ese
buse
s.
Issu
es: N
one.
Key
Act
iviti
esTh
is Q
uart
er:
(1) E
quip
men
ts fo
r mob
ile li
fts h
as b
een
deliv
ered
.
Nex
t Qua
rter
:(1
) Pro
ject
has
bee
n co
mpl
eted
.
This
will
be
the
last
qua
rter
ly re
port
for t
he p
roje
ct.
$0$5
20,0
00$5
20,0
00$3
64,5
89
FAC
ILIT
IES
/ CO
NST
RU
CTI
ON
PR
OJE
CTS
(Con
tinue
d):
2150
3
Rep
lace
Mob
ile B
us
Lifts
Pro
ject
- fo
r m
aint
enan
ce a
nd
repa
irs o
n bu
s fle
ets
$520
,000
100.
0%07
/01/
15/
07/0
1/15
A
06/3
0/16
/06
/30/
16A
$0$3
64,5
89$1
55,4
1110
0.0%
Page 7
(a)
(b)
(c)
(d)
(e)
(f)(g
) = (e
) + (f
)(h
)(i)
= (j
) - (h
)(j)
(k) =
(g) -
(j)
(l) =
(h) /
(j)
(m)
(n)
(o)
Proj
ect
No.
Proj
ect N
ame
Scop
e /
Issu
es /
Key
Act
iviti
esA
ppro
ved
Fund
ing
Orig
inal
Bud
get
App
rove
d C
hang
esC
urre
nt B
udge
tEx
pend
ed +
A
ccru
al T
o D
ate
Estim
ate
to
Com
plet
eEs
timat
e at
C
ompl
etio
nVa
rianc
e at
C
ompl
etio
n%
Exp
ende
d of
EA
CEs
t. Ph
ysic
al
% C
ompl
ete
Cur
rent
B
asel
ine
/ C
urre
nt
Star
t
Cur
rent
B
asel
ine
/ C
urre
nt
Fini
sh
Sam
Tran
s - M
ajor
Cap
ital P
roje
ct -
Qua
rter
ly R
epor
t - Q
4 FY
2016
Apr
01,
201
6 to
Jun
30,
201
6
Scop
e: T
he S
an C
arlo
s Tr
ansi
t Cen
ter P
roje
ct w
ill c
reat
e a
mul
ti-m
odal
tran
sit c
ente
r to
serv
e th
e S
an C
arlo
s C
altra
in S
tatio
n (th
e Tr
ansi
t Cen
ter)
and
to fa
cilit
ate
impr
oved
saf
ety
and
conn
ectio
ns b
etw
een
Sam
Tran
s fix
ed
rout
e bu
s se
rvic
e, C
altra
in c
omm
uter
rail,
loca
l shu
ttles
an
d pe
dest
rians
and
bic
yclis
ts.
Con
stru
ctio
n of
the
Tran
sit C
ente
r, w
hich
will
be
loca
ted
Sou
th o
f the
exi
stin
g st
atio
n pa
rkin
g lo
ts, w
ill e
nabl
e th
e pr
oper
ty u
nder
neat
h th
e ex
istin
g lo
ts to
be
deve
lope
d w
ith
hous
ing,
reta
il an
d of
fice
com
mer
cial
use
s, a
nd w
ill
supp
ort t
rans
it us
age
and
incr
ease
ped
estri
an a
cces
s at
th
e st
atio
n.
Cur
rent
sco
pe in
clud
es: P
lann
ing,
Eng
inee
ring,
C
onst
ruct
ion
and
Con
stru
ctio
n M
anag
emen
t of t
he s
tatio
n pa
rkin
g lo
t, pl
us A
dmin
istra
tion
and
Pro
ject
Ove
rsig
ht o
f th
e S
an C
arlo
s Tr
ansi
t Cen
ter P
roje
ct.
Issu
es: (
1) A
ppro
ved
Fund
ing
and
Cur
rent
Bud
get h
ave
been
incr
ease
d by
$1,
245,
462
refle
ctin
g tra
nsfe
r of
savi
ngs
from
(a) t
he H
ybrid
Bus
Pro
ject
($21
5,00
0); (
b) th
e B
uses
Pro
ject
($45
1,32
4); a
nd F
are
Col
lect
ion
($57
9,13
8).
(2) P
roje
ct s
ched
ule
has
been
ext
ende
d du
e to
del
ay in
re
ceiv
ing
the
Cal
trans
Enc
roac
hmen
t Per
mit.
Key
Act
iviti
es
This
Qua
rter
:(1
) Aw
aitin
g to
reci
eve
Cal
trans
Enc
roac
hmen
t Per
mit.
Nex
t Qua
rter
: (1
) Iss
ue L
NTP
to th
e co
ntra
ctor
-Inte
rsta
te G
radi
ng &
P
avin
g (IG
P).
(2) R
ecie
ve C
altra
ns E
ncro
achm
ent P
erm
it.
$28,
927
2123
7S
an C
arlo
s Tr
ansi
t C
ente
r Pro
ject
$5,0
36,8
68$4
,984
,465
FAC
ILIT
IES
/ CO
NST
RU
CTI
ON
PR
OJE
CTS
(Con
tinue
d):
$1,1
64,1
3225
.0%
10/3
0/12
/10
/30/
12A
11/3
0/16
/03
/01/
1718
.8%
$6,2
01,0
00$6
,229
,927
$6,2
29,9
27$1
,245
,462
Page 8
(a)
(b)
(c)
(d)
(e)
(f)(g
) = (e
) + (f
)(h
)(i)
= (j
) - (h
)(j)
(k) =
(g) -
(j)
(l) =
(h) /
(j)
(m)
(n)
(o)
Proj
ect
No.
Proj
ect N
ame
Scop
e /
Issu
es /
Key
Act
iviti
esA
ppro
ved
Fund
ing
Orig
inal
Bud
get
App
rove
d C
hang
esC
urre
nt B
udge
tEx
pend
ed +
A
ccru
al T
o D
ate
Estim
ate
to
Com
plet
eEs
timat
e at
C
ompl
etio
nVa
rianc
e at
C
ompl
etio
n%
Exp
ende
d of
EA
CEs
t. Ph
ysic
al
% C
ompl
ete
Cur
rent
B
asel
ine
/ C
urre
nt
Star
t
Cur
rent
B
asel
ine
/ C
urre
nt
Fini
sh
Sam
Tran
s - M
ajor
Cap
ital P
roje
ct -
Qua
rter
ly R
epor
t - Q
4 FY
2016
Apr
01,
201
6 to
Jun
30,
201
6
Nex
t Qua
rter
: (1
) Com
plet
e th
e co
nstru
ctio
n ph
ase
and
proj
ect c
lose
-out
.
$1,1
15,0
00$0
$26,
701
$1,1
15,0
00$3
00,0
00$8
15,0
00$1
,088
,299
7/01
/12A
/7/
01/1
2A93
.7%
09/3
0/15
/08
/31/
16
Rec
eptio
nist
Are
a S
ecur
ity
Impr
ovem
ents
P
roje
ct
Scop
e: T
he s
cope
of t
his
proj
ect i
s to
add
sec
urity
ca
mer
as a
nd a
bul
let p
roof
gla
ss e
nclo
sure
to th
e C
entra
l O
ffice
Rec
eptio
nist
are
a on
the
2nd
floor
. The
exi
stin
g w
all
in fr
ont o
f the
rece
ptio
nist
des
k w
ill b
e re
plac
ed b
y on
e ha
ving
ade
quat
e st
ruct
ural
cap
acity
to h
old
the
new
bul
let-
proo
f gla
ss a
nd s
teel
pla
tes.
Add
ition
al s
cope
incl
udes
: (1)
R
eloc
atio
n of
the
Reg
iona
l Tra
nsit
Car
d (R
TC) p
hoto
ID
mac
hine
from
the
wes
t sid
e of
the
elev
ator
s to
the
rece
ptio
nist
are
a; (2
) Con
duct
a C
rime
Pre
vent
ion
Thru
E
nviro
nmen
tal D
esig
n (C
PTE
D) s
tudy
; (3)
Impr
ove
acce
ss
arou
nd re
cept
ioni
st w
orks
pace
; (4)
Impr
ove
ergo
nom
ic o
f w
orks
pace
; and
(5) I
mpr
ove
HV
AC
, pow
er, a
nd c
ompu
ter
netw
ork
func
tions
.
Issu
es:
(1) P
roje
ct s
ched
ule
has
exte
nded
due
to th
e lo
nger
than
ex
pect
ed le
ad ti
mes
for m
ater
ial a
nd s
ecur
ity e
quip
men
t.
Als
o, m
odifi
catio
ns to
the
wor
k sp
ace
wer
e ne
eded
to
addr
ess
ergo
nom
ic is
sues
.
Key
Act
iviti
es:
Th
is Q
uart
er:
(1) C
ontin
ued
cons
truct
ion
at th
e C
entra
l Offi
ce in
clud
ing
mod
ifica
tions
to th
e w
ork
spac
e to
add
ress
erg
onom
ic
issu
es.
2121
1
SAFE
TY A
ND
SEC
UR
ITY
PRO
JEC
TS:
$1,1
15,0
0097
.6%
Page 9
(a)
(b)
(c)
(d)
(e)
(f)(g
) = (e
) + (f
)(h
)(i)
= (j
) - (h
)(j)
(k) =
(g) -
(j)
(l) =
(h) /
(j)
(m)
(n)
(o)
Proj
ect
No.
Proj
ect N
ame
Scop
e /
Issu
es /
Key
Act
iviti
esA
ppro
ved
Fund
ing
Orig
inal
Bud
get
App
rove
d C
hang
esC
urre
nt B
udge
tEx
pend
ed +
A
ccru
al T
o D
ate
Estim
ate
to
Com
plet
eEs
timat
e at
C
ompl
etio
nVa
rianc
e at
C
ompl
etio
n%
Exp
ende
d of
EA
CEs
t. Ph
ysic
al
% C
ompl
ete
Cur
rent
B
asel
ine
/ C
urre
nt
Star
t
Cur
rent
B
asel
ine
/ C
urre
nt
Fini
sh
Sam
Tran
s - M
ajor
Cap
ital P
roje
ct -
Qua
rter
ly R
epor
t - Q
4 FY
2016
Apr
01,
201
6 to
Jun
30,
201
6
Scop
e: T
o im
prov
e se
curit
y of
the
Dis
trict
pro
perti
es a
t the
C
entra
l Offi
ce a
nd th
e N
orth
and
Sou
th b
us b
ases
.
Acc
ess
cont
rol a
t the
Dis
trict
Cen
tral O
ffice
in S
an C
arlo
s is
cur
rent
ly li
mite
d to
the
pres
ence
of S
ecur
ity G
uard
s in
th
e fir
st fl
oor l
obby
and
app
roxi
mat
ely
20 p
roxi
mity
car
d co
ntro
lled
door
lock
s (a
t var
ious
loca
tions
in th
is fi
ve le
vel
build
ing)
. Th
e pr
opos
ed im
prov
emen
ts w
ill in
crea
se th
e nu
mbe
r of c
ard
cont
rolle
d do
ors
(rou
ghly
dou
ble
the
curr
ent n
umbe
r), u
pgra
de th
e lo
bby
area
acc
ess
cont
rol
feat
ures
(with
new
wal
ls a
nd d
oors
), an
d im
prov
e th
e ov
eral
l sec
urity
of t
he b
uild
ing.
The
pro
ject
als
o in
clud
es
conv
ersi
on o
f the
key
ed lo
cks
syst
em a
t the
two
Dis
trict
bu
s ba
ses
to e
lect
roni
c/ca
rd a
cces
s co
ntro
l.
Issu
es:
(1) P
roje
ct s
ched
ule
was
ext
ende
d by
due
to th
e lo
nger
th
an e
xpec
ted
lead
tim
es fo
r mat
eria
l and
sec
urity
eq
uipm
ent d
eliv
ery.
Key
Act
iviti
es
This
Qua
rter
:(1
) Con
tinue
d th
e co
nstru
ctio
n ph
ase,
incl
udin
g co
mpl
etio
n of
gla
ss w
alls
inst
alla
tion
arou
nd th
e lo
bby
elev
ator
s.
Nex
t Qua
rter
: (1
) Com
plet
e th
e co
nstru
ctio
n ph
ase
and
proj
ect c
lose
-out
.
SAFE
TY A
ND
SEC
UR
ITY
PRO
JEC
TS (C
ontin
ued)
:
$1,1
25,0
00$8
7,82
8
Cen
tral o
ffice
A
cces
s C
ontro
l Im
prov
emen
ts
Pro
ject
2131
0$1
,125
,000
$1,0
37,1
72$2
75,0
0012
/31/
15/
08/3
1/16
95.0
%07
/01/
12/
07/0
1/12
A92
.2%
$0$8
50,0
00$1
,125
,000
Page 10
(a)
(b)
(c)
(d)
(e)
(f)(g
) = (e
) + (f
)(h
)(i)
= (j
) - (h
)(j)
(k) =
(g) -
(j)
(l) =
(h) /
(j)
(m)
(n)
(o)
Proj
ect
No.
Proj
ect N
ame
Scop
e /
Issu
es /
Key
Act
iviti
esA
ppro
ved
Fund
ing
Orig
inal
Bud
get
App
rove
d C
hang
esC
urre
nt B
udge
tEx
pend
ed +
A
ccru
al T
o D
ate
Estim
ate
to
Com
plet
eEs
timat
e at
C
ompl
etio
nVa
rianc
e at
C
ompl
etio
n%
Exp
ende
d of
EA
CEs
t. Ph
ysic
al
% C
ompl
ete
Cur
rent
B
asel
ine
/ C
urre
nt
Star
t
Cur
rent
B
asel
ine
/ C
urre
nt
Fini
sh
Sam
Tran
s - M
ajor
Cap
ital P
roje
ct -
Qua
rter
ly R
epor
t - Q
4 FY
2016
Apr
01,
201
6 to
Jun
30,
201
6
Scop
e: T
his
proj
ect w
ould
add
Clo
sed
Circ
uit T
elev
isio
n (C
CTV
) cam
eras
and
sup
port
equi
pmen
t (re
cord
ers,
w
iring
, etc
.) to
the
Cen
tral O
ffice
in S
an C
arlo
s. T
his
loca
tion
will
nee
d ap
prox
imat
ely
20 c
amer
as a
dded
(whi
ch
will
be
dete
rmin
ed d
urin
g th
e de
sign
pro
cess
).
The
proj
ect w
ill in
clud
e a
secu
rity
cons
ulta
nt e
valu
atio
n of
th
e se
lect
ed D
istri
ct lo
catio
ns in
ord
er to
iden
tify
the
optim
al c
amer
a co
vera
ge, w
ith th
e in
tent
of m
axim
izin
g th
e se
curit
y be
nefit
of e
ach
new
cam
era.
Issu
es:
(1) P
roje
ct s
ched
ule
was
ext
ende
d du
e to
cha
nges
to th
e pr
ojec
t sco
pe w
hich
requ
ired
addi
tiona
l des
ign
time
and
appr
oval
of t
he c
hang
es fr
om th
e pr
ojec
t sta
keho
lder
s.
Key
Act
iviti
es
This
Qua
rter
: (1
) Con
tinue
d co
nstru
ctio
n ac
tiviti
es, i
nclu
ding
revi
ew o
f co
ntra
ctor
’s m
ater
ial s
ubm
ittal
s.
Nex
t Qua
rter
: (1
) Con
tinue
con
stru
ctio
n ac
tiviti
es, i
nclu
ding
est
ablis
hing
pr
ojec
t sch
edul
e an
d re
view
ing
of c
ontra
ctor
's s
ubm
ittal
s.
$12,
163,
511
$9,8
28,0
49$2
,335
,462
$12,
163,
511
$5,6
11,7
11$6
,367
,462
$11,
979,
173
$184
,338
46.8
%54
.4%
36.5
%55
.0%
07/0
1/13
/
01
/06/
14A
03/3
1/16
/01
/31/
1721
411
$1,0
00,0
00$1
,000
,000
$0$1
,000
,000
$364
,685
Inst
all C
CTV
to
enha
nce
safe
ty a
t C
entra
l Pro
ject
$6
35,3
15$1
,000
,000
$0
SAFE
TY A
ND
SEC
UR
ITY
PRO
JEC
TS (C
ontin
ued)
:
Tota
l Sam
Tran
s - M
ajor
Cap
ital P
roje
cts
Page 11
Federalized Projects
Status Q3 FFY16
Amount of Contracts Awarded $4,171,771
Amount of Contracts Awarded to DBEs $486,000
Overall Annual Goal in % 1.0%
% DBE Attainment 11.6%
% Over/(Under) Goal 10.6%
*No Federalized Capital Projects were awarded during this period
As of: Q3 Federal Fiscal Year (FFY) 2016(From April 1, 2016 to June 30, 2016)
The following is a summary of SamTrans DBE Status:
San Mateo County Transit District
Disadvantaged Business Enterprise (DBE) Status Report
$4,171,771.00
$486,000.00 1.0%
11.6%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
14.0%
16.0%
18.0%
20.0%
$-
$500,000.00
$1,000,000.00
$1,500,000.00
$2,000,000.00
$2,500,000.00
$3,000,000.00
$3,500,000.00
$4,000,000.00
$4,500,000.00
Amount of ContractsAwarded To Date
Amount of DBEContract Awarded
To Date
Overall Annual DBEGoal in %
% DBE Attained ToDate
DBE Goals & Achievements in $ and %
$ %
SamTrans - Disadvantage Business Enterprise (DBE) Status 3rd Quarter - Federal Fiscal Year 2016
(Cumulative From April 1, 2016 to June 30, 2016)
Page 12
SamTrans
CAPITAL PROJECTS – Quarterly Status Report
Definition of Terms
Approved Changes – Changes to the original budget and/or transfers of budget from one segment code to another that have been approved by management and/or by the SamTrans Board of Directors.
Approved Funding – The amount of funding that has been approved by the SMCTD Board for the execution of the project.
Current Budget – The current budget reflects the original budget plus approved changes or internal budget transfers which has been approved by the program manager and/or the project manager.
Expended % of EAC – This is the % of Money Spent (Not Physical Progress) as compare to the EAC.
Estimate at Completion (EAC) – The forecasted final cost of the project.
Estimate to Complete – Forecast of the cost to complete the remaining work, including anticipated and pending changes.
Estimated Physical % Complete – An estimation of the physical work completed as compared to the budgeted work expressed in %.
Expended + Accrual to Date – The cumulative project costs that have been recorded through the current reporting period in PeopleSoft + accrual cost of the work performed that has not been recorded in PeopleSoft.
Issues – Exceptions / concerns as identified for information or further actions.
Key Activities - Identifies key activities being undertaken for the project for the current month and identifies the work anticipated for the next month.
Original Budget – Budget as originally approved by senior management for execution of the approved scope of work.
Original Start / Current Start – The original planned start date and the current or actual start date of the project.
Original Finish / Current Finish – The original planned completion date and the current forecasted completion date of the project.
Page 13
SamTrans
CAPITAL PROJECTS – Quarterly Status Report
Scope - A concise description of the work elements to be performed and delivered by the project.
Variance at Completion (VAC) – Difference between the Current Budget and the Estimate at Completion. A positive value reflects potential underrun, whereas a negative amount indicates possible overun.
Page 14
San Mateo County Transit District SamTrans - Capital Programs Quarterly Status Report
Performance Status (Traffic Light) Criteria
SECTIONS On Target (GREEN)
Moderate Risk(YELLOW)
High Risk(RED)
1. SCOPE
(a) Scope is consistent with Budget or Funding.
(a) Scope is NOT consistent with Budget or Funding.
(a) Significant scope changes / significant deviations from the original plan.
(b) Scope is consistent with other projects.
(b) Scope appears to be in conflict with another project.
(b) Current Budget forecast exceeds current approved budget by more than 10%.
(c) Scope change has been mitigated.
(c) Scope changes have been proposed.
(d) Current Budget forecast exceeds the current approved budget by 5% to 10%.
2. BUDGET(a) Estimate at Completion forecast is within plus /minus 5% of the Current Approved Budget.
(a) Estimate at Completion forecast exceeds Current Approved Budget between 5% to 10%.
(a) Estimate at Completion forecast exceeds Current Approved Budget by more than 10%.
3. SCHEDULE
(a) Project milestones / critical path are within plus/minus two months of the current baseline schedule.
(a) Project milestones / critical path show slippage. Project is more than two to six months behind the current baseline schedule.
(a) Project milestones / critical path show slippage more than two consecutive months.
(b) Physical progress during the report period is consistent with incurred expenditures.
(b) No physical progress during the report period, but expenditures have been incurred.
(b) Forecast project completion date is later than the current baseline scheduled completion date by more than six months.
(c) Schedule has been defined.
(c) Detailed baseline schedule NOT finalized.
(c) Schedule NOT defined for two consecutive months.
4. FUNDING
(a) Expenditure is consistent with Available Funding.
(a) Expenditure reaches 80% of Available Funding, where remaining funding is NOT yet available.
(a) Expenditure reaches 90% of Available Funding, where remaining funding is NOT yet available.
(b) All funding has been secured or available for scheduled work.
(b) NOT all funding is secured or available for scheduled work.
(b) No funding is secured or available for scheduled work.
Note: Schedule variance for (a) Purchase of maintenance equipment; (b) Purchase of major bus components; (c) Maintenance of facilities; and (d) Upgrading of computer systems will not be monitored, as schedules for these types of projects are only a reflection of the year that funding has been allocated.
Page 15